CN211313306U - Movable scaffold for constructional engineering - Google Patents
Movable scaffold for constructional engineering Download PDFInfo
- Publication number
- CN211313306U CN211313306U CN201922293556.5U CN201922293556U CN211313306U CN 211313306 U CN211313306 U CN 211313306U CN 201922293556 U CN201922293556 U CN 201922293556U CN 211313306 U CN211313306 U CN 211313306U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- fastener
- rod
- clamping groove
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a mobile scaffold for building engineering, including head rod, second connecting rod and third connecting rod, through connecting fastener reciprocal anchorage between head rod, second connecting rod and the third connecting rod, the level is provided with the running plate between the head rod, the both ends of running plate are passed through the clamp and are fixed mutually with the head rod, vertical welding has the cat ladder between the head rod, the lower extreme of second connecting rod is provided with the adjustment stabilizer blade, the top of second connecting rod all is provided with the connecting piece. A building engineering is with removing scaffold frame, the scaffold frame of conveniently installing afterwards is placed on the connecting piece, and more firm through the bolt fastening, chucking between each connecting rod is more firm, and it is more convenient to connect the fastener installation, can conveniently remove the stabilizer blade or increase the holding area, improves the overall stability of scaffold frame.
Description
Technical Field
The utility model relates to a scaffold frame field, in particular to building engineering is with removing scaffold frame.
Background
The scaffold is a working platform which is erected for ensuring the smooth proceeding of each construction process, along with the appearance of a large number of modern large-scale building systems in China, the scaffold not only needs to ensure the safe and reliable construction and high assembly and disassembly speed, but also reduces the use of steel, greatly improves the assembly and disassembly work efficiency, can obviously reduce the construction cost, and is civilized and neat in construction site. But current scaffold frame installation is more troublesome, and the installation is fixed insecure for the installation effectiveness is low, and the scaffold frame removes inconvenient at ordinary times in addition, and the fastener between each connecting rod is connected comparatively not hard up, the holistic stability of scaffold frame that is unfavorable for.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a building engineering is with removing scaffold frame can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a mobile scaffold for building engineering, includes head rod, second connecting rod and third connecting rod, through connecting fastener reciprocal anchorage between head rod, second connecting rod and the third connecting rod, the level is provided with the running plate between the head rod, the both ends of running plate are passed through the clamp and are fixed mutually with the head rod, vertical welding has the cat ladder between the head rod, the lower extreme of second connecting rod is provided with the adjustment stabilizer blade, the top of second connecting rod all is provided with the connecting piece.
Preferably, the connecting piece includes first spliced pole, first fixing bolt, first fixed orifices, first supporting hole and first screw thread, first spliced pole is through first screw thread and second connecting rod swing joint, first supporting hole has been seted up to the top of first spliced pole, first fixed orifices has been seted up on the first spliced pole, the inside of first fixed orifices is provided with first fixing bolt.
Preferably, the connecting fastener comprises a second fixing bolt, a second fixing hole, a clamping block, a first clamping groove, a second clamping groove, a first fastener and a second fastener, the first fastener and the second fastener are both in a bowl shape, the first fastener and the second fastener are respectively provided with the second clamping groove and the first clamping groove, the clamping block is welded on the first connecting rod and the third connecting rod, the second fixing hole is formed in the clamping block, the clamping block is clamped with the first clamping groove and the second clamping groove, and the clamping block is fixed with the first clamping groove and the second clamping groove through the second fixing bolt.
Preferably, the adjustment stabilizer blade includes third fixing bolt, nut, screw rod, first backup pad, second spliced pole, second backup pad, universal wheel, preformed hole, second screw thread and second supported hole, the second spliced pole passes through second screw thread and universal wheel swing joint, and the second supported hole has been seted up to the top of second spliced pole, and the second spliced pole is fixed mutually with the second connecting rod through third fixing bolt, the welding has the second backup pad on the second spliced pole, the below of second backup pad is provided with first backup pad, and first backup pad passes through screw rod and nut and is fixed mutually with the second backup pad, the preformed hole has been seted up to the below that the centre of first backup pad is located the universal wheel.
Preferably, the first connecting rod, the second connecting rod and the third connecting rod are arranged perpendicular to each other.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses in, be provided with the connecting piece, the scaffold frame of installation afterwards is placed on the connecting piece to the convenience, and is more firm through the bolt fastening, is provided with the connection fastener for chucking is more firm between each connecting rod, and connects the fastener installation more convenient, improves the overall stability of scaffold frame, can conveniently remove the stabilizer blade or increase the holding area through the height of adjustment stabilizer blade, improves scaffold frame stability.
Drawings
Fig. 1 is a schematic overall structure diagram of a mobile scaffold for construction engineering of the present invention;
fig. 2 is a schematic view of a connecting member of a movable scaffold for construction engineering according to the present invention;
fig. 3 is a schematic view of a connecting fastener of a movable scaffold for construction engineering according to the present invention;
fig. 4 is a schematic structural view of an adjusting support leg of the movable scaffold for construction engineering of the present invention;
fig. 5 is the internal schematic view of the adjusting support leg of the movable scaffold for construction engineering.
In the figure: 1. a connecting member; 101. a first connecting column; 102. a first fixing bolt; 103. a first fixing hole; 104. a first support hole; 105. a first thread; 2. a first connecting rod; 3. a second connecting rod; 4. climbing a ladder; 5. a third connecting rod; 6. a walking board; 7. clamping a hoop; 8. connecting fasteners; 801. a second fixing bolt; 802. a second fixing hole; 803. a clamping block; 804. a first card slot; 805. a second card slot; 806. a first fastener; 807. a second fastener; 9. adjusting the supporting legs; 901. a third fixing bolt; 902. a nut; 903. a screw; 904. a first support plate; 905. a second connecting column; 906. a second support plate; 907. a universal wheel; 908. reserving a hole; 909. a second thread; 910. a second support hole.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-5, a mobile scaffold for construction engineering comprises first connecting rods 2, second connecting rods 3 and third connecting rods 5, wherein the first connecting rods 2, the second connecting rods 3 and the third connecting rods 5 are fixed to each other through connecting fasteners 8, walking boards 6 are horizontally arranged between the first connecting rods 2, two ends of each walking board 6 are fixed to the first connecting rods 2 through hoops 7, a ladder 4 is vertically welded between the first connecting rods 2, adjusting support legs 9 are arranged at the lower ends of the second connecting rods 3, and connecting pieces 1 are arranged above the second connecting rods 3;
the connecting piece 1 comprises a first connecting column 101, a first fixing bolt 102, a first fixing hole 103, a first supporting hole 104 and a first thread 105, the first connecting column 101 is movably connected with the second connecting rod 3 through the first thread 105, the first supporting hole 104 is formed above the first connecting column 101, the first connecting column 101 is provided with the first fixing hole 103, and the first fixing bolt 102 is arranged inside the first fixing hole 103; the connecting fastener 8 comprises a second fixing bolt 801, a second fixing hole 802, a clamping block 803, a first clamping groove 804, a second clamping groove 805, a first fastener 806 and a second fastener 807, the first fastener 806 and the second fastener 807 are both bowl-shaped, the first fastener 806 and the second fastener 807 are respectively provided with the second clamping groove 805 and the first clamping groove 804, the first connecting rod 2 and the third connecting rod 5 are respectively welded with the clamping block 803, the clamping block 803 is provided with the second fixing hole 802, the clamping block 803 is clamped with the first clamping groove 804 and the second clamping groove 805, and the clamping block 803 is fixed with the first clamping groove 804 and the second clamping groove 805 through the second fixing bolt 801; the adjusting support leg 9 comprises a third fixing bolt 901, a nut 902, a screw 903, a first support plate 904, a second connecting column 905, a second support plate 906, a universal wheel 907, a preformed hole 908, a second thread 909 and a second support hole 910, wherein the second connecting column 905 is movably connected with the universal wheel 907 through the second thread 909, the second support hole 910 is formed above the second connecting column 905, the second connecting column 905 is fixed with the second connecting rod 3 through the third fixing bolt 901, the second support plate 906 is welded on the second connecting column 905, the first support plate 904 is arranged below the second support plate 906, the first support plate 904 is fixed with the second support plate 906 through the screw 903 and the nut 902, and the preformed hole 908 is formed in the middle of the first support plate 904 and below the universal wheel 907; the first connecting rod 2, the second connecting rod 3 and the third connecting rod 5 are arranged perpendicular to each other.
It should be noted that, when the movable scaffold for building engineering is used, the first connecting rod 2, the second connecting rod 3, and the third connecting rod 5 are fixed by the connecting fastener 8, specifically, the first fastener 806 and the second fastener 807 are oppositely placed on the second connecting rod 3, then the clamping blocks 803 on the first connecting rod 2 and the third connecting rod 5 are clamped into the first clamping groove 804 and the second clamping groove 805, then the second fixing bolt 801 is inserted into the second fixing hole 802 for fixing, the ladder stand 4 is welded on the first connecting rod 2 in the vertical direction, then the running plate 6 is clamped on the first connecting rod 2 in the horizontal direction by the clamp 7, so that a worker can walk on the first connecting rod, when moving is needed, because the second connecting rod 3 in the second supporting hole 910 is fixed with the second connecting rod 905 by the third fixing bolt 901, the universal wheel 907 of the adjusting foot 9 is screwed with the second connecting column 905 through the second thread 909, the universal wheel 907 is exposed out of the preformed hole 908 and can be moved to a designated position, the universal wheel 907 is screwed into the first supporting plate 904, so that the first supporting plate 904 can be fixed with the second supporting plate 906 through the screw 903 and the nut 902, the supporting area is increased through the first supporting plate 904 at this time, the stability is improved, when the scaffold needs to be installed upwards again, the whole scaffold can be installed on the previous scaffold, then the second connecting rod 3 of the scaffold is placed on the connecting piece 1 of the previous scaffold, specifically, the first connecting column 101 of the connecting piece 1 is screwed with the upper end of the second connecting rod 3 through the first thread 105, then the spliced scaffold first supporting hole 104 is screwed into the first fixing hole 103 through the first fixing bolt 102 to fix the second connecting rod 3, is more convenient.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a building engineering is with removing scaffold frame which characterized in that: including head rod (2), second connecting rod (3) and third connecting rod (5), through connecting fastener (8) reciprocal anchorage between head rod (2), second connecting rod (3) and third connecting rod (5), the level is provided with running plate (6) between head rod (2), the both ends of running plate (6) are fixed mutually with head rod (2) through clamp (7), vertical welding has cat ladder (4) between head rod (2), the lower extreme of second connecting rod (3) is provided with adjustment stabilizer blade (9), the top of second connecting rod (3) all is provided with connecting piece (1).
2. A mobile scaffold for construction engineering according to claim 1, characterized in that: connecting piece (1) includes first spliced pole (101), first fixing bolt (102), first fixed orifices (103), first supporting hole (104) and first screw thread (105), first spliced pole (101) are through first screw thread (105) and second connecting rod (3) swing joint, first supporting hole (104) have been seted up to the top of first spliced pole (101), first fixed orifices (103) have been seted up on first spliced pole (101), the inside of first fixed orifices (103) is provided with first fixing bolt (102).
3. A mobile scaffold for construction engineering according to claim 1, characterized in that: the connecting fastener (8) comprises a second fixing bolt (801), a second fixing hole (802), a clamping block (803), a first clamping groove (804), a second clamping groove (805), a first fastener (806) and a second fastener (807), the first fastener (806) and the second fastener (807) are both in a bowl shape, the first fastener (806) and the second fastener (807) are respectively provided with a second clamping groove (805) and a first clamping groove (804), the first connecting rod (2) and the third connecting rod (5) are respectively welded with the clamping block (803), the clamping block (803) is provided with a second fixing hole (802), the clamping block (803) is clamped with the first clamping groove (804) and the second clamping groove (805), and the clamping block (803) is fixed with the first clamping groove (804) and the second clamping groove (805) through the second fixing bolt (801).
4. A mobile scaffold for construction engineering according to claim 1, characterized in that: the adjusting support leg (9) comprises a third fixing bolt (901), a screw cap (902), a screw rod (903), a first support plate (904), a second connecting column (905), a second support plate (906), a universal wheel (907), a preformed hole (908), a second thread (909) and a second support hole (910), the second connecting column (905) is movably connected with the universal wheel (907) through the second thread (909), a second support hole (910) is formed above the second connecting column (905), the second connecting column (905) is fixed with the second connecting rod (3) through the third fixing bolt (901), the second support plate (906) is welded on the second connecting column (905), the first support plate (904) is arranged below the second support plate (906), and the first support plate (904) is fixed with the second support plate (906) through the screw rod (903) and the screw cap (902), the middle of the first supporting plate (904) is positioned below the universal wheel (907) and is provided with a preformed hole (908).
5. A mobile scaffold for construction engineering according to claim 1, characterized in that: the first connecting rod (2), the second connecting rod (3) and the third connecting rod (5) are arranged vertically.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922293556.5U CN211313306U (en) | 2019-12-19 | 2019-12-19 | Movable scaffold for constructional engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922293556.5U CN211313306U (en) | 2019-12-19 | 2019-12-19 | Movable scaffold for constructional engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211313306U true CN211313306U (en) | 2020-08-21 |
Family
ID=72054681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922293556.5U Expired - Fee Related CN211313306U (en) | 2019-12-19 | 2019-12-19 | Movable scaffold for constructional engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211313306U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113137043A (en) * | 2021-06-09 | 2021-07-20 | 中国建筑第四工程局有限公司 | Movable scaffold |
CN113969658A (en) * | 2021-09-29 | 2022-01-25 | 哈尔滨平宝建筑器材加工有限公司 | Scaffold and mounting method thereof |
-
2019
- 2019-12-19 CN CN201922293556.5U patent/CN211313306U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113137043A (en) * | 2021-06-09 | 2021-07-20 | 中国建筑第四工程局有限公司 | Movable scaffold |
CN113969658A (en) * | 2021-09-29 | 2022-01-25 | 哈尔滨平宝建筑器材加工有限公司 | Scaffold and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211313306U (en) | Movable scaffold for constructional engineering | |
CN213115824U (en) | Construction that conveniently adjusts height is with enclosing fender device | |
CN111350337A (en) | Bearing frame for building construction | |
CN206873957U (en) | A kind of ground photovoltaic column pre-embedded anchoring bolts constructing device | |
CN210316624U (en) | Precast beam bracing structure | |
CN214090934U (en) | Building construction scaffold reinforcing apparatus | |
CN210395122U (en) | Novel template support frame is used in public road bridge roof beam construction | |
CN210887997U (en) | Building scaffold with adjustable height | |
CN114059578A (en) | Adjustable construction elevator foundation back jacking device and construction method | |
CN210685332U (en) | Spraying device convenient to install on climbing frame | |
CN218562982U (en) | Climbing frame protection device | |
CN213015731U (en) | Dust suppression device for building construction | |
CN217076777U (en) | Tower crane attachment system for frame structure | |
CN220621364U (en) | Steel pipe protection railing of adjustable height and width | |
CN205421892U (en) | Even wall scaffold for building | |
CN219158535U (en) | Support frame convenient to disassemble and assemble for repairing enclosing wall | |
CN221856137U (en) | Quick assembly disassembly's template walking platform | |
CN205116740U (en) | Concrete pump pipe fixes cassette | |
CN221799169U (en) | Reinforced concrete construction template strutting arrangement | |
CN215368572U (en) | Scaffold for building construction | |
CN205063307U (en) | Dedicated uninstallation device of inserted lift scaffold | |
CN203238949U (en) | Bracket used for boundary beam framework | |
CN219219755U (en) | Simple turning plate for climbing frame system | |
CN211736315U (en) | Scaffold frame top operation platform guardrail | |
CN216196535U (en) | Support diagonal rod convenient to disassemble and assemble and used for inner and outer vertical rods of climbing frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200821 Termination date: 20211219 |