CN111350337A - Bearing frame for building construction - Google Patents
Bearing frame for building construction Download PDFInfo
- Publication number
- CN111350337A CN111350337A CN202010084293.1A CN202010084293A CN111350337A CN 111350337 A CN111350337 A CN 111350337A CN 202010084293 A CN202010084293 A CN 202010084293A CN 111350337 A CN111350337 A CN 111350337A
- Authority
- CN
- China
- Prior art keywords
- pedal
- welded
- plate
- support plate
- screwed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 12
- 238000010276 construction Methods 0.000 claims description 15
- 230000002787 reinforcement Effects 0.000 claims description 15
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 238000002627 tracheal intubation Methods 0.000 claims description 5
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 125000006850 spacer group Chemical group 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 20
- 238000010586 diagram Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 3
- 238000005034 decoration Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/18—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
- E04G5/048—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls with hooks to be attached on the wall's crown
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/08—Scaffold boards or planks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/10—Steps or ladders specially adapted for scaffolds
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑技术领域,尤其涉及一种建筑施工用承载架。The invention relates to the technical field of construction, in particular to a bearing frame for building construction.
背景技术Background technique
建筑物是人工建筑而成的资产 ,属于固定资产范畴,包括房屋和构建物两大类。房屋是指供人居住、工作、学习、生产、经营、娱乐、储藏物品以及进行其他社会活动的工程建筑。与建筑物有区别的是构筑物,构建物指房屋以外的工程建筑,如围墙、道路、水坝、水井、隧道、水塔、桥梁和烟囱等。Buildings are artificially constructed assets, which belong to the category of fixed assets, including two categories of houses and structures. A house refers to an engineering building for people to live, work, study, produce, operate, entertain, store and carry out other social activities. Different from buildings are structures, which refer to engineering buildings other than houses, such as walls, roads, dams, wells, tunnels, water towers, bridges and chimneys.
房屋建设是日常生活中最常接触的,在房屋建设过程中,常常遇到在房子外侧进行施工,其中,在房屋装修过程中,常常遇到需要在外侧安装空调外机,尽管许多的建筑外侧预留有空调外机安装机位,但是,这些安装机位距离窗台或阳台具有一定距离,工作人员在安装时危险程度大,目前,主要依靠安全带进行防护,在搬动空调外机时移动不便,使得安装时间长,安装效率低。House construction is the most common contact in daily life. In the process of house construction, it is often encountered that construction is carried out on the outside of the house. Among them, in the process of house decoration, it is often encountered that an air conditioner needs to be installed on the outside. Although many buildings outside There are reserved installation positions for the outdoor unit of the air conditioner. However, these installation positions are at a certain distance from the window sill or balcony, and the staff is at a great risk during installation. At present, they mainly rely on the safety belt for protection, and move the outdoor unit when moving Inconvenient, the installation time is long and the installation efficiency is low.
发明内容SUMMARY OF THE INVENTION
基于现有的许多空调外机安装主要依靠安全带进行防护,在搬动空调外机时移动不便,使得安装时间长,安装效率低的技术问题,本发明提出了一种建筑施工用承载架。Based on the technical problems that many existing air conditioner outdoor units are installed mainly rely on safety belts for protection, it is inconvenient to move when moving the air conditioner outdoor unit, resulting in long installation time and low installation efficiency.
本发明提出的一种建筑施工用承载架,包括两个“Z”字形结构的支撑板,两个所述支撑板的底部均焊接有主固定板和副固定板,且副固定板的侧面螺接有两个紧固螺栓,所述紧固螺栓的端部之间通过轴承连接有夹持板,夹持板的顶端与支撑板的底端滑动连接,两个所述支撑板的顶端之间固定安装有踏板,所述支撑板的顶端设置有限位螺孔,且限位螺孔的顶端螺接有限位螺栓,所述踏板的顶端开设有两个与限位螺栓相适配的条形孔。The bearing frame for building construction proposed by the present invention includes two support plates with a "Z"-shaped structure. The bottoms of the two support plates are welded with a main fixing plate and an auxiliary fixing plate, and the side surfaces of the auxiliary fixing plates are screwed. Two fastening bolts are connected, a clamping plate is connected between the ends of the fastening bolts through a bearing, the top end of the clamping plate is slidably connected with the bottom end of the supporting plate, and the top ends of the two supporting plates are connected with each other. A pedal is fixedly installed, the top of the support plate is provided with a limit screw hole, and the top of the limit screw hole is screwed with a limit bolt, and the top of the pedal is provided with two strip holes matching the limit bolt .
优选地,所述支撑板的顶端开设有两个L型结构的安装卡槽,且踏板的底端两侧均焊接有两个L型结构的勾合件。Preferably, the top end of the support plate is provided with two L-shaped structure mounting slots, and two L-shaped structure hooks are welded on both sides of the bottom end of the pedal.
优选地,所述踏板的顶端铰接有防护栏,且防护栏与踏板之间的旋转角度为0°-90°。Preferably, the top of the pedal is hinged with a guardrail, and the rotation angle between the guardrail and the pedal is 0°-90°.
优选地,所述夹持板和主固定板相互靠近的一侧均固定安装有橡胶垫块,且橡胶垫块为倒L型结构。Preferably, rubber pads are fixedly installed on the sides of the clamping plate and the main fixing plate that are close to each other, and the rubber pads have an inverted L-shaped structure.
优选地,所述支撑板的顶端边缘处设置有凸起边缘。Preferably, the top edge of the support plate is provided with a raised edge.
优选地,所述踏板的顶端边缘处固定安装有连接板,且连接板的底端焊接有两个设置多个阶梯的连接副板,两个连接副板顶端之间焊接有多个阶梯板。Preferably, a connecting plate is fixedly installed at the top edge of the pedal, and two connecting sub-plates with multiple steps are welded to the bottom end of the connecting plate, and a plurality of stepped plates are welded between the top ends of the two connecting sub-plates.
优选地,所述支撑板的侧边焊接有多个矩形插管,且连接板的底端焊接有多个与矩形插管相适配的插杆,连接板的顶端设置有与条形孔相同尺寸的条形槽。Preferably, a plurality of rectangular cannulae are welded to the side of the support plate, a plurality of plunger rods adapted to the rectangular cannulae are welded to the bottom end of the connecting plate, and the top end of the connecting plate is provided with the same strip hole. size bar slot.
优选地,所述支撑板和主固定板之间焊接有加固撑板,且矩形插管的侧面与加固撑板焊接。Preferably, a reinforcing support plate is welded between the support plate and the main fixing plate, and the side surface of the rectangular cannula is welded with the reinforcing support plate.
优选地,所述支撑板的顶端开设有螺纹槽,且螺纹槽的顶端螺接有加固机构。Preferably, the top end of the support plate is provided with a threaded groove, and the top end of the threaded groove is screwed with a reinforcement mechanism.
优选地,所述加固机构包括内螺纹套筒、螺纹杆和焊接于螺纹杆底端的插接部,所述插接部的底端与螺纹槽相螺接,且螺纹杆顶端与内螺纹套筒螺接,所述内螺纹套筒的顶端通过轴承连接有橡胶圆台,且内螺纹套筒的侧面螺接有把手杆。Preferably, the reinforcing mechanism includes an inner threaded sleeve, a threaded rod and a plug portion welded to the bottom end of the threaded rod, the bottom end of the plugged portion is screwed with the threaded groove, and the top end of the threaded rod is connected to the internal threaded sleeve The top end of the inner thread sleeve is connected with a rubber circular platform through a bearing, and the side surface of the inner thread sleeve is screwed with a handle rod.
与现有技术相比,本发明提供了一种建筑施工用承载架,具备以下有益效果:Compared with the prior art, the present invention provides a bearing frame for building construction, which has the following beneficial effects:
工作人员可以将承载架的支撑板,通过主固定板和副固定板卡接于窗户或阳台边缘处,旋动紧固螺栓利用夹持板配合主固定板固定于窗台或阳台上,将踏板安装于两个支撑板上方,即可在窗台或阳台外侧构成一个临时的台架,便于工作人员在房屋外侧搬动空调外机,对其进行安装,操作简单方便,增加空调外机安装的安全性;The staff can clamp the support plate of the carrier frame to the edge of the window or balcony through the main fixing plate and the auxiliary fixing plate, and then rotate the fastening bolts to use the clamping plate to cooperate with the main fixing plate to fix it on the window sill or balcony, and install the pedal. Above the two support plates, a temporary bench can be formed on the outside of the window sill or balcony, which is convenient for the staff to move the air conditioner outside the house and install it. The operation is simple and convenient, and the installation safety of the air conditioner is increased. ;
在安装踏板时,将踏板底端焊接的勾合件从安装卡槽的大口处插入,进而向外侧推动踏板,利用勾合件的水平段与支撑板的底部卡合,再利用限位螺栓将踏板与支撑板之间进行旋紧固定,承载架拼装式安装结构,便于拆装,增加操作的便捷性,同时,勾合件的水平段与支撑板的底部卡合,可以避免踏板踩踏时出现翘起现象,进一步提高承载架使用的安全性;When installing the pedal, insert the hook piece welded on the bottom end of the pedal from the large opening of the installation slot, then push the pedal to the outside, use the horizontal section of the hook piece to engage with the bottom of the support plate, and then use the limit bolt to The pedal and the support plate are screwed and fixed, and the bearing frame is assembled and installed, which is convenient for disassembly and assembly, and increases the convenience of operation. Lifting phenomenon, further improve the safety of the use of the carrier;
在踏板的边缘处可以拼装由矩形插管和插杆安装的阶梯,为工作人员搬运外机提受力点,且可以增加承载架向下的延伸距离,增加承载架的适用范围,进一步增加工作人员安装空调外机的便捷性;At the edge of the pedal, a ladder installed by a rectangular intubation tube and an insertion rod can be assembled to provide a force point for the staff to carry the external machine, and can increase the downward extension distance of the carrier frame, increase the application range of the carrier frame, and further increase the work. The convenience for personnel to install the outdoor unit of the air conditioner;
在支撑板安装时,工作人员可以利用加固机构将支撑板端部进行固定,安装时插接部与支撑板固定,旋动内螺纹套筒即可调整加固机构的长度,进而使得加固机构顶端的橡胶圆台与屋顶接触,进而对承载架内外的重量进行平衡,避免工作人员踩踏时外侧下滑,进一步增加承载架使用的安全性。When the support plate is installed, the staff can use the reinforcement mechanism to fix the end of the support plate. During installation, the plug part is fixed to the support plate, and the length of the reinforcement mechanism can be adjusted by rotating the inner threaded sleeve, thereby making the top of the reinforcement mechanism The rubber round table is in contact with the roof, and then balances the weight inside and outside the carrier frame, preventing the outer side from sliding down when the staff steps on it, and further increasing the safety of the carrier frame.
附图说明Description of drawings
图1为本发明提出的一种建筑施工用承载架的剖视结构示意图;Fig. 1 is the sectional structure schematic diagram of a kind of building construction bearing frame proposed by the present invention;
图2为本发明提出的一种建筑施工用承载架的支撑板结构示意图;Fig. 2 is a kind of structural schematic diagram of the support plate of the bearing frame for building construction proposed by the present invention;
图3为本发明提出的一种建筑施工用承载架的踏板结构示意图;Fig. 3 is a kind of pedal structure schematic diagram of a building construction bearing frame proposed by the present invention;
图4为本发明提出的一种建筑施工用承载架的插杆结构示意图;Fig. 4 is a kind of structural schematic diagram of the inserting rod structure of a load-bearing frame for building construction proposed by the present invention;
图5为本发明提出的一种建筑施工用承载架实施例2的剖视结构示意图;5 is a schematic cross-sectional structural diagram of
图6为本发明提出的一种建筑施工用承载架的加固机构结构示意图。FIG. 6 is a schematic structural diagram of a reinforcement mechanism of a carrier frame for building construction proposed by the present invention.
图中:1夹持板、2橡胶垫块、3副固定板、4紧固螺栓、5支撑板、6加固撑板、7安装卡槽、8踏板、9限位螺栓、10连接板、11防护栏、12勾合件、13主固定板、14连接副板、15阶梯板、16限位螺孔、17矩形插管、18凸起边缘、19条形孔、20插杆、21螺纹槽、22螺纹杆、23内螺纹套筒、24橡胶圆台、25把手杆、26插接部。In the picture: 1 clamping plate, 2 rubber spacers, 3 auxiliary fixing plates, 4 fastening bolts, 5 supporting plates, 6 reinforcing supporting plates, 7 installation slots, 8 pedals, 9 limit bolts, 10 connecting plates, 11 Guardrail, 12 hooks, 13 main fixing plate, 14 connecting auxiliary plate, 15 step plate, 16 limit screw hole, 17 rectangular cannula, 18 raised edge, 19 strip hole, 20 insert rod, 21 thread groove , 22 threaded rod, 23 internal thread sleeve, 24 rubber round table, 25 handle rod, 26 plug-in part.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments.
在本发明的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inside", " The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation, so as to The specific orientation configuration and operation are therefore not to be construed as limitations of the present invention.
实施例1Example 1
参照图1-4,一种建筑施工用承载架,包括两个“Z”字形结构的支撑板5,两个支撑板5的底部均焊接有主固定板13和副固定板3,且副固定板3的侧面螺接有两个紧固螺栓4,紧固螺栓4的端部之间通过轴承连接有夹持板1,夹持板1的顶端与支撑板5的底端滑动连接,两个支撑板5的顶端之间固定安装有踏板8,支撑板5的顶端设置有限位螺孔16,且限位螺孔16的顶端螺接有限位螺栓9,踏板8的顶端开设有两个与限位螺栓9相适配的条形孔19,在户外安装空调外机时,工作人员可以将承载架的支撑板5,通过主固定板13和副固定板3卡接于窗户或阳台边缘处,旋动紧固螺栓4利用夹持板1配合主固定板13固定于窗台或阳台上,将踏板8安装于两个支撑板5上方,即可在窗台或阳台外侧构成一个临时的台架,便于工作人员在房屋外侧搬动空调外机,对其进行安装,操作简单方便,增加空调外机安装的安全性。Referring to Figures 1-4, a construction bearing frame includes two "Z"-
本发明中,支撑板5的顶端开设有两个L型结构的安装卡槽7,且踏板8的底端两侧均焊接有两个L型结构的勾合件12,在安装踏板8时,将踏板8底端焊接的勾合件12从安装卡槽7的大口处插入,进而向外侧推动踏板8,利用勾合件12的水平段与支撑板5的底部卡合,再利用限位螺栓9将踏板8与支撑板5之间进行旋紧固定,承载架拼装式安装结构,便于拆装,增加操作的便捷性,同时,勾合件12的水平段与支撑板5的底部卡合,可以避免踏板8踩踏时出现翘起现象,进一步提高承载架使用的安全性。In the present invention, the top end of the
本发明中,踏板8的顶端铰接有防护栏11,且防护栏11与踏板8之间的旋转角度为0°-90°,在踏板8上方安装可折叠的防护栏11,在承载架安装时,将防护栏11抬起至与踏板8垂直,为工作人员充当护栏,避免工具或工作人员滑落,进一步增加承载架使用的安全性。In the present invention, the top of the
本发明中,夹持板1和主固定板13相互靠近的一侧均固定安装有橡胶垫块2,且橡胶垫块2为倒L型结构,在支撑板5进行安装时,利用橡胶垫块2与墙面接触,避免造成墙面装修损坏,同时,橡胶垫块2水平段可以将支撑板5支起,避免与窗户框等凸起部位接触造成损坏,避免承载架在使用时对墙面造成损伤。In the present invention,
本发明中,支撑板5的顶端边缘处设置有凸起边缘18,凸起边缘18的设置,可以在踏板8安装时,对其外侧提供限位,避免踏板8滑落。In the present invention, the top edge of the
本发明中,踏板8的顶端边缘处固定安装有连接板10,且连接板10的底端焊接有两个设置多个阶梯的连接副板14,两个连接副板14顶端之间焊接有多个阶梯板15,支撑板5的侧边焊接有多个矩形插管17,且连接板10的底端焊接有多个与矩形插管17相适配的插杆20,连接板10的顶端设置有与条形孔19相同尺寸的条形槽,在踏板8的边缘处可以拼装由矩形插管17和插杆20安装的阶梯,为工作人员搬运外机提受力点,且可以增加承载架向下的延伸距离,增加承载架的适用范围,进一步增加工作人员安装空调外机的便捷性。In the present invention, the connecting
本发明中,支撑板5和主固定板13之间焊接有加固撑板6,且矩形插管17的侧面与加固撑板6焊接,利用加固撑板6增加支撑板5外侧的支撑强度,且利用加固撑板6与矩形插管17焊接,增加侧边安装的阶梯强度,进一步增加承载架使用过程中的稳定性。In the present invention, a
在本实施例中,在户外安装空调外机时,工作人员可以将承载架的支撑板5,通过主固定板13和副固定板3卡接于窗户或阳台边缘处,旋动紧固螺栓4利用夹持板1配合主固定板13固定于窗台或阳台上,将踏板8安装于两个支撑板5上方,即可在窗台或阳台外侧构成一个临时的台架,便于工作人员在房屋外侧搬动空调外机,对其进行安装,操作简单方便,增加空调外机安装的安全性。In this embodiment, when installing the outdoor unit of the air conditioner outdoors, the staff can clamp the
实施例2Example 2
参照图5-6,一种建筑施工用承载架,支撑板5的顶端开设有螺纹槽21,且螺纹槽21的顶端螺接有加固机构。5-6, a bearing frame for building construction, the top end of the
加固机构包括内螺纹套筒23、螺纹杆22和焊接于螺纹杆22底端的插接部26,插接部26的底端与螺纹槽21相螺接,且螺纹杆22顶端与内螺纹套筒23螺接,内螺纹套筒23的顶端通过轴承连接有橡胶圆台24,且内螺纹套筒23的侧面螺接有把手杆25。The reinforcement mechanism includes an internal threaded
在本实施例中,在支撑板5安装时,工作人员可以利用加固机构将支撑板5端部进行固定,安装时插接部26与支撑板5固定,旋动内螺纹套筒23即可调整加固机构的长度,进而使得加固机构顶端的橡胶圆台24与屋顶接触,进而对承载架内外的重量进行平衡,避免工作人员踩踏时外侧下滑,进一步增加承载架使用的安全性。In this embodiment, when the
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. The equivalent replacement or change of the inventive concept thereof shall be included within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010084293.1A CN111350337A (en) | 2020-02-10 | 2020-02-10 | Bearing frame for building construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010084293.1A CN111350337A (en) | 2020-02-10 | 2020-02-10 | Bearing frame for building construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111350337A true CN111350337A (en) | 2020-06-30 |
Family
ID=71193973
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010084293.1A Pending CN111350337A (en) | 2020-02-10 | 2020-02-10 | Bearing frame for building construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111350337A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112324119A (en) * | 2020-10-29 | 2021-02-05 | 罗仁富 | Building field workman high altitude construction protector |
| CN113581051A (en) * | 2021-08-09 | 2021-11-02 | 威海市妇幼保健院(威海市立第二医院、威海市妇女儿童医院) | Epidemic prevention mobile hospital convenient for logging in |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20030009257A (en) * | 2002-12-20 | 2003-01-29 | 다산건설(주) | Bracket for scaffolding |
| JP3898088B2 (en) * | 2002-05-28 | 2007-03-28 | 有限会社ミツオ電気 | Structure of work platform |
| CN201031495Y (en) * | 2007-04-25 | 2008-03-05 | 程云 | High building outdoor working device |
| CN201704941U (en) * | 2010-01-13 | 2011-01-12 | 英德市坤煌科技开发有限公司 | Maintenance platform for injection molding machine |
| CN202055500U (en) * | 2011-05-09 | 2011-11-30 | 臧敏杰 | Working platform device for aloft work |
| JP2017014744A (en) * | 2015-06-29 | 2017-01-19 | 旭化成ホームズ株式会社 | Suspending work floor |
| CN107165396A (en) * | 2017-06-27 | 2017-09-15 | 朱慧芳 | One kind building interim window side arm in high-altitude |
| CN208105835U (en) * | 2018-04-18 | 2018-11-16 | 河南威丽市政园林有限公司 | A kind of safe construction frame of construction |
| CN208718333U (en) * | 2018-08-20 | 2019-04-09 | 北京天润建设有限公司 | A kind of crosshead |
| CN209193426U (en) * | 2018-11-07 | 2019-08-02 | 中国水利水电第三工程局有限公司 | A kind of air-conditioner outdoor unit mounting device |
-
2020
- 2020-02-10 CN CN202010084293.1A patent/CN111350337A/en active Pending
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3898088B2 (en) * | 2002-05-28 | 2007-03-28 | 有限会社ミツオ電気 | Structure of work platform |
| KR20030009257A (en) * | 2002-12-20 | 2003-01-29 | 다산건설(주) | Bracket for scaffolding |
| CN201031495Y (en) * | 2007-04-25 | 2008-03-05 | 程云 | High building outdoor working device |
| CN201704941U (en) * | 2010-01-13 | 2011-01-12 | 英德市坤煌科技开发有限公司 | Maintenance platform for injection molding machine |
| CN202055500U (en) * | 2011-05-09 | 2011-11-30 | 臧敏杰 | Working platform device for aloft work |
| JP2017014744A (en) * | 2015-06-29 | 2017-01-19 | 旭化成ホームズ株式会社 | Suspending work floor |
| CN107165396A (en) * | 2017-06-27 | 2017-09-15 | 朱慧芳 | One kind building interim window side arm in high-altitude |
| CN208105835U (en) * | 2018-04-18 | 2018-11-16 | 河南威丽市政园林有限公司 | A kind of safe construction frame of construction |
| CN208718333U (en) * | 2018-08-20 | 2019-04-09 | 北京天润建设有限公司 | A kind of crosshead |
| CN209193426U (en) * | 2018-11-07 | 2019-08-02 | 中国水利水电第三工程局有限公司 | A kind of air-conditioner outdoor unit mounting device |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112324119A (en) * | 2020-10-29 | 2021-02-05 | 罗仁富 | Building field workman high altitude construction protector |
| CN113581051A (en) * | 2021-08-09 | 2021-11-02 | 威海市妇幼保健院(威海市立第二医院、威海市妇女儿童医院) | Epidemic prevention mobile hospital convenient for logging in |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2021135777A1 (en) | Connecting structure for climbing scaffolding protective reticulated panels and upright pole | |
| CN111350337A (en) | Bearing frame for building construction | |
| CN212154215U (en) | Take prefabricated wallboard bearing structure to one side of entrance to a cave | |
| CN210086771U (en) | A portable lifting frame for building air-conditioning installation | |
| CN221746966U (en) | Oil immersed transformer convenient to installation | |
| CN218323766U (en) | Telescopic scaffold structure is used in indoor construction | |
| CN215407325U (en) | Climbing frame building connecting assembly | |
| CN209375021U (en) | A kind of gantry convenient for cable sliding | |
| CN217680449U (en) | A high-altitude working edge protective railing | |
| CN210067410U (en) | Support device for climbing scaffold | |
| CN211691352U (en) | Bearing frame for building construction | |
| CN217897233U (en) | Efficient-connection climbing frame connecting device | |
| CN206110632U (en) | Shockproof scaffold support frame of building | |
| CN222797119U (en) | Assembled peripheral plug-in device | |
| CN220954488U (en) | A building intelligent combined installation frame | |
| CN221622045U (en) | Curtain shutter processing and positioning device with adjustable turnover angle | |
| CN219889763U (en) | A pipe installation hanger | |
| CN222066119U (en) | Building scaffold | |
| CN209353648U (en) | A kind of combined moving scaffold | |
| CN221646463U (en) | A temporary stair safety net | |
| CN111663646A (en) | Crossbeam and stand connecting device for assembly type structure | |
| CN216380487U (en) | Telescopic scaffold suitable for indoor use | |
| CN213626563U (en) | Concatenation formula equipment platform is used in building installation | |
| CN210947656U (en) | Double-ladder scaffold device | |
| CN217420434U (en) | Assembled suspension platform for electric hanging basket |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200630 |