CN111350337A - Bearing frame for building construction - Google Patents

Bearing frame for building construction Download PDF

Info

Publication number
CN111350337A
CN111350337A CN202010084293.1A CN202010084293A CN111350337A CN 111350337 A CN111350337 A CN 111350337A CN 202010084293 A CN202010084293 A CN 202010084293A CN 111350337 A CN111350337 A CN 111350337A
Authority
CN
China
Prior art keywords
pedal
welded
plate
support plate
screwed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010084293.1A
Other languages
Chinese (zh)
Inventor
葛飞月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010084293.1A priority Critical patent/CN111350337A/en
Publication of CN111350337A publication Critical patent/CN111350337A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • E04G5/048Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls with hooks to be attached on the wall's crown
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The invention belongs to the technical field of buildings, in particular to a bearing frame for building construction, which aims at solving the problems that the prior air conditioner external units are protected mainly by safety belts during installation, and are inconvenient to move when the air conditioner external units are moved, so that the installation time is long and the installation efficiency is low. According to the invention, the main fixing plate and the auxiliary fixing plate are clamped at the edge of a window or a balcony, the fastening bolt is screwed to be fixed on a windowsill or a balcony by utilizing the clamping plate to match with the main fixing plate, and the pedal is arranged above the two supporting plates, so that a temporary rack can be formed on the outer side of the windowsill or the balcony, a worker can conveniently move and install the air conditioner external unit on the outer side of a house, the operation is simple and convenient, and the installation safety of the air conditioner external unit is improved.

Description

一种建筑施工用承载架A bearing frame for building construction

技术领域technical field

本发明涉及建筑技术领域,尤其涉及一种建筑施工用承载架。The invention relates to the technical field of construction, in particular to a bearing frame for building construction.

背景技术Background technique

建筑物是人工建筑而成的资产 ,属于固定资产范畴,包括房屋和构建物两大类。房屋是指供人居住、工作、学习、生产、经营、娱乐、储藏物品以及进行其他社会活动的工程建筑。与建筑物有区别的是构筑物,构建物指房屋以外的工程建筑,如围墙、道路、水坝、水井、隧道、水塔、桥梁和烟囱等。Buildings are artificially constructed assets, which belong to the category of fixed assets, including two categories of houses and structures. A house refers to an engineering building for people to live, work, study, produce, operate, entertain, store and carry out other social activities. Different from buildings are structures, which refer to engineering buildings other than houses, such as walls, roads, dams, wells, tunnels, water towers, bridges and chimneys.

房屋建设是日常生活中最常接触的,在房屋建设过程中,常常遇到在房子外侧进行施工,其中,在房屋装修过程中,常常遇到需要在外侧安装空调外机,尽管许多的建筑外侧预留有空调外机安装机位,但是,这些安装机位距离窗台或阳台具有一定距离,工作人员在安装时危险程度大,目前,主要依靠安全带进行防护,在搬动空调外机时移动不便,使得安装时间长,安装效率低。House construction is the most common contact in daily life. In the process of house construction, it is often encountered that construction is carried out on the outside of the house. Among them, in the process of house decoration, it is often encountered that an air conditioner needs to be installed on the outside. Although many buildings outside There are reserved installation positions for the outdoor unit of the air conditioner. However, these installation positions are at a certain distance from the window sill or balcony, and the staff is at a great risk during installation. At present, they mainly rely on the safety belt for protection, and move the outdoor unit when moving Inconvenient, the installation time is long and the installation efficiency is low.

发明内容SUMMARY OF THE INVENTION

基于现有的许多空调外机安装主要依靠安全带进行防护,在搬动空调外机时移动不便,使得安装时间长,安装效率低的技术问题,本发明提出了一种建筑施工用承载架。Based on the technical problems that many existing air conditioner outdoor units are installed mainly rely on safety belts for protection, it is inconvenient to move when moving the air conditioner outdoor unit, resulting in long installation time and low installation efficiency.

本发明提出的一种建筑施工用承载架,包括两个“Z”字形结构的支撑板,两个所述支撑板的底部均焊接有主固定板和副固定板,且副固定板的侧面螺接有两个紧固螺栓,所述紧固螺栓的端部之间通过轴承连接有夹持板,夹持板的顶端与支撑板的底端滑动连接,两个所述支撑板的顶端之间固定安装有踏板,所述支撑板的顶端设置有限位螺孔,且限位螺孔的顶端螺接有限位螺栓,所述踏板的顶端开设有两个与限位螺栓相适配的条形孔。The bearing frame for building construction proposed by the present invention includes two support plates with a "Z"-shaped structure. The bottoms of the two support plates are welded with a main fixing plate and an auxiliary fixing plate, and the side surfaces of the auxiliary fixing plates are screwed. Two fastening bolts are connected, a clamping plate is connected between the ends of the fastening bolts through a bearing, the top end of the clamping plate is slidably connected with the bottom end of the supporting plate, and the top ends of the two supporting plates are connected with each other. A pedal is fixedly installed, the top of the support plate is provided with a limit screw hole, and the top of the limit screw hole is screwed with a limit bolt, and the top of the pedal is provided with two strip holes matching the limit bolt .

优选地,所述支撑板的顶端开设有两个L型结构的安装卡槽,且踏板的底端两侧均焊接有两个L型结构的勾合件。Preferably, the top end of the support plate is provided with two L-shaped structure mounting slots, and two L-shaped structure hooks are welded on both sides of the bottom end of the pedal.

优选地,所述踏板的顶端铰接有防护栏,且防护栏与踏板之间的旋转角度为0°-90°。Preferably, the top of the pedal is hinged with a guardrail, and the rotation angle between the guardrail and the pedal is 0°-90°.

优选地,所述夹持板和主固定板相互靠近的一侧均固定安装有橡胶垫块,且橡胶垫块为倒L型结构。Preferably, rubber pads are fixedly installed on the sides of the clamping plate and the main fixing plate that are close to each other, and the rubber pads have an inverted L-shaped structure.

优选地,所述支撑板的顶端边缘处设置有凸起边缘。Preferably, the top edge of the support plate is provided with a raised edge.

优选地,所述踏板的顶端边缘处固定安装有连接板,且连接板的底端焊接有两个设置多个阶梯的连接副板,两个连接副板顶端之间焊接有多个阶梯板。Preferably, a connecting plate is fixedly installed at the top edge of the pedal, and two connecting sub-plates with multiple steps are welded to the bottom end of the connecting plate, and a plurality of stepped plates are welded between the top ends of the two connecting sub-plates.

优选地,所述支撑板的侧边焊接有多个矩形插管,且连接板的底端焊接有多个与矩形插管相适配的插杆,连接板的顶端设置有与条形孔相同尺寸的条形槽。Preferably, a plurality of rectangular cannulae are welded to the side of the support plate, a plurality of plunger rods adapted to the rectangular cannulae are welded to the bottom end of the connecting plate, and the top end of the connecting plate is provided with the same strip hole. size bar slot.

优选地,所述支撑板和主固定板之间焊接有加固撑板,且矩形插管的侧面与加固撑板焊接。Preferably, a reinforcing support plate is welded between the support plate and the main fixing plate, and the side surface of the rectangular cannula is welded with the reinforcing support plate.

优选地,所述支撑板的顶端开设有螺纹槽,且螺纹槽的顶端螺接有加固机构。Preferably, the top end of the support plate is provided with a threaded groove, and the top end of the threaded groove is screwed with a reinforcement mechanism.

优选地,所述加固机构包括内螺纹套筒、螺纹杆和焊接于螺纹杆底端的插接部,所述插接部的底端与螺纹槽相螺接,且螺纹杆顶端与内螺纹套筒螺接,所述内螺纹套筒的顶端通过轴承连接有橡胶圆台,且内螺纹套筒的侧面螺接有把手杆。Preferably, the reinforcing mechanism includes an inner threaded sleeve, a threaded rod and a plug portion welded to the bottom end of the threaded rod, the bottom end of the plugged portion is screwed with the threaded groove, and the top end of the threaded rod is connected to the internal threaded sleeve The top end of the inner thread sleeve is connected with a rubber circular platform through a bearing, and the side surface of the inner thread sleeve is screwed with a handle rod.

与现有技术相比,本发明提供了一种建筑施工用承载架,具备以下有益效果:Compared with the prior art, the present invention provides a bearing frame for building construction, which has the following beneficial effects:

工作人员可以将承载架的支撑板,通过主固定板和副固定板卡接于窗户或阳台边缘处,旋动紧固螺栓利用夹持板配合主固定板固定于窗台或阳台上,将踏板安装于两个支撑板上方,即可在窗台或阳台外侧构成一个临时的台架,便于工作人员在房屋外侧搬动空调外机,对其进行安装,操作简单方便,增加空调外机安装的安全性;The staff can clamp the support plate of the carrier frame to the edge of the window or balcony through the main fixing plate and the auxiliary fixing plate, and then rotate the fastening bolts to use the clamping plate to cooperate with the main fixing plate to fix it on the window sill or balcony, and install the pedal. Above the two support plates, a temporary bench can be formed on the outside of the window sill or balcony, which is convenient for the staff to move the air conditioner outside the house and install it. The operation is simple and convenient, and the installation safety of the air conditioner is increased. ;

在安装踏板时,将踏板底端焊接的勾合件从安装卡槽的大口处插入,进而向外侧推动踏板,利用勾合件的水平段与支撑板的底部卡合,再利用限位螺栓将踏板与支撑板之间进行旋紧固定,承载架拼装式安装结构,便于拆装,增加操作的便捷性,同时,勾合件的水平段与支撑板的底部卡合,可以避免踏板踩踏时出现翘起现象,进一步提高承载架使用的安全性;When installing the pedal, insert the hook piece welded on the bottom end of the pedal from the large opening of the installation slot, then push the pedal to the outside, use the horizontal section of the hook piece to engage with the bottom of the support plate, and then use the limit bolt to The pedal and the support plate are screwed and fixed, and the bearing frame is assembled and installed, which is convenient for disassembly and assembly, and increases the convenience of operation. Lifting phenomenon, further improve the safety of the use of the carrier;

在踏板的边缘处可以拼装由矩形插管和插杆安装的阶梯,为工作人员搬运外机提受力点,且可以增加承载架向下的延伸距离,增加承载架的适用范围,进一步增加工作人员安装空调外机的便捷性;At the edge of the pedal, a ladder installed by a rectangular intubation tube and an insertion rod can be assembled to provide a force point for the staff to carry the external machine, and can increase the downward extension distance of the carrier frame, increase the application range of the carrier frame, and further increase the work. The convenience for personnel to install the outdoor unit of the air conditioner;

在支撑板安装时,工作人员可以利用加固机构将支撑板端部进行固定,安装时插接部与支撑板固定,旋动内螺纹套筒即可调整加固机构的长度,进而使得加固机构顶端的橡胶圆台与屋顶接触,进而对承载架内外的重量进行平衡,避免工作人员踩踏时外侧下滑,进一步增加承载架使用的安全性。When the support plate is installed, the staff can use the reinforcement mechanism to fix the end of the support plate. During installation, the plug part is fixed to the support plate, and the length of the reinforcement mechanism can be adjusted by rotating the inner threaded sleeve, thereby making the top of the reinforcement mechanism The rubber round table is in contact with the roof, and then balances the weight inside and outside the carrier frame, preventing the outer side from sliding down when the staff steps on it, and further increasing the safety of the carrier frame.

附图说明Description of drawings

图1为本发明提出的一种建筑施工用承载架的剖视结构示意图;Fig. 1 is the sectional structure schematic diagram of a kind of building construction bearing frame proposed by the present invention;

图2为本发明提出的一种建筑施工用承载架的支撑板结构示意图;Fig. 2 is a kind of structural schematic diagram of the support plate of the bearing frame for building construction proposed by the present invention;

图3为本发明提出的一种建筑施工用承载架的踏板结构示意图;Fig. 3 is a kind of pedal structure schematic diagram of a building construction bearing frame proposed by the present invention;

图4为本发明提出的一种建筑施工用承载架的插杆结构示意图;Fig. 4 is a kind of structural schematic diagram of the inserting rod structure of a load-bearing frame for building construction proposed by the present invention;

图5为本发明提出的一种建筑施工用承载架实施例2的剖视结构示意图;5 is a schematic cross-sectional structural diagram of Embodiment 2 of a construction bearing frame proposed by the present invention;

图6为本发明提出的一种建筑施工用承载架的加固机构结构示意图。FIG. 6 is a schematic structural diagram of a reinforcement mechanism of a carrier frame for building construction proposed by the present invention.

图中:1夹持板、2橡胶垫块、3副固定板、4紧固螺栓、5支撑板、6加固撑板、7安装卡槽、8踏板、9限位螺栓、10连接板、11防护栏、12勾合件、13主固定板、14连接副板、15阶梯板、16限位螺孔、17矩形插管、18凸起边缘、19条形孔、20插杆、21螺纹槽、22螺纹杆、23内螺纹套筒、24橡胶圆台、25把手杆、26插接部。In the picture: 1 clamping plate, 2 rubber spacers, 3 auxiliary fixing plates, 4 fastening bolts, 5 supporting plates, 6 reinforcing supporting plates, 7 installation slots, 8 pedals, 9 limit bolts, 10 connecting plates, 11 Guardrail, 12 hooks, 13 main fixing plate, 14 connecting auxiliary plate, 15 step plate, 16 limit screw hole, 17 rectangular cannula, 18 raised edge, 19 strip hole, 20 insert rod, 21 thread groove , 22 threaded rod, 23 internal thread sleeve, 24 rubber round table, 25 handle rod, 26 plug-in part.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments.

在本发明的描述中,需要理解的是,术语“上”、“下”、“前”、“后”、“左”、“右”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inside", " The orientation or positional relationship indicated by "outside" is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation, so as to The specific orientation configuration and operation are therefore not to be construed as limitations of the present invention.

实施例1Example 1

参照图1-4,一种建筑施工用承载架,包括两个“Z”字形结构的支撑板5,两个支撑板5的底部均焊接有主固定板13和副固定板3,且副固定板3的侧面螺接有两个紧固螺栓4,紧固螺栓4的端部之间通过轴承连接有夹持板1,夹持板1的顶端与支撑板5的底端滑动连接,两个支撑板5的顶端之间固定安装有踏板8,支撑板5的顶端设置有限位螺孔16,且限位螺孔16的顶端螺接有限位螺栓9,踏板8的顶端开设有两个与限位螺栓9相适配的条形孔19,在户外安装空调外机时,工作人员可以将承载架的支撑板5,通过主固定板13和副固定板3卡接于窗户或阳台边缘处,旋动紧固螺栓4利用夹持板1配合主固定板13固定于窗台或阳台上,将踏板8安装于两个支撑板5上方,即可在窗台或阳台外侧构成一个临时的台架,便于工作人员在房屋外侧搬动空调外机,对其进行安装,操作简单方便,增加空调外机安装的安全性。Referring to Figures 1-4, a construction bearing frame includes two "Z"-shaped support plates 5, the bottoms of the two support plates 5 are welded with a main fixing plate 13 and a secondary fixing plate 3, and the auxiliary fixing Two fastening bolts 4 are screwed on the side of the plate 3, and a clamping plate 1 is connected between the ends of the fastening bolts 4 through bearings. A pedal 8 is fixedly installed between the top ends of the support plate 5. The top end of the support plate 5 is provided with a limit screw hole 16, and the top of the limit screw hole 16 is screwed with a limit bolt 9. The top of the pedal 8 is provided with two limit screws. There is a strip hole 19 adapted to the bolt 9. When installing the outdoor unit of the air conditioner outdoors, the staff can clamp the support plate 5 of the carrier frame to the edge of the window or balcony through the main fixing plate 13 and the auxiliary fixing plate 3. Rotate the fastening bolt 4 and use the clamping plate 1 to cooperate with the main fixing plate 13 to fix it on the window sill or balcony, and install the pedal 8 above the two support plates 5 to form a temporary bench outside the window sill or balcony, which is convenient for The staff moves the air conditioner outside the house and installs it. The operation is simple and convenient, which increases the safety of the installation of the air conditioner.

本发明中,支撑板5的顶端开设有两个L型结构的安装卡槽7,且踏板8的底端两侧均焊接有两个L型结构的勾合件12,在安装踏板8时,将踏板8底端焊接的勾合件12从安装卡槽7的大口处插入,进而向外侧推动踏板8,利用勾合件12的水平段与支撑板5的底部卡合,再利用限位螺栓9将踏板8与支撑板5之间进行旋紧固定,承载架拼装式安装结构,便于拆装,增加操作的便捷性,同时,勾合件12的水平段与支撑板5的底部卡合,可以避免踏板8踩踏时出现翘起现象,进一步提高承载架使用的安全性。In the present invention, the top end of the support plate 5 is provided with two installation slots 7 of L-shaped structure, and both sides of the bottom end of the pedal 8 are welded with two hooks 12 of the L-shaped structure. When the pedal 8 is installed, Insert the hook piece 12 welded on the bottom end of the pedal 8 from the large opening of the installation slot 7, and then push the pedal 8 to the outside, use the horizontal section of the hook piece 12 to engage with the bottom of the support plate 5, and then use the limit bolts 9. Tighten and fix the pedal 8 and the support plate 5. The mounting structure of the bearing frame is assembled, which is convenient for disassembly and assembly, and increases the convenience of operation. The phenomenon of tilting when the pedal 8 is stepped on can be avoided, thereby further improving the safety of the use of the bearing frame.

本发明中,踏板8的顶端铰接有防护栏11,且防护栏11与踏板8之间的旋转角度为0°-90°,在踏板8上方安装可折叠的防护栏11,在承载架安装时,将防护栏11抬起至与踏板8垂直,为工作人员充当护栏,避免工具或工作人员滑落,进一步增加承载架使用的安全性。In the present invention, the top of the pedal 8 is hinged with a guardrail 11, and the rotation angle between the guardrail 11 and the pedal 8 is 0°-90°. The foldable guardrail 11 is installed above the pedal 8. When the carrier is installed , lift the guardrail 11 to be perpendicular to the pedal 8, act as a guardrail for the staff, prevent tools or staff from slipping, and further increase the safety of the carrier frame.

本发明中,夹持板1和主固定板13相互靠近的一侧均固定安装有橡胶垫块2,且橡胶垫块2为倒L型结构,在支撑板5进行安装时,利用橡胶垫块2与墙面接触,避免造成墙面装修损坏,同时,橡胶垫块2水平段可以将支撑板5支起,避免与窗户框等凸起部位接触造成损坏,避免承载架在使用时对墙面造成损伤。In the present invention, rubber pads 2 are fixedly installed on the sides of the clamping plate 1 and the main fixing plate 13 that are close to each other, and the rubber pads 2 have an inverted L-shaped structure. When the support plate 5 is installed, the rubber pads are used. 2. Contact with the wall to avoid damage to the wall decoration. At the same time, the horizontal section of the rubber pad 2 can support the support plate 5 to avoid contact with the window frame and other raised parts and cause damage. cause damage.

本发明中,支撑板5的顶端边缘处设置有凸起边缘18,凸起边缘18的设置,可以在踏板8安装时,对其外侧提供限位,避免踏板8滑落。In the present invention, the top edge of the support plate 5 is provided with a raised edge 18, and the arrangement of the raised edge 18 can provide a limit to the outside of the pedal 8 when it is installed to prevent the pedal 8 from slipping.

本发明中,踏板8的顶端边缘处固定安装有连接板10,且连接板10的底端焊接有两个设置多个阶梯的连接副板14,两个连接副板14顶端之间焊接有多个阶梯板15,支撑板5的侧边焊接有多个矩形插管17,且连接板10的底端焊接有多个与矩形插管17相适配的插杆20,连接板10的顶端设置有与条形孔19相同尺寸的条形槽,在踏板8的边缘处可以拼装由矩形插管17和插杆20安装的阶梯,为工作人员搬运外机提受力点,且可以增加承载架向下的延伸距离,增加承载架的适用范围,进一步增加工作人员安装空调外机的便捷性。In the present invention, the connecting plate 10 is fixedly installed at the top edge of the pedal 8, and the bottom end of the connecting plate 10 is welded with two connecting sub-plates 14 with multiple steps. A plurality of stepped plates 15 are welded, a plurality of rectangular cannulae 17 are welded to the side of the support plate 5, and a plurality of plunger rods 20 that are adapted to the rectangular cannulae 17 are welded to the bottom end of the connecting plate 10. The top of the connecting plate 10 is provided with There is a bar-shaped slot with the same size as the bar-shaped hole 19, and a ladder installed by the rectangular intubation tube 17 and the insertion rod 20 can be assembled at the edge of the pedal 8, which can provide a force point for the staff to carry the external machine, and can increase the bearing frame The downward extension distance increases the scope of application of the carrier, and further increases the convenience for the staff to install the air conditioner external unit.

本发明中,支撑板5和主固定板13之间焊接有加固撑板6,且矩形插管17的侧面与加固撑板6焊接,利用加固撑板6增加支撑板5外侧的支撑强度,且利用加固撑板6与矩形插管17焊接,增加侧边安装的阶梯强度,进一步增加承载架使用过程中的稳定性。In the present invention, a reinforcement support plate 6 is welded between the support plate 5 and the main fixing plate 13, and the side surface of the rectangular intubation tube 17 is welded with the reinforcement support plate 6, and the reinforcement support plate 6 is used to increase the support strength on the outside of the support plate 5, and The reinforcing support plate 6 is welded with the rectangular cannula 17 to increase the strength of the steps installed on the side, and further increase the stability of the carrier during use.

在本实施例中,在户外安装空调外机时,工作人员可以将承载架的支撑板5,通过主固定板13和副固定板3卡接于窗户或阳台边缘处,旋动紧固螺栓4利用夹持板1配合主固定板13固定于窗台或阳台上,将踏板8安装于两个支撑板5上方,即可在窗台或阳台外侧构成一个临时的台架,便于工作人员在房屋外侧搬动空调外机,对其进行安装,操作简单方便,增加空调外机安装的安全性。In this embodiment, when installing the outdoor unit of the air conditioner outdoors, the staff can clamp the support plate 5 of the carrier frame to the edge of the window or balcony through the main fixing plate 13 and the auxiliary fixing plate 3, and rotate the fastening bolts 4 Using the clamping plate 1 to cooperate with the main fixing plate 13 to be fixed on the window sill or balcony, and installing the pedal 8 above the two support plates 5, a temporary bench can be formed on the outside of the window sill or balcony, which is convenient for the staff to move outside the house. It is easy and convenient to operate and install the external air conditioner, which increases the safety of the installation of the external air conditioner.

实施例2Example 2

参照图5-6,一种建筑施工用承载架,支撑板5的顶端开设有螺纹槽21,且螺纹槽21的顶端螺接有加固机构。5-6, a bearing frame for building construction, the top end of the support plate 5 is provided with a threaded groove 21, and the top of the threaded groove 21 is screwed with a reinforcement mechanism.

加固机构包括内螺纹套筒23、螺纹杆22和焊接于螺纹杆22底端的插接部26,插接部26的底端与螺纹槽21相螺接,且螺纹杆22顶端与内螺纹套筒23螺接,内螺纹套筒23的顶端通过轴承连接有橡胶圆台24,且内螺纹套筒23的侧面螺接有把手杆25。The reinforcement mechanism includes an internal threaded sleeve 23, a threaded rod 22, and a plug portion 26 welded to the bottom end of the threaded rod 22. The bottom end of the plugged portion 26 is screwed with the threaded groove 21, and the top of the threaded rod 22 is connected to the internal threaded sleeve. 23 is screwed, the top end of the inner thread sleeve 23 is connected with a rubber dome 24 through a bearing, and the side surface of the inner thread sleeve 23 is screwed with a handle rod 25 .

在本实施例中,在支撑板5安装时,工作人员可以利用加固机构将支撑板5端部进行固定,安装时插接部26与支撑板5固定,旋动内螺纹套筒23即可调整加固机构的长度,进而使得加固机构顶端的橡胶圆台24与屋顶接触,进而对承载架内外的重量进行平衡,避免工作人员踩踏时外侧下滑,进一步增加承载架使用的安全性。In this embodiment, when the support plate 5 is installed, the staff can use the reinforcement mechanism to fix the end of the support plate 5. During installation, the plug portion 26 is fixed to the support plate 5, and the inner thread sleeve 23 can be rotated to adjust The length of the reinforcement mechanism makes the rubber circular platform 24 at the top of the reinforcement mechanism contact with the roof, thereby balancing the weight inside and outside the carrier, preventing the outside from sliding down when the staff steps on it, and further increasing the safety of the carrier.

以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. The equivalent replacement or change of the inventive concept thereof shall be included within the protection scope of the present invention.

Claims (10)

1.一种建筑施工用承载架,包括两个“Z”字形结构的支撑板(5),两个所述支撑板(5)的底部均焊接有主固定板(13)和副固定板(3),且副固定板(3)的侧面螺接有两个紧固螺栓(4),其特征在于,所述紧固螺栓(4)的端部之间通过轴承连接有夹持板(1),夹持板(1)的顶端与支撑板(5)的底端滑动连接,两个所述支撑板(5)的顶端之间固定安装有踏板(8),所述支撑板(5)的顶端设置有限位螺孔(16),且限位螺孔(16)的顶端螺接有限位螺栓(9),所述踏板(8)的顶端开设有两个与限位螺栓(9)相适配的条形孔(19)。1. A bearing frame for building construction, comprising two support plates (5) with a "Z"-shaped structure, and the bottoms of the two support plates (5) are welded with a main fixing plate (13) and an auxiliary fixing plate ( 3), and the side surface of the auxiliary fixing plate (3) is screwed with two fastening bolts (4), characterized in that a clamping plate (1) is connected between the ends of the fastening bolts (4) through bearings. ), the top end of the clamping plate (1) is slidably connected with the bottom end of the support plate (5), a pedal (8) is fixedly installed between the top ends of the two support plates (5), and the support plate (5) The top of the pedal (8) is provided with a limit screw hole (16), and the top of the limit screw hole (16) is screwed with a limit bolt (9), and the top of the pedal (8) is provided with two limit bolts (9). Fitting strip hole (19). 2.根据权利要求1所述的一种建筑施工用承载架,其特征在于,所述支撑板(5)的顶端开设有两个L型结构的安装卡槽(7),且踏板(8)的底端两侧均焊接有两个L型结构的勾合件(12)。2 . The construction carrier according to claim 1 , wherein the top end of the support plate ( 5 ) is provided with two L-shaped mounting slots ( 7 ), and the pedal ( 8 ) Two L-shaped hooks (12) are welded on both sides of the bottom end. 3.根据权利要求1所述的一种建筑施工用承载架,其特征在于,所述踏板(8)的顶端铰接有防护栏(11),且防护栏(11)与踏板(8)之间的旋转角度为0°-90°。3 . The construction carrier according to claim 1 , wherein a guard rail ( 11 ) is hinged on the top of the pedal ( 8 ), and the guard rail ( 11 ) and the pedal ( 8 ) are connected between the guard rail ( 11 ) and the pedal ( 8 ). 4 . The rotation angle is 0°-90°. 4.根据权利要求1所述的一种建筑施工用承载架,其特征在于,所述夹持板(1)和主固定板(13)相互靠近的一侧均固定安装有橡胶垫块(2),且橡胶垫块(2)为倒L型结构。4 . The construction carrier according to claim 1 , characterized in that, rubber pads ( 2 ) are fixedly installed on the sides of the clamping plate ( 1 ) and the main fixing plate ( 13 ) that are close to each other. 5 . ), and the rubber spacer (2) is an inverted L-shaped structure. 5.根据权利要求1所述的一种建筑施工用承载架,其特征在于,所述支撑板(5)的顶端边缘处设置有凸起边缘(18)。5 . The construction carrier according to claim 1 , wherein a raised edge ( 18 ) is provided at the top edge of the support plate ( 5 ). 6 . 6.根据权利要求1所述的一种建筑施工用承载架,其特征在于,所述踏板(8)的顶端边缘处固定安装有连接板(10),且连接板(10)的底端焊接有两个设置多个阶梯的连接副板(14),两个连接副板(14)顶端之间焊接有多个阶梯板(15)。6 . The construction carrier according to claim 1 , wherein a connecting plate ( 10 ) is fixedly installed at the top edge of the pedal ( 8 ), and the bottom end of the connecting plate ( 10 ) is welded. 7 . There are two connecting sub-boards (14) provided with multiple steps, and a plurality of stepped plates (15) are welded between the top ends of the two connecting sub-boards (14). 7.根据权利要求6所述的一种建筑施工用承载架,其特征在于,所述支撑板(5)的侧边焊接有多个矩形插管(17),且连接板(10)的底端焊接有多个与矩形插管(17)相适配的插杆(20),连接板(10)的顶端设置有与条形孔(19)相同尺寸的条形槽。7 . The construction bearing frame according to claim 6 , wherein a plurality of rectangular intubation tubes ( 17 ) are welded to the side of the support plate ( 5 ), and the bottom of the connecting plate ( 10 ) is welded. 8 . The ends are welded with a plurality of insertion rods (20) matching the rectangular intubation tube (17), and the top end of the connecting plate (10) is provided with a bar-shaped groove of the same size as the bar-shaped hole (19). 8.根据权利要求7所述的一种建筑施工用承载架,其特征在于,所述支撑板(5)和主固定板(13)之间焊接有加固撑板(6),且矩形插管(17)的侧面与加固撑板(6)焊接。8 . The construction carrier according to claim 7 , wherein a reinforcing support plate ( 6 ) is welded between the support plate ( 5 ) and the main fixing plate ( 13 ), and a rectangular cannula is provided. 9 . The side of (17) is welded to the reinforcement support plate (6). 9.根据权利要求1所述的一种建筑施工用承载架,其特征在于,所述支撑板(5)的顶端开设有螺纹槽(21),且螺纹槽(21)的顶端螺接有加固机构。9 . The construction bearing frame according to claim 1 , wherein a threaded groove ( 21 ) is formed on the top of the support plate ( 5 ), and the top of the threaded groove ( 21 ) is screwed with reinforcement. 10 . mechanism. 10.根据权利要求9所述的一种建筑施工用承载架,其特征在于,所述加固机构包括内螺纹套筒(23)、螺纹杆(22)和焊接于螺纹杆(22)底端的插接部(26),所述插接部(26)的底端与螺纹槽(21)相螺接,且螺纹杆(22)顶端与内螺纹套筒(23)螺接,所述内螺纹套筒(23)的顶端通过轴承连接有橡胶圆台(24),且内螺纹套筒(23)的侧面螺接有把手杆(25)。10 . The construction carrier according to claim 9 , wherein the reinforcing mechanism comprises an inner threaded sleeve ( 23 ), a threaded rod ( 22 ), and a plug welded to the bottom end of the threaded rod ( 22 ). 11 . A connecting part (26), the bottom end of the inserting part (26) is screwed with the threaded groove (21), and the top end of the threaded rod (22) is screwed with the inner threaded sleeve (23), the inner threaded sleeve (23) is threaded The top end of the cylinder (23) is connected with a rubber circular table (24) through a bearing, and a handle rod (25) is screwed on the side surface of the inner thread sleeve (23).
CN202010084293.1A 2020-02-10 2020-02-10 Bearing frame for building construction Pending CN111350337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010084293.1A CN111350337A (en) 2020-02-10 2020-02-10 Bearing frame for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010084293.1A CN111350337A (en) 2020-02-10 2020-02-10 Bearing frame for building construction

Publications (1)

Publication Number Publication Date
CN111350337A true CN111350337A (en) 2020-06-30

Family

ID=71193973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010084293.1A Pending CN111350337A (en) 2020-02-10 2020-02-10 Bearing frame for building construction

Country Status (1)

Country Link
CN (1) CN111350337A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112324119A (en) * 2020-10-29 2021-02-05 罗仁富 Building field workman high altitude construction protector
CN113581051A (en) * 2021-08-09 2021-11-02 威海市妇幼保健院(威海市立第二医院、威海市妇女儿童医院) Epidemic prevention mobile hospital convenient for logging in

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030009257A (en) * 2002-12-20 2003-01-29 다산건설(주) Bracket for scaffolding
JP3898088B2 (en) * 2002-05-28 2007-03-28 有限会社ミツオ電気 Structure of work platform
CN201031495Y (en) * 2007-04-25 2008-03-05 程云 High building outdoor working device
CN201704941U (en) * 2010-01-13 2011-01-12 英德市坤煌科技开发有限公司 Maintenance platform for injection molding machine
CN202055500U (en) * 2011-05-09 2011-11-30 臧敏杰 Working platform device for aloft work
JP2017014744A (en) * 2015-06-29 2017-01-19 旭化成ホームズ株式会社 Suspending work floor
CN107165396A (en) * 2017-06-27 2017-09-15 朱慧芳 One kind building interim window side arm in high-altitude
CN208105835U (en) * 2018-04-18 2018-11-16 河南威丽市政园林有限公司 A kind of safe construction frame of construction
CN208718333U (en) * 2018-08-20 2019-04-09 北京天润建设有限公司 A kind of crosshead
CN209193426U (en) * 2018-11-07 2019-08-02 中国水利水电第三工程局有限公司 A kind of air-conditioner outdoor unit mounting device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3898088B2 (en) * 2002-05-28 2007-03-28 有限会社ミツオ電気 Structure of work platform
KR20030009257A (en) * 2002-12-20 2003-01-29 다산건설(주) Bracket for scaffolding
CN201031495Y (en) * 2007-04-25 2008-03-05 程云 High building outdoor working device
CN201704941U (en) * 2010-01-13 2011-01-12 英德市坤煌科技开发有限公司 Maintenance platform for injection molding machine
CN202055500U (en) * 2011-05-09 2011-11-30 臧敏杰 Working platform device for aloft work
JP2017014744A (en) * 2015-06-29 2017-01-19 旭化成ホームズ株式会社 Suspending work floor
CN107165396A (en) * 2017-06-27 2017-09-15 朱慧芳 One kind building interim window side arm in high-altitude
CN208105835U (en) * 2018-04-18 2018-11-16 河南威丽市政园林有限公司 A kind of safe construction frame of construction
CN208718333U (en) * 2018-08-20 2019-04-09 北京天润建设有限公司 A kind of crosshead
CN209193426U (en) * 2018-11-07 2019-08-02 中国水利水电第三工程局有限公司 A kind of air-conditioner outdoor unit mounting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112324119A (en) * 2020-10-29 2021-02-05 罗仁富 Building field workman high altitude construction protector
CN113581051A (en) * 2021-08-09 2021-11-02 威海市妇幼保健院(威海市立第二医院、威海市妇女儿童医院) Epidemic prevention mobile hospital convenient for logging in

Similar Documents

Publication Publication Date Title
WO2021135777A1 (en) Connecting structure for climbing scaffolding protective reticulated panels and upright pole
CN111350337A (en) Bearing frame for building construction
CN212154215U (en) Take prefabricated wallboard bearing structure to one side of entrance to a cave
CN210086771U (en) A portable lifting frame for building air-conditioning installation
CN221746966U (en) Oil immersed transformer convenient to installation
CN218323766U (en) Telescopic scaffold structure is used in indoor construction
CN215407325U (en) Climbing frame building connecting assembly
CN209375021U (en) A kind of gantry convenient for cable sliding
CN217680449U (en) A high-altitude working edge protective railing
CN210067410U (en) Support device for climbing scaffold
CN211691352U (en) Bearing frame for building construction
CN217897233U (en) Efficient-connection climbing frame connecting device
CN206110632U (en) Shockproof scaffold support frame of building
CN222797119U (en) Assembled peripheral plug-in device
CN220954488U (en) A building intelligent combined installation frame
CN221622045U (en) Curtain shutter processing and positioning device with adjustable turnover angle
CN219889763U (en) A pipe installation hanger
CN222066119U (en) Building scaffold
CN209353648U (en) A kind of combined moving scaffold
CN221646463U (en) A temporary stair safety net
CN111663646A (en) Crossbeam and stand connecting device for assembly type structure
CN216380487U (en) Telescopic scaffold suitable for indoor use
CN213626563U (en) Concatenation formula equipment platform is used in building installation
CN210947656U (en) Double-ladder scaffold device
CN217420434U (en) Assembled suspension platform for electric hanging basket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200630