CN217205224U - Scaffold for safe construction - Google Patents

Scaffold for safe construction Download PDF

Info

Publication number
CN217205224U
CN217205224U CN202220097445.6U CN202220097445U CN217205224U CN 217205224 U CN217205224 U CN 217205224U CN 202220097445 U CN202220097445 U CN 202220097445U CN 217205224 U CN217205224 U CN 217205224U
Authority
CN
China
Prior art keywords
scaffold
plate
fixedly connected
rod
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220097445.6U
Other languages
Chinese (zh)
Inventor
黄启源
李勇
黄光伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Huadaxuan Construction Engineering Co ltd
Original Assignee
Guangdong Huadaxuan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Huadaxuan Construction Engineering Co ltd filed Critical Guangdong Huadaxuan Construction Engineering Co ltd
Priority to CN202220097445.6U priority Critical patent/CN217205224U/en
Application granted granted Critical
Publication of CN217205224U publication Critical patent/CN217205224U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The application relates to the technical field of construction equipment and discloses a scaffold for safe construction. In the application, the top surface of the bottom plate is provided with the limiting groove rod, the supporting rod is arranged inside the limiting groove rod, when a worker works on the top surface of the scaffold board, the blocking plate arranged inside the limiting groove rod can be extruded by the supporting rod, thereby achieving the effect of shock absorption, reducing the shaking of the scaffold, ensuring that the scaffold is more stable when a worker works, being beneficial to the worker to work better, meanwhile, the working personnel can be safer during the working period, the working efficiency of the working personnel is improved, when removing specific position with the scaffold frame, can be through rotating the threaded rod of threaded connection in hole inboard portion, make the fixed block of threaded rod bottom can place on ground, prevent to try hard to prevent that the scaffold frame from sliding during the use, make staff more convenient when using the scaffold frame, also make the staff simultaneously at the safety of during operation more.

Description

Scaffold for safe construction
Technical Field
This application belongs to the technical field of construction equipment, specifically is a scaffold frame of safe construction.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
Staff need frequent when using the scaffold frame walk about, probably lead to staff not special stability when using the scaffold frame, make the scaffold frame probably take place to rock, lead to staff safe inadequately at the during operation.
SUMMERY OF THE UTILITY MODEL
The purpose of this application lies in: in order to solve the problem that the scaffold is not particularly stable in use, the safety construction scaffold is provided.
The technical scheme adopted by the application is as follows: a safe construction scaffold comprises a bottom plate, wherein a limiting groove rod is fixedly connected to the top of the bottom plate, a blocking plate is arranged inside the limiting groove rod, a supporting block is arranged at the top end of the blocking plate, springs are arranged on two sides of the blocking plate, a supporting rod is fixedly connected to the top of the supporting block, and a scaffold board is fixedly connected to the top of the supporting rod;
by adopting the technical scheme, the damping effect is achieved, so that the shaking of the scaffold is reduced, the scaffold is more stable when a worker works, and the scaffold can work better by the worker.
The side four corners fixed connection of bottom plate has the hole board, the screw hole is seted up on the surface of hole board, and the inside threaded connection of screw hole has the threaded rod, the bottom fixedly connected with fixed block of threaded rod.
Through adopting above-mentioned technical scheme, be in order to prevent as far as possible that the scaffold from sliding during the use, make staff more convenient when using the scaffold, also make the staff safer at the during operation simultaneously.
Optionally, the bottom of the bottom plate is fixedly connected with a supporting block, the bottom of the supporting block is fixedly connected with a supporting plate, and rollers are arranged inside the supporting plate.
Through adopting above-mentioned technical scheme, be in order to make the scaffold frame can remove on ground, make more convenience of staff when carrying the scaffold frame.
Optionally, the top surface of the scaffold board is provided with nine drainage holes.
By adopting the technical scheme, when the scaffold is used in rainy days, rainwater can flow out of the surface of the scaffold board through the drain holes, so that workers can work better.
Optionally, the two sides and the rear of the scaffold board are fixedly connected with supporting rods, and the tops of the supporting rods are fixedly connected with handrails.
Through adopting above-mentioned technical scheme, can be more firm when making the staff carry out work on the surface of scaffold board, make staff's safety more during the work.
Optionally, a fixing plate is installed at the top of the scaffold plate, and a stair is fixedly connected to the lower portion of the side face of the fixing plate.
Through adopting above-mentioned technical scheme, the staff of being convenient for of stair sets up climbs on the scaffold board.
Optionally, a hole is formed in one side of the top of the fixing plate, a bolt is connected to the inside of the hole in a threaded mode, and the bolt penetrates through the fixing plate and is connected to the inside of the scaffold plate in a threaded mode.
Through adopting above-mentioned technical scheme, be more firm when making the stair install the surface at scaffold board.
Optionally, the first shear brace rod is arranged between the limiting groove rods on the two sides of the bottom plate, and the second shear brace rod is arranged between the limiting groove rods on the rear side of the bottom plate.
Through adopting above-mentioned technical scheme, be more firm in order to make the scaffold in the in-process of using, make staff's safety when using more.
Optionally, the number of the limiting groove rods is four, and the limiting groove rods are cylindrical.
By adopting the technical scheme, the device installed in the device can be firmer.
Optionally, the number of the rollers is four, and the shape of the roller is circular.
Through adopting above-mentioned technical scheme, be more convenient when making scaffold frame remove.
Optionally, the scaffold board is a steel plate, and the scaffold board is cuboid.
By adopting the technical scheme, the safety device is used for ensuring that the working personnel can be safer during working.
In conclusion, due to the adoption of the technical scheme, the beneficial effects of the application are as follows:
1. in this application, the staff can install the baffler in spacing recess pole inside through the bracing piece extrusion at scaffold board top surface during operation to reach absorbing effect, reduced rocking of scaffold, make the staff more stable at the during operation scaffold, the better work of carrying on of favourable staff, also make the staff more safety during operation simultaneously, improve staff's work efficiency.
2. In this application, when removing specific position with the scaffold frame, can be through rotating the threaded rod of threaded connection in hole inboard portion, make the fixed block of threaded rod bottom can place on ground, prevent to try hard to prevent that the scaffold frame from sliding during the use, make staff more convenient when using the scaffold frame, also make the staff simultaneously at during operation safety more.
Drawings
FIG. 1 is a schematic perspective view of the present application;
FIG. 2 is a schematic side view of the present application;
FIG. 3 is an enlarged view taken at A of FIG. 2 of the present application;
fig. 4 is a schematic front view of the present application.
The labels in the figure are: 1-scaffold board, 2-drain hole, 3-handrail, 4-support rod, 5-scissor brace rod I, 6-bottom board, 7-support rod, 8-limit groove rod, 9-stair, 10-fixing board, 11-bolt, 12-support board, 13-roller, 14-support block, 15-threaded rod, 16-hole board, 17-scissor brace rod II, 18-fixing block, 19-support block, 20-spring and 21-blocking board.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
A safety construction scaffolding according to an embodiment of the present application will be described in detail with reference to fig. 1 to 4.
Example (b):
referring to fig. 1 to 3, a scaffold for safe construction, including bottom plate 6, the top fixedly connected with of bottom plate 6 has spacing recess pole 8, spacing recess pole 8's shape is the cylinder type, and the quantity of spacing recess pole 8 is four, four spacing recess poles 8 are four corner positions of fixed connection at bottom plate 6 top respectively, spacing recess pole 8 is for supporting the device of installing in spacing recess pole 8 inside and carry out work, also for making the device of installing in spacing recess pole 8 inside more firm simultaneously, the internally mounted of spacing recess pole 8 has baffler 21, baffler 21 can play a absorbing effect, piece 19 is installed on the top of baffler 21, piece 19 is for supporting the device of installing piece 19 on the top, also be for making the baffler 21 of installing in its bottom can better work simultaneously.
Referring to fig. 1 to 3, both sides of barrier plate 21 are provided with spring 20, spring 20 is for preventing as far as possible that barrier plate 21 from taking place crooked at the absorbing in-process, thereby make the damping that carries out that barrier plate 21 can be better, the top fixedly connected with bracing piece 7 of piece 19, bracing piece 7 is for the device of support mounting at bracing piece 7 top, the top fixedly connected with scaffold board 1 of bracing piece 7, scaffold board 1's shape is the cuboid, and scaffold board 1 is the iron sheet that steel material made forms, and has good strength, long service life's advantage, scaffold board 1 is for making the staff can stand at the top of scaffold board 1, make the staff can better carry out work.
Referring to fig. 2 and 3, when the worker works on the top surface of the scaffold board 1, the barrier board 21 inside the limiting groove rod 8 can be extruded and installed through the supporting rod 7, so that the damping effect is achieved, the shaking of the scaffold is reduced, the worker can work more stably in the working process of the scaffold, the worker can work better, the worker can work more safely in the working process, and the working efficiency of the worker is improved.
Referring to fig. 4, the perforated plate 16 is fixedly connected to four corners of the side surface of the bottom plate 6, and the perforated plate 16 is used for supporting the device installed inside the perforated plate 16, so that the device installed inside the perforated plate 16 can be more stable, and the device installed inside the perforated plate 16 can better work.
Referring to fig. 4, a threaded hole is formed in a surface of the hole plate 16, a threaded rod 15 is threadedly connected to an inner portion of the threaded hole, the threaded rod 15 is used for fixing the scaffold at a specific position, so as to prevent the scaffold from sliding on the ground as much as possible, a fixing block 18 is fixedly connected to a bottom end of the threaded rod 15, and the fixing block 18 is used for fixing the threaded rod 15 on the ground more firmly, thereby improving the working efficiency of a worker working at the top.
Referring to fig. 4, when the scaffold is moved to a specific position, the threaded rod 15 screwed into the hole plate 16 is rotated, so that the fixing block 18 at the bottom of the threaded rod 15 can be placed on the ground, and the scaffold is prevented from sliding during use as much as possible, so that the scaffold is more convenient for a worker to use the scaffold, and is safer for the worker to work.
Referring to fig. 2 and 4, a supporting block 14 is fixedly connected to the bottom of the base plate 6, a device mounted at the bottom of the supporting block 14 is supported by the supporting block 14, a supporting plate 12 is fixedly connected to the bottom of the supporting block 14, the supporting plate 12 is used for enabling the device mounted inside the supporting plate to rotate, rollers 13 are arranged inside the supporting plate 12, the rollers 13 are circular, the number of the rollers 13 is four, and the rollers 13 are used for enabling the scaffold to move on the ground, so that a worker can carry the scaffold more conveniently.
Referring to fig. 1, the top surface of the scaffold board 1 is provided with nine drainage holes 2, and the drainage holes 2 are used to allow rainwater to flow out of the surface of the scaffold board 1 through the drainage holes 2 when the scaffold is in rainy days, so that workers can work better.
Referring to fig. 1 and 2, two sides and a rear portion of the scaffold board 1 are fixedly connected with supporting rods 4, the supporting rods 4 are used for preventing workers from falling outside the scaffold board 1 during work as much as possible, the top portions of the supporting rods 4 are fixedly connected with handrails 3, and the handrails 3 are used for enabling the workers to be more stable when the workers work on the surface of the scaffold board 1 and enabling the workers to be safer during work.
Referring to fig. 1, a fixing plate 10 is installed at the top of a scaffold board 1, the fixing plate 10 is used for supporting a device installed at the bottom of the fixing plate 10, a stair 9 is fixedly connected below the side surface of the fixing plate 10, and the stair 9 is used for facilitating a worker to the surface of the scaffold board 1, thereby improving the working efficiency of the worker.
Referring to fig. 1, a hole is formed in one side of the top of the fixing plate 10, a bolt 11 is screwed into the hole, and the bolt 11 penetrates through the fixing plate 10 and is screwed into the scaffold board 1, so that the stair 9 is more firmly installed on the surface of the scaffold board 1.
Referring to fig. 2 and 4, a scissor brace rod 5 is arranged between the limiting groove rods 8 on both sides of the bottom plate 6; be located and install scissor brace two 17 between the spacing recess pole 8 of bottom plate 6 rear side, lie in two scissor brace one 5 and two scissor brace two 17 of same side and be the cross arrangement respectively, be more firm in order to make the scaffold frame in the in-process that uses, make staff's safety when using more.
The application principle of this application safety construction scaffold frame embodiment does:
when the staff uses the scaffold frame at present, can remove specific position with the scaffold frame, and threaded connection is rotated at the inside threaded rod 15 of hole board 16 to the rethread, makes the fixed block 18 of threaded rod 15 bottom can place on ground, prevents that the scaffold frame from sliding during the use, makes more convenience of staff when the operative installations, also makes the staff simultaneously at the safety of during operation more.
Stair 9 through 1 side-mounting of scaffold board, can make the staff arrive the top of scaffold board 1, the staff is at 1 top surface during operation of scaffold board, can install the baffler 21 at 8 inside spacing recess poles through the extrusion of bracing piece 7, thereby reach absorbing effect, the rocking of scaffold frame has been reduced, make the staff more stable at the during operation device, the better work that carries on of favourable staff, also make the staff safer during operation simultaneously, improve staff's work efficiency.
The above embodiments are only used to illustrate the technical solutions of the present application, and not to limit the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions in the embodiments of the present application.

Claims (10)

1. A safe construction scaffold, includes bottom plate (6), its characterized in that: the top of the bottom plate (6) is fixedly connected with a limiting groove rod (8), a blocking plate (21) is installed inside the limiting groove rod (8), a support block (19) is installed at the top end of the blocking plate (21), springs (20) are arranged on two sides of the blocking plate (21), a support rod (7) is fixedly connected with the top of the support block (19), and a scaffold plate (1) is fixedly connected with the top of the support rod (7);
the side four corners fixed connection of bottom plate (6) is porose board (16), the screw hole is seted up on the surface of porose board (16), and the inside threaded connection of screw hole has threaded rod (15), the bottom fixedly connected with fixed block (18) of threaded rod (15).
2. A safety construction scaffold according to claim 1 wherein: the bottom of the bottom plate (6) is fixedly connected with a supporting block (14), the bottom of the supporting block (14) is fixedly connected with a supporting plate (12), and rollers (13) are arranged inside the supporting plate (12).
3. A safety construction scaffolding as claimed in claim 1, wherein: the top surface of the scaffold board (1) is provided with nine drainage holes (2), and the number of the drainage holes (2) is nine.
4. A safety construction scaffolding as claimed in claim 3, wherein: the two sides and the rear of the scaffold board (1) are fixedly connected with supporting rods (4), and the top of each supporting rod (4) is fixedly connected with a handrail (3).
5. A safety construction scaffolding as claimed in claim 3, wherein: the scaffold board is characterized in that a fixing plate (10) is installed at the top of the scaffold board (1), and a stair (9) is fixedly connected to the lower portion of the side face of the fixing plate (10).
6. A safety construction scaffolding according to claim 5, wherein: the hole is opened to top one side of fixed plate (10), and the inside threaded connection in hole has bolt (11), bolt (11) pass fixed plate (10) threaded connection in the inside of scaffold board (1).
7. A safety construction scaffold according to claim 1 wherein: and the scissor support rods I (5) are arranged between the limiting groove rods (8) on the two sides of the bottom plate (6), and the scissor support rods II (17) are arranged between the limiting groove rods (8) on the rear side of the bottom plate (6).
8. A safety construction scaffold according to claim 1 wherein: the number of the limiting groove rods (8) is four, and the limiting groove rods (8) are cylindrical.
9. A safety construction scaffolding as claimed in claim 2, wherein: the number of the rollers (13) is four, and the shape of the rollers (13) is circular.
10. A safety construction scaffold according to claim 1 wherein: the scaffold board (1) is a steel plate, and the scaffold board (1) is cuboid.
CN202220097445.6U 2022-01-14 2022-01-14 Scaffold for safe construction Active CN217205224U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220097445.6U CN217205224U (en) 2022-01-14 2022-01-14 Scaffold for safe construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220097445.6U CN217205224U (en) 2022-01-14 2022-01-14 Scaffold for safe construction

Publications (1)

Publication Number Publication Date
CN217205224U true CN217205224U (en) 2022-08-16

Family

ID=82789361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220097445.6U Active CN217205224U (en) 2022-01-14 2022-01-14 Scaffold for safe construction

Country Status (1)

Country Link
CN (1) CN217205224U (en)

Similar Documents

Publication Publication Date Title
CN211736324U (en) Lifting climbing frame wall-attached integrated device
CN210263861U (en) Attached lifting scaffold protective device
CN209855196U (en) Double-mast type combined lifting climbing frame
CN217205224U (en) Scaffold for safe construction
CN212078601U (en) Scaffold with safety device
CN211548713U (en) A suspension type scaffold frame for square chimney
CN111350337A (en) Bearing frame for building construction
CN208039787U (en) High-altitude edge-facing operation assembly operation platform
CN213268781U (en) Adjustable nodal pattern building support
CN206158146U (en) Novel building section of thick bamboo well construction operation platform
CN215212187U (en) Civil engineering construction support frame
CN213143808U (en) Scaffold for constructional engineering
CN212406023U (en) Construction scaffold
CN211691352U (en) Bearing frame for building construction
CN209924409U (en) Wall-attached self-climbing electric lifting platform
CN207863449U (en) Disk buckle type scaffold new type of safe cat ladder
CN218346720U (en) Movable's multi-functional construction platform frame
CN215407282U (en) Scaffold for building construction
CN220267171U (en) Building scaffold with detachable structure
CN215948837U (en) Scaffold convenient to workman climbs
CN215670903U (en) Scaffold with firm base
CN214943134U (en) Assembled protective barrier for supporting beam
CN211447696U (en) Scaffold frame of convenient regulation
CN216616762U (en) Foot rest for building safety
CN210918463U (en) Bidirectional arc wood grain spreading sunshade tent

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant