CN112324119A - Building field workman high altitude construction protector - Google Patents

Building field workman high altitude construction protector Download PDF

Info

Publication number
CN112324119A
CN112324119A CN202011178200.8A CN202011178200A CN112324119A CN 112324119 A CN112324119 A CN 112324119A CN 202011178200 A CN202011178200 A CN 202011178200A CN 112324119 A CN112324119 A CN 112324119A
Authority
CN
China
Prior art keywords
clamping plate
plate
rod
supporting
workers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011178200.8A
Other languages
Chinese (zh)
Inventor
罗仁富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011178200.8A priority Critical patent/CN112324119A/en
Publication of CN112324119A publication Critical patent/CN112324119A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H3/00Storage means or arrangements for workshops facilitating access to, or handling of, work tools or instruments
    • B25H3/02Boxes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • E04G5/048Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls with hooks to be attached on the wall's crown
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of buildings and discloses a high-altitude operation protection device for workers in the building field, which comprises a supporting part, wherein the supporting part comprises a bottom plate, a through hole is formed in the bottom plate, a locking part is arranged at the lower part of one end of the supporting part, the locking part comprises a clamping plate, one end of the clamping plate is connected with a supporting frame, a screw rod penetrates through one end of the clamping plate and the inside of the supporting frame, a clamping plate is arranged at one end of the screw rod on the inner side of the clamping plate, a top plate is connected to the upper end of the clamping plate, a connecting part is arranged at the joint between the supporting part and the locking part, the connecting part comprises a fixing groove, a connecting rod penetrates. This building field workman high altitude construction protector, protector need not unsettled installation, uses comparatively safelyr, and the installation that can be accurate is at the building outer wall that needs the construction, is convenient for get and puts the construction tool who places the incasement, and is more laborsaving.

Description

Building field workman high altitude construction protector
Technical Field
The invention relates to the field of buildings, in particular to a high-altitude operation protection device for workers in the field of buildings.
Background
The building refers to an asset formed by artificial construction, belongs to the category of fixed assets, and comprises two categories of houses and constructions, wherein the houses refer to engineering buildings for people to live, work, study, produce, manage, entertain, store articles and perform other social activities.
Workers can maintain high-altitude buildings through protective devices, and the common protective devices are used for hanging the workers at high altitude through guys for operation.
The existing protection device has some defects when the protection device works on windowsill glass, firstly, the protection device is very unsafe when being hung in a half-empty space, secondly, a worker uses the protection device and must fall from the top of a building, and the worker cannot accurately reach a working point of the building, and in addition, articles used for working are very inconvenient to take and place.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a protective device for workers working aloft in the building field, which has the advantages that the protective device is not required to be installed in the air, the use is safer, the protective device can be accurately installed on the outer wall of a building to be constructed, the taking and the placing of construction tools in a placing box are convenient, the labor is saved, and the like, and the problems that the traditional protective device is unsafe when being hung in a half-air space, the workers use the protective device and must fall from the top of the building, the workers cannot accurately reach the operation point of the building, and the articles used for operation are not convenient.
Technical scheme
In order to realize the purposes that the protective device does not need to be installed in the air, is safer to use, can be accurately installed on the outer wall of a building to be constructed, is convenient for taking and placing construction tools in a storage box and saves labor, the invention provides the following technical scheme: a high-altitude operation protection device for workers in the building field comprises a supporting part, wherein the supporting part comprises a bottom plate, a through hole is formed in the bottom plate, a locking part is arranged at the lower part of one end of the supporting part, the locking part comprises a clamping plate, one end of the clamping plate is connected with a supporting frame, a lead screw penetrates through one end of the clamping plate and the inside of the supporting frame, a clamping plate is arranged at one end of the lead screw on the inner side of the clamping plate, a top plate is connected to the upper end of the clamping plate, a connecting part is arranged at the joint between the supporting part and the locking part and comprises a fixing groove, a connecting rod penetrates through the inside of the fixing groove, a screw is movably connected at the joint between the fixing groove and the connecting rod, a reinforcing part is obliquely arranged in an included angle between, and the other end of cardboard is provided with the second inserted bar, the stay tube has been cup jointed with the outside of second inserted bar to first inserted bar, the one end of the outside stay tube of first inserted bar is connected with expanding spring, the top of the one end support frame of cardboard is provided with the promotion portion, the promotion portion includes the mounting panel, the top movable mounting of mounting panel has external screw thread pole, external screw thread pole's upper end is connected with the recess, the inboard top of recess is connected with the anticreep pole, the below of the inboard anticreep pole of recess is rotated and is connected with the pivot, it is provided with the cable to run through between anticreep pole and the pivot, the one end of cable is connected with places the case.
Preferably, the support frame is fixedly connected with the clamping plate, the clamping plate and the support frame are in a concave shape in the tangent plane, the outer surface of the screw rod is connected with the side wall of one end of the clamping plate and the support frame through threads, and the support frame is located at the lower portion of the clamping plate.
Preferably, the number of the screw rods is two, the other ends of the screw rods are fixedly connected with rotating handles, the clamping plates are movably connected with the screw rods, and the top plate is integrally connected to the upper ends of the clamping plates.
Preferably, the upper end of fixed slot runs through in the through-hole, the lower extreme surface of fixed slot and the upper end surface fixed connection of roof, the quantity of fixed slot is six, and the fixed slot is rectangular array and arranges, the rear end fixedly connected with limiting plate of fixed slot, the size of fixed slot is half of limiting plate.
Preferably, a threaded hole is formed in one end surface of the connecting rod, the tail end of the screw is screwed into the threaded hole, the connecting rod is fixed inside the fixing groove through the screw, and the bottom plate is detachably mounted at the upper end of the locking part through the connecting part.
Preferably, the fixed plate is welded at the lower end of the bottom plate, the first inserted bar is fixedly connected with the fixed plate, the second inserted bar is fixedly connected to the other end of the clamping plate, and the diameters of the first inserted bar and the second inserted bar are matched with the inner diameter of the supporting tube.
Preferably, the diameter of the telescopic springs is larger than the inner diameter of the supporting tube, the telescopic springs are located between the fixing plate and the supporting tube, the supporting tube is fixed between the bottom plate and the clamping plate through the fixing plate, the first inserting rods and the second inserting rods, the number of the reinforcing portions is two, and the reinforcing portions are axisymmetric with respect to the center line of the bottom plate.
Preferably, the outside of the upper end external screw thread pole bottom of mounting panel is provided with the internal thread pipe, be fixed connection between internal thread pipe and the mounting panel, the upper end of internal thread pipe is the opening, threaded connection is passed through with the internal surface of internal thread pipe to the surface of external screw thread pole, be connected as an organic whole between recess and the external screw thread pole, the length of support frame is half of mounting panel length.
Preferably, the anti-falling rod and the rotating shaft are made of stainless steel materials, the inhaul cable is rotatably connected with the outer surface of the rotating shaft, and the mounting plate is fixedly connected with the clamping plate.
Preferably, the support part further comprises a guard rail, the outer surface of the lower end of the guard rail is fixedly connected with the outer surface of the upper end of the bottom plate, and the guard rail is located at the edge of the upper part of the bottom plate.
Advantageous effects
Compared with the prior art, the invention provides a high-altitude operation protection device for workers in the field of buildings, which has the following beneficial effects:
1. the high-altitude operation protection device for workers in the building field is characterized in that a clamping plate is inserted into the wall of a windowsill, a lead screw is rotated through a rotating handle, the lead screw can rotate on the inner wall of the clamping plate and a supporting frame, a clamping plate can be driven to move towards the inner side of the clamping plate, the wall surface can be clamped through the movement of the clamping plate, the clamping plate is firmly fixed on the wall, a bottom plate is placed at the upper end of a top plate, a fixing groove is inserted into a through hole, a connecting rod is inserted into the fixing groove, a limiting plate is clamped at one end of the fixing groove, the connecting rod is screwed into a threaded hole through a screw to be fixed with the fixing groove, a supporting part is further arranged at the upper end of a locking part, the locking part is locked on the wall of the windowsill, the supporting part can be arranged at the outer side of the wall, construction can be carried out on, then insert the outside of stay tube with the other end of stay tube, can make expanding spring release, and then make the stay tube card in the outside of first inserted bar and second inserted bar, can play the effect of support to the supporting part through the reinforcement portion, can make the connection between supporting part and the sticking department more firm, it is safer to use, in addition can dismantle the connection through connecting portion between supporting part and the sticking department, can dismantle the supporting part when not using, convenient to detach carries, the supporting part can be accurate install the building outer wall that needs the construction, the inaccurate shortcoming in traditional suspension type protector location has been solved.
2. This building field workman high altitude construction protector twists the external screw thread pole in the outside of internal thread pipe, then passes the cable in the clearance between anticreep pole and the pivot, and the pulling cable can make the pivot rotatory, and then enables the cable drive and places the case and shift up, is convenient for get put the construction tool who places the incasement, and is more laborsaving, can prevent through the anticreep pole that the cable from following the surperficial landing of pivot.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic illustration of an explosive structure according to the present invention;
FIG. 3 is a schematic view of the construction of the locking portion of the present invention;
FIG. 4 is a cutaway schematic view of the locking portion of the present invention;
FIG. 5 is a schematic view of a cut-away of the reinforcement portion of the present invention;
FIG. 6 is an exploded view of the joint of the present invention;
FIG. 7 is a schematic structural view of a fixing groove of a connecting portion according to the present invention;
fig. 8 is a schematic structural view of the lifting portion of the present invention.
In the figure: 1. a support portion; 11. a base plate; 12. protecting the fence; 13. a through hole; 2. a locking portion; 21. clamping a plate; 22. a support frame; 23. a screw rod; 24. rotating the handle; 25. a splint; 26. a top plate; 3. a reinforcing part; 31. a fixing plate; 32. a first plunger; 33. a tension spring; 34. supporting a tube; 35. a second plunger; 4. a connecting portion; 41. fixing grooves; 42. a connecting rod; 43. a limiting plate; 44. a threaded hole; 45. a screw; 5. a lifting portion; 51. mounting a plate; 52. an internally threaded tube; 53. an externally threaded rod; 54. a groove; 55. an anti-drop rod; 56. a rotating shaft; 6. a cable; 7. and (4) placing the box.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-8, a high-altitude operation protection device for workers in the construction field comprises a support portion 1, the support portion 1 comprises a bottom plate 11, a through hole 13 is formed in the bottom plate 11, a locking portion 2 is arranged at the lower portion of one end of the support portion 1, the locking portion 2 comprises a clamping plate 21, one end of the clamping plate 21 is connected with a support frame 22, a screw 23 is arranged between one end of the clamping plate 21 and the support frame 22 in a penetrating manner, a clamping plate 25 is arranged at one end of the screw 23 on the inner side of the clamping plate 21, a top plate 26 is connected to the upper end of the clamping plate 21, a connecting portion 4 is arranged at the joint between the support portion 1 and the locking portion 2, the connecting portion 4 comprises a fixing groove 41, an engaging rod 42 is arranged in the fixing groove 41 in a penetrating manner, a screw 45 is movably connected to the, the one end of fixed plate 31 is provided with first inserted bar 32, and the other end of cardboard 21 is provided with second inserted bar 35, first inserted bar 32 has cup jointed the stay tube 34 with the outside of second inserted bar 35, the one end of the outside stay tube 34 of first inserted bar 32 is connected with expanding spring 33, the top of the one end support frame 22 of cardboard 21 is provided with lifting unit 5, lifting unit 5 includes mounting panel 51, mounting panel 51's top movable mounting has external screw thread pole 53, the upper end of external screw thread pole 53 is connected with recess 54, the inboard top of recess 54 is connected with anticreep pole 55, the below rotation of the inboard anticreep pole 55 of recess 54 is connected with pivot 56, it is provided with cable 6 to run through between anticreep pole 55 and the pivot 56, the one end of cable 6 is connected with places case 7.
The support part 1 further comprises a guard rail 12, wherein the outer surface of the lower end of the guard rail 12 is fixedly connected with the outer surface of the upper end of the bottom plate 11, and the guard rail 12 is positioned at the upper edge of the bottom plate 11.
In this embodiment, referring to fig. 3-4, the supporting frame 22 is fixedly connected to the clamping plate 21, the cross sections of the clamping plate 21 and the supporting frame 22 are concave, the outer surface of the screw rod 23 is connected to the side wall of one end of the clamping plate 21 and the supporting frame 22 through threads, and the supporting frame 22 is located at the lower portion of the clamping plate 21.
The number of the screw rods 23 is two, the other end of each screw rod 23 is fixedly connected with a rotating handle 24, the clamping plate 25 is movably connected with the screw rods 23, and the top plate 26 is integrally connected to the upper end of the clamping plate 21.
Insert cardboard 21 on the wall of windowsill, rotate lead screw 23 through rotatory handle 24, enable lead screw 23 rotatory at cardboard 21 and support frame 22 inner wall, and then can drive splint 25 and remove to the inboard of cardboard 21, remove through splint 25 and can press from both sides the wall tight, make cardboard 21 firmly fix on the wall.
In this embodiment, referring to fig. 6 to 7, the upper end of the fixing groove 41 penetrates through the through hole 13, the outer surface of the lower end of the fixing groove 41 is fixedly connected to the outer surface of the upper end of the top plate 26, the number of the fixing grooves 41 is six, the fixing grooves 41 are arranged in a rectangular array, the rear end of the fixing groove 41 is fixedly connected to the limiting plate 43, and the size of the fixing groove 41 is half of the size of the limiting plate 43.
A screw hole 44 is formed in one end surface of the coupling rod 42, the end of the screw 45 is screwed into the screw hole 44, the coupling rod 42 is fixed inside the fixing groove 41 by the screw 45, and the base plate 11 is detachably mounted on the upper end of the locking part 2 by the connecting part 4.
The support part 1 can be mounted on the upper end of the locking part 2 by placing the base plate 11 on the upper end of the top plate 26 such that the fixing groove 41 is inserted into the through hole 13, inserting the engagement rod 42 into the fixing groove 41 such that the stopper plate 43 is caught on one end of the fixing groove 41, and screwing the screw 45 into the screw hole 44 to fix the engagement rod 42 to the fixing groove 41.
In this embodiment, referring to fig. 5, the fixing plate 31 is welded at the lower end of the bottom plate 11, the first inserting rod 32 is fixedly connected to the fixing plate 31, the second inserting rod 35 is fixedly connected to the other end of the clamping plate 21, and the diameters of the first inserting rod 32 and the second inserting rod 35 are matched with the inner diameter of the supporting tube 34.
The diameter of the extension spring 33 is larger than the inner diameter of the support tube 34, the extension spring 33 is located between the fixing plate 31 and the support tube 34, the support tube 34 is fixed between the bottom plate 11 and the catch plate 21 through the fixing plate 31, the first inserted bar 32 and the second inserted bar 35, the number of the reinforcing parts 3 is two, and the reinforcing parts 3 are axisymmetric with respect to the center line of the bottom plate 11.
The first inserted bar 32 is fixed below the bottom plate 11 through the fixing plate 31, the telescopic spring 33 is compressed to insert one end of the supporting tube 34 into the outer side of the first inserted bar 32, then the other end of the supporting tube 34 is inserted into the outer side of the supporting tube 34, the telescopic spring 33 can be released, the supporting tube 34 is clamped on the outer sides of the first inserted bar 32 and the second inserted bar 35, the supporting part 1 can be supported through the reinforcing part 3, and the connection between the supporting part 1 and the locking part 2 can be firmer and safer to use.
In this embodiment, referring to fig. 8, an internal threaded tube 52 is disposed outside the bottom of an external threaded rod 53 at the upper end of an installation plate 51, the internal threaded tube 52 is fixedly connected to the installation plate 51, the upper end of the internal threaded tube 52 is an opening, the outer surface of the external threaded rod 53 is in threaded connection with the inner surface of the internal threaded tube 52, the groove 54 is integrally connected to the external threaded rod 53, and the length of the support frame 22 is half of the length of the installation plate 51.
The anti-drop rod 55 and the rotating shaft 56 are made of stainless steel materials, the inhaul cable 6 is rotatably connected with the outer surface of the rotating shaft 56, and the mounting plate 51 is fixedly connected with the clamping plate 21.
Twist external screw thread pole 53 in the outside of internal thread pipe 52, then pass the cable 6 the clearance between anticreep pole 55 and the pivot 56, the pulling cable 6 can make the pivot 56 rotatory, and then enables cable 6 and drive and place case 7 and move up, is convenient for get and puts the construction tool who places the incasement 7, and is more laborsaving.
When the wall-mounted type support device works, the clamping plate 21 is inserted into the wall of a windowsill, the screw rod 23 is rotated through the rotating handle 24, the screw rod 23 can rotate on the inner walls of the clamping plate 21 and the support frame 22, the clamping plate 25 is driven to move towards the inner side of the clamping plate 21, the wall surface can be clamped through the movement of the clamping plate 25, the clamping plate 21 is firmly fixed on the wall, the bottom plate 11 is placed at the upper end of the top plate 26, the fixing groove 41 is inserted into the through hole 13, the connecting rod 42 is inserted into the fixing groove 41, the screw 45 is screwed into the threaded hole 44 to fix the connecting rod 42 and the fixing groove 41, the support part 1 can be installed at the upper end of the locking part 2, the support part 1 can be installed at the outer side of the wall, a worker can stand on the bottom plate 11 to construct the outer wall of a building, the, then, the other end of the support tube 34 is inserted into the outside of the support tube 34, so that the extension spring 33 is released, the support tube 34 is clamped outside the first insertion rod 32 and the second insertion rod 35, the support portion 1 can be supported by the reinforcing portion 3, the connection between the support portion 1 and the locking portion 2 can be firmer, the external threaded rod 53 is screwed outside the internal threaded tube 52, the cable 6 passes through the gap between the anti-falling rod 55 and the rotating shaft 56, the rotating shaft 56 can be rotated by pulling the cable 6, the cable 6 can drive the placing box 7 to move upwards, and the construction tool in the placing box 7 can be conveniently taken and placed.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The utility model provides a building field workman high altitude construction protector, includes supporting part (1), its characterized in that: the supporting part (1) comprises a bottom plate (11), a through hole (13) is formed in the bottom plate (11), a locking part (2) is arranged on the lower portion of one end of the supporting part (1), the locking part (2) comprises a clamping plate (21), one end of the clamping plate (21) is connected with a supporting frame (22), a screw rod (23) penetrates through the one end of the clamping plate (21) and the inside of the supporting frame (22), a clamping plate (25) is installed at one end of the inner side screw rod (23) of the clamping plate (21), a top plate (26) is connected to the upper end of the clamping plate (21), a connecting part (4) is arranged at the connecting position between the supporting part (1) and the locking part (2), the connecting part (4) comprises a fixing groove (41), an engaging rod (42) penetrates through the inside of the fixing groove (41), and a screw (45) is movably connected to, the reinforcing part (3) is obliquely installed in an included angle between the supporting part (1) and the locking part (2), the reinforcing part (3) comprises a fixing plate (31), one end of the fixing plate (31) is provided with a first inserted bar (32), the other end of the clamping plate (21) is provided with a second inserted bar (35), a supporting tube (34) is sleeved outside the first inserted bar (32) and the second inserted bar (35), one end of the supporting tube (34) outside the first inserted bar (32) is connected with a telescopic spring (33), a lifting part (5) is arranged above a supporting frame (22) at one end of the clamping plate (21), the lifting part (5) comprises a mounting plate (51), an external threaded rod (53) is movably mounted above the mounting plate (51), the upper end of the external threaded rod (53) is connected with a groove (54), and an anti-falling rod (55) is connected to the top of the inner side of the groove (54), the lower part of the inner side anti-falling rod (55) of the groove (54) is rotatably connected with a rotating shaft (56), a pull cable (6) penetrates between the anti-falling rod (55) and the rotating shaft (56), and one end of the pull cable (6) is connected with a placing box (7).
2. The high-altitude operation protection device for workers in the construction field according to claim 1, characterized in that: the support frame (22) is fixedly connected with the clamping plate (21), the tangent planes of the clamping plate (21) and the support frame (22) are in a concave shape, the outer surface of the screw rod (23) is in threaded connection with the side wall of one end of the clamping plate (21) and the support frame (22), and the support frame (22) is located at the lower part of the clamping plate (21).
3. The high-altitude operation protection device for workers in the construction field according to claim 1, characterized in that: the number of the screw rods (23) is two, the other end of each screw rod (23) is fixedly connected with a rotating handle (24), the clamping plate (25) and the screw rods (23) are movably connected, and the top plate (26) is integrally connected to the upper end of the clamping plate (21).
4. The high-altitude operation protection device for workers in the construction field according to claim 1, characterized in that: the upper end of fixed slot (41) runs through in through-hole (13), the lower extreme surface of fixed slot (41) is connected with the upper end external surface fixed connection of roof (26), the quantity of fixed slot (41) is six, and fixed slot (41) are the rectangle array and arrange, the rear end fixedly connected with limiting plate (43) of fixed slot (41), the size of fixed slot (41) is half of limiting plate (43).
5. The high-altitude operation protection device for workers in the construction field according to claim 1, characterized in that: a threaded hole (44) is formed in one end surface of the connecting rod (42), the tail end of the screw (45) is screwed into the threaded hole (44), the connecting rod (42) is fixed inside the fixing groove (41) through the screw (45), and the bottom plate (11) is detachably mounted at the upper end of the locking part (2) through the connecting part (4).
6. The high-altitude operation protection device for workers in the construction field according to claim 1, characterized in that: the fixing plate (31) is welded at the lower end of the bottom plate (11), the first inserting rod (32) is fixedly connected with the fixing plate (31), the second inserting rod (35) is fixedly connected to the other end of the clamping plate (21), and the diameters of the first inserting rod (32) and the second inserting rod (35) are matched with the inner diameter of the supporting tube (34).
7. The high-altitude operation protection device for workers in the construction field according to claim 1, characterized in that: the diameter of the telescopic spring (33) is larger than the inner diameter of the supporting pipe (34), the telescopic spring (33) is located between the fixing plate (31) and the supporting pipe (34), the supporting pipe (34) is fixed between the bottom plate (11) and the clamping plate (21) through the fixing plate (31), the first inserted bar (32) and the second inserted bar (35), the number of the reinforcing parts (3) is two, and the reinforcing parts (3) are symmetrical about a central line of the bottom plate (11).
8. The high-altitude operation protection device for workers in the construction field according to claim 1, characterized in that: the outside of the upper end external screw thread pole (53) bottom of mounting panel (51) is provided with internal thread pipe (52), be fixed connection between internal thread pipe (52) and mounting panel (51), the upper end of internal thread pipe (52) is the opening, threaded connection is passed through with the internal surface of internal thread pipe (52) to the surface of external screw thread pole (53), be connected as an organic whole between recess (54) and external screw thread pole (53), the length of support frame (22) is half of mounting panel (51) length.
9. The high-altitude operation protection device for workers in the construction field according to claim 1, characterized in that: the anti-falling rod (55) and the rotating shaft (56) are made of stainless steel materials, the inhaul cable (6) is rotatably connected with the outer surface of the rotating shaft (56), and the mounting plate (51) is fixedly connected with the clamping plate (21).
10. The high-altitude operation protection device for workers in the construction field according to claim 1, characterized in that: the support part (1) further comprises a guard rail (12), the outer surface of the lower end of the guard rail (12) is fixedly connected with the outer surface of the upper end of the bottom plate (11), and the guard rail (12) is located on the edge of the upper portion of the bottom plate (11).
CN202011178200.8A 2020-10-29 2020-10-29 Building field workman high altitude construction protector Pending CN112324119A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011178200.8A CN112324119A (en) 2020-10-29 2020-10-29 Building field workman high altitude construction protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011178200.8A CN112324119A (en) 2020-10-29 2020-10-29 Building field workman high altitude construction protector

Publications (1)

Publication Number Publication Date
CN112324119A true CN112324119A (en) 2021-02-05

Family

ID=74296375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011178200.8A Pending CN112324119A (en) 2020-10-29 2020-10-29 Building field workman high altitude construction protector

Country Status (1)

Country Link
CN (1) CN112324119A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047592A (en) * 2021-03-30 2021-06-29 浙江泛华工程咨询有限公司 High-rise building engineering construction protector
CN113756566A (en) * 2021-09-27 2021-12-07 中建七局第六建筑有限公司 Isolated type plastic-containing outer formwork mounting structure and mounting method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2337241Y (en) * 1998-07-23 1999-09-08 金美华 Fixing support
JP2003239529A (en) * 2002-02-14 2003-08-27 Kunimoto Co Ltd Scaffold board support device for veranda handrail
CN204873689U (en) * 2015-07-28 2015-12-16 山东瑞鸿重工机械有限公司 Hoisting apparatus
CN209723674U (en) * 2019-02-25 2019-12-03 湖北鑫民建筑工程有限公司 A kind of falling object from high altitude protective device for building
CN111350337A (en) * 2020-02-10 2020-06-30 葛飞月 Bearing frame for building construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2337241Y (en) * 1998-07-23 1999-09-08 金美华 Fixing support
JP2003239529A (en) * 2002-02-14 2003-08-27 Kunimoto Co Ltd Scaffold board support device for veranda handrail
CN204873689U (en) * 2015-07-28 2015-12-16 山东瑞鸿重工机械有限公司 Hoisting apparatus
CN209723674U (en) * 2019-02-25 2019-12-03 湖北鑫民建筑工程有限公司 A kind of falling object from high altitude protective device for building
CN111350337A (en) * 2020-02-10 2020-06-30 葛飞月 Bearing frame for building construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113047592A (en) * 2021-03-30 2021-06-29 浙江泛华工程咨询有限公司 High-rise building engineering construction protector
CN113756566A (en) * 2021-09-27 2021-12-07 中建七局第六建筑有限公司 Isolated type plastic-containing outer formwork mounting structure and mounting method thereof

Similar Documents

Publication Publication Date Title
CN112324119A (en) Building field workman high altitude construction protector
US8052098B1 (en) Cable, cord, hose, and rope holding device
CN211647590U (en) Protective guard structure convenient to maintain
CN112780059A (en) Novel node structure applied to high-altitude flower stand hanging basket installation
CN215296260U (en) Tool for detecting verticality of template
CN216690951U (en) Detachable safety ladder
CN211373592U (en) Measuring equipment for verticality of historic building
CN212078625U (en) Scaffold with safeguard function for building
CN218970557U (en) Building scaffold with breakage-proof brick structure that drops
CN211693986U (en) Anti-seismic support and hanger based on disk spring vibration reduction
CN209780180U (en) Insulating scaffold for power transmission line construction
CN206609983U (en) One kind can fall wind bar
CN209129238U (en) The furred ceiling dried hanging hang structure of ceiling
CN206539000U (en) Fixture type construction hanging basket, scaffold fastening apparatus
CN221238931U (en) Gas detection auxiliary device suitable for cable worker underground operation
CN221143853U (en) Hoistway mouth protective equipment for additionally arranging construction of elevator outside building
CN211260060U (en) Petroleum refining instrument suspension device
CN220848575U (en) Scaffold device of demolishs is installed fast
CN219241269U (en) Assembled attached lifting scaffold
CN217105528U (en) Special fossil fragments frame of high strength algae calcium
CN218948007U (en) Test block child-resistant pipe support with temperature measurement function
CN213449405U (en) Construction scaffold for finishing work
CN212947763U (en) Tool rack for building construction
CN212671122U (en) Scaffold for building construction
CN218267594U (en) Supporting and hanging connecting mechanism for building electromechanical construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210205

RJ01 Rejection of invention patent application after publication