CN213449405U - Construction scaffold for finishing work - Google Patents

Construction scaffold for finishing work Download PDF

Info

Publication number
CN213449405U
CN213449405U CN202021141462.2U CN202021141462U CN213449405U CN 213449405 U CN213449405 U CN 213449405U CN 202021141462 U CN202021141462 U CN 202021141462U CN 213449405 U CN213449405 U CN 213449405U
Authority
CN
China
Prior art keywords
internal thread
fixed
connecting rod
fixing pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021141462.2U
Other languages
Chinese (zh)
Inventor
程国富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Gelangrui Decoration Engineering Co ltd
Original Assignee
Anhui Gelangrui Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Gelangrui Decoration Engineering Co ltd filed Critical Anhui Gelangrui Decoration Engineering Co ltd
Priority to CN202021141462.2U priority Critical patent/CN213449405U/en
Application granted granted Critical
Publication of CN213449405U publication Critical patent/CN213449405U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a construction scaffold for finishing work, including female fastening pipe, the rear end of female fastening pipe is provided with the connecting rod, the outside of connecting rod is provided with solid fixed ring, gu fixed ring's one end is provided with the reinforcing plate, the one end of reinforcing plate is provided with No. two female fastening pipes, the inside upper end of No. two female fastening pipes is provided with the external screw thread pole, the upper end that the outside of female fastening pipe is close to the connecting rod is provided with the limiting plate, the upper end of the outside limiting plate of female fastening pipe is provided with fixed cover, the rear end of fixed cover is provided with the locating lever, the lower extreme of female fastening pipe is provided with the gyro wheel. The utility model discloses in, the assembly of scaffold frame is more convenient, can make scaffold frame during operation place more firm, is convenient for to scaffold frame's removal, and can increase the security that scaffold frame used.

Description

Construction scaffold for finishing work
Technical Field
The utility model relates to a building field especially relates to a construction scaffold frame for finishing work.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out, and is divided into an outer scaffold and an inner scaffold according to the erected position; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials;
can decorate the wall of roof and eminence at house decoration in-process through the scaffold frame, current decoration engineering has some shortcomings with construction scaffold frame, and at first, the heavy removal of scaffold frame quality is inconvenient, and has not firm in the scaffold frame use of gyro wheel, and secondly, the scaffold frame is assembled inconveniently, in addition, the user does not have the structure that can support the hand when standing on the scaffold frame, uses very insecurity.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the construction scaffold frame for finishing work who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a construction scaffold for decoration engineering comprises a first internal thread fixing pipe, wherein a connecting rod is arranged at the rear end of the first internal thread fixing pipe, a fixing ring is arranged on the outer side of the connecting rod, a reinforcing plate is arranged at one end of the fixing ring, a second internal thread fixing pipe is arranged at one end of the reinforcing plate, an external thread rod is arranged at the upper end inside the second internal thread fixing pipe, a limiting plate is arranged at the outer side of the first internal thread fixing pipe close to the upper end of the connecting rod, a fixing sleeve is arranged at the upper end of the limiting plate outside the first internal thread fixing pipe, a positioning rod is arranged at the rear end of the fixing sleeve, a roller wheel is arranged at the lower end of the first internal thread fixing pipe, a connecting plate is arranged below the connecting rod at one end of the first internal thread fixing pipe, a lead screw penetrates through the inside of, the lower end of the screw rod is provided with a base.
As a further description of the above technical solution:
the outer surface of the front end of the connecting rod is fixedly connected with the outer surface of the rear end of the first internal thread fixing pipe, a fixing hole is formed in the connecting rod, a fixing pin shaft is arranged in the fixing hole, and the outer surface of the fixing pin shaft is fixedly connected with the connecting rod through the fixing hole.
As a further description of the above technical solution:
the utility model discloses a solid fixed ring's internal surface, including solid fixed ring, reinforcing plate, internal thread fixed tube, reinforcing plate, the internal surface of solid fixed ring and the surface swing joint of connecting rod, the reinforcing plate is connected with solid fixed ring's surface fixed, the reinforcing plate is through solid fixed ring, connecting rod and internal thread fixed tube fixed connection No. one, the structure between reinforcing plate, No. two internal thread fixed tubes is.
As a further description of the above technical solution:
the utility model discloses a wire drawing machine, including external screw thread pole, locating lever, support plate and couple fixed connection, the surface of external screw thread pole and the internal surface swing joint of No. two internal thread fixing pipes, the outside of locating lever is provided with the couple, the lower extreme surface of couple and the surface swing joint of locating lever, the one end of couple is provided with the backup pad, backup pad and couple fixed connection, the backup pad passes through couple and locating lever swing joint, the quantity of an internal thread fixing pipe is four groups.
As a further description of the above technical solution:
the upper end of gyro wheel and the lower extreme fixed connection of a internal thread fixed tube, a internal thread fixed tube is stainless steel material.
As a further description of the above technical solution:
the inner surface of the limiting plate is fixedly connected with the outer surface of the first internal thread fixing pipe, the inner surface of the fixing sleeve is movably connected with the outer surface of the first internal thread fixing pipe, and the outer surface of the lower end of the fixing sleeve is movably connected with the outer surface of the upper end of the limiting plate.
As a further description of the above technical solution:
the front end of locating lever and the fixed surface fixed connection of cover, the one end surface of connecting plate and the fixed surface fixed connection of pipe of internal thread No. one, the rear end of No. two fixed pipe of internal thread is provided with the ladder, ladder and No. two fixed pipe fixed connection of internal thread.
As a further description of the above technical solution:
the outer surface of the screw rod is movably connected with the inner surface of the connecting plate, the rotating handle is fixedly installed at the upper end of the screw rod, and the outer surface of the upper end of the base is fixedly connected with the outer surface of the lower end of the screw rod.
The utility model discloses in, can be fixed cover through the limiting plate, embolia an internal thread fixing through fixed cover in, can be fixed with a locating lever and an internal thread fixing pipe, embolia the connecting rod through solid fixed ring in, can be with an internal thread fixing pipe and No. two internal thread fixing union couplings, place the backup pad in the upper end of locating lever through the couple, can accomplish assembling of scaffold, it is more convenient to operate, and the fixed orifices fixes the one end at solid fixed ring with the fixed pin axle, can prevent that solid fixed ring from droing from the connecting rod is inside, it is fixed more firm.
The utility model discloses in, can rotate the lead screw through rotatory handle, make the lead screw drive the base move down with the ground contact, and make the gyro wheel unsettled, can make scaffold frame during operation place firmly through the base, and can make the lead screw drive rotatory handle through the rotatory handle of antiport and move up, and then make gyro wheel and ground contact, be convenient for to the removal of scaffold frame, the operation is fairly simple.
The utility model discloses in, can fix the external screw thread pole in the upper end of connecting rod through the inside of twisting the external screw thread pole into the connecting rod, the user stands and can grasp the external screw thread pole when the backup pad upper end, increases the security of use, and through threaded connection between connecting rod, the external screw thread pole, it is all more convenient to install and dismantle.
Drawings
Fig. 1 is a schematic view of the overall structure of a construction scaffold for decoration engineering according to the present invention;
fig. 2 is a schematic partial structural view of a construction scaffold for decoration engineering according to the present invention;
fig. 3 is an enlarged schematic view of a construction scaffold for decoration engineering according to the present invention;
fig. 4 is an enlarged schematic view of a B of a construction scaffold for finishing work according to the present invention;
fig. 5 is an enlarged schematic view of a C of a construction scaffold for finishing work according to the present invention;
fig. 6 is the utility model provides a decoration engineering is with external screw thread pole, No. two internal thread fixing pipe local explosion charts of construction scaffolding.
Illustration of the drawings:
1. a first internal thread fixing pipe; 2. a connecting rod; 3. a reinforcing plate; 4. a second internal thread fixing pipe; 5. positioning a rod; 6. hooking; 7. a support plate; 8. a ladder; 9. an externally threaded rod; 10. a roller; 11. a connecting plate; 12. a screw rod; 13. rotating the handle; 14. a base; 15. a fixing ring; 16. fixing a pin shaft; 17. a limiting plate; 18. and (4) fixing sleeves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance; furthermore, unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, as they may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-6, a construction scaffold for finishing work, comprising a first female thread fixing pipe 1, a connecting rod 2 provided at the rear end of the first female thread fixing pipe 1, a fixing ring 15 provided at the outer side of the connecting rod 2, a reinforcing plate 3 provided at one end of the fixing ring 15, a second female thread fixing pipe 4 provided at one end of the reinforcing plate 3, a male screw rod 9 provided at the inner upper end of the second female thread fixing pipe 4, a limit plate 17 provided at the outer side of the first female thread fixing pipe 1 near the upper end of the connecting rod 2, a fixing sleeve 18 provided at the upper end of the limit plate 17 at the outer side of the first female thread fixing pipe 1, a positioning rod 5 provided at the rear end of the fixing sleeve 18, rollers 10 provided at the lower end of the first female thread fixing pipe 1, a connecting plate 11 provided at the lower end of the connecting rod 2 of the first, the upper end of the screw rod 12 is provided with a rotating handle 13, and the lower end of the screw rod 12 is provided with a base 14.
The outer surface of the front end of the connecting rod 2 is fixedly connected with the outer surface of the rear end of the first internal thread fixing pipe 1, a fixing hole is formed in the connecting rod 2, a fixing pin shaft 16 is arranged in the fixing hole, and the outer surface of the fixing pin shaft 16 is fixedly connected with the connecting rod 2 through the fixing hole; the inner surface of the fixing ring 15 is movably connected with the outer surface of the connecting rod 2, the reinforcing plate 3 is fixedly connected with the outer surface of the fixing ring 15, the reinforcing plate 3 is fixedly connected with the first internal thread fixing pipe 1 through the fixing ring 15 and the connecting rod 2, and the structure between the reinforcing plate 3 and the second internal thread fixing pipe 4 is the same as that between the first internal thread fixing pipe 1 and the reinforcing plate 3; the outer surface of the external threaded rod 9 is movably connected with the inner surface of the second internal thread fixing tube 4, a hook 6 is arranged on the outer side of the positioning rod 5, the outer surface of the lower end of the hook 6 is movably connected with the outer surface of the positioning rod 5, a supporting plate 7 is arranged at one end of the hook 6, the supporting plate 7 is fixedly connected with the hook 6, the supporting plate 7 is movably connected with the positioning rod 5 through the hook 6, and the number of the first internal thread fixing tubes 1 is four; the upper end of the roller 10 is fixedly connected with the lower end of the first internal thread fixing pipe 1, and the first internal thread fixing pipe 1 is made of stainless steel materials; the inner surface of the limiting plate 17 is fixedly connected with the outer surface of the first internal thread fixing pipe 1, the inner surface of the fixing sleeve 18 is movably connected with the outer surface of the first internal thread fixing pipe 1, and the outer surface of the lower end of the fixing sleeve 18 is movably connected with the outer surface of the upper end of the limiting plate 17; the front end of the positioning rod 5 is fixedly connected with the outer surface of the fixing sleeve 18, the outer surface of one end of the connecting plate 11 is fixedly connected with the outer surface of the first internal thread fixing pipe 1, the rear end of the second internal thread fixing pipe 4 is provided with a ladder 8, and the ladder 8 is fixedly connected with the second internal thread fixing pipe 4; the outer surface of the screw rod 12 is movably connected with the inner surface of the connecting plate 11, the rotating handle 13 is fixedly arranged at the upper end of the screw rod 12, and the outer surface of the upper end of the base 14 is fixedly connected with the outer surface of the lower end of the screw rod 12.
The working principle is as follows: a construction scaffold for decoration engineering, firstly, the fixing sleeve 18 is sleeved into a first internal thread fixing pipe 1, the fixing sleeve 18 can be fixed through a limiting plate 17, then a positioning rod 5 is fixed with the first internal thread fixing pipe 1, a fixing ring 15 is sleeved into a connecting rod 2, the first internal thread fixing pipe 1 can be connected with a second internal thread fixing pipe 4, a supporting plate 7 is placed at the upper end of the positioning rod 5 through a hook 6, the assembly of the scaffold can be completed, the operation is convenient, a fixing pin shaft 16 is fixed at one end of the fixing ring 15 through a fixing hole, the fixing ring 15 can be prevented from falling off from the inside of the connecting rod 2, a screw 12 can be rotated through a rotating handle 13, the screw 12 drives a base 14 to move downwards to be contacted with the ground, a roller 10 is suspended, the scaffold can be stably placed during working through the base 14, and the scaffold can be conveniently, the external screw rod 9 is screwed into the connecting rod 2 to fix the external screw rod 9 to the upper end of the connecting rod 2, so that a user can hold the external screw rod 9 when standing on the upper end of the supporting plate 7, thereby increasing the safety of use.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the principles of the present invention.

Claims (8)

1. The utility model provides a construction scaffold for finishing work, includes internal thread fixing pipe (1), its characterized in that No. one: the rear end of the first internal thread fixing pipe (1) is provided with a connecting rod (2), the outer side of the connecting rod (2) is provided with a fixing ring (15), one end of the fixing ring (15) is provided with a reinforcing plate (3), one end of the reinforcing plate (3) is provided with a second internal thread fixing pipe (4), the upper end of the inner part of the second internal thread fixing pipe (4) is provided with an external thread rod (9), the outer side of the first internal thread fixing pipe (1) is provided with a limiting plate (17) close to the upper end of the connecting rod (2), the upper end of the outer limiting plate (17) of the first internal thread fixing pipe (1) is provided with a fixing sleeve (18), the rear end of the fixing sleeve (18) is provided with a positioning rod (5), the lower end of the first internal thread fixing pipe (1) is provided with a roller (10), and the lower part of the one end connecting rod (2) of the, the connecting plate is characterized in that a screw rod (12) penetrates through the connecting plate (11), a rotating handle (13) is arranged at the upper end of the screw rod (12), and a base (14) is arranged at the lower end of the screw rod (12).
2. A construction scaffold for finishing work according to claim 1, characterized in that: the utility model discloses a fixed connection of fixed pipe (1) of internal thread, including connecting rod (2), the front end surface of connecting rod (2) and the rear end fixed surface of internal thread fixed pipe (1) are connected, the inside of connecting rod (2) is provided with the fixed orifices, and the inside of fixed orifices is provided with fixed pin axle (16), the surface of fixed pin axle (16) passes through fixed orifices and connecting rod (2) fixed connection.
3. A construction scaffold for finishing work according to claim 1, characterized in that: the internal surface of solid fixed ring (15) and the surface swing joint of connecting rod (2), the fixed surface of reinforcing plate (3) and solid fixed ring (15) is connected, reinforcing plate (3) are through solid fixed ring (15), connecting rod (2) and an internal thread fixed pipe (1) fixed connection, structure between reinforcing plate (3), No. two internal thread fixed pipes (4) is the same with structure between an internal thread fixed pipe (1), reinforcing plate (3).
4. A construction scaffold for finishing work according to claim 1, characterized in that: the utility model discloses a novel thread fixing pipe, including external screw thread pole (9), the surface of locating lever (5) is provided with couple (6), the lower extreme surface of couple (6) and the surface swing joint of locating lever (5), the one end of couple (6) is provided with backup pad (7), backup pad (7) and couple (6) fixed connection, backup pad (7) are through couple (6) and locating lever (5) swing joint, the quantity of internal thread fixing pipe (1) is four groups.
5. A construction scaffold for finishing work according to claim 1, characterized in that: the upper end of the roller (10) is fixedly connected with the lower end of the first internal thread fixing pipe (1), and the first internal thread fixing pipe (1) is made of stainless steel materials.
6. A construction scaffold for finishing work according to claim 1, characterized in that: the inner surface of the limiting plate (17) is fixedly connected with the outer surface of the first internal thread fixing pipe (1), the inner surface of the fixing sleeve (18) is movably connected with the outer surface of the first internal thread fixing pipe (1), and the outer surface of the lower end of the fixing sleeve (18) is movably connected with the outer surface of the upper end of the limiting plate (17).
7. A construction scaffold for finishing work according to claim 1, characterized in that: the front end of locating lever (5) and the fixed surface fixed connection of cover (18), the one end surface of connecting plate (11) and the fixed surface fixed connection of an internal thread fixed pipe (1), the rear end of No. two internal thread fixed pipes (4) is provided with ladder (8), ladder (8) and No. two internal thread fixed pipes (4) fixed connection.
8. A construction scaffold for finishing work according to claim 1, characterized in that: the outer surface of the screw rod (12) is movably connected with the inner surface of the connecting plate (11), the rotating handle (13) is fixedly arranged at the upper end of the screw rod (12), and the outer surface of the upper end of the base (14) is fixedly connected with the outer surface of the lower end of the screw rod (12).
CN202021141462.2U 2020-06-18 2020-06-18 Construction scaffold for finishing work Active CN213449405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021141462.2U CN213449405U (en) 2020-06-18 2020-06-18 Construction scaffold for finishing work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021141462.2U CN213449405U (en) 2020-06-18 2020-06-18 Construction scaffold for finishing work

Publications (1)

Publication Number Publication Date
CN213449405U true CN213449405U (en) 2021-06-15

Family

ID=76370794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021141462.2U Active CN213449405U (en) 2020-06-18 2020-06-18 Construction scaffold for finishing work

Country Status (1)

Country Link
CN (1) CN213449405U (en)

Similar Documents

Publication Publication Date Title
CN213449405U (en) Construction scaffold for finishing work
CN211548713U (en) A suspension type scaffold frame for square chimney
CN216616822U (en) Scaffold connecting device with early warning function
CN113530279B (en) Life line device used during scaffold erection
CN215296260U (en) Tool for detecting verticality of template
CN213391157U (en) Fastener type scaffold upright rod positioning fixture
CN210767762U (en) Portable scaffold
CN211229427U (en) Scaffold for building construction
CN210866964U (en) Transformer overhauls protection frame
CN213418570U (en) Liftable concrete placement template support column
CN211523985U (en) Bearing frame for building construction
CN210505228U (en) Die steel handling safety protection frame
CN211007559U (en) A multi-functional lift platform for construction
CN215107240U (en) Safe springboard for building construction
CN212926942U (en) Protection scaffold for building engineering construction
CN214611231U (en) Detachable hanging piece structure for assembly type building
CN220967947U (en) Fixed bolster of fire extinguisher
CN214329964U (en) Hand-lifting device for large-size ceramic tiles
CN214828540U (en) Suspension bracket for high-altitude operation hanging basket
CN216277931U (en) Multi-angle rotating supporting jacking for mounting steel arch frame
CN216553728U (en) Portable removes work platform
CN208310147U (en) A kind of site construction scaffold easy to carry
CN211992775U (en) Novel roof nut is fixed device
CN212671122U (en) Scaffold for building construction
CN217478050U (en) Hanging frame for placing glass film reel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant