CN219365350U - Movable scaffold tower - Google Patents

Movable scaffold tower Download PDF

Info

Publication number
CN219365350U
CN219365350U CN202222873487.7U CN202222873487U CN219365350U CN 219365350 U CN219365350 U CN 219365350U CN 202222873487 U CN202222873487 U CN 202222873487U CN 219365350 U CN219365350 U CN 219365350U
Authority
CN
China
Prior art keywords
connecting rod
rods
pole setting
movable
connecting rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222873487.7U
Other languages
Chinese (zh)
Inventor
周峰
陆亦斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhuan Construction Engineering Co ltd
Original Assignee
Shanghai Zhuan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhuan Construction Engineering Co ltd filed Critical Shanghai Zhuan Construction Engineering Co ltd
Priority to CN202222873487.7U priority Critical patent/CN219365350U/en
Application granted granted Critical
Publication of CN219365350U publication Critical patent/CN219365350U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a movable scaffold tower, which comprises a main frame and an auxiliary frame, wherein the main frame comprises four first vertical rods, a movable wheel mounting plate is arranged at the bottom of the four first vertical rods, movable wheels are arranged at the bottom of the movable wheel mounting plate, the upper ends and the lower ends of the 2 first vertical rods are connected through first connecting rods, the first connecting rods are parallel, second connecting rods are arranged at the upper ends of the first connecting rods, the 2 second connecting rods are connected with the 1 first vertical rods, the second connecting rods are perpendicular to the first connecting rods, the auxiliary frame comprises 2 parallel third connecting rods, the third connecting rods are connected with the first vertical rods, one end of the third connecting rods is connected with the fourth connecting rods, the other ends of the fourth connecting rods are connected with the first vertical rods, the tail ends of the third connecting rods are respectively provided with second vertical rods, the tops of the second vertical rods are connected with the upper ends of the first vertical rods, a plurality of pedals are arranged between the second connecting rods, and a plurality of pedals are arranged between the third connecting rods. The utility model can be applied to the edge of the building, and is convenient for construction.

Description

Movable scaffold tower
Technical Field
The utility model relates to the technical field of scaffolds, in particular to a movable scaffold tower.
Background
The scaffold is a working platform which is erected to ensure that each construction process is carried out smoothly. The scaffold is divided into an outer scaffold and an inner scaffold according to the set-up positions; the wooden scaffold, the bamboo scaffold and the steel pipe scaffold can be divided according to different materials; the construction forms of the scaffold are upright type scaffold, bridge type scaffold, door type scaffold, suspension type scaffold, hanging type scaffold, picking type scaffold and climbing type scaffold.
In the current building construction, most of the scaffolds are erected on site, and only a small part of the scaffolds are movable, but the current movable scaffolds cannot be applied to the edges of the building, and the edges of the building are all fixed scaffolds which are erected.
Disclosure of Invention
The utility model provides a movable scaffold tower which can be applied to the edge of a building and is convenient to construct.
The technical scheme of the utility model is as follows: the utility model provides a portable scaffold tower, including body frame and subframe, the body frame includes four pole setting ones, the removal wheel mounting panel is installed to the bottom of four pole setting ones, the bottom at the removal wheel mounting panel is installed to the removal wheel, the upper end and the lower extreme of 2 pole setting ones are all connected through connecting rod one, connecting rod one is parallel, be equipped with connecting rod two at connecting rod one's upper end, 1 pole setting one is connected to 2 connecting rod two and connecting rod one, the subframe includes 2 parallel connecting rod three, connecting rod three is connected with stand one, the one end and the connecting rod four of connecting rod three are connected, the other end and the pole setting one of connecting rod four are connected, the dead lever is installed respectively to the end of 2 connecting rod three, the dead lever is installed at the top of pole setting two, the other end and the upper end of pole setting one are connected, install a plurality of pedals between 2 connecting rod one of bottom, install a plurality of pedals between 2 connecting rod three.
Further, each first upright rod is provided with 2 connecting rods III, each connecting rod III is connected with a connecting rod IV, and the connecting rods III and the connecting rod IV are connected through 2 fasteners I.
Further, the tail ends of the 2 diagonal rods are connected through a connecting rod five.
Further, connecting rods six are arranged on the 2 diagonal rods, and supporting legs which are vertically arranged are respectively arranged on two sides of each connecting rod six.
Further, the length of the first connecting rod is longer than that of the third connecting rod.
Further, the landing leg includes pole setting three, screw thread post, bottom plate and dog, and pole setting three is hollow structure, screw thread post and three threaded connection of pole setting, and the bottom plate setting is in the bottom of screw thread post, and the dog is installed on the screw thread post, and the size of dog is greater than the diameter of stand three.
Further, a plurality of clamping holes are formed in the threaded column, and the stop block is connected with the threaded column through a connecting pin.
Further, the dog includes cylinder piece and 2 ejector pad, and 2 ejector pad setting are in the outside of cylinder piece, and the cylinder piece is hollow structure, and the screw thread post passes the centre of cylinder piece.
Further, the mounting holes I and the mounting holes II are respectively arranged on 2 diagonal lines of the bottom plate.
The utility model has the beneficial effects that:
according to the utility model, the main frame and the auxiliary frame are designed, and the auxiliary frame is added, so that the working position of the building edge is saved when the building edge works, and the bottom of the main frame can push the whole scaffold tower through the wheels.
Drawings
The utility model will be described in further detail with reference to the drawings and the detailed description.
FIG. 1 is a schematic diagram of the present utility model;
FIG. 2 is a schematic view of another view of the present utility model;
FIG. 3 is a schematic view of another embodiment of the present utility model;
FIG. 4 is a schematic view of the leg of the present utility model with three legs removed;
FIG. 5 is a schematic view of the leg of the present utility model with three legs removed;
FIG. 6 is a schematic view of a stopper according to the present utility model.
Detailed Description
The technical solutions of the embodiments of the present utility model will be clearly and completely described below in conjunction with the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, not all embodiments. All other embodiments, which can be made by one of ordinary skill in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
As shown in the figure, the technical scheme of the utility model is as follows: the movable scaffold tower comprises a main frame 1 and a subframe 2, wherein the main frame 1 comprises four upright posts 11, a movable wheel mounting plate 12 is mounted at the bottom of the four upright posts 11, a movable wheel 13 is mounted at the bottom of the movable wheel mounting plate 12, the upper ends and the lower ends of the 2 upright posts 11 are connected through a first connecting rod 14, the first connecting rod 14 is parallel, a second connecting rod 15 is arranged at the upper end of the first connecting rod 14, the 2 connecting rod 15 is connected with the 1 upright posts 11, the second connecting rod 15 is perpendicular to the first connecting rod 14, the subframe 2 comprises 2 parallel connecting rods three 21, the third connecting rod 21 is connected with the first upright post 11, one end of the third connecting rod 21 is connected with a fourth connecting rod 16, the other end of the fourth connecting rod 16 is connected with the first connecting rod 11, the ends of the 2 connecting rods three 21 are respectively provided with an upright post 22, the top of the upright post 22 is provided with an inclined rod 23, the other end of the inclined rod 23 is connected with the upper end of the upright post 11, a plurality of pedals 3, and a plurality of pedals 3 are mounted between the 2 connecting rods 21.
The traditional scaffold has only 1 frame, and the main frame and the auxiliary frame are designed, so that the main frame is used for placing materials, the auxiliary frame can be used for loading staff, and the auxiliary frame does not need to use moving wheels, meanwhile, the bottom of the auxiliary frame is suspended, the working position occupying the edge of a building is smaller than that of the traditional scaffold, and the position of the scaffold does not need to be moved frequently.
In an embodiment of the present utility model, 2 connecting rods three 21 are installed on each upright one 11, each connecting rod three 21 is connected with a connecting rod four 16, and the connecting rod three 21 is connected with the connecting rod four 16 through 2 fasteners one 4.
Of course, the first upright rod is connected with other connecting rods by using fasteners.
In one embodiment of the present utility model, the ends of the 2 diagonal rods 23 are connected by links five 24.
In one embodiment of the present utility model, the 2 diagonal rods 23 are provided with six links 25, and two sides of the six links 25 are respectively provided with a vertically arranged leg 26.
The legs 26 may be used as desired, such as when a heavy object or a plurality of workers are to be loaded on the subframe, the legs 26 may be supported on other objects to provide support.
In one embodiment of the present utility model, the length of the first link 14 is greater than the length of the third link 21.
In one embodiment of the present utility model, the support leg 26 includes a third upright 261, a threaded column 262, a bottom plate 263 and a stopper 264, the third upright 261 is a hollow structure, the threaded column 262 is in threaded connection with the third upright 261, the bottom plate 264 is disposed at the bottom of the threaded column 262, the stopper 264 is mounted on the threaded column 262, and the size of the stopper 264 is larger than the diameter of the third upright 261.
The stopper 264 serves to block the third column 261, so that the screw rod 262 can be moved up and down and the bottom plate 263 can be moved up and down since the third column 261 is in a fixed position. The stopper 264 plays a limiting role.
In one embodiment of the present utility model, the threaded post 262 is provided with a plurality of clamping holes, and the stop 264 is connected with the threaded post 262 through a connecting pin.
In one embodiment of the present utility model, the stopper 264 includes a cylindrical block 2641 and 2 push blocks 2642,2 push blocks 2642 disposed outside the cylindrical block 2641, the cylindrical block 2641 is of a hollow structure, and the threaded post 262 passes through the middle of the cylindrical block 2641.
In an embodiment of the present utility model, the first mounting hole 2631 and the second mounting hole 2632 are respectively disposed on 2 diagonal lines of the bottom plate 263.
The first and second mounting holes of the bottom plate 263 may be coupled using corresponding bolts as needed.
The foregoing description of the preferred embodiments of the utility model is not intended to be limiting, but rather is intended to cover all modifications, equivalents, alternatives, and improvements that fall within the spirit and scope of the utility model.

Claims (9)

1. The utility model provides a portable scaffold tower, a serial communication port, including body frame and subframe, the body frame includes four pole setting first, the removal round mounting panel is installed to the bottom of four pole setting first, the removal round is installed in the bottom of removing round mounting panel, the upper end and the lower extreme of 2 pole setting first are all connected through connecting rod first, connecting rod first is parallel, be equipped with connecting rod second at the upper end of connecting rod first, 1 pole setting first is connected to 2 connecting rod second, connecting rod second is perpendicular with connecting rod first, the subframe includes 2 parallel connecting rod third, connecting rod third is connected with stand, the one end and the connecting rod fourth of connecting rod third are connected, the other end and the pole setting first of connecting rod fourth are connected, the dead lever is installed respectively to the end of 2 connecting rod third, the dead lever is installed at the top of pole setting second, the other end and the upper end of pole setting first are connected to the other end of dead lever, install a plurality of pedals between 2 connecting rods first of bottom, install a plurality of pedals between 2 connecting rod third.
2. The movable scaffold tower according to claim 1, wherein 2 connecting rods three are mounted on each upright one, each connecting rod three is connected with a connecting rod four, and the connecting rods three and the connecting rod four are connected through 2 fasteners one.
3. A movable scaffolding tower according to claim 2, characterised in that the ends of the 2 diagonal rods are connected by means of a connecting rod five.
4. A movable scaffolding tower according to claim 3, characterised in that the 2 diagonal rods are provided with six links, the two sides of which are provided with vertically arranged legs, respectively.
5. The movable scaffolding tower as claimed in claim 1 wherein the first link has a length greater than the third link.
6. The movable scaffold tower according to claim 4, wherein the support leg comprises a third upright, a threaded column, a bottom plate and a stop block, the third upright is of a hollow structure, the threaded column is in threaded connection with the third upright, the bottom plate is arranged at the bottom of the threaded column, the stop block is arranged on the threaded column, and the size of the stop block is larger than the diameter of the third upright.
7. The movable scaffolding tower as claimed in claim 6 wherein the threaded post is provided with a plurality of snap holes and the stop is connected to the threaded post by a connecting pin.
8. The movable scaffolding tower as claimed in claim 7 wherein the stopper comprises a cylindrical block and 2 push blocks, the 2 push blocks being disposed on the outer side of the cylindrical block, the cylindrical block being of hollow construction, the threaded post passing through the middle of the cylindrical block.
9. The movable scaffold tower according to claim 8, wherein the first mounting holes and the second mounting holes are respectively formed in 2 diagonal lines of the bottom plate.
CN202222873487.7U 2022-10-28 2022-10-28 Movable scaffold tower Active CN219365350U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222873487.7U CN219365350U (en) 2022-10-28 2022-10-28 Movable scaffold tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222873487.7U CN219365350U (en) 2022-10-28 2022-10-28 Movable scaffold tower

Publications (1)

Publication Number Publication Date
CN219365350U true CN219365350U (en) 2023-07-18

Family

ID=87137956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222873487.7U Active CN219365350U (en) 2022-10-28 2022-10-28 Movable scaffold tower

Country Status (1)

Country Link
CN (1) CN219365350U (en)

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN201665992U (en) Whole lifting platform of large steel net frame
CN210195192U (en) Scaffold frame that construction was used
CN214740171U (en) Ancient building wall body hoist and mount migration device
CN213626572U (en) Tool type external cantilever operation platform
CN219365350U (en) Movable scaffold tower
CN211548713U (en) A suspension type scaffold frame for square chimney
CN220319071U (en) Suspension mechanism with adjustable distance of hanging basket
CN215331393U (en) Protection device on scaffold
CN216042529U (en) Elevator shaft self-lifting platform device
CN214834659U (en) Attached supporting steel frame
CN206015700U (en) A kind of raft foundation steelframe support
CN210616901U (en) Precast beam prestressing force stretch-draw platform
CN113309256A (en) Construction device and construction method for prefabricated shear wall with post-pouring section
CN212478471U (en) Electric lifting movable type overhanging platform
CN219731666U (en) Engineering building construction frame
CN220395125U (en) Scaffold for building construction
CN215107118U (en) Prepackage type building wall scaffold
CN216190443U (en) Portal frame with adjustable height and width
CN219568628U (en) Spherical hinge positioning frame for bridge swivel construction
CN217782790U (en) Scaffold steel pipe stand base
CN104763165B (en) A kind of cement bunker top Elements of Space Grid Truss supporting construction
CN212154087U (en) Aerial work platform device
CN219100746U (en) Main frame is supported to electronic building machine position