CN210616901U - Precast beam prestressing force stretch-draw platform - Google Patents

Precast beam prestressing force stretch-draw platform Download PDF

Info

Publication number
CN210616901U
CN210616901U CN201920944446.8U CN201920944446U CN210616901U CN 210616901 U CN210616901 U CN 210616901U CN 201920944446 U CN201920944446 U CN 201920944446U CN 210616901 U CN210616901 U CN 210616901U
Authority
CN
China
Prior art keywords
jack
platform
precast beam
construction
chain block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920944446.8U
Other languages
Chinese (zh)
Inventor
张鹏
郭伟平
汪建群
袁青
张帅珂
曹继文
刘伟
彭盼
胡佳欣
杨新宇
张阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University of Science and Technology
CCCC Seventh Engineering Co Ltd
Original Assignee
Hunan University of Science and Technology
CCCC Seventh Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology, CCCC Seventh Engineering Co Ltd filed Critical Hunan University of Science and Technology
Priority to CN201920944446.8U priority Critical patent/CN210616901U/en
Application granted granted Critical
Publication of CN210616901U publication Critical patent/CN210616901U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a precast beam prestressing force stretch-draw platform, hang the mechanism including braced frame, jack hang the mechanism including couple, chain block, horizon bar, jack, the horizon bar sets up on braced frame, and the couple is hung on the horizon bar, and chain block hangs on the couple, the braced frame is improved level and is equipped with construction platform, is equipped with the jack on the construction platform, and the jack is connected with the chain block lower extreme. The utility model provides a portable, simple structure, convenient operation's precast beam prestressing force stretch-draw platform can remove by arbitrary direction all around, for the construction provides nimble convenient construction position, has simplified the construction greatly, has shortened the time limit for a project.

Description

Precast beam prestressing force stretch-draw platform
Technical Field
The utility model relates to a precast beam prestressing force stretch-draw platform.
Background
Along with the development of bridge construction in China, the prestressed precast beam is adapted to the development trend of bridge construction and is rapidly developed, a safe and firm tensioning platform cannot be erected due to the limitation of construction conditions, different tensioning platforms need to be erected at different positions, so that the erecting and dismantling workload is large, the construction period is long, and the requirements of safe and reliable construction, convenience and quickness in construction and high construction speed cannot be met. Meanwhile, due to the limitation of construction space, after the tensioning platform is erected, the danger is often great, and the safety of constructors cannot be guaranteed.
Disclosure of Invention
In order to solve the technical problem, the utility model provides a precast beam prestressing force stretch-draw platform that simple structure, work efficiency are high.
The utility model provides a technical scheme of above-mentioned problem is: the utility model provides a precast beam prestressing force stretch-draw platform, hangs the mechanism including braced frame, jack suspension mechanism includes couple, chain block, horizon bar, jack, the horizon bar sets up on braced frame, and the couple is hung on the horizon bar, and chain block hangs on the couple, the braced frame is improved level and is equipped with construction platform, is equipped with the jack on the construction platform, and the jack is connected with the chain block lower extreme.
Above-mentioned precast beam prestressing force stretch-draw platform, braced frame includes four stands, two horizontal beam, two horizontal longerons, and four vertical settings of stand just are square putting, and two horizontal beam, two horizontal longerons are square putting at four stand tops and constitute a box frame construction jointly with four stands, four angles of construction platform are fixed respectively in four stand lower parts.
The bottom of each of the four stand columns is provided with a roller.
According to the precast beam prestress tensioning platform, the baffle is welded on one side of the supporting frame.
The beneficial effects of the utility model reside in that: the utility model provides a portable, simple structure, convenient operation's precast beam prestressing force stretch-draw platform can remove by arbitrary direction all around, for the construction provides nimble convenient construction position, has simplified the construction greatly, has shortened the time limit for a project. The jack can also move horizontally and vertically, and can move in combination with the tensioning platform, so that the prestress tensioning at any position can be realized. In addition, potential safety hazards are prevented to a certain extent by the arranged baffle, and the safety of constructors is guaranteed to a certain extent.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a side view of fig. 1.
In the figure: 7 is an iron chain.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and examples.
As shown in fig. 1 and 2, the precast beam prestress tensioning platform comprises a support frame and a jack suspension mechanism, wherein the jack suspension mechanism comprises a hook 5, a chain block 6, a horizontal rod 4 and a jack 8, the horizontal rod 4 is arranged on the support frame, and the hook 5 is hung on the horizontal rod 4 and can be freely moved; the chain block 6 is hung on the hook 5, the support frame is horizontally provided with a construction platform 10, the construction platform 10 is provided with a jack 8, and the jack 8 is connected with the lower end of the chain block 6. A baffle plate 9 is welded on one side of the supporting frame, so that potential safety hazards can be prevented.
The supporting frame comprises four stand columns 2, two horizontal cross beams 3 and two horizontal longitudinal beams 11, wherein the four stand columns 2 are vertically arranged and are placed in a square mode, rollers 1 are arranged at the bottoms of the four stand columns 2, the two horizontal cross beams 3 and the two horizontal longitudinal beams 11 are placed at the tops of the four stand columns 2 in a square mode and form a box-type frame structure together with the four stand columns 2, the four corners of the construction platform 10 are fixed to the lower portions of the four stand columns 2 respectively, and constructors can operate on the construction platform 10 in a standing mode.
The utility model is simple in operation, convenient to use. Only need with the utility model discloses remove to the assigned position, can remove wantonly on the level land, and control easily. After the steel bar tensioning jack is moved to a specified position, the jack 8 can be lifted at will and adjusted in the horizontal and vertical directions, a constructor fixes the steel bar to be tensioned on a tensioning platform, and then a machine switch is turned on for operation.

Claims (4)

1. The utility model provides a precast beam prestressing force stretch-draw platform which characterized in that: including braced frame, jack suspension mechanism includes couple, chain block, horizon bar, jack, the horizon bar sets up on braced frame, and the couple is hung on the horizon bar, and chain block hangs on the couple, braced frame is improved level and is equipped with construction platform, is equipped with the jack on the construction platform, and the jack is connected with the chain block lower extreme.
2. The precast beam prestress tensioning platform according to claim 1, wherein: the supporting frame comprises four stand columns, two horizontal cross beams and two horizontal longitudinal beams, the four stand columns are vertically arranged and are placed in a square mode, the two horizontal cross beams and the two horizontal longitudinal beams are placed at the tops of the four stand columns in a square mode and jointly form a box-type frame structure with the four stand columns, and the four corners of the construction platform are fixed to the lower portions of the four stand columns respectively.
3. The precast beam prestress tensioning platform according to claim 1, wherein: the bottoms of the four upright posts are provided with rollers.
4. The precast beam prestress tensioning platform according to claim 1, wherein: and a baffle plate is welded on one side of the supporting frame.
CN201920944446.8U 2019-06-21 2019-06-21 Precast beam prestressing force stretch-draw platform Expired - Fee Related CN210616901U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920944446.8U CN210616901U (en) 2019-06-21 2019-06-21 Precast beam prestressing force stretch-draw platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920944446.8U CN210616901U (en) 2019-06-21 2019-06-21 Precast beam prestressing force stretch-draw platform

Publications (1)

Publication Number Publication Date
CN210616901U true CN210616901U (en) 2020-05-26

Family

ID=70765974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920944446.8U Expired - Fee Related CN210616901U (en) 2019-06-21 2019-06-21 Precast beam prestressing force stretch-draw platform

Country Status (1)

Country Link
CN (1) CN210616901U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114030077A (en) * 2021-11-15 2022-02-11 中国建筑土木建设有限公司 Tensioning jack mounting equipment for beam field and prestressed cable tensioning method for precast beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114030077A (en) * 2021-11-15 2022-02-11 中国建筑土木建设有限公司 Tensioning jack mounting equipment for beam field and prestressed cable tensioning method for precast beam

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN101619630A (en) Mounting method of steel chimney and implementary jacking device
CN210616901U (en) Precast beam prestressing force stretch-draw platform
CN105421741A (en) Self-standing tower crane and formwork integrated construction platform system
CN212957538U (en) Roof flower frame beam and outer wall decoration construction movable operation platform
CN213626572U (en) Tool type external cantilever operation platform
CN201186864Y (en) Self-climbing type hydraulic jacking device for mounting large-sized equipment
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
CN219280494U (en) Tower beam temporary consolidation supporting structure for bridge tower stability control
CN203462736U (en) Operating platform for lift shaft structural steel construction
CN213563427U (en) Precast beam removes stretch-draw rack
CN110304593A (en) A kind of upright hoisting auxiliary device of PC column
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN205820800U (en) The hydraulic lift without scaffold building template frame can be realized
CN214994020U (en) Combined tower crane foundation pre-embedded structure
CN112573341B (en) Column top hoisting mechanism and construction method thereof
CN210507161U (en) Novel outer hanging anticollision barrier construction dolly
CN209780229U (en) Jacking platform system of integrated tower crane
CN103711112B (en) Build large-span concrete beam combined type Bailey bracket bearing bent frame
CN219902075U (en) Prefabricated component bottom maintenance frame
CN219365350U (en) Movable scaffold tower
CN217972263U (en) Novel beam lifter structure
CN204609260U (en) A kind of removable fluid pressure type integral elevating floor scaffold
CN215290657U (en) Be used for building structure to assemble and use telescopic bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200526

Termination date: 20210621

CF01 Termination of patent right due to non-payment of annual fee