CN211873780U - Attached safety operation protection platform for building construction - Google Patents

Attached safety operation protection platform for building construction Download PDF

Info

Publication number
CN211873780U
CN211873780U CN202020350713.1U CN202020350713U CN211873780U CN 211873780 U CN211873780 U CN 211873780U CN 202020350713 U CN202020350713 U CN 202020350713U CN 211873780 U CN211873780 U CN 211873780U
Authority
CN
China
Prior art keywords
guide rails
scaffold
boards
fixed
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020350713.1U
Other languages
Chinese (zh)
Inventor
王玉平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020350713.1U priority Critical patent/CN211873780U/en
Application granted granted Critical
Publication of CN211873780U publication Critical patent/CN211873780U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model belongs to the technical field of the construction technology and specifically relates to an attached safety work protection platform for construction, to the trouble and the complicated problem of promotion thing of over-and-under type scaffold frame equipment among the prior art, the following scheme is put forward now, and it includes two first guide rails, two second guide rails, two scaffold boards and a plurality of trompil scaffold boards, two first guide rail all with wall body fixed connection, two the second guide rail is located one side of two first guide rails respectively, and one side from the top down that two first guide rails and two second guide rails are close to mutually all is fixed with a plurality of boards of placing, and a plurality of tops of placing the board have all seted up the connecting hole, two the bottom both sides of scaffold board and the bottom both sides of a plurality of trompil scaffold boards all are fixed with two screw thread posts. The utility model discloses rational in infrastructure, easy operation, it is simple convenient not only to assemble, and the support body atress is reasonable moreover, and stability is good, also conveniently promotes article to eminence when using simultaneously, easily uses widely.

Description

Attached safety operation protection platform for building construction
Technical Field
The utility model relates to a construction field especially relates to an attached safety work protection platform for construction.
Background
At present, the outer wall climbing frame all adopts lifting scaffold in high-rise reinforced concrete building construction basically, and this kind of scaffold has more defect, and spare part when the equipment is more on the one hand, and the equipment is troublesome, takes place the omission of spare part moreover easily, and the other hand is that current lifting scaffold stability is relatively poor, and it is more complicated to promote the thing.
Therefore, the scheme provides an attached safety operation protection platform for building construction.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pair of adhesion type safety work protection platform for construction has solved the trouble and complicated problem of promotion thing of lifting scaffold equipment among the prior art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an attached safety operation protection platform for building construction comprises two first guide rails, two second guide rails, two scaffold boards and a plurality of perforated scaffold boards, wherein the two first guide rails are fixedly connected with a wall body, the two second guide rails are respectively positioned on one sides of the two first guide rails, a plurality of placing boards are respectively fixed on the adjacent sides of the two first guide rails and the two second guide rails from top to bottom, connecting holes are respectively formed in the tops of the placing boards, two threaded columns are respectively fixed on the two sides of the bottoms of the two scaffold boards and the two sides of the bottoms of the perforated scaffold boards, the two scaffold boards and the perforated scaffold boards are respectively positioned on the tops of the placing boards on the two first guide rails and the two second guide rails, the threaded columns penetrate through the connecting holes and extend to the bottoms of the placing boards, the threaded columns and the placing boards are locked through nuts, and the perforated scaffold boards are positioned between the two scaffold boards, the electric hoist is arranged on the bottom surface of the scaffold board positioned at the top.
Preferably, two equal equidistance has seted up a plurality of bolt holes on the both sides outer wall of first guide rail and on the both sides outer wall of two second guide rails, one side of placing the board is fixed with two connecting plates, first guide rail and second guide rail all are located between two connecting plates of placing the board, and equal threaded connection has locking bolt on the outer wall of two connecting plates, and locking bolt's one end extends to the inside and bolt hole threaded connection of bolt hole.
Preferably, two the card hole has all been seted up to the one side that first guide rail and two second guide rails are close to mutually, and the board is placed one side of being fixed with the connecting plate and is fixed with the fixed column, and the one end of fixed column extends to the inside in card hole and blocks the hole and coincide.
Preferably, two one side that two second guide rails were kept away from to first guide rail all is fixed with a plurality of fixed plates, has all seted up two fixed orificess on a plurality of fixed plates two first guide rail all through fixed plate and wall fixed connection.
Preferably, a plurality of trompil scaffold board's top has all seted up the trompil, and the trompil cooperatees with the electric hoist.
Preferably, guard railings are fixed to the tops of the two scaffold boards and the tops of the multiple perforated scaffold boards respectively, each guard railing comprises a cross rod and multiple vertical rods, the multiple vertical rods are fixedly connected with the bottom of the cross rod, bottom plates are fixed to the bottoms of the multiple vertical rods, and the bottom plates are fixed to the two scaffold boards and the multiple perforated scaffold boards through screws.
The utility model has the advantages that:
1. through two first guide rails, two second guide rails, two scaffold boards, a plurality of trompil scaffold boards, place board, connecting plate, screw post, fixed column, card hole, nut, locking bolt and the cooperation between the bolt hole, reach the purpose of conveniently assembling protection platform, great reduction the degree of difficulty of equipment protection platform.
2. Through the cooperation between electric hoist, two scaffold boards and a plurality of trompil scaffold boards, reach the purpose that conveniently promotes the thing, operate convenience more.
The utility model discloses rational in infrastructure, design benefit, easy operation, it is simple convenient not only to assemble, and the support body atress is reasonable moreover, and stability is good, also conveniently promotes article to eminence when using simultaneously, easily uses widely.
Drawings
Fig. 1 is a left side view of the present invention.
Fig. 2 is a left side sectional view of the present invention.
Fig. 3 is a top view of the present invention.
Reference numbers in the figures: the device comprises a first guide rail 1, a second guide rail 2, a scaffold plate 3, a scaffold plate 4 with holes, a fixing plate 5, a locking bolt 6, a bolt hole 7, a connecting plate 8, a cross rod 9, a vertical rod 10, a bottom plate 11, a placing plate 12, a nut 13, a threaded column 14, an electric hoist 15, a hole 16, a connecting hole 17, a clamping hole 18, a fixing column 19 and a fixing hole 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, an attached safety work protection platform for building construction, including two first guide rails 1, two second guide rails 2, two scaffold boards 3 and a plurality of trompil scaffold boards 4, two first guide rails 1 all are connected with wall body fixed, two second guide rails 2 are located one side of two first guide rails 1 respectively, one side that two second guide rails 2 were kept away from to two first guide rails 1 all is fixed with a plurality of fixed plates 5, two fixed orificess 20 have all been seted up on a plurality of fixed plates 5, two first guide rails 1 all pass through fixed plate 5 and wall fixed connection, when fixing first guide rail 1, utilize the bolt to pass fixed orificess 20 on the fixed plate 5 to fix fixed plate 5 on the wall body, then fix two second guide rails 2 correspondence on one side subaerial of two first guide rails 1.
One side from the top down that two first guide rails 1 and two second guide rails 2 are close to mutually all is fixed with a plurality of boards 12 of placing, a plurality of bolt holes 7 have all been seted up to equal equidistance on the both sides outer wall of two first guide rails 1 and the both sides outer wall of two second guide rails 2, one side of placing board 12 is fixed with two connecting plates 8, first guide rail 1 and second guide rail 2 all are located between two connecting plates 8 of placing board 12, equal threaded connection has locking bolt 6 on the outer wall of two connecting plates 8, the inside and bolt hole 7 threaded connection of bolt hole 7 are extended to the one end of locking bolt 6, through connecting plate 8, the cooperation between bolt hole 7 and the locking bolt 6, conveniently will place board 12 and fix on first guide rail 1 or second guide rail 2.
Card hole 18 has all been seted up to one side that two first guide rails 1 and two second guide rails 2 are close to mutually, place one side that board 12 is fixed with connecting plate 8 and be fixed with fixed column 19, the one end of fixed column 19 extends to the inside and the card hole 18 of calorie hole 18 coincide, cooperation through calorie hole 18 and fixed column 19 between, can be convenient fix a position the position of placing board 12, thereby make things convenient for locking bolt 6 to screw into the inside of bolt hole 7, the setting of fixed column 19 also plays the purpose that the support was placed board 12 simultaneously.
Connecting holes 17 have all been seted up at a plurality of tops of placing board 12, two screw thread post 14 have all been fixed with in the bottom both sides of two scaffold boards 3 and the bottom both sides of a plurality of trompil scaffold boards 4, two scaffold boards 3 and a plurality of trompil scaffold boards 4 are located the top of placing board 12 on two first guide rails 1 and two second guide rails 2 respectively, screw thread post 14 runs through connecting hole 17 and extends to the below of placing board 12, and screw thread post 14 with place and lock through nut 13 between the board 12, a plurality of trompil scaffold boards 4 are located between two scaffold boards 3, through screw thread post 14, cooperation between connecting hole 17 and the nut, conveniently with scaffold board 3 or trompil scaffold board 4 with place board 12 fixed together.
Electric hoist 15 is installed to the bottom surface that is located the scaffold board 3 at top, and trompil 16 has all been seted up at the top of a plurality of trompil scaffold boards 4, and trompil 16 cooperatees with electric hoist 15, through the setting of electric hoist 15 and trompil 15, conveniently promotes the eminence with the object of low.
The equal fixed rail guard in top of two scaffold boards 3 and the top of a plurality of trompil scaffold boards 4, the rail guard includes horizontal pole 9 and a plurality of vertical pole 10, a plurality of vertical poles 10 all with the bottom fixed connection of horizontal pole 9, the bottom of a plurality of vertical poles 10 all is fixed with bottom plate 11, pass through the fix with screw between bottom plate 11 and two scaffold boards 3 and a plurality of trompil scaffold boards 4, the setting of rail guard has played safety protection's effect to the workman, and vertical pole 10 and bottom plate 11 set up the installation that has made things convenient for the rail guard fixed.
The working principle is as follows: when the fixing device is assembled, firstly, the two first guide rails 1 are fixed on a wall body, when in fixing, the fixing plate 5 is fixed on the wall body by bolts penetrating through the fixing holes 20 on the fixing plate 5, then the two second guide rails 2 are correspondingly fixed on the ground at one side of the two first guide rails 1, then the plurality of placing plates 12 are respectively fixed on the two first guide rails 1 and the two second guide rails 2, when the placing plates 12 are fixed, the fixing columns 19 are firstly inserted into the clamping holes 18, then the bolts on the two connecting plates 8 on the placing plates 12 can be conveniently screwed in the bolt holes 7 at the two sides of the first guide rails 1 or in the bolts 7 at the two sides of the second guide rails 2, so that the placing plates 12 are fixed on the first guide rails 1 or on the second guide rails 2, then the two scaffold plates 3 and the plurality of second scaffold plates 4 are fixed on the tops of the placing plates 12 on the two first guide rails 1 and the two second guide rails 2, when fixing the scaffold board 3, pass the screw thread post 14 of scaffold board 3 bottom and place connecting hole 17 on the board 12, then reuse nut 13 with screw thread post 14 with place the board 12 fixed together, fix according to same mode when fixed trompil scaffold board 4, after the installation of scaffold board 3 and trompil scaffold board 4 is accomplished, fix the rail guard at the top of scaffold board 3 and trompil scaffold board 4.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. An attached safety operation protection platform for building construction comprises two first guide rails (1), two second guide rails (2), two scaffold boards (3) and a plurality of perforated scaffold boards (4), and is characterized in that the two first guide rails (1) are fixedly connected with a wall body, the two second guide rails (2) are respectively positioned on one sides of the two first guide rails (1), the side, close to the two first guide rails (1) and the two second guide rails (2), of each first guide rail is fixedly provided with a plurality of placing boards (12) from top to bottom, the tops of the placing boards (12) are respectively provided with a connecting hole (17), two threaded columns (14) are respectively fixed on the two sides of the bottoms of the two scaffold boards (3) and the two sides of the bottoms of the perforated scaffold boards (4), the two scaffold boards (3) and the perforated scaffold boards (4) are respectively positioned on the tops of the placing boards (12) on the two first guide rails (1) and the two second guide rails (2), screw thread post (14) through connecting hole (17) extend to the below of placing board (12), and screw thread post (14) with place and lock through nut (13) between board (12), a plurality of trompil scaffold board (4) are located between two scaffold boards (3), and electric hoist (15) are installed to the bottom surface of scaffold board (3) that is located the top.
2. The attached safety work protection platform for building construction according to claim 1, wherein a plurality of bolt holes (7) are formed in the outer walls of two sides of the two first guide rails (1) and the outer walls of two sides of the two second guide rails (2) at equal intervals, two connecting plates (8) are fixed to one side of the placing plate (12), the first guide rails (1) and the second guide rails (2) are located between the two connecting plates (8) of the placing plate (12), locking bolts (6) are connected to the outer walls of the two connecting plates (8) in a threaded mode, and one ends of the locking bolts (6) extend to the inside of the bolt holes (7) and are connected with the bolt holes (7) in a threaded mode.
3. The attached safety work protection platform for building construction according to claim 1, wherein clamping holes (18) are formed in the sides, close to each other, of the two first guide rails (1) and the two second guide rails (2), fixing columns (19) are fixed to the sides, fixed to the connecting plates (8), of the placing plates (12), and one ends of the fixing columns (19) extend to the insides of the clamping holes (18) to be matched with the clamping holes (18).
4. The attached safety operation protection platform for building construction according to claim 1, wherein a plurality of fixing plates (5) are fixed on one side of each of the two first guide rails (1) away from the two second guide rails (2), two fixing holes (20) are formed in each of the plurality of fixing plates (5), and the two first guide rails (1) are fixedly connected with a wall through the fixing plates (5).
5. The attached safety work protection platform for building construction according to claim 1, wherein the top of the plurality of perforated scaffold boards (4) are provided with perforations (16), and the perforations (16) are matched with the electric hoist (15).
6. The attached safety work protection platform for building construction according to claim 1, wherein guard rails are fixed on the tops of the two scaffold plates (3) and the tops of the plurality of perforated scaffold plates (4), each guard rail comprises a cross rod (9) and a plurality of vertical rods (10), the plurality of vertical rods (10) are fixedly connected with the bottom of the cross rod (9), bottom plates (11) are fixed on the bottoms of the plurality of vertical rods (10), and the bottom plates (11) are fixed with the two scaffold plates (3) and the plurality of perforated scaffold plates (4) through screws.
CN202020350713.1U 2020-03-19 2020-03-19 Attached safety operation protection platform for building construction Expired - Fee Related CN211873780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020350713.1U CN211873780U (en) 2020-03-19 2020-03-19 Attached safety operation protection platform for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020350713.1U CN211873780U (en) 2020-03-19 2020-03-19 Attached safety operation protection platform for building construction

Publications (1)

Publication Number Publication Date
CN211873780U true CN211873780U (en) 2020-11-06

Family

ID=73258631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020350713.1U Expired - Fee Related CN211873780U (en) 2020-03-19 2020-03-19 Attached safety operation protection platform for building construction

Country Status (1)

Country Link
CN (1) CN211873780U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323366A (en) * 2021-06-17 2021-08-31 广西博强建筑科技有限公司 Attached lifting scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323366A (en) * 2021-06-17 2021-08-31 广西博强建筑科技有限公司 Attached lifting scaffold
CN113323366B (en) * 2021-06-17 2022-10-28 广西博强建筑科技有限公司 Attached lifting scaffold

Similar Documents

Publication Publication Date Title
CN211873780U (en) Attached safety operation protection platform for building construction
CN214641256U (en) Wind power tower cylinder door frame combination welded platform
CN214659376U (en) Novel guardrail bar is prevented at elevator shaft entrance to a cave
CN213571565U (en) Assembled bridge floor protection device
CN212026845U (en) High-rise building girder steel structure
CN211110536U (en) Elevator frame easy to assemble
CN217782775U (en) Scaffold for civil engineering construction
CN212689540U (en) Guide rail for climbing frame
CN217711652U (en) Portable safe type horizontal pole
CN206110640U (en) A scalable scaffold frame plate for scaffold frame
CN215594413U (en) Novel section steel concrete column beam joint connection structure
CN212583162U (en) Assembled integral protection operation platform
CN214364797U (en) Scaffold for external construction of tower
CN218234276U (en) Balcony decoration operation platform
CN214939361U (en) Adjustable cantilever operation platform
CN212671158U (en) Novel steel cat ladder of outrigger for construction
CN214192350U (en) Tower crane frame structure
CN218879192U (en) Spacing fixed plate of prestressing force coincide floor
CN218091900U (en) Safety protection scaffold for construction
CN218406844U (en) Zinc steel guardrail that use intensity is high
CN216105627U (en) Auxiliary frame for installation equipment of construction elevator
CN220705379U (en) Building engineering construction rail
CN217232608U (en) Assembled multifunctional scaffold for constructional engineering
CN219060354U (en) Assembled concrete wallboard steel construction connecting device
CN211396899U (en) Quick detach protection rail for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201106

Termination date: 20210319

CF01 Termination of patent right due to non-payment of annual fee