CN218879192U - Spacing fixed plate of prestressing force coincide floor - Google Patents
Spacing fixed plate of prestressing force coincide floor Download PDFInfo
- Publication number
- CN218879192U CN218879192U CN202320103567.6U CN202320103567U CN218879192U CN 218879192 U CN218879192 U CN 218879192U CN 202320103567 U CN202320103567 U CN 202320103567U CN 218879192 U CN218879192 U CN 218879192U
- Authority
- CN
- China
- Prior art keywords
- floor
- floor body
- fixed plate
- prestressing force
- cardboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003466 welding Methods 0.000 abstract description 7
- 238000005457 optimization Methods 0.000 description 6
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 3
- 235000017491 Bambusa tulda Nutrition 0.000 description 3
- 241001330002 Bambuseae Species 0.000 description 3
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 3
- 239000011425 bamboo Substances 0.000 description 3
- 238000011065 in-situ storage Methods 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a spacing fixed plate of prestressing force coincide floor belongs to coincide floor technical field, and its technical scheme main points include the floor body, the outside both ends of floor body all are provided with the cardboard, the inside of cardboard is provided with the multiunit bolt, the one end of bolt extends to the inside of floor body, the welding of top of cardboard has the spliced pole, the inside swing joint of spliced pole has the guide post, through setting up floor body, cardboard, bolt, spliced pole and guide post, when using, installs the cardboard on the outer wall of floor body through the bolt, makes the spliced pole be in on same horizontal plane through the guide post after that, can hoist the floor body through outside mechanical equipment after that, because the cardboard passes through the bolt fastening on the floor body, so when hoisting the floor body, the floor body also can not drop, has played and has prevented that the floor from dropping and has caused the problem of potential safety hazard.
Description
Technical Field
The utility model relates to a coincide floor technical field, in particular to spacing fixed plate of prestressing force coincide floor.
Background
The composite floor slab is an integral assembled floor slab formed by laminating prefabricated slabs and cast-in-situ reinforced concrete layers, is suitable for high-rise buildings and large-bay buildings with higher integral rigidity requirements, and has the advantages of high integrity and rigidity of the cast-in-situ floor slab, good crack resistance, no increase of the consumption of reinforcing steel bars, template saving and the like.
The problem that current spacing fixed plate of prestressing force coincide floor exists is: at present, when the floor slab is used, the floor slab needs to be lifted, and when the floor slab is lifted, mechanical equipment for lifting the floor slab can shake the floor slab, so that the floor slab drops, certain potential safety hazards exist, and the floor slab needs to be limited and fixed.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
The utility model provides a spacing fixed plate of prestressing force coincide floor aims at solving and has now when using the floor, need hoist the floor, and when hoisting the floor, the mechanical equipment of hoisting the floor probably can make the floor produce and rock to make the floor drop, have the problem of certain potential safety hazard.
2. Technical scheme
The utility model discloses a realize like this, a spacing fixed plate of prestressing force coincide floor, including the floor body, the outside both ends of floor body all are provided with the cardboard, the inside of cardboard is provided with the multiunit bolt, the one end of bolt extends to the inside of floor body, the top welding of cardboard has the spliced pole, the inside swing joint of spliced pole has the guide post.
In order to make cardboard can convenient to detach, as the utility model discloses a spacing fixed plate of prestressing force coincide floor is preferred, the welding has the screw rod on the lateral wall of spliced pole, the outside threaded connection of screw rod has the spiral shell section of thick bamboo.
In order to make outside mechanical equipment be convenient for be connected with the spliced pole, conduct the utility model discloses a spacing fixed plate of prestressing force coincide floor is preferred, the top threaded connection of spliced pole has the couple that conveniently removes the spliced pole.
In order to make floor body surface adhesion degree increase, as the utility model discloses a spacing fixed plate of prestressing force coincide floor is preferred, all offer the slot that is used for increasing floor body surface adhesion degree on floor body's the outer diapire and floor body's the outer diapire.
In order to make the stability of cardboard increase, as the utility model discloses a spacing fixed plate of prestressing force coincide floor is preferred, a plurality of spread grooves have been seted up to floor body's inside, the welding has a plurality of inserted bars on the interior lateral wall of cardboard, the inserted bar uses with the spread groove cooperation.
Reduce in order to make the impact that the floor body received, conduct the utility model discloses a spacing fixed plate of prestressing force coincide floor is preferred, the bottom bolt of cardboard has the buffer board, the bottom of buffer board bonds and has the rubber pad.
In order to make the floor body can remove at the in-process that removes, as the utility model discloses a spacing fixed plate of prestressing force coincide floor is preferred, the bolt joint has the handle of being convenient for remove the cardboard on the outer lateral wall of cardboard.
3. Advantageous effects
Compared with the prior art, the beneficial effects of the utility model are that:
this spacing fixed plate of prestressing force coincide floor, through setting up the floor body, the cardboard, the bolt, spliced pole and guide post, when using, install the cardboard on the outer wall of floor body through the bolt, make the spliced pole be in on the same horizontal plane through the guide post after that, can hoist the floor body through outside mechanical equipment after that, because the cardboard passes through the bolt fastening on the floor body, so when hoisting the floor body, the floor body can not drop yet, the problem that prevents the floor and drop and cause the potential safety hazard has been played.
Drawings
FIG. 1 is an overall structure diagram of the present invention;
fig. 2 is a left side view of the present invention;
fig. 3 isbase:Sub>A perspective cross-sectional view taken along linebase:Sub>A-base:Sub>A of fig. 2 according to the present invention;
FIG. 4 is a schematic view of the rubber pad of the present invention;
fig. 5 is a schematic view of the insertion rod of the present invention.
The numbering in the figures illustrates:
1. a floor slab body; 2. clamping a plate; 3. a bolt; 4. connecting columns; 5. a guide post; 6. a screw; 7. a screw cylinder; 8. hooking; 9. a trench; 10. connecting grooves; 11. inserting a rod; 12. a buffer plate; 13. a rubber pad; 14. a handle.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on those shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. In addition, in the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a spacing fixed plate of prestressing force coincide floor, includes floor body 1, and floor body 1's outside both ends all are provided with cardboard 2, and the inside of cardboard 2 is provided with multiunit bolt 3, and the one end of bolt 3 extends to floor body 1's inside, and the welding of cardboard 2's top has spliced pole 4, and spliced pole 4's inside swing joint has guide post 5.
In this embodiment: through setting up floor body 1, cardboard 2, bolt 3, spliced pole 4 and guide post 5, when using, install cardboard 2 on floor body 1's outer wall through bolt 3, make spliced pole 4 be located same horizontal plane through guide post 5 after that, can hoist floor body 1 through outside mechanical equipment after that, because cardboard 2 passes through bolt 3 to be fixed on floor body 1, so when hoisting floor body 1, floor body 1 also can not drop, prevented that the floor from dropping and causing the problem of potential safety hazard has been played.
As the technical optimization scheme of the utility model, the welding has screw rod 6 on the lateral wall of spliced pole 4, and the outside threaded connection of screw rod 6 has a spiral shell section of thick bamboo 7.
In this embodiment: through setting up screw rod 6 and barrel 7, can make two adjacent spliced poles 4 connect and become a whole, prevent that spliced pole 4 from dropping.
As the technical optimization scheme of the utility model, the top threaded connection of spliced pole 4 has the couple 8 that conveniently removes spliced pole 4.
In this embodiment: through setting up couple 8, when mechanical equipment outside needs to hoist floor body 1, can be quick hoist floor body 1.
As the utility model discloses a technical optimization scheme all offers the slot 9 that is used for increasing floor body 1 surface adhesion degree on floor body 1's the outer diapire of floor body 1's the outer top wall.
In this embodiment: through setting up slot 9, can increase floor body 1's surface adhesion degree, make the building more firm.
As the utility model discloses a technical optimization scheme, a plurality of spread grooves 10 have been seted up to floor body 1's inside, and the welding has a plurality of inserted bars 11 on the interior lateral wall of cardboard 2, and inserted bar 11 uses with the spread groove 10 cooperation.
In this embodiment: through setting up connecting groove 10 and inserted bar 11, when installing cardboard 2 on floor body 1's surface through bolt 3, insert the inside of connecting groove 10 with inserted bar 11, can increase cardboard 2's stability.
As the technical optimization scheme of the utility model, the bottom bolt of cardboard 2 has buffer board 12, and the bottom of buffer board 12 bonds there is rubber pad 13.
In this embodiment: through setting up buffer board 12 and rubber pad 13, when hoisting floor body 1 in suitable position, the impact that floor body 1 received can effectual reduction by rubber pad 13 and buffer board 12, prevents that floor body 1 from breaking.
As the technical optimization scheme of the utility model, the bolted connection has the handle 14 of being convenient for remove cardboard 2 on the outer lateral wall of cardboard 2.
In this embodiment: through setting up handle 14, when hoisting floor slab body 1, can adjust the position of the floor slab body 1 who lifts by handle 14, conveniently place floor slab body 1 in suitable position.
The working principle is as follows: at first, rotatory screw section of thick bamboo 7 makes inserted bar 11 get into the inside of spread groove 10, then install cardboard 2 on floor body 1's outer wall through bolt 3, be connected with couple 8 through outside mechanical equipment subsequently, then hoist floor body 1, when floor body 1 is hoisted, can adjust the position of the floor body 1 of being hoisted through handle 14, when removing floor body 1 to suitable position, rubber pad 13 and buffer 12 can reduce the impact that floor body 1 received, prevent floor body 1 from breaking.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent replacements, and improvements made within the spirit and principle of the present invention should be included within the protection scope of the present invention.
Claims (7)
1. The utility model provides a spacing fixed plate of prestressing force coincide floor, includes floor body (1), its characterized in that: the floor slab is characterized in that clamping plates (2) are arranged at two outer ends of the floor slab body (1), a plurality of groups of bolts (3) are arranged inside the clamping plates (2), one ends of the bolts (3) extend into the floor slab body (1), connecting columns (4) are welded at the tops of the clamping plates (2), and guide columns (5) are movably connected inside the connecting columns (4).
2. The spacing fixed plate of prestressing force coincide floor of claim 1, its characterized in that: a screw rod (6) is welded on one side wall of the connecting column (4), and a screw cylinder (7) is connected to the outer portion of the screw rod (6) in a threaded mode.
3. The spacing fixed plate of prestressing force coincide floor of claim 1, its characterized in that: the top of the connecting column (4) is in threaded connection with a hook (8) which is convenient for moving the connecting column (4).
4. The spacing fixed plate of prestressing force coincide floor according to claim 1, its characterized in that: grooves (9) used for increasing the surface adhesion degree of the floor slab body (1) are formed in the outer top wall of the floor slab body (1) and the outer bottom wall of the floor slab body (1).
5. The spacing fixed plate of prestressing force coincide floor of claim 1, its characterized in that: a plurality of connecting grooves (10) are formed in the floor slab body (1), a plurality of inserting rods (11) are welded on the inner side wall of the clamping plate (2), and the inserting rods (11) are matched with the connecting grooves (10) for use.
6. The spacing fixed plate of prestressing force coincide floor of claim 1, its characterized in that: the bottom of the clamping plate (2) is bolted with a buffer plate (12), and the bottom of the buffer plate (12) is bonded with a rubber pad (13).
7. The spacing fixed plate of prestressing force coincide floor of claim 1, its characterized in that: and a handle (14) which is convenient for moving the clamping plate (2) is bolted on one outer side wall of the clamping plate (2).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320103567.6U CN218879192U (en) | 2023-02-03 | 2023-02-03 | Spacing fixed plate of prestressing force coincide floor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202320103567.6U CN218879192U (en) | 2023-02-03 | 2023-02-03 | Spacing fixed plate of prestressing force coincide floor |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218879192U true CN218879192U (en) | 2023-04-18 |
Family
ID=85954953
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202320103567.6U Active CN218879192U (en) | 2023-02-03 | 2023-02-03 | Spacing fixed plate of prestressing force coincide floor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218879192U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119266437A (en) * | 2024-11-15 | 2025-01-07 | 济南一建集团有限公司 | Prefabricated composite floor slab connection device and connection method |
-
2023
- 2023-02-03 CN CN202320103567.6U patent/CN218879192U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119266437A (en) * | 2024-11-15 | 2025-01-07 | 济南一建集团有限公司 | Prefabricated composite floor slab connection device and connection method |
| CN119266437B (en) * | 2024-11-15 | 2025-04-15 | 济南一建集团有限公司 | Connecting device and connecting method for prefabricated composite floor slab |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202370233U (en) | Pull rod type external wall cantilever discharging platform setting-up structure | |
| CN209780193U (en) | Suspension type scaffold | |
| CN218879192U (en) | Spacing fixed plate of prestressing force coincide floor | |
| CN102912996A (en) | Steel tube concrete column high-altitude construction safety protection system | |
| CN105926925A (en) | Joist steel cantilever beam of suspended scaffold and construction method thereof | |
| CN109577643B (en) | Embedded steel formwork for supporting steel platform and construction method thereof | |
| CN111395184A (en) | System and method for constructing high pier with gradually-changed section by using electric bridge type scaffold platform | |
| CN201762974U (en) | System for simultaneous construction of upper horizontal structure and lower horizontal structure in core tube | |
| CN213682119U (en) | Foundation pile pours and uses steel reinforcement cage fixing device | |
| CN210827998U (en) | double-T plate of underground garage | |
| CN218619794U (en) | Prefabricated stand special lifting device based on UHPC connects | |
| CN217105624U (en) | Autoclaved aerated concrete slotting anti-cracking plate | |
| CN219431433U (en) | Independent climbing operation protection integrated platform structure | |
| CN102127962B (en) | The bidirectional stress base section of the attached lift scaffold improved | |
| CN216713867U (en) | Fixed bolster of prefabricated wallboard and contain braced system of this support | |
| CN210396074U (en) | Lifting point truss and attached lifting scaffold thereof | |
| KR101740273B1 (en) | Fixing device for tower crane | |
| CN210530314U (en) | Formwork frame is pour to steel concrete combination shear wall T type node | |
| CN210313129U (en) | Prefabricated floor hoisting structure | |
| CN212388964U (en) | Additional support for lifting of continuous high and large structural space climbing frame | |
| CN222632920U (en) | A support device for upper side wall | |
| CN216662192U (en) | Special fixture for horizontal transportation of ALC (autoclaved lightweight concrete) plate | |
| CN221919899U (en) | Prefabricated wall body is built in room | |
| CN220503877U (en) | Extension cage of wall steel reinforcement cage is even to ground | |
| CN219887568U (en) | High-altitude adjustable formwork support |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |