CN217631722U - Building well rail guard - Google Patents

Building well rail guard Download PDF

Info

Publication number
CN217631722U
CN217631722U CN202221767075.9U CN202221767075U CN217631722U CN 217631722 U CN217631722 U CN 217631722U CN 202221767075 U CN202221767075 U CN 202221767075U CN 217631722 U CN217631722 U CN 217631722U
Authority
CN
China
Prior art keywords
frame
building
stand
clamping
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221767075.9U
Other languages
Chinese (zh)
Inventor
刘蕾
于艳卿
王丽明
王令
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CITY UNIVERSITY
Original Assignee
BEIJING CITY UNIVERSITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CITY UNIVERSITY filed Critical BEIJING CITY UNIVERSITY
Priority to CN202221767075.9U priority Critical patent/CN217631722U/en
Application granted granted Critical
Publication of CN217631722U publication Critical patent/CN217631722U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a construction guardrail technical field, in particular to building well rail guard, including frame and demountable installation at the stand of frame both sides, integrated into one piece has the grid in the frame, every both ends all are equipped with the mounting bar about the stand, frame both sides four corners all is equipped with joint spare, the joint spare of frame corresponds the one end of block at the mounting bar of stand, install in the sleeve bottom the stand, the sleeve both sides all are fixed with and are horizontally supporting shoe, every the supporting shoe back is fixed with the couple of horizontal distribution, two the couple orientation of supporting shoe is opposite, the couple endotheca is equipped with the fixed pin, install at building subaerial fixed pin bottom. The utility model discloses technical scheme's easy equipment of rail guard is dismantled, is fit for the interim protection of building well construction, convenient to use.

Description

Building well rail guard
Technical Field
The utility model relates to a construction guardrail technical field, concretely relates to building well rail guard.
Background
The protective fence is an industrial protective fence or a crash protective fence, and is mainly used for protection and protection occasions of equipment and facilities in factories, workshops and warehouses. Usually made of steel, such as round steel pipe, square steel pipe or profiled steel sheet. The surface treatment process comprises the following steps: fully automatic electrostatic powder spraying (i.e. plastic spraying) or paint spraying. The raw materials used for the surface treatment of the outdoor crash barrier are waterproof materials. The manufactured anti-collision guardrail has beautiful appearance and is not easy to rust. The upright post of the anti-collision guardrail is fixed with the ground through an expansion bolt. Are usually installed on the sides of logistics channels, the periphery of production equipment, building corners, the sides of doors and the edges of cargo beds, etc. The damage of equipment and facilities caused by accidental impact when the carrying equipment shuttles back and forth is effectively avoided.
The current interim guardrail to construction well adopts monolithic structure mostly, adopts bolt direct mount to locate at the entrance, and the installation is dismantled inconveniently, when needs get into the well temporarily, needs wholly dismantle the rail guard, consequently needs the technical scheme of this application to solve above-mentioned problem urgently.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome above-mentioned prior art not enough, provide an easy assembly and disassembly of building well rail guard, be fit for the interim protection of building well construction, convenient to use.
The utility model provides a building well rail guard, including frame and demountable installation at the stand of frame both sides, integrated into one piece has the grid in the frame, every both ends all are equipped with the mounting bar about the stand, frame both sides four corners all is equipped with joint spare, the joint spare of frame corresponds the one end of block at the mounting bar of stand, install in the sleeve bottom the stand, the sleeve both sides all are fixed with and are horizontally supporting shoe, every the supporting shoe back is fixed with horizontal distribution's couple, two the couple orientation of supporting shoe is opposite, the couple endotheca is equipped with the fixed pin, install at the building subaerial fixed pin bottom.
In some embodiments, the post is a stainless steel tube post.
In some embodiments, the mounting bar comprises a semicircular mounting part and clamping bars arranged at two ends of the mounting part, the mounting part is fixed on the outer side of the upright post through screws, and a boss is arranged at the tail end of each clamping bar.
In some embodiments, the clamping member is an angle iron block, one end of the clamping member is fixedly connected with the outer frame, a clamping groove is formed in the bottom of the other end of the clamping member, and the clamping member is clamped on the clamping strip of the mounting strip through the clamping groove.
In some embodiments, two ends of the upper part of the sleeve extend outwards to form a rectangular cavity, and a wedge with a platform at the top is installed in the cavity.
In some embodiments, the top of the post is flush with the top of the outer frame.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that: the clamping piece of the outer frame is correspondingly clamped at one end of the mounting strip of the stand column, so that the outer frame can be lifted upwards and taken down from between the two stand columns, the outer frame can conveniently enter a building shaft temporarily, the temporary protection of the construction of the building shaft is suitable, and the use is convenient; the horizontal supporting blocks are fixed on two sides of the arranged sleeve, and the supporting blocks are sleeved on the fixing pins through the hooks, so that the whole sleeve and the stand column are also convenient to disassemble, and the whole protective guard is easy to assemble and disassemble.
Drawings
In order to more clearly illustrate the technical solution of the present invention, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic front structure diagram of a protective fence for a building hoistway according to the present invention.
Fig. 2 is a schematic view of the back-side three-dimensional enlarged structure of the mounting bar and the clip member of the protective fence for construction shaft provided by the present invention.
Fig. 3 is an enlarged schematic view of the sleeve of the protective guard for the construction shaft according to the present invention.
Fig. 4 is a schematic view of a part a of fig. 1.
Detailed Description
The foregoing and other technical contents, features and advantages of the present invention will be apparent from the following detailed description of the embodiments with reference to the accompanying drawings. The following description contains various specific details to aid in this understanding, but these details should be construed as merely exemplary. Moreover, descriptions of well-known functions and constructions may be omitted for clarity and conciseness.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "left", "right", "top", "bottom", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention.
As shown in fig. 1-4, the building hoistway guard railing of this embodiment includes an outer frame 1 and columns 2 detachably mounted on two sides of the outer frame 1, a grid 3 (specifically, a stainless steel material is integrally formed) is integrally formed in the outer frame 1, mounting bars 4 are respectively disposed at upper and lower ends of each column 2, four corners of two sides of the outer frame 1 are respectively provided with a clamping member 5, the clamping member 5 of the outer frame 1 corresponds to one end of the mounting bar 4 clamped on the column 2, the bottom of the column 2 is mounted in a sleeve 6, horizontal support blocks 7 are respectively fixed on two sides of the sleeve 6, hooks 8 horizontally distributed are fixed on the back of each support block 7, the hooks 8 of the two support blocks 7 face oppositely, a fixing pin 9 is sleeved in each hook 8, so that the horizontal position of the hooks 8 after being sleeved on the fixing pin 9 is limited, the sleeves 6 can only be taken out upwards, the bottom of the fixing pin 9 is mounted on the ground of a building, when the building is mounted, holes are drilled on the ground in advance, and then the fixing pin 9 is knocked in.
Based on the arrangement of the structure, the clamping piece 5 of the outer frame 1 is correspondingly clamped at one end of the mounting strip 4 of the stand column 2, so that the outer frame 1 can be lifted up and taken down from between the two stand columns 2, the outer frame can conveniently enter a building shaft temporarily, the temporary protection of the construction of the building shaft is suitable, and the use is convenient; the two sides of the sleeve 6 are respectively fixed with a horizontal supporting block 7, the supporting blocks 7 are sleeved on the fixing pins 9 through hooks 8, so that the whole sleeve 6 and the stand column 2 are also convenient to disassemble, and the whole protective guard is easy to assemble, disassemble and assemble
Preferably, the column 2 is a stainless steel tube column. The insertion of the upright 2 into the sleeve 6 for assembly is facilitated.
According to fig. 2, the mounting strip 4 comprises a semicircular mounting part 41 and clamping strips 42 arranged at two ends of the mounting part 41, the mounting part 41 is fixed on the outer side of the upright post 2 through screws, a boss 43 is arranged at the tail end of each clamping strip 42, and the boss 43 is used for preventing the clamping piece 5 clamped on the clamping strips 42 from slipping off in the horizontal direction.
Further, joint spare 5 is the angle bar piece, and 5 one end of joint spare and frame 1 fixed connection specifically adopt the welded mode fixed, and 5 other end bottoms of joint spare are equipped with draw-in groove 51, and joint spare 5 makes things convenient for frame 1 to install and dismantle through draw-in groove 51 block on the card strip 42 of mounting bar 4 like this.
Preferably, as shown in fig. 3 and 4, rectangular cavities 61 are formed in the upper ends of the sleeve 6 and extend outwards, a wedge 62 with a platform at the top is installed in each cavity 61, and the installation structure of the column 2 in the sleeve 6 can be firm by knocking in the wedge 62 in each cavity 61.
Specifically, the top of the upright post 2 is flush with the top of the outer frame 1, so as to keep the upper structure of the whole guard rail flat.
The above description is only exemplary embodiments of the present invention, and should not be construed as limiting the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a building well rail guard, its characterized in that includes frame (1) and demountable installation stand (2) in frame (1) both sides, integrated into one piece has grid (3), every in frame (1) both ends all are equipped with mounting bar (4) about stand (2), frame (1) both sides four corners all is equipped with joint spare (5), the joint spare (5) of frame (1) correspond the one end of block in mounting bar (4) of stand (2), install in sleeve (6) stand (2) bottom, sleeve (6) both sides all are fixed with and are horizontally supporting shoe (7), every supporting shoe (7) back is fixed with horizontally distributed's couple (8), two couple (8) the opposite orientation of supporting shoe (7), couple (8) endotheca is equipped with fixed pin (9), install at building subaerial fixed pin (9) bottom.
2. The building hoistway guard rail of claim 1, wherein the column (2) is a stainless steel tube column.
3. The building hoistway guard rail according to claim 2, wherein the mounting bar (4) comprises a semicircular mounting part (41) and clamping bars (42) arranged at two ends of the mounting part (41), the mounting part (41) is fixed on the outer side of the upright post (2) through screws, and a boss (43) is arranged at the tail end of each clamping bar (42).
4. The building hoistway guard railing of claim 3, wherein the clamping member (5) is an angle iron block, one end of the clamping member (5) is fixedly connected with the outer frame (1), a clamping groove (51) is formed in the bottom of the other end of the clamping member (5), and the clamping member (5) is clamped on the clamping strip (42) of the mounting strip (4) through the clamping groove (51).
5. The building hoistway guard fence according to claim 1, wherein rectangular cavities (61) are formed in two ends of the upper portion of the sleeve (6) in an outward extending mode, and wedges (62) with platforms at the tops are installed in the cavities (61).
6. The building hoistway guard rail of claim 1, wherein the top of the upright post (2) is flush with the top of the outer frame (1).
CN202221767075.9U 2022-07-09 2022-07-09 Building well rail guard Active CN217631722U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221767075.9U CN217631722U (en) 2022-07-09 2022-07-09 Building well rail guard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221767075.9U CN217631722U (en) 2022-07-09 2022-07-09 Building well rail guard

Publications (1)

Publication Number Publication Date
CN217631722U true CN217631722U (en) 2022-10-21

Family

ID=83633318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221767075.9U Active CN217631722U (en) 2022-07-09 2022-07-09 Building well rail guard

Country Status (1)

Country Link
CN (1) CN217631722U (en)

Similar Documents

Publication Publication Date Title
EP0711889A2 (en) Form panel
CN107327111A (en) A kind of dried hanging hang structure and finishing systems
CN215212255U (en) Suspension type frame combined high-altitude operation platform
CN217631722U (en) Building well rail guard
CN207122081U (en) A kind of dried hanging hang structure and finishing systems
CN109853744B (en) Assembled steel structure frame supporting system and mounting method
CN217129027U (en) Telescopic portable slab rib protection temporary bridge
CN211873780U (en) Attached safety operation protection platform for building construction
CN209874424U (en) Building assembled safety scaffold
CN210530504U (en) Multifunctional protective railing for construction site
CN210508494U (en) Combined fairway
KR200460577Y1 (en) Handrail
CN112112273A (en) Connecting piece
CN220058564U (en) Reinforcing bar rack supports protector
CN211500043U (en) Combined adjustable hole protective device
CN211421944U (en) Module unit and safety protection shed thereof
CN218264834U (en) Roofing transformation engineering protection outrigger
CN215717764U (en) Bridge road construction rail guard
CN215443196U (en) Building wall curtain wall installation location construction equipment
CN215564317U (en) Novel stores pylon for assembly type structure
CN212453930U (en) Guardrail for building convenient to installation warning sign
CN221095548U (en) Hanging framework and stone curtain wall mounting system
CN216109850U (en) Practical special guardrail for high-altitude edge-facing protection
CN212689540U (en) Guide rail for climbing frame
CN218990858U (en) Portable hanging flower basket device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant