KR200460577Y1 - Handrail - Google Patents

Handrail Download PDF

Info

Publication number
KR200460577Y1
KR200460577Y1 KR20100005994U KR20100005994U KR200460577Y1 KR 200460577 Y1 KR200460577 Y1 KR 200460577Y1 KR 20100005994 U KR20100005994 U KR 20100005994U KR 20100005994 U KR20100005994 U KR 20100005994U KR 200460577 Y1 KR200460577 Y1 KR 200460577Y1
Authority
KR
South Korea
Prior art keywords
horizontal support
bolt
reinforcing bar
transfer
head
Prior art date
Application number
KR20100005994U
Other languages
Korean (ko)
Other versions
KR20110011546U (en
Inventor
유은상
Original Assignee
유은상
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유은상 filed Critical 유은상
Priority to KR20100005994U priority Critical patent/KR200460577Y1/en
Publication of KR20110011546U publication Critical patent/KR20110011546U/en
Application granted granted Critical
Publication of KR200460577Y1 publication Critical patent/KR200460577Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S256/00Fences

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 고안은 난간 지주에 관한 것으로서, 더욱 상세하게는 교량이나 도로 등 다양한 시설물에 시공되는 난간 지주를 호환이 가능한 구조로 형성하여 시공장소에 기설치된 기초철근에 체결구조를 간편성과 견고성을 높인 난간 지주에 관한 것이다.The present invention relates to railing struts, and more particularly, railing struts that are constructed in various facilities such as bridges or roads to form a compatible structure, and a fastening structure to a basic reinforcement installed in a city factory has a simple and robust railing strut. It is about.

Description

난간 지주{PARAPET SUPPORT}Railing Shore {PARAPET SUPPORT}

본 고안은 난간 지주에 관한 것으로서, 더욱 상세하게는 교량이나 도로 등 다양한 시설물에 시공되는 난간 지주를 호환이 가능한 구조로 형성하여 시공장소에 기 설치된 기초철근에 체결구조를 편리하게 한 간편성과 견고성을 높인 난간 지주에 관한 것이다.The present invention relates to a handrail prop. More specifically, the handrail strut constructed in various facilities such as a bridge or a road is formed into a compatible structure, which provides convenience and robustness to make a fastening structure convenient for the basic reinforcement installed in a factory. It is about raised rail props.

일반적으로, 교량, 도로 등을 비롯한 다양한 시설물에 왕래하는 차량이나 사Generally, vehicles or cars that come and go to various facilities, including bridges, roads, etc.

람의 낙하 또는 이탈을 방지하기 위한 난간이 설치된다. 이러한 난간은 수직방향으Railings are installed to prevent the falling or falling of the ram. These railings are vertical

로 세워 설치되는 지주와 이 지주에 수평 또는 교차방향으로 결합된 난간대로 이루It is composed of props installed vertically and railings joined horizontally or crosswise to the props.

어지며, 통상 설치 장소의 바닥면에 다수의 지주를 소정 간격으로 설치하고, 이 지Usually, a plurality of struts are installed at predetermined intervals on the bottom surface of the installation site.

주에 난간대를 결합하는 방식으로 시공된다.It is constructed in such a way that the railing is attached to the main.

도 1에 상기한 방식으로 시공되는 종래 난간의 지주 설치 구조가 도시되어 Figure 1 shows a structure for installing a strut of a conventional railing constructed in the manner described above

있다. 도시된 바와 같이 종래에는 시공면에 고정되어 있는 볼트(20)의 측방에 지주(10)를 세워 배치한 다음, 지주(10)의 일측을 클램프(30)를 이용하여 볼트(20)에 밀착되도록 체결하고, 이 클램프(30)가 체결된 부분보다 위쪽부분을 별도의 체결구(40)를 이용하여 상기 볼트(20)와 소정 간격 이격된 위치의 다른 볼트(20')에 연결하여 지주(10)를 고정시켰다. 상기 클램프(30)는 비계 설치에 사용되는 통상의 것으로 힌지결합된 두 개의 부재가 볼트(31) 및 너트(32)에 의해 체결되는 구조이고, 상기 체결구(40)는 지지바아(43)의 양측에 각각 상기 지주(10)에 볼트(47) 및 너트(48)로 체결되는 결합부재(15) 및 상기 볼트(20')의 헤드에 걸어 체결되는 고리형 결합부재(41)가 힌지결합된 구조를 갖는다.have. As shown in the prior art, the support 10 is placed upright on the side of the bolt 20 fixed to the construction surface, and then one side of the support 10 is brought into close contact with the bolt 20 using the clamp 30. The upper portion of the upper portion of the clamp 30 to which the clamp 30 is fastened is connected to another bolt 20 'at a position spaced apart from the bolt 20 by using a separate fastener 40 to support the post 10. ) Is fixed. The clamp 30 has a structure in which two hinged members are fastened by bolts 31 and nuts 32, and the fastener 40 has a support bar 43. The coupling member 15 which is fastened by the bolt 47 and the nut 48 to the support 10 and the ring-shaped coupling member 41 which is fastened to the head of the bolt 20 'is hingedly coupled to both sides, respectively. Has a structure.

종래의 지주(10)는 볼트(20)에 외접한 상태로 체결하여 고정시키는 구조였기 때문에, 상기 클램프(30)에 의한 일점 체결만으로는 지주(10)의 고정이 불안정하여 상기한 바와 같은 체결구(40)를 지주(10)의 다른 위치에 추가로 체결해야만 했다. 이에 따라, 지주(10)의 설치에 많은 자재비용이 소요되며, 설치작업도 불편하고 시간도 많이 소요되는 문제점이 있었다.Since the conventional post 10 is structured to be fastened by fixing in a state of being external to the bolt 20, the fastening of the post 10 is unstable only by one-point fastening by the clamp 30. 40) had to be additionally tightened at other positions of the strut 10. Accordingly, a large material cost is required for the installation of the support 10, there is a problem that the installation work is inconvenient and takes a lot of time.

더욱이, 지주(10)와 인접한 볼트(20)가 전체적으로 밀착되도록 하기 위해 볼Furthermore, in order to ensure that the struts 10 and the adjacent bolts 20 are brought into close contact with each other,

트(20)의 헤드(21) 형태에 따라 지주(10)에 함몰부(11)를 형성하고, 시공면 상의 돌부(22) 형태에 따라 지주(10)에 절개홈(30)을 형성해야 하며, 특히 상기 함몰부(11)를 현장에서 타격 또는 가압하여 형성함으로 인해 지주(10)의 손상 및 구조적 약화가 발생되는 문제점이 있었다.According to the shape of the head 21 of the trough 20, the depression 11 is formed on the support 10, and the incision groove 30 must be formed in the support 10 according to the shape of the protrusion 22 on the construction surface. In particular, there is a problem that damage and structural weakening of the support (10) occurs due to the impact formed by hitting or pressing the depression 11 in the field.

상기이 문제를 해결하기 위해 도 2에 도시한 본원 출원인이 출원하여 등록한 실용신안등록20-0439600호(2008.04.21) 난간지주는 시공면에 세워진 상태로 기존에 설치되어 있는 볼트(20)에 체결하여 고정하도록 된 난간 지주에 있어서, 상기 볼트(20)가 내부에 삽입될 수 있도록 내부 공간이 형성된 관체로 이루어지며, 일측에는 삽입된 볼트(20)의 헤드(21)가 외부로 돌출되는 관통공(101)이 형성되고, 타측에는 삽입공(103)이 형성된 지주본체(100); 및 상기 지주본체(100)의 외부에 결합되며 상기 삽입공(103)을 향하는 방향으로 결합공(111)이 형성된 지지부재(110)와, 상기 삽입공(103)을 통해 왕복 가능하도록 상기 지지부재(110)의 결합공(111)에 나사결합되어 그 회전에 따라 상기 볼트(20)를 지주본체(100)의 내면에 가압 고정하는 고정스크류(122)로 이루어진 체결구(120)를 포함하는 난간 지주를 구성하였으나, 본원실용신안은 기초철근중에 "

Figure 112010036755270-utm00001
" 철근을 고정하기 어려워 다목적으로 사용이 불편한 문제점을 해결하기 위한 것이다. Utility Model Registration No. 20-0439600 (2008.04.21) handrail filed and filed by the applicant of the present application shown in FIG. 2 to solve this problem by fastening to the existing bolt (20) installed on the construction surface In the handrail to be fixed, the bolt 20 is made of a tubular body formed with an inner space to be inserted therein, one side of the through hole through which the head 21 of the inserted bolt 20 protrudes to the outside ( 101 is formed, the holding body 100 is formed on the other side insertion hole 103; And a support member 110 coupled to the outside of the support main body 100 and having a coupling hole 111 in a direction toward the insertion hole 103 and reciprocating through the insertion hole 103. Handrail including a fastener 120 made of a fixing screw 122 is screwed to the coupling hole 111 of the 110 and pressurized and fixed to the inner surface of the support body 100 according to the rotation thereof. Although the landlord constituted a landlord,
Figure 112010036755270-utm00001
"It is to solve the problem that it is hard to fix the rebar and is inconvenient to use.

본 고안이 해결하고자 하는 과제는 시공면에 세워진 상태로 기존에 설치되어 있는 돌출 기초철근(볼트철근, 일자형철근,

Figure 112010036755270-utm00002
철근)에 적용하여 체결구조의 간편성과 견고성을 높인 난간 지주를 제공하는 데 그 목적이 있다.The problem to be solved by the present invention is a projected foundation rebar (bolt reinforcement, straight reinforcement,
Figure 112010036755270-utm00002
The purpose of this invention is to provide handrail struts, which are applied to rebars, to increase the simplicity and robustness of fastening structure.

본 고안의 해결 수단은 시공면에 세워진 상태로 기존에 설치되어 있는 돌출 기초철근(볼트철근, 일자형철근,

Figure 112010036755270-utm00003
철근에 체결하여 고정하도록 된 난간 지주에 있어서, 안전끈 걸이구가 형성되고, 시공면에 세워진 상태로 기존에 설치되어 있는 돌출 기초철근(볼트철근, 일자형철근,
Figure 112010036755270-utm00004
철근에 체결하여 고정하도록 된 난간 지주에 있어서, 기초철근이 내부에 삽입될 수 있도록 외부에서 안쪽으로 형성한 안착홈(100)과, 상기 안착홈의 상부에는 기초철근중에 머리가 있는 볼트를 장착시 머리가 외부에서 안쪽으로 장착되도록 관통구가 형성된 관체로 형성되며 양측면에 제1,2체결너트가 용접된 지주본체와, 상기 제1, 2체결너트에 공구취부가 형성된 제1,2 이송스크류를 장착하고, 상기 이송스크류를 고정하도록 후면에 락너트를 구성하고, 제 1,2 이송스크류의 전방에는 기초철근을 고정할 수 있도록 가로지지대(180)와 상기 가로지지대의 전면 내부에 다수개의 밀착홈이 형성된 밀착판과, 상기 제 1체결너트에 끼워진 제1 이송스크류에 결합되는 가로지지대에 장착되어 회전할 수 있도록 구성한 축관과, 상기 가로지지대에 걸고리브라켓를 구성하여 제2 이송스크류에 걸어서 기초철근을 고정하도록 달성 하였다.The solution of the present invention is a projected foundation rebar (bolt reinforcement, straight reinforcement,
Figure 112010036755270-utm00003
In railing struts which are fastened and fixed to reinforcing bars, protruding base bars (bolt reinforcing bars, straight bars,
Figure 112010036755270-utm00004
In the handrail to be fastened to the reinforcing bars, the mounting groove 100 formed inward from the outside so that the base reinforcement can be inserted into the inside, and the upper part of the mounting groove when mounting the head bolt in the base reinforcement The main body is formed of a tubular body formed with a through hole so that the head is mounted from the outside inwards, and the first and second fastening nuts welded to the first and second fastening nuts on both sides thereof, and the first and second conveying screws having the tool attachments to the first and second fastening nuts. And a lock nut at a rear side to fix the transfer screw, and a horizontal support 180 and a plurality of close grooves inside the front side of the horizontal support so as to fix the basic reinforcement at the front of the first and second transfer screws. And a shaft tube configured to be attached to and rotated on a horizontal support coupled to the first conveying screw fitted to the first fastening nut, and a hook bracket formed on the horizontal support. It was achieved to fix the basic rebar by walking on the second transfer screw.

본 고안에 의하면, 견고하고 신속하게 지주를 설치할 수 있어 난간 시공에 소요되는 부자재 비용과 인력 및 시간을 절감할 수 있는 효과가 있다.According to the present invention, it is possible to install the struts quickly and robustly, thereby reducing the cost and manpower and time required for subsidiary materials.

작업 편의성이 향상되고 시공 후 지주의 설치 상태가 더욱 견고하게 유지될 수 있는 효과가 있으므로 매우 유용한 고안인 것이다.It is a very useful design because the work convenience is improved and the installation state of the post after construction can be more firmly maintained.

도 1은 종래의 지주난간을 도시한 상태도.
도 2는 종래의 지주난간을 도시한 상태도.
도 3은 본 고안의 지주 난간을 도시한 사시도.
도 4는 본 고안의 지주 난간의 작용상태도.
도 5는 본 고안의 지주 난간을 볼트철근에 장착한 상태의 사시도.
도 6은 본 고안의 지주 난간을

Figure 112010036755270-utm00005
철근에 장착한 상태의 사시도.
* 도면을 주요부호에 대한 상세한 설명 *
100 : 안착홈 110 : 관통구
120 : 제1 체결너트 130 : 제2 체결너트
140 : 제1 이송스크류 150 : 제2 이송스크류
160 : 락너트 180 : 가로지지대
190 : 밀착판 200 : 축관
210 : 걸고리브라켓 220 : 공구취부
300 : 지주본체1 is a state diagram showing a conventional strut rail.
Figure 2 is a state diagram showing a conventional strut rail.
Figure 3 is a perspective view of the prop rail of the present invention.
Figure 4 is a state of action of the holding rail of the present invention.
5 is a perspective view of a state in which the holding railings of the present invention are mounted on bolt reinforcing bars.
6 is a holding handrail of the present invention
Figure 112010036755270-utm00005
Perspective view with the rebar mounted.
Detailed description of the main symbols in the drawings
100: seating groove 110: through hole
120: first tightening nut 130: second tightening nut
140: first transfer screw 150: second transfer screw
160: lock nut 180: horizontal support
190: contact plate 200: shaft tube
210: hook bracket 220: tool mounting
300: holding body

본 고안의 바람직한 실시예의 첨부된 도면을 참조하여 상세히 설명한다.With reference to the accompanying drawings of a preferred embodiment of the present invention will be described in detail.

도 3내지 도 7에 도시한 본 고안의 지주 난간은 시공면에 세워진 상태로 기존에 설치되어 있는 돌출된 볼트철근, 일자형철근,

Figure 112010036755270-utm00006
철근 등에 호환이 가능하도록 설계한 것을 요지로 하고 있다.3 to 7 of the strut handrail of the present invention shown in Figure 3 is a protruding bolt reinforcement, straight reinforcement, which is installed in the state standing on the construction surface,
Figure 112010036755270-utm00006
It is designed to be compatible with rebars.

본 고안의 지주 난간은 안전끈 걸이구가 형성되고, 시공면에 세워진 상태로 기존에 설치되어 있는 돌출 기초철근(볼트철근, 일자형철근,

Figure 112010036755270-utm00007
철근에 체결하여 고정하도록 된 난간 지주에 있어서, 상기 기초철근이 내부에 삽입될 수 있도록 외부에서 안쪽으로 형성한 안착홈(100)과, 상기 안착홈의 상부에는 기초철근 중에 머리가 있는 볼트를 장착시 머리가 외부에서 안쪽으로 장착되도록 관통구(110)가 형성된 관체로 형성되며 양측면에 제1,2체결너트(120,130)가 용접된 지주본체(300); 상기 제1, 2체결너트(120,130)에 공구취부가 형성된 제1,2 이송스크류(140,150)를 장착하고, 상기 이송스크류를 고정하도록 후면에 락너트(160)를 구성하고, 제 1,2 이송스크류의 전방에는 기초철근을 고정할 수 있도록 가로지지대(180)와 상기 가로지지대의 전면 내부에 다수개의 밀착홈이 형성된 밀착판(190)과, 상기 제 1체결너트(120)에 끼워진 제1 이송스크류(140)에 결합되는 가로지지대에 장착되어 회전할 수 있도록 구성한 축관(200)과, 상기 가로지지대(180)에 걸고리브라켓(210)를 구성하여 제2 이송스크류(150)에 걸어서 기초철근을 고정하도록 한 특징이 있다.The strut handrail of the present invention is formed with a safety strap hanger, and is installed on the construction surface of the existing foundation reinforcing bar (bolt reinforcement, straight reinforcement,
Figure 112010036755270-utm00007
In the handrail to be fastened to be fixed to the rebar, the mounting groove 100 formed inward from the outside so that the basic reinforcement can be inserted into the inside, and the upper part of the mounting groove is equipped with a head bolt in the base reinforcement When the head is mounted from the outside to the inside is formed of a through-hole 110 is formed, the holding body 300 welded to the first and second fastening nuts (120,130) on both sides; The first and second fastening nuts 120 and 130 are equipped with first and second conveying screws 140 and 150 having a tool attachment, and the lock nut 160 is formed on the rear surface to fix the conveying screw, and the first and second conveying screws. In front of the horizontal support 180 and the contact plate 190 formed with a plurality of contact grooves in the front of the horizontal support so as to fix the base reinforcement, and the first transfer screw fitted to the first fastening nut 120 The shaft pipe 200 is mounted on the horizontal support coupled to the horizontal support 140, and the hook bracket 210 is formed on the horizontal support 180 to fix the basic rebar by walking on the second transfer screw 150. There is a feature to make.

도 6에 도시한 본 고안은

Figure 112010036755270-utm00008
철근에 장착하거나 도 5에 도시한 머리부분이 있는 볼트철근 등에 장착할 수 있는 구조를 형성하기 위해 지주본체(300)에 안착홈(100)을 형성하고 밀착판(190)을 구성한 가로지지대(180)를 양쪽에서 당겨서 밀착하도록 제1,2 이송스크류(140,150)를 구성하였다.The present invention shown in Figure 6
Figure 112010036755270-utm00008
In order to form a structure that can be mounted on the rebar or mounted on the bolt reinforcement with a head portion shown in Figure 5 forming a mounting groove 100 in the holding body 300 and the horizontal support 180 formed a contact plate 190 The first and second transfer screws 140 and 150 were configured to be in close contact with each other by pulling).

도 3과 도 4에 도시한 본 고안의 난간 지주에 장착된 가로지지대(180)은 제1체결너트(120)에 공구취부(220)가 형성된 제 1이송스크류(140)를 장착하고, 상기 제1 이송스크류(140)를 고정하도록 후면에 락너트(160)를 구성하고 있다.3 and 4, the horizontal support 180 mounted on the handrail of the present invention includes a first transfer screw 140 having a tool mounting 220 formed on the first fastening nut 120, and 1 locknut 160 is configured on the rear side to fix the transfer screw 140.

다음 제2 체결너트(130)에 공구취부(220)가 형성된 제2 이송스크류(150)를 장착하고, 상기 제2 이송스크류(150)를 고정하도록 후면에 락너트(160)를 구성하고 있다.Next, the second fastening nut 130 is equipped with a second conveying screw 150 having the tool mounting 220 formed thereon, and a lock nut 160 is formed on the rear surface to fix the second conveying screw 150.

상기와 같이 "H"형 구조로 제1,2 이송스크류(140,150)로 당겨서 가로지지대를 밀착하도록 구성하였다.As described above, the first and second transfer screws 140 and 150 are pulled into the “H” type structure to close the horizontal support.

상기 제1이송스크류의 끝단에는 회전가능하도록 축관(200)을 끼워져 있으며, 상기 축관(200)은 가로지지대(180)에 용접되어 결합하고 있다. 상기 가로지지대의 반대방향에는 걸고리브라켓(210)을 용접하여 제2이송스크류(150)에 걸어서 결합할 수 있도록 구성하고 있다.A shaft tube 200 is fitted to the end of the first conveying screw so as to be rotatable, and the shaft tube 200 is joined to the horizontal support 180 by welding. The hook bracket 210 is welded in the opposite direction to the horizontal support so as to be coupled to the second transfer screw 150.

제 1,2이송스크류(140,150)의 전방에는 기초철근을 고정할 수 있도록 다수개의 밀착홈이 형성된 밀착판(180)과 상기 밀착판을 고정하는 가로지지대가 구성된다.In front of the first and second conveying screws 140 and 150, a contact plate 180 having a plurality of contact grooves formed thereon to fix the basic rebar and a horizontal support fixing the contact plate is configured.

가로지지대(180)의 사이에는 철근을 고정할 수 있도록 밀착홈이 일정한 간격(철근의 돌기의 간격과 동일한 간격)으로 배열하여 구성한 밀착판(180)을 구성하였다. Between the horizontal support 180 to form a close contact plate 180 was formed by arranging the contact grooves at regular intervals (the same interval as the spacing of the reinforcement of the reinforcing bars) to fix the rebar.

철근의 돌기에 맞물려 견고하게 고정하도록 구성되고 지주본체의 안착홈(100)에 안착되어 고정하여 밀착할 수 있는 면적을 높이도록 구성하였다.It is configured to be firmly fixed by engaging with the protrusion of the reinforcing bar and was mounted in the seating groove 100 of the holding body to be configured to increase the area that can be tightly fixed.

지주본체(300)에 제1,2체결너트(120,130)를 용접하여 고정하고 상기 제1,2체결너트에 공구취구(220)가 형성된 제 1,2이송스크류에 락너트를 조립하여 쉽게 풀리지 않도록 결합하였다. 상기 가로지지대는 1단,2단,3단으로 적층하여 용접이 가능하도록 구성하여 결합하였다.The first and second fastening nuts 120 and 130 are welded and fixed to the support main body 300, and the lock nuts are assembled to the first and second fastening screws having the tool holder 220 formed on the first and second fastening nuts. It was. The horizontal support was laminated in one, two, and three tiers and joined to form a weldable construction.

공구취부(220)에 공구를 끼워 제 1.2이송스크류를 회전시켜 느슨하게 한 후에 철근에 장착한 후에 가로지지대를 축관을 축으로 회전하여 제 2이송스크류(150)에 걸고 난후에 다시 제 1,2 이송스크류(140,150)를 견고하게 조이면 밀착판(190)이 밀착하여 고정물을 견고하게 쉽게 고정된다.Insert the tool into the tool mounting 220 to loosen the 1.2th feed screw, and then attach it to the rebar. Then, after mounting the reinforcing bar, rotate the horizontal support shaft to the shaft and hook the second feed screw 150. If the screws 140 and 150 are firmly tightened, the contact plate 190 may be in close contact with each other to fix the fixture firmly and easily.

도 7에 도시한 본 고안의 다른 실시예는 제 1,2 이송스크류(140,150)의 끝단에 가로지지대를 결합시 관통구(280)를 형성하여 고정너트(290)로 체결하여 고정하였다.Another embodiment of the present invention shown in Figure 7 is fastened by fastening with a fixing nut 290 by forming a through hole 280 when the horizontal support is coupled to the ends of the first and second transfer screws (140,150).

본 고안의 구성은 안전끈 걸이구가 형성되고, 시공면에 세워진 상태로 기존에 설치되어 있는 돌출 기초철근(볼트철근, 일자형철근,

Figure 112010036755270-utm00009
철근에 체결하여 고정하도록 된 난간 지주에 있어서, 상기 기초철근이 내부에 삽입될 수 있도록 외부에서 안쪽으로 형성한 안착홈(100)과, 상기 안착홈의 상부에는 기초철근중에 머리가 있는 볼트를 장착시 머리가 외부에서 안쪽으로 장착되도록 관통구(110)가 형성된 관체로 형성되며 양측면에 제1,2체결너트(120,130)가 용접된 지주본체(300)을 구성하였다.The structure of the present invention is a safety strap hanger is formed, the projecting foundation reinforcement (bolt reinforcement, straight reinforcing bar,
Figure 112010036755270-utm00009
In the handrail to be fastened to the reinforcing bars, the mounting groove 100 is formed from the outside to the inside so that the base reinforcement can be inserted into the inside, and the upper head of the mounting groove is equipped with a head bolt in the base reinforcement When the head is mounted from the outside to the inside is formed of a tubular body formed with a through hole 110, and the first and second fastening nuts (120, 130) on both sides constituted the holding body 300.

상기 제1, 2체결너트(120,130)에 공구취부(220)가 형성된 제1,2 이송스크류(140,150)를 장착하고, 상기 이송스크류를 고정하도록 후면에 락너트(160)를 구성하고, 제 1,2 이송스크류의 전방에는 기초철근을 고정할 수 있도록 가로지지대(180)와 상기 가로지지대의 양쪽면에 관통구(280)가 제1,2 이송스크류를 끼워 고정너트(290)로 결합한 특징이 있다.The first and second fastening nuts 120 and 130 are mounted on the first and second transfer screws 140 and 150 having the tool mounting 220 formed thereon, and the lock nut 160 is formed on the rear surface to fix the transfer screws. 2 The front of the transfer screw is characterized in that the through hole 280 to the first and second transfer screw in the horizontal support 180 and the both sides of the horizontal support so as to fix the base reinforcement is coupled to the fixing nut 290. .

이상 살펴본 바와 같이 본 고안은 도면에 도시된 실시 예를 참고로 설명되었으나 이는 예시적인 것에 불과하며 본 기술 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 모양의 변형 및 균등한 타 실시 예가 가능하다는 점을 이해할 것이다. 따라서 본 고안의 진정한 기술적인 보호 범위는 첨부된 청구범위의 기술적 사상에 의해 정해져야 할 것이다.
As described above, the present invention has been described with reference to the embodiment illustrated in the drawings, but this is merely an example, and those skilled in the art may have various shapes and other equivalent embodiments therefrom. Will understand. Therefore, the true technical protection scope of the present invention should be defined by the technical spirit of the appended claims.

Claims (2)

안전끈 걸이구가 형성되고, 시공면에 세워진 상태로 기존에 설치되어 있는 돌출 기초철근(볼트철근, 일자형철근,
Figure 112010036755270-utm00010
철근에 체결하여 고정하도록 된 난간 지주에 있어서,
상기 기초철근이 내부에 삽입될 수 있도록 외부에서 안쪽으로 형성한 안착홈(100)과, 상기 안착홈의 상부에는 기초철근중에 머리가 있는 볼트를 장착시 머리가 외부에서 안쪽으로 장착되도록 관통구(110)가 형성된 관체로 형성되며 양측면에 제1,2체결너트(120,130)가 용접된 지주본체(300);
상기 제1, 2체결너트(120,130)에 공구취부(220)가 형성된 제1,2 이송스크류(140,150)를 장착하고, 상기 이송스크류를 고정하도록 후면에 락너트(160)를 구성하고, 제 1,2 이송스크류의 전방에는 기초철근을 고정할 수 있도록 가로지지대(180)와 상기 가로지지대의 전면 내부에 다수개의 밀착홈이 형성된 밀착판(190)과, 상기 제 1체결너트(120)에 끼워진 제1 이송스크류(140)에 결합되는 가로지지대(180)에 장착되어 회전할 수 있도록 구성한 축관(200)과, 상기 가로지지대(180)에 걸고리브라켓(210)를 구성하여 제2 이송스크류(150)에 걸어서 기초철근을 고정하도록 한 것을 특징으로 하는 난간 지주.

Safety strap hanger is formed, and the existing foundation reinforcing bar (bolt reinforcing bar, straight reinforcing bar,
Figure 112010036755270-utm00010
In the handrail strut to be fastened to the rebar,
The mounting groove 100 formed inward from the outside so that the base reinforcement can be inserted into the inside, and the upper part of the mounting groove so that the head is mounted inward from the outside when the bolt with the head is mounted in the base reinforcement ( 110 is formed of a tubular body formed with a holding body 300, the first and second fastening nuts (120, 130) welded on both sides;
The first and second fastening nuts 120 and 130 are mounted on the first and second transfer screws 140 and 150 having the tool mounting 220 formed thereon, and the lock nut 160 is formed on the rear surface to fix the transfer screws. 2 The front plate of the transfer screw to the base support to secure the reinforcing bars 180 and the contact plate 190 formed with a plurality of contact grooves in the front of the horizontal support, and the first fastening nut 120 A shaft pipe 200 is configured to be mounted on the horizontal support 180 coupled to the transfer screw 140 and configured to rotate, and the hook bracket 210 is formed on the horizontal support 180 to form a second transfer screw 150. Balustrade prop characterized in that the base reinforcement is fixed by walking on.

안전끈 걸이구가 형성되고, 시공면에 세워진 상태로 기존에 설치되어 있는 돌출 기초철근(볼트철근, 일자형철근,
Figure 112010036755270-utm00011
철근에 체결하여 고정하도록 된 난간 지주에 있어서,
상기 기초철근이 내부에 삽입될 수 있도록 외부에서 안쪽으로 형성한 안착홈(100)과, 상기 안착홈의 상부에는 기초철근중에 머리가 있는 볼트를 장착시 머리가 외부에서 안쪽으로 장착되도록 관통구(110)가 형성된 관체로 형성되며 양측면에 제1,2체결너트(120,130)가 용접된 지주본체(300);
상기 제1, 2체결너트(120,130)에 공구취부(220)가 형성된 제1,2 이송스크류(140,150)를 장착하고, 상기 이송스크류를 고정하도록 후면에 락너트(160)를 구성하고, 제 1,2 이송스크류의 전방에는 기초철근을 고정할 수 있도록 가로지지대(180)와 상기 가로지지대의 양쪽면에 관통구(280)가 제1,2 이송스크류를 끼워 고정너트(290)로 결합한 것을 특징으로 하는 난간 지주.
Safety strap hanger is formed, and the existing foundation reinforcing bar (bolt reinforcing bar, straight reinforcing bar,
Figure 112010036755270-utm00011
In the handrail strut to be fastened to the rebar,
The mounting groove 100 formed inward from the outside so that the base reinforcement can be inserted into the inside, and the upper part of the mounting groove so that the head is mounted inward from the outside when the bolt with the head is mounted in the base reinforcement ( 110 is formed of a tubular body formed with a holding body 300, the first and second fastening nuts (120, 130) welded on both sides;
The first and second fastening nuts 120 and 130 are mounted on the first and second transfer screws 140 and 150 having the tool mounting 220 formed thereon, and the lock nut 160 is formed on the rear surface to fix the transfer screws. 2 The front of the transfer screw is characterized in that the through-hole 280 is coupled to the fixing nut 290 by inserting the first and second transfer screws on both sides of the horizontal support 180 and the horizontal support so as to fix the base reinforcement. Handrail holding.
KR20100005994U 2010-06-08 2010-06-08 Handrail KR200460577Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20100005994U KR200460577Y1 (en) 2010-06-08 2010-06-08 Handrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20100005994U KR200460577Y1 (en) 2010-06-08 2010-06-08 Handrail

Publications (2)

Publication Number Publication Date
KR20110011546U KR20110011546U (en) 2011-12-14
KR200460577Y1 true KR200460577Y1 (en) 2012-06-04

Family

ID=47309937

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20100005994U KR200460577Y1 (en) 2010-06-08 2010-06-08 Handrail

Country Status (1)

Country Link
KR (1) KR200460577Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101542013B1 (en) 2014-07-14 2015-08-04 (주)삼호엔씨티 Easy installation security and street holding a folding structure rotation

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11746595B2 (en) * 2021-03-05 2023-09-05 RentACoop LLC Fence opening apparatus

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200295909Y1 (en) 2002-08-13 2002-11-23 한국산업안전공단 a safety guard supporter's fixed-unit in construction work

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200295909Y1 (en) 2002-08-13 2002-11-23 한국산업안전공단 a safety guard supporter's fixed-unit in construction work

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101542013B1 (en) 2014-07-14 2015-08-04 (주)삼호엔씨티 Easy installation security and street holding a folding structure rotation

Also Published As

Publication number Publication date
KR20110011546U (en) 2011-12-14

Similar Documents

Publication Publication Date Title
JP5968846B2 (en) Concrete wall railing mounting structure
US9644392B2 (en) Barrier cable anchor rail
KR101271450B1 (en) Safety fence for easy control angle
KR200460577Y1 (en) Handrail
KR20100009385U (en) Improvement connecting clamp of h beam
KR100737841B1 (en) Clamp for fixing a concrete form
CN204571486U (en) A kind of building operations temporary protection railing lower margin holding clamp
JP3189564U (en) Fall prevention fence for concrete structures
JP5773469B1 (en) Suspended scaffolding
KR200430532Y1 (en) A combination structure of guardrail pipe
KR200456756Y1 (en) Functional parapet support
KR200435422Y1 (en) Post bar Supporter
KR200314568Y1 (en) A clamping device for safety porch of gang form of construct
KR200284897Y1 (en) A construction guardrail pole for ship
KR200463380Y1 (en) A Combination Members Of Safety Bar
KR100433700B1 (en) Mold system for slab concrete of bridge
KR200463386Y1 (en) Bonding Material for a reinforcing rod safety bar
KR20200117824A (en) A Study on the Hypothesis Tread Plates for Framed Construction
JP5812554B1 (en) Mounting bracket and mounting structure for strut mooring
KR200347093Y1 (en) Mold system for slab concrete of bridge
KR100680277B1 (en) Ladder's bracket for H-beam
JP5851315B2 (en) Scaffolding bracket and its mounting method
CN216157089U (en) Scaffold for construction site
KR200439600Y1 (en) Parapet support
KR20080072170A (en) A fixing clamp for a form handrail

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20160311

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170426

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180410

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190325

Year of fee payment: 8