KR200435422Y1 - Post bar Supporter - Google Patents

Post bar Supporter Download PDF

Info

Publication number
KR200435422Y1
KR200435422Y1 KR2020060021350U KR20060021350U KR200435422Y1 KR 200435422 Y1 KR200435422 Y1 KR 200435422Y1 KR 2020060021350 U KR2020060021350 U KR 2020060021350U KR 20060021350 U KR20060021350 U KR 20060021350U KR 200435422 Y1 KR200435422 Y1 KR 200435422Y1
Authority
KR
South Korea
Prior art keywords
support
bridge
installation
outside
railings
Prior art date
Application number
KR2020060021350U
Other languages
Korean (ko)
Inventor
이석우
Original Assignee
(주)삼덕엔씨아이
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)삼덕엔씨아이 filed Critical (주)삼덕엔씨아이
Priority to KR2020060021350U priority Critical patent/KR200435422Y1/en
Application granted granted Critical
Publication of KR200435422Y1 publication Critical patent/KR200435422Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3223Means supported by building floors or flat roofs, e.g. safety railings
    • E04G21/3228Folding railings for flat roof edge, e.g. to hide the railings from view when not in use

Abstract

본 고안은 교량 안전 난간 설치용 지주 보조대에 관한 것으로서,The present invention relates to a prop support for bridge safety railing installation,
교량 건설 현장에서 교량 상판 위에서 작업을 하는 근로자들이 작업중 추락하는 것을 방지하기 위하여 교량 난간에 안전 난간을 설치함에 있어서,In installing safety railings on bridge railings to prevent workers working on bridge decks at the bridge construction site from falling during work,
교량 상판에 설치된 스터드 볼트 외부에, 2개 1조로 구성되고 접촉면에 끼워 맞춤 돌기와 요홈이 각각 형성되며, 내부에 스터드 볼트의 머리 지지턱이 구비된 보조대를 결합시킨 뒤, 보조대 외부에 지주대를 끼워 설치할 수 있게 함으로써,On the outside of the stud bolt installed on the bridge top plate, it is composed of two sets of fitting projections and grooves respectively formed on the contact surface, and after joining the support with the head support jaw of the stud bolt inside, the support post is inserted outside the support. By allowing you to install
시공이 보다 간편하고, 원가가 절감되며, 공사 후 수거하여 재사용이 가능한 교량 안전 난간 설치용 지주 보조대를 제공할 수 있도록 한 것이다.It is intended to provide a support for the installation of bridge safety railings, which is easier to install, lower in cost, and can be collected and reused after construction.
교량 안전 난간 설치용 지주 보조대Shoring support for bridge guardrail installation

Description

교량 안전 난간 설치용 지주 보조대{Post bar Supporter}Post bar supporter for bridge guardrail installation
도 1 은 본 고안의 분해 사시도,1 is an exploded perspective view of the present invention,
도 2 는 본 고안의 결합 상태의 외형 사시도,
도 3 은 동 종단면도,
도 4 는 본 고안의 설치 상태를 나타낸 정면도.
* 도면의 주요 부분에 대한 부호의 설명
1 : 맞춤 돌기 3 : 요홈
5 : 지지턱 7, 7' : 보조대
8 : 교량 상판 9 : 스터드 볼트
11 : 지주대 12 : 안전 난간
2 is an external perspective view of the combined state of the present invention,
3 is a longitudinal cross-sectional view,
Figure 4 is a front view showing the installation state of the present invention.
* Explanation of symbols for the main parts of the drawings
1: custom protrusion 3: groove
5: support jaw 7, 7 ': support base
8: bridge deck 9: stud bolt
11: holding stand 12: safety railing
본 고안은 교량 안전 난간 설치용 지주 보조대에 관한 것으로서,The present invention relates to a prop support for bridge safety railing installation,
교량 건설 현장에서 교량 상판 위에서 작업을 하는 근로자들이 작업중 추락하는 것을 방지하기 위하여 교량 난간에 안전 난간을 설치함에 있어서,In installing safety railings on bridge railings to prevent workers working on bridge decks at the bridge construction site from falling during work,
교량 상판에 설치된 스터드 볼트 외부에, 2개 1조로 구성되고 접촉면에 끼워 맞춤 돌기와 요홈이 각각 형성되며, 내부에 스터드 볼트의 머리 지지턱이 구비된 보조대를 결합시킨 뒤, 보조대 외부에 지주대를 끼워 설치할 수 있게 함으로써,On the outside of the stud bolt installed on the bridge top plate, it is composed of two sets of fitting projections and grooves respectively formed on the contact surface, and after joining the support with the head support jaw of the stud bolt inside, the support post is inserted outside the support. By allowing you to install
시공이 보다 간편하고, 원가가 절감되며, 공사 후 수거하여 재사용이 가능한 교량 안전 난간 설치용 지주 보조대를 제공할 수 있도록 한 것이다.It is intended to provide a support for the installation of bridge safety railings, which is easier to install, lower in cost, and can be collected and reused after construction.
일반적으로 교량 건설 현장에는 교량 상판 위에서 작업하는 근로자들이 추락하는 것을 방지하기 위하여, 교량의 상판 난간에 매설된 스터드 볼트에 지주대와 안전 난간이 설치되어 있다.In general, bridge construction sites are equipped with struts and safety railings in stud bolts embedded in the bridge railings of the bridges to prevent workers working on the bridge decks from falling down.
이와 같은 안전 난간을 설치함에 있어서, 종래에는 스터드 볼트에 금속 파이프로 된 지주대를 클램프로 체결한 후, 흔들림과 탈락을 방지하기 위하여 중간 부분에 안전 난간을 연결하여 인근 지주대에 연속적으로 연결하는 방식으로 설치하였으나,
스터드 볼트의 머리 부분의 직경이 크고 볼트 부분의 직경이 작아 지주대를 설치하는데 많은 애로점이 발생하였고, 체결 방법이 복잡하며, 자재 중량이 무거워 운반 및 설치 도중, 사고 발생 우려가 있고, 자재 원가가 고가여서 공사비가 상승하게 되는 결점이 있었다.
In installing such a safety railing, in the related art, after clamping a strut made of metal pipe to a stud bolt with a clamp, the safety rail is connected continuously to a neighboring strut in order to prevent shaking and falling off. Installed in the same way,
Due to the large diameter of the head part of the stud bolt and the small diameter of the bolt part, there are many difficulties in installing the holding post, the fastening method is complicated, the material weight is heavy, and there is a risk of accident during transportation and installation, and the cost of material There was a drawback that the cost of construction was high.
본 고안은 이와 같은 종래의 안전 난간 설치 방식이 갖고 있는 제반 문제점을 해소하기 위하여 고안된 것으로서,The present invention is designed to solve the problems of the conventional safety rail installation method as described above,
본 고안의 목적은 시공이 보다 간편하고, 원가가 절감되며, 공사 후 수거하여 재사용이 가능한 교량 안전 난간 설치용 지주 보조대를 제공하는데 있다.The purpose of the present invention is to provide a support for the bridge guardrail installation for easier construction, cost reduction, and can be collected and reused after construction.
이를 위하여 본 고안은,To this end, the present invention,
교량 건설 현장에서 교량 상판 위에서 작업을 하는 근로자들이 작업중 추락하는 것을 방지하기 위하여 교량 난간에 안전 난간을 설치함에 있어서,In installing safety railings on bridge railings to prevent workers working on bridge decks at the bridge construction site from falling during work,
교량 상판에 설치된 스터드 볼트 외부에, 2개 1조로 구성되고 접촉면에 끼워 맞춤 돌기와 요홈이 각각 형성되며, 내부에 스터드 볼트의 머리 지지턱이 구비된 보조대를 결합시킨 뒤, 보조대 외부에 지주대를 끼워 설치할 수 있게 함으로써,On the outside of the stud bolt installed on the bridge top plate, it is composed of two sets of fitting projections and grooves respectively formed on the contact surface, and after joining the support with the head support jaw of the stud bolt inside, the support post is inserted outside the support. By allowing you to install
시공이 보다 간편하고, 원가가 절감되며, 공사 후 수거하여 재사용이 가능한 교량 안전 난간 설치용 지주 보조대를 제공할 수 있도록 한 것을 특징으로 한다.Construction is more simple, cost is reduced, and after the construction is characterized in that it is possible to provide a support post for the bridge safety rail installation can be collected and reused.
삭제delete
삭제delete
이하 본 고안의 바람직한 실시예를 첨부 도면에 따라 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 1 은 본 고안의 분해 사시도,
도 2 는 본 고안의 결합 상태의 외형 사시도,
도 3 은 동 종단면도,
도 4 는 본 고안의 설치 상태를 나타낸 정면도로서,
1 is an exploded perspective view of the present invention,
2 is an external perspective view of the combined state of the present invention,
3 is a longitudinal cross-sectional view,
4 is a front view showing an installation state of the present invention,
본 고안의 교량 안전 난간 설치용 지주 보조대는,
2개 1조로 구성되고, 접촉면에 끼워 맞춤 돌기(1)와 요홈(3)이 각각 형성되며, 내부에 스터드 볼트의 머리 지지턱(5)이 구비된 보조대(7)(7')를 교량 상판(8)에 설치된 스터드 볼트(9) 외부에 결합시킨 뒤, 보조대(7)(7') 외부에 지주대(11)를 끼워 설치할 수 있도록 한 구조이다.
The prop support for the bridge safety railing installation of the present invention,
It consists of two pairs, and the fitting projections 1 and the recesses 3 are formed on the contact surface, respectively, and the support plates 7 and 7 'with the head support jaws 5 of the stud bolts are formed therein. After coupling to the outside of the stud bolt (9) installed in (8), it is a structure that can be installed by inserting the support base (11) to the outside of the support (7) (7 ').
미설명 부호 12 는 안전 난간이다.Reference numeral 12 is a safety handrail.
이와 같이 구성된 본 고안의 교량 안전 난간 설치용 지주 보조대는 설치시,
교량 상판(8)의 난간에 설치된 스터드 볼트(9)의 머리 부분이 보조대(7)(7')의 머리 지지턱(5)에 지지된 상태로 스터드 볼트(9)의 외부에 보조대(7)(7')를 결합시킨 뒤,
그 외부에 금속 파이프로 된 지주대(11)를 삽입한 후,
지주대(11) 사이에 안전 난간(12)을 연결시킴으로써, 설치 작업이 완료된다.
When the bridge support rail installation guard support of the present invention configured as described above,
The support 7 on the outside of the stud bolt 9 with the head of the stud bolt 9 installed on the railing of the bridge deck 8 supported by the head support jaw 5 of the support 7, 7 ′. (7 ') and then
After inserting the support stand 11 made of a metal pipe to the outside thereof,
The installation work is completed by connecting the safety handrail 12 between the props 11.
따라서 이와 같은 본 고안의 교량 안전 난간 설치용 지주 보조대에 의하면,
교량 건설 현장에서 교량 상판 위에서 작업을 하는 근로자들이 작업중 추락하는 것을 방지하기 위하여 교량 난간에 안전 난간을 설치함에 있어서,
교량 난간에 설치된 스터드 볼트(9) 외부에 보조대(7)(7')를 결합시킨 뒤,
그 외부에 금속 파이프로 된 지주대(11)를 삽입한 후, 지주대(11) 사이에 안전 난간(12)을 연결시키는 것만으로 설치 작업이 완료되므로,
시공이 보다 간편하고, 원가가 절감되며, 건설 공사 완료 후, 보조대(7)(7')를 수거하여 재사용이 가능한 장점이 있다.
Therefore, according to the bridge support rail installation guard support of the present invention,
In installing safety railings on bridge railings to prevent workers working on bridge decks at the bridge construction site from falling during work,
After joining the supports (7) (7 ') to the outside of the stud bolt (9) installed on the bridge railing,
After inserting the support base 11 made of metal pipes to the outside thereof, the installation work is completed only by connecting the safety railings 12 between the support bases 11,
Construction is more convenient, cost is reduced, and after the completion of the construction, there is an advantage that can be reused by collecting the support (7) (7 ').
이상에서는 본 고안을 특정한 실시예에 의거하여 설명하였으나, 상기 실시예는 하나의 예시일 뿐, 본 고안은 그 기술적 사상 내에서 여러 변형이 있을 수 있다.
즉, 보조대(7)(7')의 외부 형상에 있어서, 그 형태를 사각형이나 육각형, 팔각형, 사다리꼴형, 피라미드형 등으로 변형하여도 동일한 효과를 볼 수 있으며, 지주대(7)(7')의 결합 방식에 있어서도 여러 방식으로 변형이 가능하며, 상기 실시예 만으로 본 고안의 기술적 범위가 한정되는 것은 물론 아니다.
In the above described the present invention based on a specific embodiment, the above embodiment is only one example, the present invention may have a number of variations within the technical idea.
In other words, in the external shape of the support 7, 7 ', the same effect can be obtained even if the shape is modified into a square, hexagon, octagon, trapezoid, pyramid, or the like. In the combination method of) can be modified in various ways, the technical scope of the present invention is not limited only to the above embodiment.
이상과 같이, 본 고안의 교량 안전 난간 설치용 지주 보조대는 시공이 보다 간편하고, 원가가 절감되며, 건설 공사 완료 후, 보조대(7)(7')를 수거하여 재사용이 가능한 효과가 있다.As described above, the construction of the support bridge for the bridge safety railing of the present invention is easier to construct, the cost is reduced, and after completion of the construction work, there is an effect that can be reused by collecting the support (7) (7 ').
삭제delete
삭제delete

Claims (1)

  1. 2개 1조로 구성되고, 접촉면에 끼워 맞춤 돌기(1)와 요홈(3)이 각각 형성되며, 내부에 스터드 볼트의 머리 지지턱(5)이 구비된 보조대(7)(7')를 교량 상판(8)에 설치된 스터드 볼트(9) 외부에 결합시킨 뒤, 보조대(7)(7') 외부에 공지의 지주대(11)를 끼워 설치할 수 있도록 한 것을 특징으로 하는 교량 안전 난간 설치용 지주 보조대.It consists of two pairs, and the fitting projections 1 and the recesses 3 are formed on the contact surface, respectively, and the support plates 7 and 7 'with the head support jaws 5 of the stud bolts are formed therein. A support post for the bridge safety railing, characterized in that the mounting of the known support post (11) on the outside of the support (7) (7 ') after being coupled to the outside of the stud bolt (9) provided in (8).
KR2020060021350U 2006-08-09 2006-08-09 Post bar Supporter KR200435422Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060021350U KR200435422Y1 (en) 2006-08-09 2006-08-09 Post bar Supporter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060021350U KR200435422Y1 (en) 2006-08-09 2006-08-09 Post bar Supporter

Publications (1)

Publication Number Publication Date
KR200435422Y1 true KR200435422Y1 (en) 2007-01-22

Family

ID=41563306

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060021350U KR200435422Y1 (en) 2006-08-09 2006-08-09 Post bar Supporter

Country Status (1)

Country Link
KR (1) KR200435422Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100903442B1 (en) 2007-07-24 2009-06-18 김기수 Supporting structure of railing
KR101066182B1 (en) 2009-07-28 2011-09-20 이상식 Guard Rail Clamp
KR101475613B1 (en) * 2013-07-10 2014-12-22 윤종철 Safety Guard Connecting Apparatus For Connecting Stud Bolt

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100903442B1 (en) 2007-07-24 2009-06-18 김기수 Supporting structure of railing
KR101066182B1 (en) 2009-07-28 2011-09-20 이상식 Guard Rail Clamp
KR101475613B1 (en) * 2013-07-10 2014-12-22 윤종철 Safety Guard Connecting Apparatus For Connecting Stud Bolt

Similar Documents

Publication Publication Date Title
KR101687733B1 (en) Deckroad guardrail assembly
RU2400609C2 (en) Complex system of accident prevention support in construction
KR200435422Y1 (en) Post bar Supporter
KR20120006518U (en) An security a railing
KR200314568Y1 (en) A clamping device for safety porch of gang form of construct
JP2010185173A (en) Load receiving stage
KR200340325Y1 (en) Bridge inspection
KR200430532Y1 (en) A combination structure of guardrail pipe
KR100808291B1 (en) A safety device for pierces
KR200284897Y1 (en) A construction guardrail pole for ship
KR20120003729U (en) System support Head
KR200375145Y1 (en) The Bridge Check Walkway Bracket With Earthquake Resistant
KR100688149B1 (en) Supporting structure of parapet for steel bridge
KR100903442B1 (en) Supporting structure of railing
KR200467302Y1 (en) Safety guard rail pole
KR101376948B1 (en) An apparatus for supporting safety guard
KR101185578B1 (en) Temporary Construction Bracket
JP5773469B1 (en) Suspended scaffolding
KR200313899Y1 (en) Pole of temporary guardrail for working in a block of the hull
KR100924522B1 (en) Hull block edge clamp
JP5812554B1 (en) Mounting bracket and mounting structure for strut mooring
KR200460577Y1 (en) Handrail
CN207944783U (en) A kind of construction fixture type protective fence
KR100834771B1 (en) Safety handrail for construction
KR200451716Y1 (en) Pedestrian Railings Fixed on Brackets of Bridge Bridges

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20111216

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee