CN215443196U - Installation and positioning construction device for building wall and curtain wall - Google Patents

Installation and positioning construction device for building wall and curtain wall Download PDF

Info

Publication number
CN215443196U
CN215443196U CN202121974943.6U CN202121974943U CN215443196U CN 215443196 U CN215443196 U CN 215443196U CN 202121974943 U CN202121974943 U CN 202121974943U CN 215443196 U CN215443196 U CN 215443196U
Authority
CN
China
Prior art keywords
installation
wall
rectangular
curtain
steel column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121974943.6U
Other languages
Chinese (zh)
Inventor
徐豪
王李霞
王赵斌
郑怀彬
蔡敏慧
陈慧慧
戴善平
董永舟
潘宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Darch Construction Group Co ltd
Original Assignee
Darch Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Darch Construction Group Co ltd filed Critical Darch Construction Group Co ltd
Priority to CN202121974943.6U priority Critical patent/CN215443196U/en
Application granted granted Critical
Publication of CN215443196U publication Critical patent/CN215443196U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

本申请公开了建筑墙面幕墙安装定位施工装置,涉及幕墙安装的技术领域,改善建筑墙面幕墙,在安装完成后不方便进行拆卸的问题,包括安装立柱,安装立柱的正面设置有连接条,安装立柱的两侧均插接有横梁,横梁的正面设置有支撑条,支撑条的上表面和下表面均设置有幕墙板,连接条的正面通过沉头螺栓设置有定位板,加固块通过第一螺栓设置在安装立柱的侧壁,加固块的下表面与横梁之间通过第二螺栓连接,通过设置的定位板与沉头螺栓配合能够限制幕墙板的位置,在幕墙板损坏后直接将沉头螺栓和定位板拆下,就能够将幕墙板从幕墙安装架上取下进行维修和更换。

Figure 202121974943

The present application discloses a construction device for installation and positioning of building wall and curtain wall, which relates to the technical field of curtain wall installation, and improves the problem of inconvenient disassembly of building wall and curtain wall after installation. Both sides of the installation column are plugged with beams, the front of the beam is provided with support bars, the upper and lower surfaces of the support bars are provided with curtain wall panels, the front of the connecting bars is provided with positioning plates through countersunk bolts, and the reinforcement blocks pass through the A bolt is arranged on the side wall of the installation column, and the lower surface of the reinforcing block and the beam are connected by a second bolt. The positioning plate and the countersunk head bolt can be used to limit the position of the curtain wall panel. The curtain wall panel can be removed from the curtain wall mounting frame for maintenance and replacement by removing the head bolts and the positioning plate.

Figure 202121974943

Description

Building wall curtain wall installation location construction equipment
Technical Field
The application relates to the technical field of curtain installation, in particular to a building wall surface curtain installation and positioning construction device.
Background
Along with the high-speed development of national economy and the continuous improvement of the living standard of people in China and the improvement of the design concept of architects 'humanity is better than construction', buildings are developed to the direction of high-rise, high-grade and multifunctional more and more. More and more building surfaces are therefore provided with curtain walls. The curtain wall is usually used outside the main body structure, generally covers the surface of the main body structure, does not bear load, is hung like a curtain, is a light wall with decorative effect commonly used by modern large-scale and high-rise buildings, generally consists of panels such as glass, metal plates, stone plates and ceramic plates, and supporting structures such as aluminum beam columns, steel structures, glass ribs and the like at the back, can have certain displacement capacity or certain deformation capacity relative to the main body structure, and does not bear the building peripheral protective structure or decorative structure acted by the main body structure.
The existing building wall curtain wall is inconvenient to disassemble after installation is finished, and the curtain wall plate is inconvenient to maintain and replace after being damaged.
SUMMERY OF THE UTILITY MODEL
In order to improve building wall curtain, inconvenient dismantlement after the installation is accomplished, also inconvenient the problem of maintaining and changing to the curtain board after the curtain board damages, this application provides building wall curtain installation location construction equipment.
The application provides building wall curtain installation location construction equipment adopts following technical scheme:
building wall curtain installation location construction equipment, including the installation stand, the front of installation stand is provided with the connecting strip, the both sides of installation stand are all pegged graft and are had the crossbeam, the front of crossbeam is provided with the support bar, the upper surface and the lower surface of support bar all are provided with curtain board, the front of connecting strip is provided with the locating plate through the countersunk head bolt, and the reinforcement piece sets up the lateral wall at the installation stand through first bolt, through second bolted connection between the lower surface of reinforcement piece and the crossbeam.
Through adopting above-mentioned technical scheme, the position of locating plate and countersunk head bolt cooperation can restrict the curtain board, directly pulls down countersunk head bolt and locating plate after the curtain board damages, just can take off the curtain board from the curtain mounting bracket and maintain and change.
Optionally, the mounting column includes a first rectangular steel column, and rectangular connecting holes are formed in both sides of the first rectangular steel column.
Through adopting above-mentioned technical scheme, the mounted position of crossbeam can be restricted to the rectangular connection hole, what make the crossbeam can install simultaneously is more firm.
Optionally, the connecting strip includes a rectangular strip arranged on the front surface of the first rectangular steel column, mounting holes are uniformly formed in the front surface of the rectangular strip, and the mounting holes are connected with the countersunk bolts.
Through adopting above-mentioned technical scheme, the mounted position of curtain board can be restricted to the rectangle strip, and the front at the rectangle strip can be installed to the locating plate in mounting hole and countersunk head bolt cooperation.
Optionally, the cross beam includes a second rectangular steel column disposed on the side wall of the first rectangular steel column, and a connecting block is disposed on one side of the second rectangular steel column, which is close to the first rectangular steel column.
Through adopting above-mentioned technical scheme, second rectangle steel column makes more durable of crossbeam body when using, and curtain mounting bracket is more firm after making the crossbeam installation.
Optionally, the positioning plate comprises a rectangular plate arranged on the front surface of the rectangular strip, and countersunk holes and annular grooves are uniformly formed in the front surface of the rectangular plate.
Through adopting above-mentioned technical scheme, the counter sink can make things convenient for the counter sink bolt to install, makes the head of counter sink bolt can sink in inside the counter sink completely.
Optionally, the reinforcing block includes an L-shaped plate disposed on the side wall of the first rectangular steel column, and triangular reinforcing plates are disposed at two ends of the L-shaped plate.
Through adopting above-mentioned technical scheme, through first bolted connection between L shaped plate and the first rectangle steel column, through second bolted connection between L shaped plate and the second rectangle steel column, the triangle reinforcing plate can make more durable, non-deformable of reinforcing block.
Optionally, the front surface of the second rectangular steel column is connected with the back surface of the supporting bar, and the outer wall of the connecting block is inserted into the inner wall of the rectangular connecting hole.
Through adopting above-mentioned technical scheme, the connecting block is pegged graft in the rectangular connection hole, can restrict the mounted position of crossbeam.
Optionally, the inner wall of the countersunk hole is connected with the outer wall of the countersunk bolt, and the inner wall of the annular groove is inserted with the waterproof cover.
Through adopting above-mentioned technical scheme, the buckler can prevent that countersunk head bolt contact rainwater from can be corroded for a long time.
In summary, the present application includes at least one of the following benefits:
1. can restrict the position of curtain board through locating plate and countersunk head bolt cooperation, directly pull down countersunk head bolt and locating plate after the curtain board damages, just can take off curtain board from the curtain mounting bracket and maintain and change.
2. The two cross beams are relatively inserted in the two sides of the mounting stand column during mounting, the mounting positions of the curtain wall plate are limited by the connecting strips and the supporting bars arranged through the rethread, the mounting stand column and the cross beams can be more stably connected through the reinforcing blocks, the cross beams cannot easily fall off after mounting, the mounting positions of the cross beams can be limited through the rectangular connecting holes, and meanwhile the cross beams can be mounted more stably.
3. Through first bolted connection between the L shaped plate that sets up and the first rectangle steel column, through second bolted connection between L shaped plate and the second rectangle steel column, the triangle reinforcing plate can make more durable of reinforcing block, non-deformable, and the internal diameter of the counter sink of setting and the external diameter phase-match of counter sink bolt can be convenient for counter sink bolt's installation, and the buckler can prevent that counter sink bolt contact rainwater can be corroded for a long time.
Drawings
FIG. 1 is a schematic view of the overall structure of the present embodiment;
FIG. 2 is a schematic view of the structure of the mounting post of the present embodiment;
FIG. 3 is a schematic view of the structure of the connection bar of the present embodiment;
FIG. 4 is a schematic view of the cross member of the present embodiment;
FIG. 5 is a schematic view of a positioning plate of the present embodiment;
fig. 6 is a schematic structural view of the reinforcing block of the present embodiment.
Description of reference numerals: 1. mounting the upright post; 101. a first rectangular steel column; 102. a rectangular connecting hole; 2. a connecting strip; 201. a rectangular strip; 202. mounting holes; 3. a cross beam; 301. a second rectangular steel column; 302. connecting blocks; 4. a supporting strip; 5. a curtain wall plate; 6. a countersunk bolt; 7. positioning a plate; 701. a rectangular plate; 702. a countersunk hole; 703. an annular groove; 8. a first bolt; 9. a reinforcing block; 901. an L-shaped plate; 902. a triangular reinforcing plate; 10. a second bolt; 11. a water shield.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
Example (b):
the embodiment of the application discloses a building wall curtain wall mounting and positioning construction device, referring to fig. 1 and 2, the building wall curtain wall mounting and positioning construction device comprises a mounting upright post 1, a connecting strip 2 is arranged on the front surface of the mounting upright post 1, cross beams 3 are inserted into two sides of the mounting upright post 1, the two cross beams 3 are inserted into two sides of the mounting upright post 1 relatively during mounting, a supporting strip 4 is arranged on the front surface of each cross beam 3, curtain plates 5 are arranged on the upper surfaces and the lower surfaces of the supporting strips 4, the connecting strip 2 and the supporting strip 4 limit the mounting positions of the curtain plates 5, inclined surfaces are arranged on the upper surfaces and the lower surfaces of the curtain plates 5 and the supporting strips 4, rainwater can be prevented from permeating from connecting seams of the curtain plates 5 and the supporting strips 4 to the back of the curtain plates 5, a positioning plate 7 is arranged on the front surface of the connecting strip 2 through countersunk head bolts 6, the positioning plate 7 can limit the positions of the curtain plates 5 by matching with the countersunk bolts 6, directly pull down countersunk head bolt 6 and locating plate 7 after curtain wall board 5 damages, just can take off curtain wall board 5 from the curtain mounting bracket and maintain and change, reinforcing block 9 sets up the lateral wall at installation stand 1 through first bolt 8, is connected through second bolt 10 between reinforcing block 9's lower surface and the crossbeam 3, and reinforcing block 9 can make installation stand 1 and crossbeam 3 be connected more firm, makes crossbeam 3 can not drop easily after the installation.
Referring to fig. 3, the mounting column 1 includes a first rectangular steel column 101, rectangular connection holes 102 are provided on both sides of the first rectangular steel column 101, and the rectangular connection holes 102 can limit the mounting position of the cross beam 3, and at the same time, the cross beam 3 can be mounted more stably.
Referring to fig. 3, the connecting strip 2 includes the rectangular strip 201 arranged on the front of the first rectangular steel column 101, the rectangular strip 201 can limit the installation position of the curtain wall plate 5, the front of the rectangular strip 201 is uniformly provided with the installation hole 202, the installation hole 202 is connected with the countersunk head bolt 6, the inner diameter of the installation hole 202 is matched with the outer diameter of the countersunk head bolt 6, the installation hole 202 is matched with the countersunk head bolt 6, and the positioning plate 7 can be installed on the front of the rectangular strip 201.
Referring to fig. 2 and 4, the cross beam 3 includes a second rectangular steel column 301 arranged on the side wall of the first rectangular steel column 101, the second rectangular steel column 301 enables the body of the cross beam 3 to be more firm and durable when in use, so that the curtain wall mounting frame is more stable after the cross beam 3 is installed, a connecting block 302 is arranged on one side, close to the first rectangular steel column 101, of the second rectangular steel column 301, and the connecting block 302 enables the cross beam 3 to be connected with the mounting upright 1.
Referring to fig. 2, 3 and 5, the positioning plate 7 includes a rectangular plate 701 disposed on the front surface of the rectangular strip 201, countersunk holes 702 and annular grooves 703 are uniformly formed on the front surface of the rectangular plate 701, and the countersunk holes 702 can facilitate the installation of the countersunk bolts 6, so that the heads of the countersunk bolts 6 can be completely sunk inside the countersunk holes 702, and the heads of the countersunk bolts 6 are prevented from protruding.
Referring to fig. 2 and 6, the reinforcing block 9 includes an L-shaped plate 901 disposed on a side wall of the first rectangular steel column 101, the L-shaped plate 901 is connected to the first rectangular steel column 101 through a first bolt 8, the L-shaped plate 901 is connected to the second rectangular steel column 301 through a second bolt 10, triangular reinforcing plates 902 are disposed at two ends of the L-shaped plate 901, and the triangular reinforcing plates 902 can make the reinforcing block 9 more firm and not easily deformed.
Referring to fig. 3 and 4, the front surface of the second rectangular steel column 301 is connected to the back surface of the support bar 4, and the outer wall of the connecting block 302 is inserted into the inner wall of the rectangular connecting hole 102, so as to limit the installation position of the cross beam 3.
Referring to fig. 1, 2 and 5, the inner wall of the countersunk hole 702 is connected with the outer wall of the countersunk bolt 6, the inner diameter of the countersunk hole 702 is matched with the outer diameter of the countersunk bolt 6, so that the countersunk bolt 6 can be conveniently installed, the inner wall of the annular groove 703 is inserted with the waterproof cover 11, and the waterproof cover 11 can prevent the countersunk bolt 6 from being corroded due to contact with rainwater for a long time.
The implementation principle of the building wall curtain wall installation and positioning construction device provided by the embodiment of the application is as follows:
through the locating plate 7 that sets up and the position that countersunk head bolt 6 cooperation can restrict curtain board 5, direct pull down countersunk head bolt 6 and locating plate 7 after curtain board 5 damages, just can take off curtain board 5 from the curtain mounting bracket and maintain and change, peg graft two relative crossbeam 3 in the both sides of installation stand 1 during the installation, the connecting strip 2 and the support bar 4 that the rethread set up restrict the mounted position of curtain board 5, the upper surface and the lower surface of curtain board 5 and the support bar 4 that set up all are provided with the inclined plane, can prevent to have the rainwater to permeate to curtain board 5 back from curtain board 5 and the joint line of support bar 4, reinforcing block 9 can make the firm more of being connected of installation stand 1 and crossbeam 3, make crossbeam 3 can not drop easily after the installation.
Be connected through first bolt 8 between the L shaped plate 901 of setting and the first rectangle steel column 101, be connected through second bolt 10 between L shaped plate 901 and the second rectangle steel column 301, triangle reinforcing plate 902 can make more durable of reinforcing block 9, non-deformable, the internal diameter of counter sink 702 and the external diameter phase-match of counter sink bolt 6, the installation of counter sink bolt 6 of can being convenient for, the buckler 11 of setting can prevent that counter sink bolt 6 contact rainwater from can be corroded for a long time.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1.建筑墙面幕墙安装定位施工装置,其特征在于,包括:1. The installation and positioning construction device for building wall and curtain wall is characterized in that, comprising: 安装立柱(1),所述安装立柱(1)的正面设置有连接条(2),所述安装立柱(1)的两侧均插接有横梁(3),所述横梁(3)的正面设置有支撑条(4),所述支撑条(4)的上表面和下表面均设置有幕墙板(5),所述连接条(2)的正面通过沉头螺栓(6)设置有定位板(7);An installation column (1) is provided, the front of the installation column (1) is provided with a connecting strip (2), both sides of the installation column (1) are plugged with beams (3), and the front of the beam (3) A support bar (4) is provided, the upper surface and the lower surface of the support bar (4) are provided with curtain wall panels (5), and the front surface of the connecting bar (2) is provided with a positioning plate through countersunk bolts (6). (7); 加固块(9),通过第一螺栓(8)设置在安装立柱(1)的侧壁,所述加固块(9)的下表面与横梁(3)之间通过第二螺栓(10)连接。The reinforcement block (9) is arranged on the side wall of the installation column (1) by the first bolt (8), and the lower surface of the reinforcement block (9) and the beam (3) are connected by the second bolt (10). 2.根据权利要求1所述的建筑墙面幕墙安装定位施工装置,其特征在于:所述安装立柱(1)包括第一矩形钢柱(101),所述第一矩形钢柱(101)的两侧均开设有矩形连接孔(102)。2. The installation and positioning construction device for building wall and curtain wall according to claim 1, characterized in that: the installation column (1) comprises a first rectangular steel column (101), and the first rectangular steel column (101) has a Rectangular connecting holes (102) are opened on both sides. 3.根据权利要求1所述的建筑墙面幕墙安装定位施工装置,其特征在于:所述连接条(2)包括设置在第一矩形钢柱(101)正面的矩形条(201),所述矩形条(201)的正面均匀开设有安装孔(202),所述安装孔(202)与沉头螺栓(6)相连接。3. The installation and positioning construction device for building wall and curtain wall according to claim 1, characterized in that: the connecting bar (2) comprises a rectangular bar (201) arranged on the front of the first rectangular steel column (101), the Mounting holes (202) are evenly opened on the front surface of the rectangular bar (201), and the mounting holes (202) are connected with the countersunk bolts (6). 4.根据权利要求1所述的建筑墙面幕墙安装定位施工装置,其特征在于:所述横梁(3)包括设置在第一矩形钢柱(101)侧壁的第二矩形钢柱(301),所述第二矩形钢柱(301)靠近第一矩形钢柱(101)的一侧设置有连接块(302)。The installation and positioning construction device for building wall and curtain wall according to claim 1, characterized in that: the beam (3) comprises a second rectangular steel column (301) arranged on the side wall of the first rectangular steel column (101) A connecting block (302) is provided on the side of the second rectangular steel column (301) close to the first rectangular steel column (101). 5.根据权利要求1所述的建筑墙面幕墙安装定位施工装置,其特征在于:所述定位板(7)包括设置在矩形条(201)正面的矩形板(701),所述矩形板(701)的正面均匀开设有沉头孔(702)和环形槽(703)。5 . The installation and positioning construction device for building walls and curtain walls according to claim 1 , wherein the positioning plate ( 7 ) comprises a rectangular plate ( 701 ) arranged on the front of the rectangular strip ( 201 ), and the rectangular plate ( The front surface of 701) is evenly provided with countersunk holes (702) and annular grooves (703). 6.根据权利要求1所述的建筑墙面幕墙安装定位施工装置,其特征在于:所述加固块(9)包括设置在第一矩形钢柱(101)侧壁的L形板(901),所述L形板(901)的两端均设置有三角加固板(902)。6. The installation and positioning construction device for building wall and curtain wall according to claim 1, characterized in that: the reinforcing block (9) comprises an L-shaped plate (901) arranged on the side wall of the first rectangular steel column (101), Both ends of the L-shaped plate (901) are provided with triangular reinforcing plates (902). 7.根据权利要求4所述的建筑墙面幕墙安装定位施工装置,其特征在于:所述第二矩形钢柱(301)的正面与支撑条(4)的背面相连接,所述连接块(302)的外壁插接在矩形连接孔(102)的内壁。7. The installation and positioning construction device for building wall and curtain wall according to claim 4, characterized in that: the front side of the second rectangular steel column (301) is connected with the back side of the support bar (4), and the connection block ( The outer wall of 302) is inserted into the inner wall of the rectangular connecting hole (102). 8.根据权利要求5所述的建筑墙面幕墙安装定位施工装置,其特征在于:所述沉头孔(702)的内壁与沉头螺栓(6)的外壁相连接,所述环形槽(703)的内壁插接有防水罩(11)。8. The installation and positioning construction device for building walls and curtain walls according to claim 5, characterized in that: the inner wall of the countersunk head hole (702) is connected with the outer wall of the countersunk head bolt (6), and the annular groove (703) ) is plugged with a waterproof cover (11).
CN202121974943.6U 2021-08-19 2021-08-19 Installation and positioning construction device for building wall and curtain wall Expired - Fee Related CN215443196U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121974943.6U CN215443196U (en) 2021-08-19 2021-08-19 Installation and positioning construction device for building wall and curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121974943.6U CN215443196U (en) 2021-08-19 2021-08-19 Installation and positioning construction device for building wall and curtain wall

Publications (1)

Publication Number Publication Date
CN215443196U true CN215443196U (en) 2022-01-07

Family

ID=79695578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121974943.6U Expired - Fee Related CN215443196U (en) 2021-08-19 2021-08-19 Installation and positioning construction device for building wall and curtain wall

Country Status (1)

Country Link
CN (1) CN215443196U (en)

Similar Documents

Publication Publication Date Title
CN201221198Y (en) Aluminum alloy formwork system
CN104120811A (en) Metal panel unitized curtain wall system
CN215443196U (en) Installation and positioning construction device for building wall and curtain wall
CN107989224B (en) Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism
CN212715900U (en) Early-dismantling template system for supporting first and then shaping
CN110056115B (en) A method of using a ceiling-mounted metal keel structure
CN204920452U (en) Hang dress formula building site and enclose fender system
CN209620560U (en) A new climbing frame hanger
CN116771105B (en) Template supporting device of frame structure complicated special-shaped cornice
CN201883679U (en) Steel-frame strong-plasticity polypropylene (PP) plastic combined large template
CN213297120U (en) Quick-release aluminum formwork for building construction
CN213710350U (en) A kind of lowering plate hanging form for kitchen and bathroom
CN216239838U (en) An embedded box pre-positioning fixing device
CN214246247U (en) Stone curtain wall system without cross beam
CN210947661U (en) Installation device of socket type overhanging scaffold
CN211666339U (en) Building site is with interim worker's canopy convenient to installation and dismantlement
CN210396108U (en) Supporting mechanism for quickly mounting and dismounting concrete formwork
CN206888511U (en) A kind of aluminum alloy formwork system for variable cross-section rectangular column
CN218894375U (en) Outside upper portion protector of formwork support
CN219528082U (en) Open stone curtain wall construction system
CN208056812U (en) A kind of construction enclosing based on enclosure wall basis
CN222066122U (en) A scaffolding positioning structure for building construction
CN205224579U (en) Steel framework template and self -supporting truss board combination concrete quick detach system
CN211666033U (en) Locating component for mounting curtain wall
CN213979425U (en) A composite wall panel that is easy to be spliced firmly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220107

CF01 Termination of patent right due to non-payment of annual fee