CN212689540U - Guide rail for climbing frame - Google Patents
Guide rail for climbing frame Download PDFInfo
- Publication number
- CN212689540U CN212689540U CN202021229083.9U CN202021229083U CN212689540U CN 212689540 U CN212689540 U CN 212689540U CN 202021229083 U CN202021229083 U CN 202021229083U CN 212689540 U CN212689540 U CN 212689540U
- Authority
- CN
- China
- Prior art keywords
- channel
- steel
- groups
- guide rail
- channel steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a guide rail for climbing frame, which comprises two groups of parallel stand columns, a channel steel parallel to the stand columns and a group of base plates, wherein the two groups of stand columns are connected through a plurality of transverse rods, the outer wall of each group of transverse rods is vertically connected with a group of connecting rods, the tail end of each group of connecting rods is provided with an external thread part, and the external thread part runs through the bottom of the channel steel to extend into the channel steel; the base plate is arranged on the groove surface of the channel steel, two groups of parallel connecting plates are vertically arranged on the base plate, the outer walls of the two groups of connecting plates are attached to the side walls of two sides in the channel steel groove, a group of bolts penetrate through the two groups of connecting plates and the external thread part between the two side walls of the channel steel; during the installation the opening face of channel-section steel is supported to two sets of connecting plates for base plate and channel-section steel constitute the rectangle structure, and the stability of increase channel-section steel structure is when dismantling, demolishs the bolt, and the connecting rod is taken out from the channel-section steel, makes two sets of stands and channel-section steel dismantle the separation, the transportation of being convenient for transition.
Description
Technical Field
The utility model relates to a building climbing frame field especially relates to a guide rail for climbing frame.
Background
The climbing frame is a construction platform in the process of building high-rise buildings, and can be lifted along the shear wall of the building as required by the construction height progress of the building.
The guide rail is installed and is used for providing the structure of support and guide effect for climbing the frame on the shear force wall, and prior art's guide rail generally includes three stands that are parallel to each other, through connecting piece welded fastening and unable dismantlement between the stand, because overall structure is great, needs whole transportation in the transportation of transition, and is very inconvenient, and jolts and leads to its welded structure's fastness to reduce easily.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a dismantled and assembled guide rail that is used for climbing the frame.
The purpose of the utility model is realized through the following technical scheme:
a guide rail for a creel, comprising:
the two groups of upright posts are arranged in parallel, the two groups of upright posts are connected through a plurality of cross rods, and the outer wall of each group of cross rods is vertically connected with a group of connecting rods;
the tail end of each group of connecting rods is provided with an external thread part which penetrates through the bottom of the channel steel to extend into the channel steel;
the base plate, the base plate sets up in the groove face of channel-section steel, be provided with two sets of parallel connecting plates of each other perpendicularly on the base plate, the outer wall laminating of two sets of connecting plates is on the both sides lateral wall of channel-section steel inslot, wear to be equipped with a set of bolt between the both sides wall of channel-section steel, just the bolt runs through two sets of connecting plates and external screw thread portion.
In some preferred embodiments, the connecting rod is vertically connected to the middle of the cross bar so that the channel is located on the perpendicular bisector of the line between the two sets of uprights in any plane perpendicular to the uprights.
In some preferred embodiments, a diagonal brace is further arranged between the cross bar and the channel steel.
In some preferred embodiments, a sleeve is arranged at a first end of the diagonal brace, a support block is arranged at a second end of the diagonal brace, the support block and the sleeve are respectively sleeved on two adjacent groups of connecting rods, and when the sleeve abuts against the outer wall of the cross bar, the end face of the support block abuts against the outer wall of the channel steel.
In some preferred embodiments, the end of the sleeve is provided with an arcuate notch having an arc matching the arc of the outer wall of the crossbar.
In some preferred embodiments, a nut is sleeved on the external thread part, so that the groove bottom of the channel steel is fixedly locked between the nut and the end face of the supporting block.
The utility model has the advantages of it is following:
the utility model discloses a guide rail for climbing frame, including two sets of parallel arrangement's stand, the channel-section steel parallel with the stand and a set of base plate, connect through a plurality of horizontal poles between two sets of stands, all be connected with a set of connecting rod perpendicularly on every horizontal pole outer wall, the end of every connecting rod of group all is equipped with external screw thread portion, and external screw thread portion runs through the tank bottom of channel-section steel in order to extend to the channel-section steel; the base plate is arranged on the groove surface of the channel steel, two groups of parallel connecting plates are vertically arranged on the base plate, the outer walls of the two groups of connecting plates are attached to the side walls of two sides in the channel steel groove, a group of bolts penetrate through the two groups of connecting plates and the external thread part between the two side walls of the channel steel; during the installation the opening face of channel-section steel is supported to two sets of connecting plates for base plate and channel-section steel constitute the rectangle structure, and the stability of increase channel-section steel structure is when dismantling, demolishs the bolt, and the connecting rod is taken out from the channel-section steel, makes two sets of stands and channel-section steel dismantle the separation, the transportation of being convenient for transition.
Drawings
Fig. 1 is a schematic structural view of a guide rail for a climbing frame according to the present invention;
fig. 2 is a top view of the guide rail for the climbing frame of the present invention;
fig. 3 is a schematic structural view of the diagonal brace of the present invention;
FIG. 4 is a schematic view of the connection relationship between two sets of diagonal braces according to the present invention;
in the figure: 1-upright column, 100-cross bar, 110-connecting rod, 111-external thread part, 112-nut, 112 a-gasket, 2-channel steel, 200-base plate, 201-connecting plate, 210-through hole, 211-bolt, 3-diagonal brace rod, 300-sleeve, 301-notch, 310-supporting block and 311-round hole.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-4, a guide rail for a climbing frame includes two sets of columns 1 arranged in parallel, channel steel 2 parallel to the columns 1, and a set of base plates 200.
The two groups of upright posts 1 are vertically arranged and are connected with the wall-attached guide support in a sliding manner, the two groups of upright posts 1 are connected through a plurality of cross rods 100, and the distance between every two adjacent cross rods 100 is equal.
All be connected with a set of connecting rod 110 on every group horizontal pole 100 outer wall perpendicularly, and the end of every group connecting rod 110 all is equipped with external screw thread portion 111, just external screw thread portion 111 runs through in channel-section steel 2's tank bottom is in order to extend to channel-section steel 2, links together through connecting rod 110 between channel-section steel 2 and the two sets of stands 1.
A set of bolts 211 is inserted between two side walls of the channel steel 2, and the bolts 211 penetrate through the external thread part 111 and the two sets of connecting plates 201.
In the embodiment, a set of bolts 211 is inserted through the external thread portion 111 of each set of connecting rods 110, and two sets of connecting plates 201 are inserted through each set of bolts 211 simultaneously. The base plate 200 and the connecting plate 201 are fixed to the channel steel 2 by a plurality of bolts 211.
In this embodiment, as shown in fig. 2, the connecting rod 110 is vertically connected to the middle of the cross rod 100, so that the channel steel 2 is located on the perpendicular bisector of the connecting line between two sets of the columns 1 on any plane perpendicular to the columns 1.
As shown in fig. 1, a diagonal brace 3 is further disposed between the crossbar 100 and the channel steel 2.
As shown in fig. 2 to 4, a sleeve 300 is disposed at a first end of the diagonal rod 3, a support block 310 is disposed at a second end of the diagonal rod 3, the support block 310 and the sleeve 300 are respectively sleeved on two adjacent sets of the connecting rods 110, and when the sleeve 300 abuts against an outer wall of the crossbar 100, an end surface of the support block 310 abuts against an outer wall of the channel steel 2, so that the rail structure is more stable.
The tip of sleeve 300 is equipped with curved breach 301, the radian of breach 301 and the radian phase-match of the outer wall of horizontal pole 100, breach 301 tightly supports on the outer wall of horizontal pole 100, be equipped with round hole 311 in the supporting shoe 310, on connecting rod 110 is worn to locate by round hole 311, just the cover is equipped with nut 112 and gasket 112a on external screw thread portion 111, with the fixed locking of the tank bottom of channel-section steel 2 is between the terminal surface of nut 112 and supporting shoe 310.
When the supporting blocks 310 of the two groups of diagonal braces 3 are simultaneously sleeved on the one group of connecting rods 110, the two groups of supporting blocks 310 are both in an L shape and are spliced together to form a group of rectangular whole, so that the two groups of diagonal braces 3 also have a mutual supporting function.
In addition, through holes 210 are formed in the side walls of the two sides of the channel steel 2 to penetrate through bolts to be connected with an external structure.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. A guide rail for a creel, comprising:
the device comprises two groups of upright posts (1) which are arranged in parallel, wherein the two groups of upright posts (1) are connected through a plurality of cross rods (100), and the outer wall of each group of cross rods (100) is vertically connected with a group of connecting rods (110);
the connecting structure comprises channel steel (2) parallel to an upright post (1), wherein the tail end of each group of connecting rods (110) is provided with an external thread part (111), and the external thread part (111) penetrates through the bottom of the channel steel (2) to extend into the channel steel (2);
base plate (200), base plate (200) set up in the trough surface of channel-section steel (2), be provided with two sets of parallel connecting plates (201) of each other perpendicularly on base plate (200), the outer wall laminating of two sets of connecting plates (201) is on channel-section steel (2) both sides lateral wall of inslot, wear to be equipped with a set of bolt (211) between the both sides wall of channel-section steel (2), just bolt (211) run through two sets of connecting plates (201) and external screw thread portion (111).
2. The guide rail for a climbing shelf according to claim 1, characterized in that: the connecting rod (110) is vertically connected to the middle of the cross rod (100) so that on any plane perpendicular to the upright columns (1), the channel steel (2) is located on a perpendicular bisector of a connecting line between the two groups of upright columns (1).
3. The guide rail for a climbing shelf according to claim 2, characterized in that: and an inclined support rod (3) is further arranged between the cross rod (100) and the channel steel (2).
4. The guide rail for a climbing shelf according to claim 3, characterized in that: the first end of the inclined strut (3) is provided with a sleeve (300), the second end of the inclined strut (3) is provided with a supporting block (310), the supporting block (310) and the sleeve (300) are respectively sleeved on the two adjacent groups of connecting rods (110), and when the sleeve (300) abuts against the outer wall of the cross rod (100), the end face of the supporting block (310) abuts against the outer wall of the channel steel (2).
5. The guide rail for a climbing shelf according to claim 4, characterized in that: the tip of sleeve (300) is equipped with curved breach (301), the radian of breach (301) and the radian phase-match of the outer wall of horizontal pole (100).
6. The guide rail for a climbing shelf according to claim 4, characterized in that: the outer thread part (111) is sleeved with a nut (112) so as to fix and lock the groove bottom of the channel steel (2) between the nut (112) and the end face of the supporting block (310).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021229083.9U CN212689540U (en) | 2020-06-29 | 2020-06-29 | Guide rail for climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021229083.9U CN212689540U (en) | 2020-06-29 | 2020-06-29 | Guide rail for climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212689540U true CN212689540U (en) | 2021-03-12 |
Family
ID=74894598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021229083.9U Active CN212689540U (en) | 2020-06-29 | 2020-06-29 | Guide rail for climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212689540U (en) |
-
2020
- 2020-06-29 CN CN202021229083.9U patent/CN212689540U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206800949U (en) | Operating platform for construction work high above the ground | |
CN212689540U (en) | Guide rail for climbing frame | |
CN210659407U (en) | Tool type protective shed for machining of reinforcing steel bars | |
CN211873780U (en) | Attached safety operation protection platform for building construction | |
CN211421793U (en) | Design steel operation platform | |
CN209874424U (en) | Building assembled safety scaffold | |
CN211640388U (en) | Concrete test block maintenance frame convenient to dismantle and install | |
CN208918331U (en) | A kind of upright post type high support template scaffold | |
CN206126696U (en) | A detachable indoor hoist for buckling restrained brace | |
CN214364797U (en) | Scaffold for external construction of tower | |
CN219100689U (en) | Attachment structure suitable for super high floor attached lifting scaffold | |
CN210918489U (en) | Protective guard device of supporting platform | |
CN217054263U (en) | Draw scaffold frame of encorbelmenting to one side | |
CN211556095U (en) | Multifunctional rapid freely-assembled pole for floor | |
CN215858956U (en) | Scaffold frame that security performance is high | |
CN218117190U (en) | Aerial walkway of ladder cage | |
CN217782775U (en) | Scaffold for civil engineering construction | |
CN215254500U (en) | Stable form hanging flower basket supporting component for girder steel | |
CN219952651U (en) | Fixed slot type protective net for climbing frame | |
CN216999351U (en) | Novel square pier column tie beam assembly type bracket device | |
CN210194870U (en) | High-pressure-bearing combined steel structure | |
CN212671158U (en) | Novel steel cat ladder of outrigger for construction | |
CN215889277U (en) | Steel structure platform support frame | |
CN219864221U (en) | Edge safety protection device | |
CN216238971U (en) | Anti-seismic profile steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |