CN218117190U - Aerial walkway of ladder cage - Google Patents

Aerial walkway of ladder cage Download PDF

Info

Publication number
CN218117190U
CN218117190U CN202222337977.5U CN202222337977U CN218117190U CN 218117190 U CN218117190 U CN 218117190U CN 202222337977 U CN202222337977 U CN 202222337977U CN 218117190 U CN218117190 U CN 218117190U
Authority
CN
China
Prior art keywords
walking platform
pavement
ladder cage
connecting piece
aerial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222337977.5U
Other languages
Chinese (zh)
Inventor
杨宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Shengsheng Security Equipment Co ltd
Original Assignee
Yunnan Shengsheng Security Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Shengsheng Security Equipment Co ltd filed Critical Yunnan Shengsheng Security Equipment Co ltd
Priority to CN202222337977.5U priority Critical patent/CN218117190U/en
Application granted granted Critical
Publication of CN218117190U publication Critical patent/CN218117190U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an aerial pavement of ladder cage, including first pavement and a plurality of second pavement, first pavement includes first walking platform, the second pavement includes second walking platform, the one end of first walking platform is equipped with the connecting plate, the connecting plate passes through high strength bolt and ladder cage fixed connection, the other end of the first walking platform of telling with second walking platform, adjacent all can dismantle the connection through first connecting piece between the second walking platform. The utility model discloses can adjust the length of aerial pavement through the quantity that increases or reduces the second pavement, and then be applicable to the ladder cage of different projects and the distance between the building, and set up through detachable, make things convenient for the secondary to have enough to meet the need the use, practice thrift the resource, reduce construction cost.

Description

Aerial walkway of ladder cage
Technical Field
The utility model belongs to the technical field of the construction auxiliary assembly, concretely relates to aerial walkways of ladder cage.
Background
In the building construction, since the building is tall, workers need to climb to the top of the building by means of a cage ladder to perform construction work. The utility model with the patent number of CN210134651U discloses an aerial walkway for high-rise building construction, which comprises a support column, a safety net, frame longitudinal rods, frame transverse rods, a platform and skirting boards, wherein the two frame longitudinal rods are in a group, the two frame longitudinal rods have the same length and are positioned on the same horizontal line, a plurality of frame transverse rods are uniformly arranged between the two frame longitudinal rods, and a rectangular frame is formed between each two frame transverse rods and the frame longitudinal rods; handing-over department of frame transverse bar and frame longitudinal rod all passes through steel card fixed connection, and the rectangle four corners that frame transverse bar and frame longitudinal rod constitute respectively is equipped with a support column, and the support column is fixed in the platform outside, and frame longitudinal rod bottom all is equipped with the stiffening plate, all is equipped with the safety net between per two support columns that lie in on the frame longitudinal rod, and the baseboard is all installed to safety net inboard bottom, and this utility model discloses can make the safer building top construction operation of walking from top layer ladder cage of personnel. The utility model discloses a length of frame longitudinal rod is fixed, and the distance between the ladder cage of every project and the building all is different, therefore, this utility model is difficult to the reutilization, and the practicality is low, has caused construction cost to increase and the wasting of resources.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides an aerial pavement of ladder cage to the aerial pavement length of solving among the prior art is fixed, and the ladder cage of every project and the distance between the building all are different, and aerial pavement is difficult to the technical problem of reutilization.
The technical purpose of the utility model is realized through following technical scheme:
the utility model provides an aerial pavement of ladder cage, includes first pavement and a plurality of second pavement, first pavement includes first walking platform, the second pavement includes second walking platform, the one end of first walking platform is equipped with the connecting plate, the connecting plate passes through high strength bolt and ladder cage fixed connection, the other end of the first walking platform of telling with second platform, adjacent all can dismantle the connection through first connecting piece between the second platform.
Further, the first walking platform comprises two first cross rods, the connecting plate is arranged at the front ends of the two first cross rods, and a first walkway plate is arranged between the two first cross rods; the second walking platform comprises two second cross rods, a second walking board is arranged between the two second cross rods, one end of the first cross rod, opposite to the connecting plate, of the first cross rod and the second cross rod are detachably connected through the first connecting piece, and the second cross rods are adjacent to each other and detachably connected through the first connecting piece.
Furthermore, the top of first connecting piece is equipped with the recess, the both ends of connecting piece are equipped with and run through the first connecting hole in side, first horizontal pole for the second connecting hole has all been seted up to the side at the side of the one end of ladder cage and the side at second horizontal pole both ends, first horizontal pole is violently embedded in with the second in the recess, the second connecting piece passes first connecting hole and second connecting hole will respectively the both ends of connecting piece with first horizontal pole is connected with the second horizontal pole.
Further, the second connecting piece is a screw nut component.
Further, the second connecting piece is a bolt pin assembly.
Furthermore, guardrails are arranged on two sides of the first walking platform and two sides of the second walking platform.
Furthermore, rings are arranged on the first cross rod and the second cross rod.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses an aerial pavement of ladder cage is set to first pavement and a plurality of second pavement, between first pavement and the second pavement, all can dismantle between the adjacent second pavement and be connected, can adjust the length of aerial pavement through the quantity that increases or reduce the second pavement, and then be applicable to the distance between ladder cage and the building of different projects, and through the detachable setting, make things convenient for the secondary to have enough to meet the need the use, practiced thrift the resource, reduced construction cost.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the principles of the invention.
FIG. 1 is a schematic view of the solid structure of the present invention;
fig. 2 is a schematic structural view of the first connecting member and the second connecting member in fig. 1.
The labels in the figure are: 1-first walkway, 2-second walkway, 10-first walking platform, 11-connecting plate, 12-first cross bar, 13-first walkway plate, 20-second walking platform, 21-second cross bar, 22-second walkway plate, 201-second connecting hole, 30-first connecting piece, 31-second connecting piece, 301-groove, 302-first connecting hole, 40-guardrail, 50-hanging ring.
Detailed Description
In order to make the objects and technical solutions of the present invention clear and fully described, and the advantages thereof more clearly understood, the embodiments of the present invention are described in further detail below with reference to the accompanying drawings.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal", "first", "second", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases for those skilled in the art.
Please refer to fig. 1: the utility model provides an aerial pavement of ladder cage, including a first pavement 1 and a plurality of second pavement 2, first pavement 1 includes first walking platform 10, second pavement 2 includes second walking platform 20, the one end of first walking platform 10 is equipped with connecting plate 11, the bolt hole has been seted up on connecting plate 11, connecting plate 11 is through high strength bolt and ladder cage fixed connection, the other end of first walking platform 10 can be dismantled through first connecting piece 30 with second walking platform 20 and be connected, also can dismantle the connection through first connecting piece 30 between the adjacent second walking platform 20. When using, can adjust the length of aerial pavement through the quantity that increases or reduces second pavement 2 to be applicable to the distance between the ladder cage of different projects and the building, through the modularization setting, not only be convenient for install and dismantle, also be convenient for shift and transportation, make things convenient for the secondary to have enough to meet the need the use, practiced thrift the resource, reduced construction cost.
Referring to fig. 1 and 2, the first walking platform 10 includes two first crossbars 12, a connecting plate 11 welded to the front ends of the two first crossbars 12, and a first walkway plate 13 welded between the two first crossbars 12; the second walking platform 20 includes two second cross bars 21, and a second walkway plate 22 is welded between the two second cross bars 21. Two second connecting holes 201 are formed in the side face of one end of the first cross bar 12 close to the second cross bar 21 and the side faces of two ends of the second cross bar 21. The top of the first connecting member 30 is provided with a groove 301, two ends of the first connecting member 30 are respectively provided with two first connecting holes 302 penetrating through the side surfaces thereof, when the first cross bar 12 and the second cross bar 21 or the two second cross bars 21 are embedded in the groove 301, the first connecting holes 302 correspond to the second connecting holes 201, the second connecting member 31 passes through the first connecting holes 302 and the second connecting holes 201 to connect the two ends of the first connecting member 30 with the first cross bar 12 and the second cross bar 21, the connection mode of the two adjacent second cross bars 21 and the first connecting member 30 is the same as that of the first cross bar 12 and the second cross bar 21, and details are not repeated herein.
In this embodiment, the second connecting member 21 is a screw nut assembly, and a screw passes through the first connecting hole 302 and the second connecting hole 201 to be connected with a nut, thereby fixing the first cross bar 12 and the second cross bar 21 to both ends of the first connecting member 30. It is understood that in other embodiments of the present application, the second connecting member 30 may be a pin assembly, the pin passes through the first connecting hole 302 and the second connecting hole 201, and the end of the pin is inserted with a pin, thereby fixing the first cross bar 12 and the second cross bar 21 to both ends of the first connecting member 30.
Referring to fig. 1, guard rails 40 are disposed on both sides of the first walking platform 10 and the second walking platform 20, in this embodiment, the guard rails 40 are installed on the top surfaces of the first cross bar 12 and the second cross bar 21, and the guard rails 40 are fixedly connected to the first cross bar 12 and the second cross bar 21 by bolts. It is understood that in other embodiments of the present application, the guard rail 40 may be disposed on the outer side surfaces of the first cross bar 12 and the second cross bar 21 by welding or the like.
Referring to fig. 1, the first cross bar 12 and the second cross bar 21 are provided with hanging rings 50 to facilitate the crane to hang the first walkway or the second walkway during installation or removal.
It should be noted that the above-mentioned embodiments are only preferred embodiments of the present invention, and the present invention is not limited thereto, and although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications can be made to the technical solutions described in the foregoing embodiments, or some technical features thereof can be replaced with equivalents. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. An aerial walkway for a ladder cage, comprising: including first pavement and a plurality of second pavement, first pavement includes first walking platform, the second pavement includes second walking platform, the one end of first walking platform is equipped with the connecting plate, the connecting plate passes through high strength bolt and terraced cage fixed connection, the other end of the first walking platform of telling with second walking platform, adjacent all can dismantle the connection through first connecting piece between the second walking platform.
2. The cage sky walkway of claim 1, wherein: the first walking platform comprises two first cross rods, the connecting plate is arranged at the front ends of the two first cross rods, and a first walking board is arranged between the two first cross rods; the second walking platform comprises two second cross rods, a second walking board is arranged between the two second cross rods, one end of the first cross rod, opposite to the connecting plate, of the first cross rod and the second cross rod are detachably connected through the first connecting piece, and the second cross rods are adjacent to each other and detachably connected through the first connecting piece.
3. An aerial walkway for a ladder cage as claimed in claim 2, wherein: the top of first connecting piece is equipped with the recess, the both ends of connecting piece are equipped with and run through the first connecting hole in side, first horizontal pole for the second connecting hole has all been seted up to the side at the side of the one end of ladder cage and the side at second horizontal pole both ends, first horizontal pole is violently embedded in the recess with the second, and the second connecting piece passes first connecting hole and second connecting hole will respectively the both ends of connecting piece with first horizontal pole is connected with the second horizontal pole.
4. An aerial walkway for a ladder cage as defined in claim 3 wherein: the second connecting piece is a screw nut component.
5. An aerial walkway for a ladder cage as claimed in claim 3, wherein: the second connecting piece is a bolt pin component.
6. An aerial walkway for a ladder cage as claimed in claim 1, wherein: and guardrails are arranged on two sides of the first walking platform and the second walking platform.
7. An aerial walkway for a ladder cage as claimed in claim 2, wherein: and the first cross rod and the second cross rod are both provided with lifting rings.
CN202222337977.5U 2022-09-02 2022-09-02 Aerial walkway of ladder cage Active CN218117190U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222337977.5U CN218117190U (en) 2022-09-02 2022-09-02 Aerial walkway of ladder cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222337977.5U CN218117190U (en) 2022-09-02 2022-09-02 Aerial walkway of ladder cage

Publications (1)

Publication Number Publication Date
CN218117190U true CN218117190U (en) 2022-12-23

Family

ID=84528160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222337977.5U Active CN218117190U (en) 2022-09-02 2022-09-02 Aerial walkway of ladder cage

Country Status (1)

Country Link
CN (1) CN218117190U (en)

Similar Documents

Publication Publication Date Title
CN218117190U (en) Aerial walkway of ladder cage
CN213417598U (en) Basket is hung with portable to bridge construction
CN212101748U (en) Tower crane attaches wall operation platform device
CN212836642U (en) Cantilever beam structure
CN210152320U (en) Bolt ball node type net rack jig frame
CN211775603U (en) Combined type step construction platform
CN211421793U (en) Design steel operation platform
CN212689540U (en) Guide rail for climbing frame
CN206829587U (en) A kind of hydraulic climbing formwork wall-attached frame
CN220336411U (en) Protection platform lifting point truss for building construction
CN211556095U (en) Multifunctional rapid freely-assembled pole for floor
CN213743213U (en) Climbing ladder for photovoltaic power generation project
CN212671158U (en) Novel steel cat ladder of outrigger for construction
CN111379407A (en) Universal safety net and suspension bracket system for scaffold
CN211623293U (en) Can install and remove oblique cat ladder of standard festival and tower crane
CN219952651U (en) Fixed slot type protective net for climbing frame
CN214575514U (en) Scaffold for engineering building
CN219314519U (en) Safety protection structure of elevator
CN215107168U (en) High-rise building elevator shaft safety protection platform
CN217205786U (en) Guard bar
CN211257739U (en) Safe scaffold of bridge construction usefulness
CN211691385U (en) Combined tower crane wall-attached operation platform
CN215323221U (en) Aerial work platform
CN218175612U (en) Movable guardrail formwork mounting operation platform
CN217782775U (en) Scaffold for civil engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant