CN206829587U - A kind of hydraulic climbing formwork wall-attached frame - Google Patents

A kind of hydraulic climbing formwork wall-attached frame Download PDF

Info

Publication number
CN206829587U
CN206829587U CN201720176029.4U CN201720176029U CN206829587U CN 206829587 U CN206829587 U CN 206829587U CN 201720176029 U CN201720176029 U CN 201720176029U CN 206829587 U CN206829587 U CN 206829587U
Authority
CN
China
Prior art keywords
plate
hook
column
tripod
vertical rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720176029.4U
Other languages
Chinese (zh)
Inventor
徐栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU DAMON SECURITY TECHNOLOGY Co Ltd
Original Assignee
GUANGZHOU DAMON SECURITY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU DAMON SECURITY TECHNOLOGY Co Ltd filed Critical GUANGZHOU DAMON SECURITY TECHNOLOGY Co Ltd
Priority to CN201720176029.4U priority Critical patent/CN206829587U/en
Application granted granted Critical
Publication of CN206829587U publication Critical patent/CN206829587U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of hydraulic climbing formwork wall-attached frame, including main support, the main support includes the first vertical rod and the second vertical rod, a tripod is provided with the top of the main support, the tripod is by spandrel girder, column and brace are formed by connecting, load-bearing hook is provided with the column, the load-bearing hook includes connecting plate and two hooks, a baffle plate is provided with the connecting plate, two hook installing plates are provided with the baffle plate, a hook is installed on every piece of hook installing plate, the hook installing plate upper end is provided with upper guard board, the hook installing plate lower end is provided with lower hanging plate, the lower hanging plate is connected with lower backplate, the lower backplate is connected by an oil cylinder hanging plate with baffle plate, two rollers are provided with the inside of the hook installing plate, the lower end of the column is provided with a tripod hanging seat.The utility model structure setting is simple, and tripod is arranged at main support top plate so that sound construction is reliable, and installation and removal are all very convenient, and efficiency of construction is high.

Description

A kind of hydraulic climbing formwork wall-attached frame
Technical field
It the utility model is related to engineering construction field, and in particular to a kind of hydraulic climbing formwork wall-attached frame.
Background technology
As the high speed development of national economy, the continuous improvement of scientific and technological level are more next come the skyscraper built with creeping formwork It is more.Connection member of the wall-attached frame as guide rail and building, to keep guide rail and integrally-built stabilization.At present, attached wall Frame and guide rail are connected there has been no special attachment structure, therefore very inconvenient when installation is with dismantling, and have impact on construction Efficiency.
Utility model content
The utility model aims to provide a kind of hydraulic climbing formwork wall-attached frame, and to solve current wall-attached frame, there has been no special company Binding structure, installation with dismounting when it is very inconvenient the problem of, improve the deficiency in existing hydraulic climbing formwork wall-attached frame.
A kind of hydraulic climbing formwork wall-attached frame, including main support, the main support includes the first vertical rod and the second vertical rod, described Connected between first vertical rod and the second vertical rod by two crossbeams, be provided with a tripod at the top of the main support, the tripod by Spandrel girder, column and brace are formed by connecting, and are provided with load-bearing hook on the column, load-bearing hook include connecting plate with Two are linked up with, and a baffle plate is provided with the connecting plate, and two hook installing plates are provided with the baffle plate, and every piece is linked up with installing plate One hook is installed, the hook installing plate upper end is provided with upper guard board, and the hook installing plate lower end is provided with lower hanging plate, institute State lower hanging plate and be connected with lower backplate, the lower backplate is connected by an oil cylinder hanging plate with baffle plate, the inner side of the hook installing plate Two rollers are provided with, the lower end of the column is provided with a tripod hanging seat, and the tripod hanging seat includes bottom plate, hanging seat is installed Plate and side plate, the side of the bottom plate are provided with hanging seat installing plate, and the both sides of the hanging seat installing plate are respectively arranged with biside plate, The bottom base plate is provided with two otic placodes, is connected between the otic placode by otic placode reinforcing plate, two risers are provided with the bottom plate, The side of the riser is connected with a floor.
Further, two column mounting holes and a brace mounting hole, two column mounting holes are provided with the side plate It is correspondingly arranged between two risers, the brace mounting hole is correspondingly arranged in below floor.
Further, the spandrel girder lower end is provided with two brace installing plates, and brace is provided with the brace installing plate Fixing hole.
Further, the load-bearing hook is connected with attached wall key.
Further, four connecting holes for being used to connect anti-dumping supporting leg are provided with the hanging seat installing plate.
Further, multiple column through holes are provided with the connecting plate.
Further, first vertical rod is bolted with spandrel girder, and second vertical rod passes through bolt with otic placode Connection.
The utility model has the advantage of:A kind of hydraulic climbing formwork is simple with wall-attached frame structure setting, and tripod is by load-bearing Beam, column and brace are formed by connecting, and tripod is arranged at main support top plate so that and sound construction of the present utility model is reliable, Load-bearing hook is provided with column, load-bearing hook is connected with attached wall key, and the lower end of column is provided with a tripod hanging seat, triangle The hanging seat installing plate of frame hanging seat is connected with anti-dumping supporting leg, so that wall-attached frame can preferably connect guide rail and building, safety Performance is high, and using the connected mode of bolt or latch, installation and dismounting are all very convenient, and operating efficiency is high.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation of hydraulic climbing formwork wall-attached frame.
Fig. 2 is the structural representation of crossbeam and column.
Fig. 3 is the structural representation of load-bearing hook.
Fig. 4 is the structural representation of tripod hanging seat.
Fig. 5 is the present invention looks up structural representation of tripod hanging seat.
Fig. 6 is the side structure schematic view of tripod hanging seat.
In figure:1 main support, 2 first vertical rods, 3 second vertical rods, 4 crossbeams, 5 tripods, 6 spandrel girders, 7 columns, 8 braces, 9 Brace installing plate, 10 brace fixing holes, 11 load-bearing hook, 12 attached wall keys, 13 connecting plates, 14 hooks, 15 baffle plates, 16 hook installations Plate, 17 upper guard boards, 18 times hanging plates, 19 times backplates, 20 oil cylinder hanging plates, 21 rollers, 22 tripod hanging seats, 23 bottom plates, 24 hanging seats peace Loading board, 25 side plates, 26 anti-dumping supporting legs, 27 connecting holes, 28 column mounting holes, 29 brace mounting holes, 30 otic placodes, 31 otic placodes are strengthened Plate, 32 risers, 33 floors, 34 column through holes, 35 guide rails.
Embodiment
In order to solve current wall-attached frame there has been no special attachment structure, it is very inconvenient when installation is with dismounting the problem of, The utility model provides a kind of hydraulic climbing formwork wall-attached frame that can improve efficiency of construction.
A kind of hydraulic climbing formwork wall-attached frame, including main support 1, the main support 1 include the first vertical rod 2 and the second vertical rod 3, Connected between the vertical rod 3 of first vertical rod 2 and second by two crossbeams 4, the top of main support 1 is provided with a tripod 5, institute Tripod 5 to be stated to be formed by connecting by spandrel girder 6, column 7 and brace 8, the lower end of spandrel girder 6 is provided with two brace installing plates 9, Brace fixing hole 10 is provided with the brace installing plate 9, load-bearing hook 11 is provided with the column 7, the load-bearing is hung Hook 11 is connected with attached wall key 12, and the load-bearing hook 11 includes the hook of connecting plate 13 and two 14, is provided with the connecting plate 13 One baffle plate 15, two hook installing plates 16 are provided with the baffle plate 15, a hook 14, institute are installed on every piece of hook installing plate 16 State hook installing plate 16 upper end and be provided with upper guard board 17, hook installing plate 16 lower end is provided with lower hanging plate 18, the lower extension Plate 18 is connected with lower backplate 19, and the lower backplate 19 is connected by an oil cylinder hanging plate 20 with baffle plate 15, the hook installing plate 16 Inner side be provided with two rollers 21, the lower end of the column 7 is provided with a tripod hanging seat 22, and the tripod hanging seat 22 includes Bottom plate 23, hanging seat installing plate 24 and side plate 25, the side of the bottom plate 23 are provided with hanging seat installing plate 24, the hanging seat installing plate Four connecting holes 27 for being used to connect anti-dumping supporting leg 26 are provided with 24, the both sides of the hanging seat installing plate 24 are respectively arranged with two Side plate 25, two column mounting holes 28 and a brace mounting hole 29 is provided with the side plate 25, the bottom of bottom plate 23 is provided with Two otic placodes 30, connected by otic placode reinforcing plate 31 between the otic placode 30, two risers 32 are provided with the bottom plate 23, described two is vertical Post mounting hole 28 is correspondingly arranged between two risers 32, and the side of the riser 32 is connected with a floor 33, the brace mounting hole 29 are correspondingly arranged in the lower section of floor 33, are provided with multiple column through holes 34 on the connecting plate 13, first vertical rod 2 is with holding Weight beam 6 is bolted, and second vertical rod 3 is bolted with otic placode 30.
Operation principle of the present utility model is:During installation, spandrel girder is connected with column, bolt or latch are passed through connection Load-bearing hook is installed on column upper end by the column through hole on plate, and attached wall key and load-bearing hook are connected, bolt or latch are worn Tripod hanging seat is fixed on column lower end by two column mounting holes crossed on side plate, and anti-dumping supporting leg is fixed on into hanging seat installing plate On, bolt or latch through the brace mounting hole on side plate and the brace fixing hole on brace installing plate with bracing diagonal, from And the installation of tripod is completed, and the first vertical rod is bolted with spandrel girder, the second vertical rod is bolted with otic placode, Tripod is fixed on the top of main support.
By described above, the utility model has the advantage of:The utility model structure setting is simple, and tripod is by load-bearing Beam, column and brace are formed by connecting, and tripod is arranged at main support top plate so that and sound construction of the present utility model is reliable, Load-bearing hook is provided with column, load-bearing hook is connected with attached wall key, and the lower end of column is provided with a tripod hanging seat, triangle The hanging seat installing plate of frame hanging seat is connected with anti-dumping supporting leg, so that wall-attached frame can preferably connect guide rail and building, safety Performance is high, and using the connected mode of bolt or latch, installation is quite convenient to fast, improve operating efficiency with dismounting.
Above content is to combine specific preferred embodiment further detailed description of the utility model, it is impossible to Assert that specific implementation of the present utility model is confined to these explanations.For the ordinary skill of the utility model art For personnel, without departing from the concept of the premise utility, some simple deduction or replace can also be made, should all be regarded To belong to the scope of protection of the utility model.

Claims (7)

1. a kind of hydraulic climbing formwork wall-attached frame, including main support, it is characterised in that the main support includes the first vertical rod and second Vertical rod, first vertical rod are connected between the second vertical rod by two crossbeams, and a tripod is provided with the top of the main support, described Tripod is formed by connecting by spandrel girder, column and brace, and load-bearing hook is provided with the column, and the load-bearing hook includes Connecting plate and two is linked up with, and a baffle plate is provided with the connecting plate, and two hook installing plates, every piece of hook are provided with the baffle plate One hook is installed, the hook installing plate upper end is provided with upper guard board, and the hook installing plate lower end is provided with installing plate Lower hanging plate, the lower hanging plate are connected with lower backplate, and the lower backplate is connected by an oil cylinder hanging plate with baffle plate, the hook installation Be provided with two rollers on the inside of plate, the lower end of the column is provided with a tripod hanging seat, the tripod hanging seat include bottom plate, Hanging seat installing plate and side plate, the side of the bottom plate are provided with hanging seat installing plate, and the both sides of the hanging seat installing plate are set respectively There is biside plate, the bottom base plate is provided with two otic placodes, connects by otic placode reinforcing plate between the otic placode, set on the bottom plate There are two risers, the side of the riser is connected with a floor.
2. a kind of hydraulic climbing formwork wall-attached frame according to claim 1, it is characterised in that it is vertical that two are provided with the side plate Post mounting hole and a brace mounting hole, two column mounting holes are correspondingly arranged between two risers, and the brace mounting hole is corresponding It is arranged at below floor.
3. a kind of hydraulic climbing formwork wall-attached frame according to claim 1, it is characterised in that the spandrel girder lower end is provided with Two brace installing plates, brace fixing hole is provided with the brace installing plate.
4. a kind of hydraulic climbing formwork wall-attached frame according to claim 1, it is characterised in that the load-bearing hook is connected with attached Wall key.
5. a kind of hydraulic climbing formwork wall-attached frame according to claim 1, it is characterised in that set on the hanging seat installing plate There are four connecting holes for being used to connect anti-dumping supporting leg.
6. a kind of hydraulic climbing formwork wall-attached frame according to claim 1, it is characterised in that be provided with the connecting plate more Individual column through hole.
7. a kind of hydraulic climbing formwork wall-attached frame according to claim 1, it is characterised in that first vertical rod and spandrel girder It is bolted, second vertical rod is bolted with otic placode.
CN201720176029.4U 2017-02-27 2017-02-27 A kind of hydraulic climbing formwork wall-attached frame Active CN206829587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720176029.4U CN206829587U (en) 2017-02-27 2017-02-27 A kind of hydraulic climbing formwork wall-attached frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720176029.4U CN206829587U (en) 2017-02-27 2017-02-27 A kind of hydraulic climbing formwork wall-attached frame

Publications (1)

Publication Number Publication Date
CN206829587U true CN206829587U (en) 2018-01-02

Family

ID=60779321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720176029.4U Active CN206829587U (en) 2017-02-27 2017-02-27 A kind of hydraulic climbing formwork wall-attached frame

Country Status (1)

Country Link
CN (1) CN206829587U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235873A (en) * 2018-10-08 2019-01-18 中国建筑第八工程局有限公司 Can seperated detachable creeping formwork wall-attaching equipment and its installation correcting construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235873A (en) * 2018-10-08 2019-01-18 中国建筑第八工程局有限公司 Can seperated detachable creeping formwork wall-attaching equipment and its installation correcting construction method

Similar Documents

Publication Publication Date Title
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN101839070B (en) Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
CN205804190U (en) A kind of travelling bridge for the guardrail construction that builds a bridge
CN209179535U (en) Basement reinforcing and supporting structure
CN206829587U (en) A kind of hydraulic climbing formwork wall-attached frame
CN207538483U (en) A kind of steel box-girder suspender
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN211368423U (en) Stay cable tower top lifting traction operation platform
CN110886225A (en) Construction method of cable tower stay cable installation system
CN103950811B (en) The people's Cargo Lift mounting structure and its installation method of complicated appearance building structure
CN212836642U (en) Cantilever beam structure
CN201502170U (en) Horizontal supporting device of building external frame
CN203430006U (en) Quick disassembly and assembly cantilever bracket for building outer wall construction
CN211499466U (en) Civil engineering is with strengthening support post
CN204038917U (en) Detachable external hanging type operating platform
CN203783106U (en) Hanging assembling moving platform
CN113605659A (en) Elevator shaft tool type safe operation platform and construction method thereof
CN220336411U (en) Protection platform lifting point truss for building construction
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN221119197U (en) Suspended reinforced concrete coal bucket template supporting device
CN219100689U (en) Attachment structure suitable for super high floor attached lifting scaffold
CN217326383U (en) Parapet hanging basket structure
CN216240384U (en) Operation platform assembly with ladder stand suitable for steel structure high altitude installation
CN210763801U (en) Install elevator assembled connecting channel additional
CN103993729A (en) High rise elevator shaft formwork erecting platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A serial communication port,

Effective date of registration: 20181107

Granted publication date: 20180102

Pledgee: Guangzhou Caold financing Company limited by guarantee

Pledgor: GUANGZHOU DAMENG SECURITY TECHNOLOGY CO.,LTD.

Registration number: 2018440000309

PE01 Entry into force of the registration of the contract for pledge of patent right
PP01 Preservation of patent right

Effective date of registration: 20240103

Granted publication date: 20180102

PP01 Preservation of patent right