CN109235873A - Can seperated detachable creeping formwork wall-attaching equipment and its installation correcting construction method - Google Patents
Can seperated detachable creeping formwork wall-attaching equipment and its installation correcting construction method Download PDFInfo
- Publication number
- CN109235873A CN109235873A CN201811168017.2A CN201811168017A CN109235873A CN 109235873 A CN109235873 A CN 109235873A CN 201811168017 A CN201811168017 A CN 201811168017A CN 109235873 A CN109235873 A CN 109235873A
- Authority
- CN
- China
- Prior art keywords
- wall
- supporting seat
- seat
- attached supporting
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 54
- 238000009415 formwork Methods 0.000 title claims abstract description 47
- 238000010276 construction Methods 0.000 title claims abstract description 16
- 230000009194 climbing Effects 0.000 claims abstract description 17
- NOQGZXFMHARMLW-UHFFFAOYSA-N Daminozide Chemical group CN(C)NC(=O)CCC(O)=O NOQGZXFMHARMLW-UHFFFAOYSA-N 0.000 claims abstract description 11
- 238000000034 method Methods 0.000 claims description 12
- 238000006073 displacement reaction Methods 0.000 claims description 7
- 230000002787 reinforcement Effects 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000004992 fission Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/28—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
- E04G11/30—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete which are lifted from layer to layer by turning, tilting, or similar moving upwards about a horizontal axis
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The present invention provide it is a kind of can seperated detachable creeping formwork wall-attaching equipment and its installation correcting construction method, the wall-attaching equipment includes the wall-attached supporting seat and hanging seat for being configured to individual member, the both ends alar part of the wall-attached supporting seat after mounting in the horizontal direction is equipped with lateral adjustments hole, with cooperate it is pre-buried climb cone and high-strength bolt place the lateral adjustments after be locked on surface of wall, and wall-attached supporting seat and hanging seat are divided into equipped with the matched tenon block of planform and tongue-and-groove;Whereby, wall-attached supporting seat can carry out during installation Primary Location correction by its lateral adjustments hole, hanging seat with wall-attached supporting seat group after connecing, pass through planform matching but realize to adjust to move in the horizontal direction along attached wall without the tenon block and tongue-and-groove being fastenedly connected and carries out secondary positioning correcting, and then offset the pre-buried pre-buried error for climbing cone, to solve the technical issues of creeping formwork built-in fitting deviation causes, reach and effectively solves creeping formwork, wall-attached supporting seat connection installation question, ensure that erection of frames is accurate, reduces frame body and climb difficulty.
Description
Technical field
The present invention relates to the creeping formwork wall-attaching equipment in technical field of building construction, relating in particular to can seperated detachable
Creeping formwork wall-attaching equipment and its installation correcting construction method.
Background technique
During construction of super highrise building, shear wall structure hydraulic climbing mould construction is a relatively advanced construction party
Method, refer to it is pre-buried in wall climb cone, when hydraulic self-creeping formwork is constructed, the climbing frame of climbing form system supports each other with guide rail, mutually
Jacking, template is in place with climbing frame, and is operated by climbing frame, i.e., guide rail is mentioned by the hydraulic system being attached on climbing frame
It rises, rear in place to connect with top climbing frame suspender, climbing frame then passes through jack-up hydraulic ram with template system and climbed along guide rail
It rises.The positioning operation that climbs of climbing frame and template is just realized in this way, forms each layer working procedure circulation of shear wall body.Hydraulic
In climbing formwork for construction, the most key is needed in wall installing wall-attaching equipment to support entire hydraulic climbing system.
It is worth noting that, during lifting rail climbs, the case where being frequently encountered creeping formwork built-in fitting deviation, cause
With the lifting rail not situation on a vertical line after attached wall installation, lifting rail is resulted in this way and deviates attached wall, gives climbing frame
Frame body, which climbs, causes difficulty, is further improved.
Summary of the invention
In view of the foregoing, the present invention provide it is a kind of can seperated detachable creeping formwork wall-attaching equipment and its installation correction construction
Method, to solve the technical issues of creeping formwork built-in fitting deviation causes.
To achieve the above object, the technical solution adopted by the present invention is that provide it is a kind of can seperated detachable creeping formwork attached wall dress
It sets, for lifting rail to be installed and connected in wall;Wherein, the creeping formwork wall-attaching equipment includes: two fastener inserts, is embedded in advance
In the wall;Wall-attached supporting seat, is formed with installation seat plate, and the installation seat plate has two opposite side surfaces;The mounting base
Plate protrudes to form tenon block in the intermediate position of a wherein side surface, and the two-end part of the installation seat plate forms the wall-attached supporting seat
Two alar parts;Defining the direction extended along the both ends of the installation seat plate is that laterally, each alar part transversely offers strip
The lateral adjustments hole of shape;The wall-attached supporting seat places the lateral adjustments hole by the fastener inserts with location and installation in described
On wall;Hanging seat, has opposite two sides, the tongue-and-groove that side is recessed shape and the tenon block matches, the other side with it is described
Lifting rail group connects;The tongue-and-groove is formed with opposite notch and groove bottom wall, and the tongue-and-groove is along the groove bottom wall extending direction
The perforation of two slot ends;The slot end for enabling the tenon block of the wall-attached supporting seat from the hanging seat tongue-and-groove is embedded, and the hanging seat passes through along cross
To displacement to adjust the installation site corrected on wall.
In creeping formwork wall-attaching equipment embodiment of the invention, each fastener inserts include built-in base, taper carrying fitting sleeve
Pipe and high-strength bolt;The built-in base is embedded in advance inside the wall, and the taper carrying swagelok is embedded in the wall in advance
It is interior and connect with the surface of wall, perforation connection is equipped between the built-in base and taper carrying swagelok;Enable institute
The body portion of high-strength bolt is stated to be spirally connected behind the lateral adjustments hole of the wall-attached supporting seat and the perforation with the built-in base fixation,
The head of the high-strength bolt is revealed on the alar part for being anchored on the wall-attached supporting seat outside the wall.
In creeping formwork wall-attaching equipment embodiment of the invention, definition connect the opposite sides on the installation seat plate surface and with institute
It is longitudinal for stating laterally vertical direction;The tenon block is the trapezoidal block of longitudinal profile, and the tenon block, which has, to be longitudinally expanded
2 first limit angle vertebras, be formed separately between the 2 first limit angle vertebra and the opposite sides plate face of the installation seat plate
Reinforcement part.
In creeping formwork wall-attaching equipment embodiment of the invention, the tongue-and-groove is the trapezoidal groove body of longitudinal profile, the tongue-and-groove
Notch opposite sides transversely be formed with 2 second limit angle vertebras;The tenon block is limited with the tongue-and-groove by described first
Angle vertebra is mutually fixed with the second limit angle vertebra and chimeric group connects.
In creeping formwork wall-attaching equipment embodiment of the invention, the groove bottom wall of the tongue-and-groove and the second limit angle vertebra adjoiner
It is configured to cambered surface, enables the longitudinal profile of the tongue-and-groove in the class trapezoidal shape for being equipped with chamfering between bottom and bevel edge.
In creeping formwork wall-attaching equipment embodiment of the invention, the tenon block connects with the mutually embedding group of the tongue-and-groove, the slot of the hanging seat
Mouth is engaged with the surface of the wall-attached supporting seat.
In creeping formwork wall-attaching equipment embodiment of the invention, between the hanging seat and the lifting rail there is connector to connect
It connects, the connector is articulated with the top of the hanging seat by safety pin.
The step of present invention separately provides a kind of installation correcting construction method of aforementioned creeping formwork wall-attaching equipment, the method is wrapped
It includes: the lifting rail is installed on the hanging seat;When the hanging seat finds there is deviation when the guide rail of climbing frame climbs, pass through
It transfers the relatively described wall-attached supporting seat of the hanging seat to be transversely displaced, to offset the built-in base, taper carrying swagelok
In the pre-buried error of the wall installation site.
In embodiment of the method for the invention, the method also includes installing by the lifting rail to before the hanging seat
It follows the steps below:
When binding the reinforcing bar of wall, pre-buried built-in base and taper carry swagelok;
The wall-attached supporting seat is placed after the concreting and form removable work for completing wall, then through high-strength bolt
Swagelok is carried with the taper, enables the built-in base screw lock inside the high-strength bolt and wall to determine the wall-attached supporting seat
Position is installed on the wall;
By the hanging seat transversely with displacement with the wall-attached supporting seat grafting, with enable the hanging seat tongue-and-groove and the attached wall
Support tenon block is fitted into group and connects.
In embodiment of the method for the invention, the step of the method further include: pass through in the wall-attached supporting seat described high-strength
Bolt location and installation utilizes the strip lateral adjustments being formed in two flank section of wall-attached supporting seat before on the wall
Hole makes the wall-attached supporting seat and places the high-strength bolt in the lateral adjustments hole relatively lateral displacement, to carry out the creeping formwork
Wall-attaching equipment is corrected in the Primary Location of wall installation site.
The present invention is due to wall-attached supporting seat and hanging seat being formed separately and are independent component using above technical scheme, institute
The both ends alar part of wall-attached supporting seat after mounting in the horizontal direction is stated equipped with lateral adjustments hole, pre-buried climbs cone and high-strength bolt to cooperate
It is locked on surface of wall after placing the lateral adjustments, and the wall-attached supporting seat and the hanging seat are divided into equipped with planform matching
Tenon block and tongue-and-groove;Whereby, the wall-attached supporting seat can carry out during installation Primary Location correction, institute by its lateral adjustments hole
Hanging seat is stated after connecing with the wall-attached supporting seat group, by planform matching but without the tenon block that is fastenedly connected and tongue-and-groove realize along
Attached wall adjust in the horizontal direction it is mobile carry out secondary positioning correcting, and then offset the pre-buried pre-buried error for climbing cone, with solve creeping formwork,
The problem of wall-attached supporting seat connection installation misalignment, and ensure that erection of frames is accurate, reduces frame body and climb difficulty.
These and other objects of the invention, feature and advantage, are filled by following detailed descriptions and claim
Fission is existing, and can be achieved by means, device and the their combination specially pointed out in appended claims.
Detailed description of the invention
Fig. 1 be the present invention can seperated detachable creeping formwork wall-attaching equipment composite structure schematic cross-sectional view.
Fig. 2 is the three-dimensional appearance structural schematic diagram of wall-attached supporting seat of the present invention.
Fig. 3 is the plane side structure schematic view of hanging seat of the present invention.
The corresponding relationship of appended drawing reference and component is as follows:
Wall 10;Lifting rail 20;Fastener inserts 30;Built-in base 31;Taper carries swagelok 32;High-strength bolt 33;
Body portion 331;Head 332;Wall-attached supporting seat 40;Installation seat plate 401;Alar part 41;Lateral adjustments hole 42;First limit angle vertebra 43;Add
Strong portion 44;Hanging seat 50;Tongue-and-groove 501;Notch 51;Groove bottom wall 52;Second limit angle vertebra 53;Cambered surface 54;Connector 55.
Specific embodiment
Detailed specific embodiment of the invention will be disclosed herein.It should be appreciated, however, that disclosed embodiment
Only typical example of the invention, and the present invention can be implemented by a variety of alterative versions.Therefore, disclosed herein
Specific structure and function details are not limiting, and are only to illustrate using claim as principle as to those skilled in the art
The representativeness principle of different embodiments.
For the benefit of to the present invention can seperated detachable creeping formwork wall-attaching equipment and its understanding of correcting construction method is installed, with
Lower combination Fig. 1 is illustrated to Fig. 3 and embodiment.
As shown in Figure 1, it is provided by the invention can seperated detachable creeping formwork wall-attaching equipment for lifting rail 20 to be installed
It is connected on wall 10, the wall 10 is the base configuration that internal configuration reinforcement cage is formed through concreting, described to climb
Guide rail 20 is for connecting with creeping formwork frame body, to realize component that creeping formwork frame body climbs along wall 10.Wherein, creeping formwork attached wall of the present invention
Device includes fastener inserts 30, wall-attached supporting seat 40 and hanging seat 50.
As shown in Figure 1 and Figure 2, the wall-attached supporting seat 40 has installation seat plate 401 and forms in the installation seat plate 401 1
The length direction intersection of the tenon block 402 of side surface, the installation seat plate 401 and the tenon block 402 keeps the wall-attached supporting seat 40 general
In dagger.Specifically, the installation seat plate 401 has two opposite side surfaces;The installation seat plate 401 is in wherein one
The intermediate position of side surface protrudes to form the tenon block 402, and the two-end part of the installation seat plate 401 is enabled to form the attached wall branch
Two alar parts 41 of seat 40.Defining the direction extended along the both ends of the installation seat plate 401 is lateral (the i.e. described installation seat plate 401
Length direction), each alar part 41 transversely offers the lateral adjustments hole 42 of strip;The wall-attached supporting seat 40 passes through institute
It states fastener inserts 30 and places the lateral adjustments hole 42 with location and installation on the wall 10.
In the embodiment of the present invention, 30 quantity of fastener inserts of the creeping formwork wall-attaching equipment is two groups, as shown in Figure 1, respectively
The group fastener inserts 30 include built-in base 31, taper carrying swagelok 32 and high-strength bolt 33;Wherein, the built-in base 31
Be embedded in inside the wall 10 in advance, taper carrying swagelok 32 be embedded in the wall 10 in advance and with 10 table of wall
Face connection is reserved with perforation connection between the built-in base 31 and taper carrying swagelok 32;Enable the high-strength bolt
33 body portion 331 is spirally connected behind the lateral adjustments hole 42 of the wall-attached supporting seat 40 and the perforation with the built-in base 31 solid
Fixed, the head 332 of the high-strength bolt 33 is revealed on the alar part 41 for being anchored on the wall-attached supporting seat 40 outside the wall 10.
As shown in Figure 1, Figure 3, the hanging seat 50 has opposite two sides, and side is recessed shape and 402 phase of tenon block
Matched tongue-and-groove 501, the other side connect for 20 groups with the lifting rail;The tongue-and-groove 501 is formed with opposite notch 51 and slot bottom
Wall 52, the tongue-and-groove 501 are penetrated through along two slot ends of 52 extending direction of groove bottom wall;Enable the tenon block 402 of the wall-attached supporting seat 40
It is embedded from the slot end of 50 tongue-and-groove 501 of hanging seat, the hanging seat 50 adjusts correction by being transversely displaced in wall 10
On installation site.Definition connects the opposite sides on 401 surface of installation seat plate and the direction vertical with the transverse direction is vertical
To (length direction of the i.e. described tenon block 402);The tenon block 402 is the trapezoidal block of longitudinal profile, and the tenon block 402 has
The 2 first limit angle vertebras 43 longitudinally expanded, the opposite sides of the 2 first limit angle vertebra 43 and the installation seat plate 401
Reinforcement part 44 has been formed separately between plate face.
More specifically, as shown in Fig. 2, the longitudinal sectional shape of the tenon block 402 is to rotate 90 ° trapezoidal, it is described trapezoidal
Upper bottom connect with the surface of the installation seat plate 401, the trapezoidal bottom and two bevel edges define to form described 2 the jointly
The triangular profiles of one limit angle vertebra 43.
In the embodiment of the present invention, as shown in Figure 1, Figure 3, the tongue-and-groove 501 of the hanging seat 50 is that longitudinal profile is trapezoidal
Groove body, the opposite sides of the notch 51 of the tongue-and-groove 501 transversely are formed with 2 second limit angle vertebras 53;The tenon block 402 with
The tongue-and-groove 501 is connect by the first limit angle vertebra 43 with mutual chimeric group of the fixing of the second limit angle vertebra 53.
More specifically, the groove bottom wall 52 of the tongue-and-groove 501 and 53 adjoiner of the second limit angle vertebra are configured to cambered surface 54,
Enable the longitudinal profile of the tongue-and-groove 501 in the class trapezoidal shape for being equipped with chamfering between bottom and bevel edge;Whereby, the tenon block is enabled
After the 402 insertion tongue-and-grooves 501, the tenon block 402 is by the cambered surface 54 to the 43 the top of the horn position shape of the first limit angle vertebra
At limitation, the surface of tenon block 402 and the groove bottom wall 52 of the tongue-and-groove 501 is avoided to connect, with guarantee tenon block 402 and tongue-and-groove 501 it
Between be connection relationship that chimeric but non-fastening group connects, and as shown in Figure 1, the tenon block 402 connects with the mutually embedding group of the tongue-and-groove 501,
The notch 51 of the hanging seat 50 is engaged with the surface of the wall-attached supporting seat 40.
In addition, in the embodiment of the present invention, as shown in Figure 1, the hanging seat 50 passes through connector 55 at the top of it
Support connects the lifting rail 20;Specifically, the connector 55 is longitudinal sectional shape in the T shape component for being inverted 90 °, body
Portion end is articulated with the top of the hanging seat 50 by safety pin 56, and is connected to the lifting rail by the support of its head
Between 20 and the top of the hanging seat 50, it is ensured that the secure connection between lifting rail 20 and hanging seat 50 is fixed.
Be explained above the present invention can seperated detachable creeping formwork wall-attaching equipment specific implementation aspect, please cooperate again below
Refering to fig. 1 to Fig. 3, illustrate the present invention can seperated detachable creeping formwork wall-attaching equipment installation correcting construction method;The method
The step of include:
Step 1: when binding the reinforcing bar of wall 10, pre-buried built-in base 31 and taper carry swagelok 32;
Step 2: placing institute after the concreting and form removable work for completing wall 10, then through high-strength bolt 33
Wall-attached supporting seat 40 and taper carrying swagelok 32 are stated, 31 spiral shell of built-in base inside the high-strength bolt 33 and wall 10 is enabled
Lock with by 40 location and installation of wall-attached supporting seat on the wall 10;
Step 3: by the hanging seat 50 transversely with displacement with 40 grafting of wall-attached supporting seat, to enable the tenon of the hanging seat 50
Slot 501 connects with described chimeric group of 40 tenon block 402 of wall-attached supporting seat;
Step 4: the lifting rail 20 is installed on the hanging seat 50;When the hanging seat 50 climbs in the guide rail of climbing frame
Shi Faxian has deviation, is transversely displaced by transferring the relatively described wall-attached supporting seat 40 of hanging seat 50, to offset the built-in base
31, the pre-buried error of the taper carrying swagelok 32.
In creeping formwork wall-attaching equipment installation correcting construction method embodiment of the invention, the step 2 is in the attached wall branch
Seat 40 by 33 location and installation of high-strength bolt before on the wall 10, preferably first with being formed in the wall-attached supporting seat
Strip lateral adjustments hole 42 in 40 liang of flank sections 41 makes the wall-attached supporting seat 40 and places the height in the lateral adjustments hole 42
The relatively lateral displacement of strength bolt 33 is corrected with carrying out the creeping formwork wall-attaching equipment in the Primary Location of 10 installation site of wall,
To be further ensured that the accuracy of creeping formwork wall-attaching equipment installation site.
It is described the invention in detail above in conjunction with accompanying drawings and embodiments, those skilled in the art can basis
Above description makes many variations example to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention,
The present invention will be using the range that the appended claims define as protection scope of the present invention.
Claims (10)
1. one kind can seperated detachable creeping formwork wall-attaching equipment, for lifting rail to be installed and connected in wall;Its feature exists
In the creeping formwork wall-attaching equipment includes:
Two fastener inserts are embedded in advance in the wall;
Wall-attached supporting seat, is formed with installation seat plate, and the installation seat plate has two opposite side surfaces;The installation seat plate is in wherein
The intermediate position of one side surface protrudes to form tenon block, and the two-end part of the installation seat plate forms two wings of the wall-attached supporting seat
Portion;Defining the direction extended along the both ends of the installation seat plate is that laterally, each alar part transversely offers the cross of strip
To adjustment hole;The wall-attached supporting seat places the lateral adjustments hole by the fastener inserts with location and installation in the wall
On;
Hanging seat has opposite two sides, and the tongue-and-groove that side is recessed shape and the tenon block matches, the other side is climbed with described
Guide rail group connects;The tongue-and-groove is formed with opposite notch and groove bottom wall, two slots of the tongue-and-groove along the groove bottom wall extending direction
End perforation;The slot end for enabling the tenon block of the wall-attached supporting seat from the hanging seat tongue-and-groove is embedded, and the hanging seat passes through transversely position
It moves to adjust the installation site corrected on wall.
2. it is according to claim 1 can seperated detachable creeping formwork wall-attaching equipment, it is characterised in that:
Each fastener inserts include built-in base, taper carrying swagelok and high-strength bolt;The built-in base is embedded in described in advance
Inside wall, the taper carrying swagelok is embedded in the wall in advance and connect with the surface of wall, the built-in base
And perforation connection is equipped between the taper carrying swagelok;Enable the body portion of the high-strength bolt through the wall-attached supporting seat
Be spirally connected behind lateral adjustments hole and the perforation with the built-in base fixation, and the head of the high-strength bolt is revealed in outside the wall
Portion is anchored on the alar part of the wall-attached supporting seat.
3. it is according to claim 1 can seperated detachable creeping formwork wall-attaching equipment, it is characterised in that:
Definition connects the opposite sides on the installation seat plate surface and the direction vertical with the transverse direction is longitudinal;The tenon block is
The trapezoidal block of longitudinal profile, the tenon block have the 2 first limit angle vertebras longitudinally expanded, 2 first limit angle
Reinforcement part has been formed separately between vertebra and the opposite sides plate face of the installation seat plate.
4. it is according to claim 3 can seperated detachable creeping formwork wall-attaching equipment, it is characterised in that:
The tongue-and-groove is the trapezoidal groove body of longitudinal profile, and the opposite sides of the notch of the tongue-and-groove transversely is formed with 2 second
Limit angle vertebra;The tenon block is mutually fixed by the first limit angle vertebra with the second limit angle vertebra embedding with the tongue-and-groove
It is combined and connects.
5. it is according to claim 4 can seperated detachable creeping formwork wall-attaching equipment, it is characterised in that:
The groove bottom wall of the tongue-and-groove and the second limit angle vertebra adjoiner are configured to cambered surface, enable the longitudinal profile of the tongue-and-groove be in
The class trapezoidal shape of chamfering is equipped between bottom and bevel edge.
6. it is according to claim 1 or 4 can seperated detachable creeping formwork wall-attaching equipment, it is characterised in that:
The tenon block connects with the mutually embedding group of the tongue-and-groove, and the notch of the hanging seat is engaged with the surface of the wall-attached supporting seat.
7. it is according to claim 1 can seperated detachable creeping formwork wall-attaching equipment, it is characterised in that:
There is connector connection, the connector is articulated with described by safety pin between the hanging seat and the lifting rail
The top of hanging seat.
8. a kind of install correcting construction method to creeping formwork wall-attaching equipment described in any claim in 7 according to claim 1,
It is characterized in that, the step of the method includes:
The lifting rail is installed on the hanging seat;When the hanging seat finds there is deviation when the guide rail of climbing frame climbs, lead to
It crosses and transfers the relatively described wall-attached supporting seat of the hanging seat and be transversely displaced, to offset the built-in base, taper carrying fitting sleeve
Pre-buried error of the pipe in the wall installation site.
9. creeping formwork wall-attaching equipment according to claim 8 installs correcting construction method, which is characterized in that the method is also wrapped
It includes and is followed the steps below before installing the lifting rail to the hanging seat:
When binding the reinforcing bar of wall, pre-buried built-in base and taper carry swagelok;
The wall-attached supporting seat and institute are placed after the concreting and form removable work for completing wall, then through high-strength bolt
Taper carrying swagelok is stated, the built-in base screw lock inside the high-strength bolt and wall is enabled to pacify to position the wall-attached supporting seat
Loaded on the wall;
By the hanging seat transversely with displacement with the wall-attached supporting seat grafting, with enable the hanging seat tongue-and-groove and the wall-attached supporting seat
Tenon block is fitted into group and connects.
10. creeping formwork wall-attaching equipment according to claim 9 installs correcting construction method, which is characterized in that the method
Step further include:
The wall-attached supporting seat by the high-strength bolt location and installation before on the wall, using being formed in the attached wall
Strip lateral adjustments hole in two flank section of support makes the wall-attached supporting seat and places the high-strength bolt in the lateral adjustments hole
Relatively lateral displacement is corrected with carrying out the creeping formwork wall-attaching equipment in the Primary Location of wall installation site.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811168017.2A CN109235873B (en) | 2018-10-08 | 2018-10-08 | Detachable and detachable creeping formwork wall-attached device and installation, correction and construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201811168017.2A CN109235873B (en) | 2018-10-08 | 2018-10-08 | Detachable and detachable creeping formwork wall-attached device and installation, correction and construction method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN109235873A true CN109235873A (en) | 2019-01-18 |
| CN109235873B CN109235873B (en) | 2021-08-10 |
Family
ID=65055253
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201811168017.2A Active CN109235873B (en) | 2018-10-08 | 2018-10-08 | Detachable and detachable creeping formwork wall-attached device and installation, correction and construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109235873B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116856673A (en) * | 2023-08-24 | 2023-10-10 | 四川宇通路特机械设备有限公司 | Bearing device for hydraulic climbing formwork and construction method thereof |
Citations (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0103760A2 (en) * | 1982-09-22 | 1984-03-28 | Hünnebeck GmbH | Climbing form for shuttering concrete walls |
| US4709899A (en) * | 1985-10-28 | 1987-12-01 | Shimizu Construction Co., Ltd. | Climbing formwork apparatus for concrete placing |
| JPH05338963A (en) * | 1992-06-02 | 1993-12-21 | Konoike Constr Ltd | Vertical conveyer device with arm |
| KR20090105902A (en) * | 2009-09-15 | 2009-10-07 | 최재주 | Anchor bolt cover up and down device to prevent fall of gang form |
| CN201747052U (en) * | 2009-12-24 | 2011-02-16 | 北京市建筑工程研究院 | Novel nondestructive tight bind type attachment device of creeping climbing formwork and climbing frame |
| CN202248860U (en) * | 2011-10-12 | 2012-05-30 | 四川路桥建设股份有限公司 | Hydraulic climbing formwork system |
| CN203834928U (en) * | 2014-05-16 | 2014-09-17 | 中国建筑第四工程局有限公司 | Automatic climbing formwork |
| CN203878981U (en) * | 2014-03-31 | 2014-10-15 | 中国建筑第八工程局有限公司 | Improved wall attaching key for hydraulic climbing formwork |
| CN203878982U (en) * | 2014-03-31 | 2014-10-15 | 中国建筑第八工程局有限公司 | Improved type attached wall connecting plate for hydraulic climbing formwork |
| CN104164968A (en) * | 2013-08-20 | 2014-11-26 | 北京市建筑工程研究院有限责任公司 | Novel shiftable through-wall (or embedded) type double-point adhering device |
| CN204876565U (en) * | 2015-07-31 | 2015-12-16 | 武汉建工集团股份有限公司 | Fixed concrete connects simple and easy device of stubble department template |
| CN105971271A (en) * | 2016-05-20 | 2016-09-28 | 北京卓良模板有限公司 | Single-side self-climbing cantilever formwork and construction method thereof |
| CN206188161U (en) * | 2016-11-16 | 2017-05-24 | 南京高立工程机械有限公司 | It climbs high slip and attaches wall device to improve construction elevator |
| CN107100361A (en) * | 2017-03-20 | 2017-08-29 | 广州珠江工程建设监理有限公司 | Inner support aluminum dipping form device and its installation method are climbed outside a kind of |
| CN206625549U (en) * | 2017-03-13 | 2017-11-10 | 广州达蒙安防科技有限公司 | A kind of hydraulic climbing formwork attached wall part |
| CN206829587U (en) * | 2017-02-27 | 2018-01-02 | 广州达蒙安防科技有限公司 | A kind of hydraulic climbing formwork wall-attached frame |
| CN107620462A (en) * | 2017-10-09 | 2018-01-23 | 深圳市特辰科技股份有限公司 | One kind builds the mechanical arm attachment device that climbs |
| CN207048293U (en) * | 2017-06-19 | 2018-02-27 | 上海建工集团股份有限公司 | Hydraulic climbing formwork self-balancing type wall-attaching equipment |
| CN207314828U (en) * | 2017-10-01 | 2018-05-04 | 郑州科润机电工程有限公司 | Jaw arrangement is climbed in one kind commutation |
| CN207453449U (en) * | 2017-10-10 | 2018-06-05 | 李波 | A kind of scaffold Level tune support device for building |
| CN207484942U (en) * | 2017-09-12 | 2018-06-12 | 上海建工集团股份有限公司 | A kind of climbing device wall-attaching equipment of adjustable absolute altitude |
| CN207499385U (en) * | 2017-09-29 | 2018-06-15 | 中国建筑第八工程局有限公司 | Plug-in tower crane supporting beam, which has bad luck installation and climbs, uses operating platform |
| CN108166752A (en) * | 2017-11-23 | 2018-06-15 | 中国建筑股份有限公司 | Scalable supporting body and its application method |
-
2018
- 2018-10-08 CN CN201811168017.2A patent/CN109235873B/en active Active
Patent Citations (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0103760A2 (en) * | 1982-09-22 | 1984-03-28 | Hünnebeck GmbH | Climbing form for shuttering concrete walls |
| US4709899A (en) * | 1985-10-28 | 1987-12-01 | Shimizu Construction Co., Ltd. | Climbing formwork apparatus for concrete placing |
| JPH05338963A (en) * | 1992-06-02 | 1993-12-21 | Konoike Constr Ltd | Vertical conveyer device with arm |
| KR20090105902A (en) * | 2009-09-15 | 2009-10-07 | 최재주 | Anchor bolt cover up and down device to prevent fall of gang form |
| CN201747052U (en) * | 2009-12-24 | 2011-02-16 | 北京市建筑工程研究院 | Novel nondestructive tight bind type attachment device of creeping climbing formwork and climbing frame |
| CN202248860U (en) * | 2011-10-12 | 2012-05-30 | 四川路桥建设股份有限公司 | Hydraulic climbing formwork system |
| CN104164968A (en) * | 2013-08-20 | 2014-11-26 | 北京市建筑工程研究院有限责任公司 | Novel shiftable through-wall (or embedded) type double-point adhering device |
| CN203878981U (en) * | 2014-03-31 | 2014-10-15 | 中国建筑第八工程局有限公司 | Improved wall attaching key for hydraulic climbing formwork |
| CN203878982U (en) * | 2014-03-31 | 2014-10-15 | 中国建筑第八工程局有限公司 | Improved type attached wall connecting plate for hydraulic climbing formwork |
| CN203834928U (en) * | 2014-05-16 | 2014-09-17 | 中国建筑第四工程局有限公司 | Automatic climbing formwork |
| CN204876565U (en) * | 2015-07-31 | 2015-12-16 | 武汉建工集团股份有限公司 | Fixed concrete connects simple and easy device of stubble department template |
| CN105971271A (en) * | 2016-05-20 | 2016-09-28 | 北京卓良模板有限公司 | Single-side self-climbing cantilever formwork and construction method thereof |
| CN206188161U (en) * | 2016-11-16 | 2017-05-24 | 南京高立工程机械有限公司 | It climbs high slip and attaches wall device to improve construction elevator |
| CN206829587U (en) * | 2017-02-27 | 2018-01-02 | 广州达蒙安防科技有限公司 | A kind of hydraulic climbing formwork wall-attached frame |
| CN206625549U (en) * | 2017-03-13 | 2017-11-10 | 广州达蒙安防科技有限公司 | A kind of hydraulic climbing formwork attached wall part |
| CN107100361A (en) * | 2017-03-20 | 2017-08-29 | 广州珠江工程建设监理有限公司 | Inner support aluminum dipping form device and its installation method are climbed outside a kind of |
| CN207048293U (en) * | 2017-06-19 | 2018-02-27 | 上海建工集团股份有限公司 | Hydraulic climbing formwork self-balancing type wall-attaching equipment |
| CN207484942U (en) * | 2017-09-12 | 2018-06-12 | 上海建工集团股份有限公司 | A kind of climbing device wall-attaching equipment of adjustable absolute altitude |
| CN207499385U (en) * | 2017-09-29 | 2018-06-15 | 中国建筑第八工程局有限公司 | Plug-in tower crane supporting beam, which has bad luck installation and climbs, uses operating platform |
| CN207314828U (en) * | 2017-10-01 | 2018-05-04 | 郑州科润机电工程有限公司 | Jaw arrangement is climbed in one kind commutation |
| CN107620462A (en) * | 2017-10-09 | 2018-01-23 | 深圳市特辰科技股份有限公司 | One kind builds the mechanical arm attachment device that climbs |
| CN207453449U (en) * | 2017-10-10 | 2018-06-05 | 李波 | A kind of scaffold Level tune support device for building |
| CN108166752A (en) * | 2017-11-23 | 2018-06-15 | 中国建筑股份有限公司 | Scalable supporting body and its application method |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116856673A (en) * | 2023-08-24 | 2023-10-10 | 四川宇通路特机械设备有限公司 | Bearing device for hydraulic climbing formwork and construction method thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CN109235873B (en) | 2021-08-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10370843B2 (en) | Advanced curtain wall mullion anchoring system | |
| TWI616577B (en) | Mullion anchoring system | |
| CN110965712B (en) | Prefabricated staircase for house building and installation method thereof | |
| CN112112261B (en) | Fabricated building and construction method thereof | |
| CN113136984B (en) | Prefabricated wallboard of assembly type building and installation method thereof | |
| WO2015179883A2 (en) | Support arrangement | |
| CN104895082B (en) | Precise large-diameter steel casing deviation rectifying device and method | |
| CN109642431B (en) | Improvements in building systems, panel systems and formwork systems | |
| CN109235873A (en) | Can seperated detachable creeping formwork wall-attaching equipment and its installation correcting construction method | |
| CN205955173U (en) | Modular link wall spare subassembly | |
| CN205399856U (en) | Hollow step combination stair | |
| CN109750840B (en) | Installation method of material distribution platform system for construction of super high-rise tubular structure | |
| CN214575809U (en) | An auxiliary positioning device for prefabricated building inserts | |
| CN106567538B (en) | A kind of positioning mold of toilet concrete flanging | |
| CN106939642B (en) | Under hanging riding track davit structure and its installation forming method | |
| KR20180047905A (en) | Device for fixing concrete form for construction and method of manafacturing thereof | |
| CN101886470B (en) | Construction method of exposed concrete ribbed beams | |
| CN105317180A (en) | Semi-assembly stair with prefabricated steps | |
| CN106499420B (en) | A kind of mechanical high-constant-resistance single column installation method and support method | |
| CN110616911B (en) | Historic building mud wall reinforcing device | |
| CN210658676U (en) | Assembled building primary and secondary roof beam steel connected node structure | |
| CN205063336U (en) | Turn down rims positioning die of bathroom concrete | |
| CN106436987A (en) | Partition wall anchor adjusting, fixing and sealing device and construction technology thereof | |
| CN108643604B (en) | Pin-connected panel standard stair based on deep basal pit | |
| CN116816033B (en) | Method for installing two adjacent smoke tubes on building and building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||