CN211368423U - Stay cable tower top lifting traction operation platform - Google Patents
Stay cable tower top lifting traction operation platform Download PDFInfo
- Publication number
- CN211368423U CN211368423U CN201922127893.7U CN201922127893U CN211368423U CN 211368423 U CN211368423 U CN 211368423U CN 201922127893 U CN201922127893 U CN 201922127893U CN 211368423 U CN211368423 U CN 211368423U
- Authority
- CN
- China
- Prior art keywords
- cantilever
- cable
- tower
- operation platform
- tower top
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种斜拉索塔顶提升牵引操作平台,涉及桥梁工程技术领域。本实用新型包括间隔对称预埋在塔顶的预埋钢板、螺纹套筒、螺杆、连接支腿,连接支腿连接卧置在塔顶的底端板,预埋钢板通过框格板作为衬垫,分别焊接两侧悬挑支架,悬挑支架顶部焊接横梁;同时,横梁两端与悬挑支架通过悬挑立杆、悬挑斜撑竖向连接加强,横梁中间与底端板通过立杆、斜撑、连接固定接。本实用新型解决了塔顶空间受限无法安装大型吊装设备的问题,通过预埋构件连接操作平台的支架体系,安装动力装置解决斜拉索的提升与牵引,各构件连接方式可采用铆接或焊接,大大降低了费用投入,具有不占用塔内空间、拆装方便、结构稳定性好等特点。
The utility model discloses an inclined-stayed cable tower top lifting and traction operation platform, which relates to the technical field of bridge engineering. The utility model comprises a pre-embedded steel plate, a threaded sleeve, a screw rod and a connecting leg, which are pre-embedded at the top of the tower symmetrically at intervals. The connecting leg is connected to the bottom end plate lying on the top of the tower. , Weld the cantilever brackets on both sides respectively, and weld the beam on the top of the cantilever bracket; at the same time, the two ends of the beam and the cantilever bracket are strengthened by the vertical connection of the cantilever pole and the cantilever diagonal brace, and the middle of the beam and the bottom end plate are connected by the pole, Diagonal support, connection and fixed connection. The utility model solves the problem that large-scale hoisting equipment cannot be installed due to the limited space at the top of the tower. The bracket system of the operating platform is connected by the embedded components, and the power device is installed to solve the lifting and pulling of the stay cable. The connection mode of each component can be riveted or welded. , which greatly reduces the cost investment, and has the characteristics of not occupying the space in the tower, convenient disassembly and assembly, and good structural stability.
Description
技术领域technical field
本实用新型属于桥梁工程技术领域,特别是涉及一种索塔塔顶用于斜拉索提升与牵引的操作平台。The utility model belongs to the technical field of bridge engineering, in particular to an operation platform used for the lift and traction of stay cables on the top of a cable tower.
背景技术Background technique
目前斜拉索的塔端挂设大多采用塔吊等大型机械设备,通常做法为在主塔旁安装塔吊或支架等措施完成斜拉索的吊装工作,机械设备的进场、组装、支架的搭设等都需要大量的时间,造价也较高。同时,若大桥的主塔地处河内且邻高速公路,无法应用塔吊,给斜拉索的施工带来很多不便。At present, the tower end hanging of stay cables mostly adopts tower cranes and other large-scale mechanical equipment. The usual practice is to install tower cranes or brackets next to the main tower to complete the hoisting work of the stay cables, and the approach, assembly, and erection of brackets of mechanical equipment, etc. It takes a lot of time and the cost is high. At the same time, if the main tower of the bridge is located in Hanoi and adjacent to the expressway, the tower crane cannot be used, which will bring a lot of inconvenience to the construction of the stay cables.
塔顶支架是利用塔顶预埋件搭设操作平台,并提供高空吊点。一般地,在塔顶封塔端砼浇筑时根据钢支架的外形尺寸定位预埋有预埋件,待塔顶封顶后,塔顶支架整体用塔式吊机整提升到塔顶与预埋件连接。塔顶支架作为塔外平台、应保持足够的强度和支撑稳定性。传统塔顶支架的施工平台只带有两个支撑脚,两个支撑脚从两个正对的方向安装在塔柱顶部,施工平台的稳定性欠佳。The tower top bracket is to use the tower top embedded parts to set up the operating platform and provide high-altitude lifting points. Generally, when the top of the tower is closed and the tower is poured, the embedded parts are positioned and embedded according to the external dimensions of the steel support. After the top of the tower is capped, the tower top support is lifted to the top of the tower and the embedded parts by a tower crane. connect. The tower top bracket, as the outer platform of the tower, should maintain sufficient strength and support stability. The construction platform of the traditional tower top bracket has only two supporting feet, and the two supporting feet are installed on the top of the tower column from two opposite directions, and the stability of the construction platform is not good.
针对塔顶操作平台搭设在实际工程中遇到的这些问题,有必要开发一种施工效率高、经济性好、稳定性强的塔顶提升牵引操作平台,本实用新型正是在这样的背景下开发而成的。In view of these problems encountered in the actual engineering of the tower top operating platform erection, it is necessary to develop a tower top lifting traction operating platform with high construction efficiency, good economy and strong stability. developed.
实用新型内容Utility model content
本实用新型的目的在于针对斜拉桥塔端挂设设备造价高、塔顶提升牵引操作平台稳定性欠佳等问题。The purpose of the utility model is to solve the problems of high cost of hanging equipment at the tower end of the cable-stayed bridge, poor stability of the tower top lifting traction operation platform and the like.
为解决上述技术问题,本实用新型是通过以下技术方案实现的:In order to solve the above-mentioned technical problems, the utility model is realized through the following technical solutions:
一种斜拉索塔顶提升牵引操作平台,装设于塔体上部,包括:An inclined-stayed cable tower top lifting traction operation platform is installed on the upper part of the tower body, comprising:
预埋钢板,预埋钢板预埋在塔体的上部两侧,预埋钢板上安装有若干螺纹套筒;Pre-embedded steel plates, pre-embedded steel plates are pre-buried on both sides of the upper part of the tower body, and several threaded sleeves are installed on the pre-embedded steel plates;
底端板,底端板间隔卧置于塔体顶端,底端板两侧端安装有连接支腿,连接支腿上连接有与螺纹套筒相对应的螺杆;The bottom end plate is lying on the top of the tower body at intervals, and connecting legs are installed on both sides of the bottom end plate, and the connecting legs are connected with screws corresponding to the threaded sleeves;
悬挑支架,悬挑支架通过预埋钢板装设于塔体的上部两侧,每两相对悬挑支架之间焊接有一横梁,横梁上装设有若干牵引装置。The cantilever bracket is installed on both sides of the upper part of the tower body through embedded steel plates, a beam is welded between each two opposite cantilever brackets, and a number of traction devices are installed on the beam.
可选的,悬挑支架与预埋钢板之间设有框格板作为连接衬垫。Optionally, a frame plate is provided between the cantilever bracket and the embedded steel plate as a connecting pad.
可选的,多个横梁之间安装有多个纵梁。Optionally, a plurality of longitudinal beams are installed between the plurality of transverse beams.
可选的,横梁两端与悬挑支架之间安装有悬挑立杆、悬挑斜撑。Optionally, a cantilever pole and a cantilever diagonal brace are installed between the two ends of the beam and the cantilever bracket.
可选的,横梁中部与底端板之间安装有立杆、斜撑。Optionally, a vertical pole and a diagonal brace are installed between the middle part of the beam and the bottom end plate.
可选的,每两横向相邻立杆之间安装有平联。Optionally, a parallel connection is installed between every two horizontally adjacent vertical poles.
可选的,每两纵向相邻的立杆之间安装有水平连杆。Optionally, a horizontal connecting rod is installed between every two longitudinally adjacent vertical rods.
可选的,每两相邻悬挑支架之间安装有交叉设置的侧面斜撑。Optionally, cross-arranged side diagonal braces are installed between every two adjacent cantilever brackets.
可选的,每两相邻悬挑支架之间安装有中横梁。Optionally, a middle beam is installed between every two adjacent cantilever brackets.
可选的,牵引装置为卷扬机。Optionally, the traction device is a hoist.
本实用新型的实施例具有以下有益效果:The embodiment of the present utility model has the following beneficial effects:
1、本实用新型的一个实施例解决了塔顶空间受限无法安装大型吊装设备的问题,通过预埋构件连接操作平台的支架体系,安装动力装置,解决了斜拉索的提升与牵引。1. An embodiment of the present utility model solves the problem that the space at the top of the tower cannot be installed with large-scale hoisting equipment. The support system of the operating platform is connected by the embedded components, and the power device is installed to solve the lifting and traction of the stay cable.
2、本实用新型的一个实施例与安装塔吊或支架等吊装措施相比,节省了费用投入与时间成本,具有占用塔内空间少、拆装方便的特点。2. Compared with hoisting measures such as installing tower cranes or brackets, an embodiment of the present invention saves costs and time costs, and has the characteristics of less space in the tower and convenient disassembly and assembly.
3、本实用新型的一个实施例塔顶预埋连接构件,安装底端板,增加了该支架体系超静定次数,结构体系的稳定性增强。3. In one embodiment of the present utility model, the tower top is pre-embedded with connecting members, and the bottom end plate is installed, which increases the statically indeterminate times of the support system and enhances the stability of the structural system.
当然,实施本实用新型的任一产品并不一定需要同时达到以上所述的所有优点。Of course, any product implementing the present invention does not necessarily need to simultaneously achieve all of the above-mentioned advantages.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例的技术方案,下面将对实施例描述所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.
图1为本实用新型实施例的操作平台正视图;Fig. 1 is the front view of the operation platform of the utility model embodiment;
图2为本实用新型实施例的操作平台侧视图;Fig. 2 is the side view of the operating platform of the embodiment of the present utility model;
图3为本实用新型实施例的操作平台俯视图;Fig. 3 is the top view of the operating platform of the embodiment of the present utility model;
图4为图1中A处结构放大示意图;Fig. 4 is the enlarged schematic diagram of the structure at place A in Fig. 1;
附图中,各标号所代表的部件列表如下:In the accompanying drawings, the list of components represented by each number is as follows:
1.塔体,2.底端板,3.悬挑支架,4.立杆,5.横梁,6.平联,7.斜撑,8.悬挑立杆,9.悬挑斜撑,10.卷扬机,11.螺栓组,12.预埋钢板,13.框格板,14.螺纹套筒,15.螺杆,16.连接支腿,17.纵梁,18.中横梁,19.侧面斜撑,20.水平连杆。1. Tower body, 2. Bottom end plate, 3. Cantilever bracket, 4. Upright pole, 5. Beam, 6. Flat joint, 7. Diagonal brace, 8. Cantilevered pole, 9. Cantilevered diagonal brace, 10. Winch, 11. Bolt group, 12. Pre-embedded steel plate, 13. Sash plate, 14. Threaded sleeve, 15. Screw, 16. Connecting leg, 17. Longitudinal beam, 18. Middle beam, 19. Side Diagonal brace, 20. Horizontal link.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
在本实用新型的描述中,需要理解的是,术语“开孔”、“上”、“中”、“长度”、“内”等指示方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的组件或元件必须具有特定的方位,以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "opening", "upper", "middle", "length", "inside", etc. indicate orientation or positional relationship, and are only for the convenience of describing the present invention and The description is simplified rather than indicating or implying that the components or elements referred to must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as limiting the invention.
为了保持本实用新型实施例的以下说明清楚且简明,本实用新型省略了已知功能和已知部件的详细说明。In order to keep the following description of the embodiments of the present invention clear and concise, the present invention omits detailed descriptions of known functions and well-known components.
请参阅图1所示,在本实施例中提供了一种斜拉索塔顶提升牵引操作平台,装设于塔体1顶部,包括:间隔对称预埋在塔顶的预埋钢板12、螺纹套筒14、螺杆15、连接支腿16,在本实施例中,预埋钢板12预埋在塔体1的上部两侧,螺纹套筒14设于预埋钢板12上,塔体1顶端间隔卧置若干底端板2,底端板2两侧端设有连接支腿16,连接支腿16上连接有与螺纹套筒14相对应的螺杆15,底端板2两侧端通过螺杆15连接预埋钢板12,底端板2底端通过螺栓组11固定在塔体1顶端,预埋钢板12通过框格板13作为衬垫,分别对称焊接两侧悬挑支架3,两侧对称的悬挑支架3顶端焊接同一横梁5。Please refer to FIG. 1 , in this embodiment, a cable-stayed tower top lifting and traction operation platform is provided, which is installed on the top of the
在本实施例的一个方面中,横梁5两端与悬挑支架3通过悬挑立杆8、悬挑斜撑9竖向连接加强,横梁5中间与底端板2通过立杆4、斜撑7连接固定。In one aspect of this embodiment, the two ends of the
在本实施例的一个方面中,相邻悬挑支架3通过中横梁18、交叉的侧面斜撑19加强。In one aspect of this embodiment, the adjacent cantilevered
在本实施例的一个方面中,横梁5与纵梁17在水平面上垂直连接,横向相邻的立杆4通过平联6连接加强,纵向相邻的立杆4通过水平连杆20连接加强。具体的,在本实施例中,每两横向相邻立杆4之间安装有平联6,每两纵向相邻的立杆4之间安装有水平连杆20。In one aspect of this embodiment, the
在本实施例的一个方面中,横梁5上安装若干卷扬机10。In one aspect of this embodiment,
在本实施例的一个方面中,如图4,预埋钢板12上带有螺纹套筒14,螺纹套筒14连接螺杆15,螺杆15底部带有连接支腿16。In one aspect of this embodiment, as shown in FIG. 4 , the embedded
本实施例一个方面的应用为:An aspect of the application of this embodiment is:
安装塔顶预埋构件:在塔体1封顶前,间隔对称安装预埋钢板12、螺纹套筒14、螺杆15、连接支腿16。以每个预埋钢板12为序,在塔体1顶部内腔内间隔卧置底端板2,底端板2的两端焊接连接支腿16,底端板2两侧端通过连接支腿16上的螺杆15连接预埋钢板12,底端板2底端通过螺栓组11固定在塔体1顶端。Install the embedded components at the top of the tower: Before the top of the
安装塔顶提升牵引操作平台上部支架:利用螺栓组11将立杆4、斜撑7与底端板2连接,再焊接立杆4间的平联6、水平连杆20;采用焊接或螺栓连接方式将框格板13与预埋钢板12连接,再依次焊接悬挑支架3、横梁5、纵梁17、悬挑立杆8、悬挑斜撑9、侧面斜撑19。Install the upper bracket of the lifting and traction operation platform on the top of the tower: use the
上述实施例可以相互结合。The above-described embodiments may be combined with each other.
在本说明书的描述中,参考术语“一个实施例”、“示例”、“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本实用新型的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。In the description of this specification, description with reference to the terms "one embodiment", "example", "specific example", etc. means that a specific feature, structure, material or characteristic described in connection with the embodiment or example is included in the present invention. in at least one embodiment or example. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
以上公开的本实用新型优选实施例只是用于帮助阐述本实用新型。优选实施例并没有详尽叙述所有的细节,也不限制该实用新型仅为所述的具体实施方式。显然,根据本说明书的内容,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本实用新型的原理和实际应用,从而使所属技术领域技术人员能很好地理解和利用本实用新型。本实用新型仅受权利要求书及其全部范围和等效物的限制。The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details, nor do they limit the invention to only the described embodiments. Obviously, many modifications and variations are possible in light of the content of this specification. This specification selects and describes these embodiments in order to better explain the principle and practical application of the present invention, so that those skilled in the art can well understand and utilize the present invention. The present invention is limited only by the claims and their full scope and equivalents.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922127893.7U CN211368423U (en) | 2019-11-29 | 2019-11-29 | Stay cable tower top lifting traction operation platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922127893.7U CN211368423U (en) | 2019-11-29 | 2019-11-29 | Stay cable tower top lifting traction operation platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211368423U true CN211368423U (en) | 2020-08-28 |
Family
ID=72172984
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922127893.7U Active CN211368423U (en) | 2019-11-29 | 2019-11-29 | Stay cable tower top lifting traction operation platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211368423U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114457699A (en) * | 2022-03-31 | 2022-05-10 | 江苏润扬大桥发展有限责任公司 | Platform device for transportation equipment of extra-large cable bridge |
| CN115162184A (en) * | 2022-07-26 | 2022-10-11 | 中铁大桥局集团有限公司 | Suspension bridge steel truss erecting system and method |
| CN117536139A (en) * | 2023-11-13 | 2024-02-09 | 中交二航局第四工程有限公司 | Tool and installation method for cable replacement of stay cable in operation period of large-span cable-stayed bridge |
| CN117904979A (en) * | 2024-03-20 | 2024-04-19 | 四川公路桥梁建设集团有限公司 | Cable-stayed bridge cable high-altitude suspension conveying device |
-
2019
- 2019-11-29 CN CN201922127893.7U patent/CN211368423U/en active Active
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114457699A (en) * | 2022-03-31 | 2022-05-10 | 江苏润扬大桥发展有限责任公司 | Platform device for transportation equipment of extra-large cable bridge |
| CN115162184A (en) * | 2022-07-26 | 2022-10-11 | 中铁大桥局集团有限公司 | Suspension bridge steel truss erecting system and method |
| CN117536139A (en) * | 2023-11-13 | 2024-02-09 | 中交二航局第四工程有限公司 | Tool and installation method for cable replacement of stay cable in operation period of large-span cable-stayed bridge |
| CN117904979A (en) * | 2024-03-20 | 2024-04-19 | 四川公路桥梁建设集团有限公司 | Cable-stayed bridge cable high-altitude suspension conveying device |
| CN117904979B (en) * | 2024-03-20 | 2024-06-11 | 四川公路桥梁建设集团有限公司 | Cable-stayed bridge cable high-altitude suspension conveying device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211368423U (en) | Stay cable tower top lifting traction operation platform | |
| CN102359303B (en) | UHV ordinary line iron tower assembly method | |
| CN107100187B (en) | Tower crane steel girder erection structure and installation method | |
| CN105905781B (en) | The hanging method of big segment steel truss girder | |
| CN219080947U (en) | Adjustable cantilever support | |
| CN201458583U (en) | A liftable and detachable hoisting platform | |
| CN101294369B (en) | Method and device for hanging and transferring bracket of movable mould frame | |
| CN202785387U (en) | Indoor cantilever crane | |
| CN203487767U (en) | Cross plate scaffold | |
| CN203021207U (en) | Large-load multifunctional gantry crane capable of being flexibly spliced | |
| CN206172871U (en) | Movable jack -up machines | |
| CN218323967U (en) | Steel construction roof truss goes up and down and stop device | |
| CN211548702U (en) | Upper and lower lifting point truss device for attached lifting scaffold | |
| CN210238296U (en) | A large-scale tower crane attached wall space steel truss foundation | |
| CN219709023U (en) | Steel corridor hydraulic lifting platform | |
| CN216512520U (en) | Lifting system suitable for small space | |
| CN206457187U (en) | A kind of pole of mounting steel chimney | |
| CN214527669U (en) | Bridge steel case roof beam hoisting structure | |
| CN104374566A (en) | Conductor passing pulley experiment rack | |
| CN204980945U (en) | Supplementary tower crane dismounting device | |
| CN114084814A (en) | Lifting system suitable for small space | |
| CN210420898U (en) | Novel No. 0 block support of steel box girder | |
| CN209868519U (en) | Driving maintenance auxiliary device | |
| CN209637198U (en) | A hook-type safety anti-tilt device | |
| CN207967747U (en) | A kind of outdoor voltage transformer maintenance special hoisting bar |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Lifting and traction operation platform for cable-stayed tower top Effective date of registration: 20230927 Granted publication date: 20200828 Pledgee: Industrial Bank Limited by Share Ltd. Wuhan branch Pledgor: HUBEI PROVINCIAL ROAD & BRIDGE Co.,Ltd. Registration number: Y2023980059401 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20200828 Pledgee: Industrial Bank Limited by Share Ltd. Wuhan branch Pledgor: HUBEI PROVINCIAL ROAD & BRIDGE Co.,Ltd. Registration number: Y2023980059401 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Lifting and traction operation platform for cable-stayed tower top Granted publication date: 20200828 Pledgee: Agricultural Bank of China Limited Wuhan Development Zone Branch Pledgor: HUBEI PROVINCIAL ROAD & BRIDGE Co.,Ltd. Registration number: Y2025980044785 |