CN214364797U - Scaffold for external construction of tower - Google Patents

Scaffold for external construction of tower Download PDF

Info

Publication number
CN214364797U
CN214364797U CN202120033369.8U CN202120033369U CN214364797U CN 214364797 U CN214364797 U CN 214364797U CN 202120033369 U CN202120033369 U CN 202120033369U CN 214364797 U CN214364797 U CN 214364797U
Authority
CN
China
Prior art keywords
scaffold
tower
placing frame
placing
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120033369.8U
Other languages
Chinese (zh)
Inventor
甘东情
王海鱼
管珞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical Second Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN202120033369.8U priority Critical patent/CN214364797U/en
Application granted granted Critical
Publication of CN214364797U publication Critical patent/CN214364797U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold for construction outside tower, which comprises four first supporting rods, a transverse rod is arranged between the front and the rear two first supporting rods, a placing groove is arranged on the top of the transverse rod, a placing plate is arranged on the top of the two placing grooves, a first placing frame is fixedly connected between the opposite sides of the two placing plates, an inserting column is inserted into the top of the first supporting rod, a second supporting rod is fixedly connected to the top end of the inserting column, a second placing frame is arranged between the two second supporting rods, fixed blocks are fixedly connected to the front sides of the first placing frame and the second placing frame, a connecting hole is arranged inside the fixed blocks, a ladder stand is arranged between the first placing frame and the second placing frame, the second supporting rod can be arranged on the inserting column, the placing plates can be arranged by matching with the transverse rod, so that the whole scaffold can be disassembled one by one, the convenience of scaffold installation and dismantlement has been improved.

Description

Scaffold for external construction of tower
Technical Field
The utility model relates to a tower technical field specifically is a scaffold frame is under construction outside tower.
Background
The tower is a name for buildings with different building structures, and generally refers to a high-rise building. The tower and the floor are understood from the plan view of the building. The plan view of the tower is characterized in that a plurality of households, generally more than four and five households, surround or encircle a building plane formed by a group of public vertical transportation, the length and the width of the plane are approximately the same, the height of the building is from more than 12 floors to 35 floors, the super-high floors are formed when the height of the building exceeds 35 floors, and the tower generally ranges from one ladder to four households to one ladder, namely 12 households.
Present scaffold frame for tower construction all is difficult to dismantle it, generally all is through the welding between the steel pipe or with the rope winding together, whole installation comparatively complicated, and the security is lower, for this reason the utility model provides a scaffold frame is under construction outside the tower.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction scaffold frame outside tower to solve the problem that proposes in the above-mentioned background art.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model provides an outer construction scaffold frame of tower, including four first bracing pieces, two around install the horizontal pole between the first bracing piece, the standing groove has been seted up at the top of horizontal pole, two the board of placing has all been placed at the top of standing groove, two place the first rack of fixedly connected with between the relative one side of board, it has the post of inserting to peg graft at the top of first bracing piece, the top fixedly connected with second bracing piece of post of inserting.
As an optimal technical solution of the utility model: and a second placing frame is arranged between the two second supporting rods.
As an optimal technical solution of the utility model: the front of first rack and second rack all fixedly connected with fixed block, the connecting hole has been seted up to the inside of fixed block, install the cat ladder between first rack and the second rack.
As an optimal technical solution of the utility model: the top and the bottom of the ladder stand are fixedly connected with hooks, and the hooks are hung in the connecting holes.
As an optimal technical solution of the utility model: the top surface of first bracing piece and second bracing piece has all seted up the draw-in groove, the card post has been seted up to the surface of inserting the post, the surface of card post and the inside joint of draw-in groove.
As an optimal technical solution of the utility model: the front side and the rear side of the cross rod are respectively connected with the two first supporting rods through mounting studs.
The utility model discloses the beneficial effect who reaches is: the utility model discloses an insert the post and can install the second bracing piece, deuterogamy the horizontal pole and can install and place the board, make whole scaffold frame all can dismantle one by one, improved the convenience of scaffold frame installation and dismantlement.
Drawings
Fig. 1 is a schematic structural diagram of a scaffold constructed outside a tower.
Fig. 2 is a schematic structural diagram of cross bar connection in a scaffold for construction outside a tower.
Fig. 3 is a schematic structural diagram of a first placing frame in a scaffold for construction outside a tower.
Fig. 4 is a schematic structural view of a fixing block in a scaffold for construction outside a tower.
In the figure: 1. a first support bar; 2. a cross bar; 3. a placement groove; 4. placing the plate; 5. a first placing rack; 6. inserting a column; 7. a second support bar; 8. a second rack; 9. a fixed block; 10. connecting holes; 11. climbing a ladder; 12. hooking; 13. a card slot; 14. clamping the column; 15. and (6) mounting the stud.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example (b): as shown in fig. 1-4, the utility model provides a tower outer construction scaffold, including four first bracing pieces 1, install horizontal pole 2 between two first bracing pieces 1 around, standing groove 3 has been seted up at the top of horizontal pole 2, standing plate 4 has all been placed at the top of two standing grooves 3, two are placed the first rack 5 of fixedly connected with between the relative one side of board 4, peg graft at the top of first bracing piece 1 and have inserted post 6, the top fixedly connected with second bracing piece 7 of inserted post 6, through inserting (6 can install second bracing piece 7, board 4 can be installed and placed to the horizontal pole 2 of deuterogamying, make whole scaffold all can dismantle one by one, the convenience of scaffold installation and dismantlement has been improved.
Wherein, a second placing frame 8 is arranged between the two second supporting rods 7.
Wherein, the equal fixedly connected with fixed block 9 in front of first rack 5 and second rack 8, connecting hole 10 has been seted up to the inside of fixed block 9, installs cat ladder 11 between first rack 5 and the second rack 8, can be convenient for the staff to climb up the scaffold frame through cat ladder 11.
Wherein, the top and the bottom of the ladder stand 11 are both fixedly connected with hooks 12, and the hooks 12 are hung in the connecting holes 10.
Wherein, draw-in groove 13 has all been seted up to the top surface of first bracing piece 1 and second bracing piece 7, and the surface of inserting post 6 has seted up card post 14, and the surface of card post 14 and the inside joint of draw-in groove 13.
Wherein, both sides are all connected with two first bracing pieces 1 respectively through installation double-screw bolt 15 around horizontal pole 2.
Specifically, the utility model discloses during the use: install horizontal pole 2 between two first bracing pieces 1 in the front and back through installation double-screw bolt 15, install first rack 5 on 3 surfaces of standing groove at horizontal pole 2 top through the board 4 of placing of both sides again, peg graft second bracing piece 7 again through inserting post 6 top of first bracing piece 1 again, make the inside of card post 14 joint at draw-in groove 13, avoid second bracing piece 7 to take place purple brick, strengthened the stability of second bracing piece 7 from this
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (6)

1. The utility model provides a scaffold frame is under construction outside tower, is including four first bracing pieces (1), its characterized in that, two around install horizontal pole (2) between first bracing piece (1), standing groove (3) have been seted up at the top of horizontal pole (2), two board (4) of placing have all been placed at the top of standing groove (3), two place first rack (5) of fixedly connected with between the relative one side of board (4), the top of first bracing piece (1) is pegged graft and is had inserted post (6), the top fixedly connected with second bracing piece (7) of inserting post (6).
2. The scaffold for construction outside tower as claimed in claim 1, wherein a second placing frame (8) is installed between two second supporting rods (7).
3. The scaffold for construction outside the tower as claimed in claim 1, wherein the front surfaces of the first placing frame (5) and the second placing frame (8) are fixedly connected with fixing blocks (9), connecting holes (10) are formed in the fixing blocks (9), and a ladder (11) is installed between the first placing frame (5) and the second placing frame (8).
4. The external construction scaffold of the tower as claimed in claim 3, wherein the top and the bottom of the ladder (11) are fixedly connected with hooks (12), and the hooks (12) are hung in the connecting holes (10).
5. The scaffold for construction outside tower as claimed in claim 1, wherein the top surfaces of the first support rod (1) and the second support rod (7) are both provided with a clamping groove (13), the outer surface of the insert column (6) is provided with a clamping column (14), and the outer surface of the clamping column (14) is clamped with the inside of the clamping groove (13).
6. The scaffold for the external construction of the tower as claimed in claim 1, wherein the front and rear sides of the cross bar (2) are respectively connected with the two first supporting rods (1) through mounting studs (15).
CN202120033369.8U 2021-01-07 2021-01-07 Scaffold for external construction of tower Active CN214364797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120033369.8U CN214364797U (en) 2021-01-07 2021-01-07 Scaffold for external construction of tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120033369.8U CN214364797U (en) 2021-01-07 2021-01-07 Scaffold for external construction of tower

Publications (1)

Publication Number Publication Date
CN214364797U true CN214364797U (en) 2021-10-08

Family

ID=77953904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120033369.8U Active CN214364797U (en) 2021-01-07 2021-01-07 Scaffold for external construction of tower

Country Status (1)

Country Link
CN (1) CN214364797U (en)

Similar Documents

Publication Publication Date Title
CN214364797U (en) Scaffold for external construction of tower
CN214995820U (en) Small-space lifting scaffold
CN205669326U (en) Combined protective shed for constructional engineering
CN211873780U (en) Attached safety operation protection platform for building construction
CN112144851A (en) Temporary passing jumping frame structure for house building construction
CN212689540U (en) Guide rail for climbing frame
CN218522613U (en) Vertical climbing hanging ladder
CN111042558A (en) A assembled protector for facing limit is enclosed
CN219034083U (en) Beam frame device easy to install
CN213234224U (en) Lifting scaffold guide rail
CN211286581U (en) External net type scaffold
JPH0317350A (en) Scaffold for building structure
CN217782775U (en) Scaffold for civil engineering construction
CN215167951U (en) Anti-falling scaffold
CN219411715U (en) Scaffold easy to store and detach
CN218406373U (en) Scaffold
CN221219652U (en) Hanging die device for house building engineering construction
CN219100689U (en) Attachment structure suitable for super high floor attached lifting scaffold
CN219691022U (en) Indoor building decoration mobile platform
CN213418450U (en) Hanging flower basket mounting on roof pergola roof beam
CN215331339U (en) Net frame external suspension construction platform
CN217461409U (en) Building scaffold bearing structure
CN218562982U (en) Climbing frame protection device
CN218581135U (en) Foldable scaffold for building construction
CN215520133U (en) Safety ladder for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant