CN217461409U - Building scaffold bearing structure - Google Patents

Building scaffold bearing structure Download PDF

Info

Publication number
CN217461409U
CN217461409U CN202220616532.8U CN202220616532U CN217461409U CN 217461409 U CN217461409 U CN 217461409U CN 202220616532 U CN202220616532 U CN 202220616532U CN 217461409 U CN217461409 U CN 217461409U
Authority
CN
China
Prior art keywords
bearing
scaffold
steel pipe
steel
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220616532.8U
Other languages
Chinese (zh)
Inventor
姚宏
杨帆
王宝山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Binhai Construction Group Co ltd
Original Assignee
Qingdao Binhai Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Binhai Construction Group Co ltd filed Critical Qingdao Binhai Construction Group Co ltd
Priority to CN202220616532.8U priority Critical patent/CN217461409U/en
Application granted granted Critical
Publication of CN217461409U publication Critical patent/CN217461409U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a building scaffold bearing structure, including perpendicular steel pipe and horizontal steel pipe, through the scaffold frame knot fixed combination make up into the scaffold frame between perpendicular steel pipe and the horizontal steel pipe, erect the bearing device on two adjacent horizontal steel pipes, the bearing device all includes the rectangle frame plate, the both ends of rectangle frame plate all have welded the side arm board, the arc draw-in groove has all been seted up to the lower extreme of side arm board, the side arm board all passes through the arc draw-in groove card on corresponding horizontal steel pipe, the inside of rectangle frame plate all is fixed with the bearing steel mesh, this building scaffold bearing structure installation is simple, construction is convenient, only need aim at two adjacent horizontal steel pipes respectively with two arc draw-in grooves of bearing device lower extreme and the card is fixed can greatly improve the installation effectiveness, and this bearing structure stability is higher, the bearing steel mesh bottom that sets up is supported by vertically and horizontally staggered's pipe fitting, can greatly improve the security of bearing structure, the practicability is strong.

Description

Building scaffold bearing structure
Technical Field
The utility model relates to a building technical field specifically is a building scaffold bearing structure.
Background
The scaffold refers to various supports erected on a construction site for workers to operate and solve vertical and horizontal transportation. The general term of the building industry refers to that the scaffold is used in places where external walls, interior decoration or high floor height cannot be directly constructed on a building site, and a bearing structure is required to be installed on the scaffold for walking and standing construction of workers, but the traditional scaffold bearing structure generally has the problems of complex installation, inconvenient construction and difficult disassembly, and the stability is required to be improved; to this end, we propose a building scaffold support structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building scaffold bearing structure to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building scaffold bearing structure, includes perpendicular steel pipe and horizontal steel pipe, detain the fixed scaffold frame that makes up through the scaffold frame between perpendicular steel pipe and the horizontal steel pipe, adjacent two the horizontal steel pipe is put on the shelf and is equipped with bearing device, bearing device all includes the rectangle deckle board, the both ends of rectangle deckle board have all been welded and have been leaned on the board, the arc draw-in groove has all been seted up to the lower extreme of side deckle board, the side deckle board all passes through the arc draw-in groove card on corresponding horizontal steel pipe, the inside of rectangle deckle board all is fixed with the bearing steel mesh.
Preferably, a plurality of first reinforcing pipes are transversely welded at the lower end of the bearing steel mesh, a plurality of second reinforcing pipes are welded at the lower ends of the first reinforcing pipes along the front-back direction, and the two ends of each of the first reinforcing pipes and the two ends of each of the second reinforcing pipes are welded on the inner wall of the rectangular frame plate.
Preferably, reinforcing angle steels are welded at four corners of the lower end of the rectangular frame plate, and vertical plates of the reinforcing angle steels are welded on the side arm plates and fixed.
Preferably, the bearing steel mesh is at least provided with two layers, and the upper end of the bearing steel mesh is flush with the upper end of the rectangular frame plate.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of reasonable design, this building scaffold bearing structure installation is simple, it is convenient to be under construction, only need aim at two adjacent horizontal steel pipes respectively with two arc draw-in grooves of bearing device lower extreme and go into fixedly can, after installing first bearing device, the workman can stand and continue to install next on the good bearing device of installation, can improve the installation effectiveness greatly, and this bearing structural stability is higher moreover, the bearing steel mesh bottom of setting is supported by vertically and horizontally staggered's pipe fitting, can improve bearing structure's security greatly, therefore, the clothes hanger is strong in practicability.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the supporting device of the present invention.
In the figure: the device comprises a vertical steel pipe 1, a horizontal steel pipe 2, a scaffold clasp 3, a supporting device 4, a rectangular frame plate 401, a side pole plate 402, a supporting steel mesh 403, an arc-shaped clamping groove 404, a first reinforcing pipe 405, a second reinforcing pipe 406 and reinforcing angle steel 407.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a building scaffold bearing structure comprises vertical steel pipes 1 and horizontal steel pipes 2, wherein the vertical steel pipes 1 and the horizontal steel pipes 2 are fixedly combined into a scaffold through scaffold buckles 3, and the scaffold is assembled in the prior art;
two adjacent transverse steel pipes 2 are erected with a supporting device 4, the supporting device 4 is installed between four vertical steel pipes 1 (see fig. 1), the supporting device 4 comprises a rectangular frame plate 401, reinforcing angle steels 407 are welded at four corners of the lower end of the rectangular frame plate 401, the vertical plates of the reinforcing angle steels 407 are welded on side arm plates 402 and fixed, side arm plates 402 are welded at two ends of the rectangular frame plate 401, arc-shaped slots 404 are formed at the lower ends of the side arm plates 402, the side arm plates 402 are clamped on the corresponding transverse steel pipes 2 through the arc-shaped slots 404, supporting steel meshes 403 are fixed inside the rectangular frame plate 401, at least two layers of the supporting steel meshes 403 are arranged, the upper end of the bearing steel mesh 403 is flush with the upper end of the rectangular frame plate 401, a plurality of first reinforcing pipes 405 are transversely welded to the lower end of the bearing steel mesh 403, a plurality of second reinforcing pipes 406 are welded to the lower ends of the plurality of first reinforcing pipes 405 in the front-back direction, and the two ends of each of the first reinforcing pipes 405 and the two ends of each of the second reinforcing pipes 406 are welded to the inner wall of the rectangular frame plate 401; this building scaffold bearing structure installation is simple, it is convenient to be under construction, only need aim at two adjacent horizontal steel pipes 2 respectively with two arc draw-in grooves 404 of bearing device 4 lower extreme and the card goes into fixedly can, install the first bearing device 4 back, the workman can stand and continue to install next on the bearing device 4 of installing, analogize with this, can improve the installation effectiveness greatly, and this bearing structural stability is higher, the bearing steel mesh 403 bottom of setting is supported by vertically and horizontally staggered's pipe fitting, can improve bearing structure's security greatly, therefore, the clothes hanger is strong in practicability.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a building scaffold bearing structure, includes perpendicular steel pipe (1) and horizontal steel pipe (2), detain (3) through the scaffold between perpendicular steel pipe (1) and horizontal steel pipe (2) and fixed the combination into scaffold, its characterized in that: two adjacent horizontal steel pipes (2) are erected with supporting devices (4), the supporting devices (4) all comprise rectangular frame plates (401), side load bearing plates (402) are welded at two ends of each rectangular frame plate (401), arc-shaped clamping grooves (404) are formed in the lower ends of the side load bearing plates (402), the side load bearing plates (402) are clamped on the corresponding horizontal steel pipes (2) through the arc-shaped clamping grooves (404), and supporting steel meshes (403) are fixed inside the rectangular frame plates (401).
2. A construction scaffolding support structure as claimed in claim 1 in which: the lower extreme of bearing steel mesh (403) transversely welds has a plurality of first reinforcement pipes (405), and the lower extreme of a plurality of first reinforcement pipes (405) has a plurality of second reinforcement pipes (406) along the welding of fore-and-aft direction, the both ends of first reinforcement pipe (405) and second reinforcement pipe (406) all weld on the inner wall of rectangle framed panel (401).
3. A construction scaffold support structure in accordance with claim 1 wherein: and reinforcing angle steel (407) are welded at four corners of the lower end of the rectangular frame plate (401), and vertical plates of the reinforcing angle steel (407) are welded on the side arm plates (402) and fixed.
4. A construction scaffolding support structure as claimed in claim 1 in which: the bearing steel mesh (403) is at least provided with two layers, and the upper end of the bearing steel mesh (403) is flush with the upper end of the rectangular frame plate (401).
CN202220616532.8U 2022-03-21 2022-03-21 Building scaffold bearing structure Expired - Fee Related CN217461409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220616532.8U CN217461409U (en) 2022-03-21 2022-03-21 Building scaffold bearing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220616532.8U CN217461409U (en) 2022-03-21 2022-03-21 Building scaffold bearing structure

Publications (1)

Publication Number Publication Date
CN217461409U true CN217461409U (en) 2022-09-20

Family

ID=83266051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220616532.8U Expired - Fee Related CN217461409U (en) 2022-03-21 2022-03-21 Building scaffold bearing structure

Country Status (1)

Country Link
CN (1) CN217461409U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115754962A (en) * 2022-11-21 2023-03-07 北京环境特性研究所 Bearing device for pyramid wave-absorbing material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115754962A (en) * 2022-11-21 2023-03-07 北京环境特性研究所 Bearing device for pyramid wave-absorbing material

Similar Documents

Publication Publication Date Title
CN212534174U (en) Raft foundation steel bar supporting tool
CN215631482U (en) An installation structure of a cantilever socket type disc buckle scaffold
CN204662916U (en) For the construction operation platform between the narrow and small superaltitude of double-deck exterior wall
CN217461409U (en) Building scaffold bearing structure
CN111058555A (en) Windproof fireproof heat-preservation type quick-dismantling assembly building steel structure and splicing method thereof
CN110565941A (en) PC aluminum formwork system for prefabricated building and construction method thereof
CN215055192U (en) Scaffold frame external corner position adjustable support encorbelments
CN113550560A (en) A construction method of connecting wall system for forming large-scale hole frame structure
CN208950124U (en) A kind of large-span steel truss
CN218493188U (en) Concrete slat outer wall opening in a wall mouth reinforced structure
CN216077114U (en) Reaction frame
CN214117546U (en) Elevator shaft material distributing machine operation and protection integrated device
CN212201400U (en) Assembled steel structure external hanging type protective frame
CN117302746A (en) Bearing frame for stacking reinforcing steel bars convenient to assemble
CN209556320U (en) A steel structure work platform for super high-rise building core tube construction
CN211775611U (en) Self-suspension type operating platform for formwork construction
CN208950125U (en) A kind of large-span steel truss floor system
CN222759350U (en) Wall-attached connection node of electric bridge scaffold
CN210918167U (en) Triangular section steel construction device for overhanging scaffold
CN208023608U (en) A kind of post-cast strip can have enough to meet the need steel channel formwork system
CN223707155U (en) Round steel pipe construction support
CN223482238U (en) Cantilever scaffold bottom sealing device and cantilever scaffold with same
CN219100434U (en) Steel construction well outer facade curtain wall construction
CN219690809U (en) Partition wall smooth transition node structure for different materials and thicknesses
CN217840810U (en) Drawknot connecting node of assembled overhanging outer vertical surface protection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220920