CN215331339U - Net frame external suspension construction platform - Google Patents
Net frame external suspension construction platform Download PDFInfo
- Publication number
- CN215331339U CN215331339U CN202121204602.0U CN202121204602U CN215331339U CN 215331339 U CN215331339 U CN 215331339U CN 202121204602 U CN202121204602 U CN 202121204602U CN 215331339 U CN215331339 U CN 215331339U
- Authority
- CN
- China
- Prior art keywords
- construction
- construction platform
- platform
- channel
- guardrail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Fencing (AREA)
Abstract
A construction platform for hanging a net rack outside is characterized in that a construction platform (1) is a square platform formed by welding steel frames, a construction channel (2) is a rectangular platform formed by welding steel frames, and one side of the construction platform (1) is connected with the construction channel (2); the construction platform hook (3) comprises a hook (31) and hook rods (32), the hook rods (32) are respectively and vertically arranged at the connection positions of the construction platform (1) and the construction channel (2), the top of each hook rod (32) is provided with the hook (31), and the hooks at the two sides are connected by a cross rod (33); construction channel guardrails (5) are arranged on two sides of the construction channel (2), construction platform guardrails (4) are arranged on the periphery of the construction platform (1), and a channel is arranged at the joint of the construction platform (1) and the construction channel (2); the pedal (6) is laid on the construction platform (1) and the construction channel (2). The utility model saves the labor cost for assembling and disassembling the scaffold, saves the material cost of the scaffold and shortens the construction period.
Description
Technical Field
The present invention relates to a building construction apparatus.
Background
The construction of the installation of the support steel framework of the existing net rack outer curtain wall generally adopts a scaffold-building mode to establish a construction platform for installing the support steel framework of the net rack outer curtain wall. But the construction period of the scaffold is long and the cost is high.
Disclosure of Invention
The utility model aims to provide a construction platform for externally suspending a net rack, which better solves the construction problem of mounting a supporting steel framework of a net rack external curtain wall.
The utility model adopts a technical scheme for achieving the aim that: a construction platform for hanging a net rack outside comprises a construction platform, a construction channel, construction platform hooks, construction platform guardrails and construction channel guardrails, wherein the construction platform is a square platform formed by welding steel frames, the construction channel is a rectangular platform formed by welding steel frames, and one side of the construction platform is connected with the construction channel; the construction platform hook comprises a hook and a hook rod, the joint of the construction platform and the construction channel is respectively and vertically provided with a hook rod, and the top of the hook rod is provided with a hook; construction channel guardrails are arranged on two sides of the construction channel, construction platform guardrails are arranged on the periphery of the construction platform, and a channel is arranged at the joint of the construction platform and the construction channel; running-boards are laid on the construction platform and the construction channel.
Further, the hook is in a triangular configuration.
Furthermore, a connecting and fixing cross rod is arranged to connect the tops of the two hook rods.
Further, the hook faces the direction of the construction platform.
Furthermore, the pedal is in a full-spread state and is fixed on the construction platform and the steel frame of the construction channel through screws.
The utility model effectively utilizes the original equipment and facilities, and ensures the green construction process of land and material saving; the safety of the constructors for working aloft up and down is ensured; the construction platform is connected with the fairway by adopting the wood boards on the inner side of the channel, so that the safety of constructors is ensured; the labor cost for putting and dismounting the scaffold is saved, the material cost of the scaffold is saved, and the construction period is shortened.
Drawings
FIG. 1 is a schematic diagram of a preferred embodiment of the present invention;
FIG. 2 is a schematic diagram of a preferred embodiment of the present invention;
FIG. 3 is a bottom schematic view of the preferred embodiment of the present invention;
FIG. 4 is a schematic diagram of the preferred embodiment of the present invention.
Detailed Description
The utility model will be further explained with reference to the following figures and examples:
as shown in fig. 1 and 2, a construction platform for hanging a net rack outside comprises a construction platform 1, a construction channel 2, construction platform hooks 3, construction platform guardrails 4 and construction channel guardrails 5, wherein the construction platform 1 is a square platform formed by welding steel frames, the construction channel 2 is a rectangular platform formed by welding steel frames, and one side of the construction platform 1 is connected with the construction channel 2; the construction platform hook 3 comprises a hook 31 and a hook rod 32, the joint of the construction platform 1 and the construction channel 2 is respectively and vertically provided with the hook rod 32, and the top of the hook rod 32 is provided with the hook 31; construction channel guardrails 5 are arranged on two sides of the construction channel 2, construction platform guardrails 4 are arranged on the periphery of the construction platform 1, and a channel is arranged at the joint of the construction platform 1 and the construction channel 2; the construction platform 1 and the construction channel 2 are paved with foot boards 6.
As shown in fig. 1 and 2, the hook 31 has a triangular configuration, which enhances the strength of the hook 31. A connecting fixed cross bar 33 is arranged to connect the tops of the two hook rods 32, so that the construction platform hook 3 is more stable. The hook 31 faces the direction of the construction platform 1, so that the hanging is convenient.
As shown in fig. 1 and 2, the footrest 6 is in a full-spread state and is fixed to the construction platform 1 and the steel frame of the construction tunnel 2 by screws. In this embodiment, the footrest 6 is a wooden form with a thickness of 12 mm. The pedal 6 can also be made of other materials, such as steel plates and the like; or other thicknesses, all with respect to safe use.
As shown in fig. 3, the construction platform 1 is a frame body, and a reinforcing rod 11 is provided in the middle of the frame body. The construction channel 2 is a long frame body, and a reinforcing rod 21 is arranged in the middle of the frame body. The reinforcing rods and the reinforcing rods reinforce the strength of the frame body.
As shown in fig. 1, the construction platform guardrail 4 includes guardrail posts 41 and guardrail cross bars 42, the guardrail posts 41 are vertically disposed at the corners of the construction platform, a plurality of guardrail cross bars 42 are disposed between the adjacent guardrail posts 41, and the guardrail cross bars 42 at the passage side are disposed between the guardrail posts 41 and the hook bars 32. The construction channel guardrail 5 comprises guardrail blocking posts 51 and guardrail cross blocking rods 52, wherein the guardrail blocking posts 51 are vertically arranged at the corners of the construction channel, and the guardrail cross blocking rods 52 are arranged between the adjacent guardrail blocking posts 51 and the hook rods 32 on one side.
As shown in figure 4, the utility model utilizes the original net rack roof packway as the outer overhanging part structure of the construction channel design for construction, takes the existing net rack cross rod as the hanging point of the hanging construction platform, utilizes the construction channel 2 to be connected with the net rack packway of the roof, and leads the personnel to reach the construction working face through the packway channel. The construction platform is connected with the sidewalk by the wood plates and bound by the steel wires, so that the unstable shaking of the hanging construction platform is guaranteed, and the safety of construction personnel is guaranteed. The utility model reduces the construction measure cost of the curtain wall, and effectively utilizes the existing channel to carry out green construction; the construction cost is reduced; the construction period is shortened, and the construction surface can be spread.
The utility model effectively utilizes the original equipment and facilities, and ensures the green construction process of land and material saving; the safety of the constructors for working aloft up and down is ensured; the construction platform is connected with the fairway by adopting the wood boards on the inner side of the channel, so that the safety of constructors is ensured; the labor cost for putting and dismounting the scaffold is saved, the material cost of the scaffold is saved, and the construction period is shortened.
Claims (9)
1. The utility model provides a rack hangs construction platform outward which characterized in that: the construction platform comprises a construction platform (1), a construction channel (2), construction platform hooks (3), construction platform guardrails (4) and construction channel guardrails (5), wherein the construction platform (1) is a square platform formed by welding steel frames, the construction channel (2) is a rectangular platform formed by welding steel frames, and one side of the construction platform (1) is connected with the construction channel (2); the construction platform hook (3) comprises a hook (31) and hook rods (32), the hook rods (32) are respectively and vertically arranged at the connection positions of the construction platform (1) and the construction channel (2), and the hook (31) is arranged at the top of each hook rod (32); construction channel guardrails (5) are arranged on two sides of the construction channel (2), construction platform guardrails (4) are arranged on the periphery of the construction platform (1), and a channel is arranged at the joint of the construction platform (1) and the construction channel (2); the pedal (6) is laid on the construction platform (1) and the construction channel (2).
2. The externally suspended construction platform of the net rack according to claim 1, characterized in that: the hook (31) is in a triangular configuration.
3. The externally suspended construction platform of the net rack according to claim 1, characterized in that: a connecting fixed cross bar (33) is arranged to connect the tops of the two hook rods (32).
4. The externally suspended construction platform of the net rack according to claim 1, characterized in that: the hook (31) faces the construction platform (1).
5. The externally suspended construction platform of the net rack according to claim 1, characterized in that: the pedal (6) is in a full-spread state and is fixed on the steel frame of the construction platform (1) and the construction channel (2) through screws.
6. The externally suspended construction platform of the net rack according to claim 1, characterized in that: the construction platform (1) is a frame body, and a reinforcing rod (11) is arranged in the middle of the frame body.
7. The externally suspended construction platform of the net rack according to claim 1, characterized in that: the construction channel (2) is a long frame body, and a reinforcing rod (21) is arranged in the middle of the frame body.
8. The externally suspended construction platform of the net rack according to claim 1, characterized in that: construction platform guardrail (4) include guardrail post (41) and guardrail horizontal pole (42), and guardrail post (41) set up perpendicularly in construction platform's edge, and a plurality of guardrail horizontal poles (42) set up between adjacent guardrail post (41), and guardrail horizontal pole (42) of passageway side set up between guardrail post (41) and couple pole (32).
9. The externally suspended construction platform of the net rack according to claim 1, characterized in that: construction passageway guardrail (5) include guardrail bumping post (51) and guardrail crosspiece pole (52), and guardrail bumping post (51) set up perpendicularly in construction passageway's edge, and a plurality of guardrail crosspiece poles (52) set up between adjacent guardrail bumping post (51) in one side and couple pole (32).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121204602.0U CN215331339U (en) | 2021-05-31 | 2021-05-31 | Net frame external suspension construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121204602.0U CN215331339U (en) | 2021-05-31 | 2021-05-31 | Net frame external suspension construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215331339U true CN215331339U (en) | 2021-12-28 |
Family
ID=79549845
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121204602.0U Active CN215331339U (en) | 2021-05-31 | 2021-05-31 | Net frame external suspension construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215331339U (en) |
-
2021
- 2021-05-31 CN CN202121204602.0U patent/CN215331339U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210767927U (en) | Safety protection platform of attached lifting operation | |
CN211923476U (en) | Electric hoist lifting system attached to lifting scaffold | |
CN215212255U (en) | Suspension type frame combined high-altitude operation platform | |
CN215331339U (en) | Net frame external suspension construction platform | |
CN113789945B (en) | Sliding type safety operation frame for out-window construction and construction method thereof | |
CN214246528U (en) | Scaffold for building construction | |
CN212740512U (en) | Climb frame attached tower crane safety passage | |
CN113481872A (en) | Structure and construction method for safety guardrail on bent cap | |
CN210798251U (en) | But scaffold of automatically regulated height | |
CN207761269U (en) | Integrated form lift platform system | |
CN218028901U (en) | Stable attached type climbing frame | |
JP4027170B2 (en) | External scaffold device and construction method of external scaffold device | |
CN216276814U (en) | Building machine walkway plate connecting assembly | |
CN206126696U (en) | A detachable indoor hoist for buckling restrained brace | |
CN221027087U (en) | Suspension type construction elevator guard gate | |
CN211396522U (en) | Construction platform with triangular transportation channel | |
CN210685313U (en) | Safe convenient house steel connection structure | |
CN218375102U (en) | Metal roofing furred ceiling bottom plate installation device | |
CN215564253U (en) | Vertical frame structure of building construction scaffold | |
CN211286560U (en) | Spherical node suspension adjustable operation platform | |
CN220599110U (en) | Movable bridge type operation platform | |
CN219411757U (en) | Attached lifting scaffold | |
CN212866841U (en) | Novel formwork support device for building construction | |
CN215484831U (en) | Construction safety passageway structure | |
CN218114720U (en) | Elevator pre-installation elevator car structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |