CN218091900U - Safety protection scaffold for construction - Google Patents

Safety protection scaffold for construction Download PDF

Info

Publication number
CN218091900U
CN218091900U CN202221961768.1U CN202221961768U CN218091900U CN 218091900 U CN218091900 U CN 218091900U CN 202221961768 U CN202221961768 U CN 202221961768U CN 218091900 U CN218091900 U CN 218091900U
Authority
CN
China
Prior art keywords
wall
dead lever
safety protection
fixed mounting
thick bamboo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221961768.1U
Other languages
Chinese (zh)
Inventor
苗鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221961768.1U priority Critical patent/CN218091900U/en
Application granted granted Critical
Publication of CN218091900U publication Critical patent/CN218091900U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of scaffold, a safety protection scaffold for construction is disclosed, including loading board and activity set up in the fly leaf and the roof at loading board top, the top four corners edge fixed mounting of loading board has first supporting shoe, the top fixed mounting of first supporting shoe has first dead lever, the top fixed mounting of loading board has the second supporting shoe of symmetry, the top fixed mounting of second supporting shoe has evenly distributed's second dead lever, the outer wall activity of second dead lever is provided with a movable section of thick bamboo, the fly leaf activity sets up in the top of a movable section of thick bamboo, the bottom four corners edge fixed mounting of roof has a movable section of thick bamboo of third, the inner wall of a movable section of thick bamboo of third and the laminating of the top outer wall of first dead lever mutually. This scaffold can be fast assembly and set up the use, and safety protection nature is better, can improve the safety protection to the constructor who stands on the scaffold.

Description

Safety protection scaffold for construction
Technical Field
The application relates to the technical field of scaffolds, more specifically say, relate to a safety protection scaffold for construction.
Background
Scaffold frame that construction used generally builds in the building outside, common scaffold frame comprises a plurality of steel pipes and building buckle, a plurality of steel pipe vertically and horizontally staggered form netted structure, the tip of steel pipe is the fixed position, the building buckle is fixed vertically and horizontally staggered's steel pipe at the fixed position, to the low-rise building, it is comparatively loaded down with trivial details and waste time and energy to build the scaffold frame according to current mode, present scaffold frame is difficult to fast assembly and builds the use, and safety protection nature is not enough, be difficult to improve the safety protection to the constructor of standing on the scaffold frame, the improvement that remains further.
At present, the utility model patent of patent number CN202022748888.0 discloses a construction scaffold frame, adopts following technical scheme: the utility model provides a construction scaffold, comprises a frame body, the support body includes support frame and construction platform, the support frame is used for supporting construction platform, the subplate is worn to be equipped with by the construction platform internalization, the subplate is worn out by a construction platform side and is used for increasing construction platform construction area, be provided with the anticreep subassembly that is used for preventing the subplate and breaks away from in the construction platform, this scaffold stretches out through the subplate of wearing to establish with the construction platform internalization, makes constructor can stand and be close to the region that needs the construction more on the subplate to the region of can't being under construction on construction platform stands is under construction, and the constructor of being convenient for is close to the construction area and is under construction, and simultaneously, the anticreep subassembly that sets up in the construction platform can be used for preventing the subplate and drop when outwards roll-off, has promoted the security of use, but present scaffold is difficult to fast assembly and is built the use to the safety protection nature is not enough, is difficult to improve the safety protection to the constructor's of standing on the scaffold.
Therefore, to the above-mentioned present scaffold is difficult to fast assembly to build and use to safety protection is not enough, is difficult to improve the problem to the constructor's of standing on the scaffold safety protection, needs urgently to be solved, but in order to realize that the scaffold can fast assembly to build and use, safety protection is better, can improve the ability to the constructor's of standing on the scaffold safety protection.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the application provides a safety protection scaffold for construction.
The application provides a safety protection scaffold frame for construction adopts following technical scheme:
the utility model provides a safety protection scaffold frame for construction, include the loading board with the activity set up in the fly leaf and the roof at loading board top, the top four corners edge fixed mounting of loading board has first supporting shoe, the top fixed mounting of first supporting shoe has first dead lever, the top fixed mounting of loading board has the second supporting shoe of symmetry, the top fixed mounting of second supporting shoe has evenly distributed's second dead lever, the outer wall activity of second dead lever is provided with a first activity section of thick bamboo, the fly leaf activity sets up in the top of a first activity section of thick bamboo, the bottom four corners edge fixed mounting of roof has a third activity section of thick bamboo, the inner wall of a third activity section of thick bamboo is laminated with the top outer wall of first dead lever mutually.
Through above-mentioned technical scheme, place a first activity section of thick bamboo on the top of second supporting shoe, make the inner wall of a first activity section of thick bamboo laminate with the outer wall of second dead lever mutually, place the fly leaf on the top of a first activity section of thick bamboo, place a third activity section of thick bamboo on the top outer wall of first dead lever, realize that this scaffold frame can fast assembly and build the use, avoided using the building buckle, be applicable to the low-rise building, the installation is swift convenient.
Further, the top and the bottom of fly leaf run through and set up evenly distributed's second through-hole, the inner wall of second through-hole and the laminating of the top outer wall of second dead lever mutually.
Through above-mentioned technical scheme, the setting that the outer wall of second through-hole and second dead lever was laminated mutually plays limiting displacement to the fly leaf, does benefit to the rapid and stable of fly leaf and places.
Furthermore, a first ladder stand is fixedly mounted at one end of the movable plate, a second ladder stand is fixedly mounted at one end of the top plate, and the outer wall of the first ladder stand and the outer wall of the second ladder stand are located on the same plane.
Through above-mentioned technical scheme, the climbing of the device is made things convenient for in setting up of first cat ladder and second cat ladder.
Furthermore, the both ends of loading board run through and are seted up evenly distributed's first through-hole, the inner wall activity of first through-hole is provided with spacing post.
Through the technical scheme, when a plurality of the devices are butted for use, the limiting column is moved into the first through holes in the two bearing plates, and the butting for the two devices can be realized.
Further, the top and the bottom of roof run through and set up evenly distributed's third through-hole, the top activity of fly leaf is provided with a second movable section of thick bamboo, the top inner wall fixed mounting third dead lever of a second movable section of thick bamboo, the outer wall of third dead lever is laminated with the inner wall of third through-hole mutually.
Through above-mentioned technical scheme, the third dead lever passes the top that the third through-hole extends to the third through-hole, and the third dead lever plays safety protection's effect to the constructor of standing on the roof top, can improve constructor's safety protection to standing on the scaffold.
Further, the top and the bottom four corners edge of fly leaf run through and have seted up the fourth through-hole, the inner wall of fourth through-hole is laminated with the outer wall of first dead lever mutually.
Through above-mentioned technical scheme, the setting that the outer wall of fourth through-hole and first dead lever was laminated mutually does benefit to the quick spacing of fly leaf and places.
In summary, the present application includes at least one of the following advantageous technical effects:
(1) The scaffold can be quickly assembled and built, the first movable cylinder is placed at the top end of the second supporting block by arranging the first movable cylinder and the third movable cylinder, the inner wall of the first movable cylinder is attached to the outer wall of the second fixed rod, the movable plate is placed at the top end of the first movable cylinder, and the third movable cylinder is placed on the outer wall of the top end of the first fixed rod, so that the scaffold can be quickly assembled, built and used, building buckles are avoided, the scaffold is suitable for low-rise buildings, and the scaffold is quick and convenient to install;
(2) The scaffold is provided with the second through hole and the fourth through hole, the inner wall of the second through hole is attached to the outer wall of the second fixed rod, and the inner wall of the fourth through hole is attached to the outer wall of the first fixed rod, so that the capacity of quickly limiting and installing the movable plate is realized, the movable plate is conveniently and quickly installed, the inner wall of the third movable cylinder is attached to the outer wall of the first fixed rod, and the third movable cylinder is conveniently and quickly installed and placed;
(3) This scaffold frame is through setting up a plurality of second dead levers, and constructor stands at the top during operation of fly leaf, and a plurality of second dead levers can play the guard action, and when needs used the roof, constructor stands at the top during operation of roof, and the third fixed rod plays safety protection's effect to the constructor of standing on the roof top, can improve the safety protection to the constructor of standing on scaffold frame, has better safety protection nature.
Drawings
FIG. 1 is a schematic perspective view of a safety protection scaffold for building construction;
fig. 2 is a schematic perspective split structure diagram of a second fixed rod, a first movable barrel and a second movable barrel in the present application;
fig. 3 is a schematic perspective view of a movable plate in the present application;
fig. 4 is a schematic perspective view of the top plate in the present application.
The numbering in the figures illustrates: 1. a carrier plate; 2. a first support block; 3. a first fixing lever; 4. a second support block; 5. a second fixing bar; 6. a first movable barrel; 7. a movable plate; 8. a second movable barrel; 9. a third fixing bar; 10. a top plate; 11. a third movable barrel; 12. a first through hole; 13. a limiting column; 14. a second through hole; 15. a third through hole; 16. a first ladder stand; 17. a second ladder stand; 18. and a fourth via.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses safety protection scaffold for building construction, set up in fly leaf 7 and roof 10 at loading board 1 top including loading board 1 and activity, the top four corners edge fixed mounting of loading board 1 has first supporting shoe 2, the top fixed mounting of first supporting shoe 2 has first dead lever 3, the top fixed mounting of loading board 1 has symmetrical second supporting shoe 4, the top fixed mounting of second supporting shoe 4 has evenly distributed's second dead lever 5, the outer wall activity of second dead lever 5 is provided with first activity section of thick bamboo 6, fly leaf 7 activity sets up in the top of first activity section of thick bamboo 6, the bottom four corners edge fixed mounting of roof 10 has third activity section of thick bamboo 11, the inner wall of third activity section of thick bamboo 11 and the laminating of the top outer wall of first dead lever 3 mutually, the one end fixed mounting of fly leaf 7 has first cat ladder 16, the one end fixed mounting of roof 10 has second cat ladder 17, the outer wall of first cat ladder 16 and the outer wall of second cat ladder 17 are in the coplanar, the top and the bottom of roof 10 run through evenly distributed's third tee bend hole 15, the top activity section of thick bamboo 8, the inner wall of second activity section of movable ladder 9 and the laminating of third dead lever 9 mutually.
In order to realize the limiting placement of the movable plate 7, the top end and the bottom end of the movable plate 7 are penetrated through by the second through holes 14 which are uniformly distributed, the inner walls of the second through holes 14 are attached to the outer wall of the top end of the second fixing rod 5, the edges of the four corners of the top end and the bottom end of the movable plate 7 are penetrated through by the fourth through holes 18, and the inner walls of the fourth through holes 18 are attached to the outer wall of the first fixing rod 3. The arrangement of the second through hole 14 and the fourth through hole 18 can realize the position limitation of the movable plate 7.
In order to realize quick alignment when a plurality of the device are used in combination, the first through holes 12 which are uniformly distributed are formed in the two ends of the bearing plate 1 in a penetrating manner, and the inner walls of the first through holes 12 are movably provided with limiting columns 13. When two the device combination uses, place spacing post 13 in the first through-hole 12 of two loading boards 1, can realize that a plurality of the device combination uses quick counterpoint and place.
The implementation principle of safety protection scaffold for construction of this application embodiment is: when the scaffold is used, the first movable cylinder 6 is placed at the top end of the second supporting block 4, the inner wall of the first movable cylinder 6 is attached to the outer wall of the second fixing rod 5, the movable plate 7 is placed at the top end of the first movable cylinder 6, the inner wall of the second through hole 14 is attached to the outer wall of the second fixing rod 5, meanwhile, the inner wall of the fourth through hole 18 is attached to the outer wall of the first fixing rod 3, the second movable cylinder 8 is placed at the top end of the movable plate 7, the top end of the third fixing rod 9 penetrates through the third through hole 15 and extends to the top of the third through hole 15, the third movable cylinder 11 is placed at the outer wall of the top end of the first fixing rod 3, the scaffold can be rapidly assembled, built and used, when a constructor stands on the top end of the movable plate 7, the plurality of second fixing rods 5 can play a protection role, when the top plate 10 is needed, the constructor stands on the top end of the top plate 10 and works, the third fixing rod 9 plays a role in safety protection for the constructor standing on the scaffold.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (6)

1. The utility model provides a safety protection scaffold for construction, include loading board (1) and activity set up in fly leaf (7) and roof (10) at loading board (1) top, its characterized in that: the utility model discloses a bearing plate, including roof (10), loading board (1), top four corners edge fixed mounting of loading board (1) has first supporting shoe (2), the top fixed mounting of first supporting shoe (2) has first dead lever (3), the top fixed mounting of loading board (1) has second supporting shoe (4) of symmetry, the top fixed mounting of second supporting shoe (4) has evenly distributed's second dead lever (5), the outer wall activity of second dead lever (5) is provided with a first movable section of thick bamboo (6), fly leaf (7) activity sets up in the top of a first movable section of thick bamboo (6), the bottom four corners edge fixed mounting of roof (10) has a third movable section of thick bamboo (11), the inner wall of a third movable section of thick bamboo (11) is laminated with the top outer wall of first dead lever (3) mutually.
2. The safety protection scaffold for building construction according to claim 1, characterized in that: the top and the bottom of fly leaf (7) run through and set up evenly distributed second through-hole (14), the inner wall of second through-hole (14) and the top outer wall laminating of second dead lever (5) mutually.
3. The safety protection scaffold for building construction according to claim 1, characterized in that: one end of the movable plate (7) is fixedly provided with a first ladder stand (16), one end of the top plate (10) is fixedly provided with a second ladder stand (17), and the outer wall of the first ladder stand (16) and the outer wall of the second ladder stand (17) are positioned on the same plane.
4. The safety protection scaffold for building construction according to claim 1, characterized in that: the bearing plate is characterized in that first through holes (12) which are uniformly distributed are formed in the two ends of the bearing plate (1) in a penetrating mode, and limiting columns (13) are movably arranged on the inner walls of the first through holes (12).
5. The safety protection scaffold for building construction according to claim 1, characterized in that: the top and the bottom of roof (10) run through and set up evenly distributed's third through-hole (15), the top activity of fly leaf (7) is provided with a second activity section of thick bamboo (8), the top inner wall fixed mounting third dead lever (9) of a second activity section of thick bamboo (8), the outer wall of third dead lever (9) is laminated with the inner wall of third through-hole (15) mutually.
6. The safety protection scaffold for building construction according to claim 1, characterized in that: fourth through holes (18) are formed in the edges of the four corners of the top end and the bottom end of the movable plate (7) in a penetrating mode, and the inner walls of the fourth through holes (18) are attached to the outer wall of the first fixing rod (3).
CN202221961768.1U 2022-07-28 2022-07-28 Safety protection scaffold for construction Active CN218091900U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221961768.1U CN218091900U (en) 2022-07-28 2022-07-28 Safety protection scaffold for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221961768.1U CN218091900U (en) 2022-07-28 2022-07-28 Safety protection scaffold for construction

Publications (1)

Publication Number Publication Date
CN218091900U true CN218091900U (en) 2022-12-20

Family

ID=84485067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221961768.1U Active CN218091900U (en) 2022-07-28 2022-07-28 Safety protection scaffold for construction

Country Status (1)

Country Link
CN (1) CN218091900U (en)

Similar Documents

Publication Publication Date Title
CN214834619U (en) Aluminum alloy integrated attached lifting scaffold
CN218091900U (en) Safety protection scaffold for construction
CN214884370U (en) Aluminum alloy supporting beam for movable board house
CN210032088U (en) Easily install steel construction assembled node
CN214615300U (en) Scaffold for construction
CN211873780U (en) Attached safety operation protection platform for building construction
CN210459514U (en) Reinforcing apparatus for assembled wall
CN209874424U (en) Building assembled safety scaffold
CN212176623U (en) Stable form bed-jig convenient to adjustment prefabricated assembled buckling-restrained steel plate wall state
CN212689540U (en) Guide rail for climbing frame
CN211007486U (en) Elevated floor supporting structure
CN213742181U (en) High-rise climbing frame with top self-fixing effect
CN212507487U (en) Constructional engineering assembled building steel structure
CN214364797U (en) Scaffold for external construction of tower
CN216766730U (en) Aluminum-plastic composite climbing frame walkway plate
CN219952651U (en) Fixed slot type protective net for climbing frame
CN215519853U (en) Attached scaffold
CN215254840U (en) Post-cast strip supporting structure
CN220620990U (en) Integrated climbing frame
CN210264009U (en) Attached lifting scaffold protective net mounting structure
CN220621173U (en) Face limit protection device of assembled building
CN216277000U (en) Jig frame combined structure for truss assembly
CN110725523A (en) Scaffold for building construction
CN218754593U (en) Tower crane assembled base for construction
CN218230168U (en) Connecting structure of loft type goods shelf

Legal Events

Date Code Title Description
GR01 Patent grant