CN209468979U - A kind of high-speed rail station curtain wall overhauling scaffold - Google Patents
A kind of high-speed rail station curtain wall overhauling scaffold Download PDFInfo
- Publication number
- CN209468979U CN209468979U CN201821837646.5U CN201821837646U CN209468979U CN 209468979 U CN209468979 U CN 209468979U CN 201821837646 U CN201821837646 U CN 201821837646U CN 209468979 U CN209468979 U CN 209468979U
- Authority
- CN
- China
- Prior art keywords
- baffle
- scaffold
- card slot
- curtain wall
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 33
- 235000005121 Sorbus torminalis Nutrition 0.000 claims description 3
- 244000152100 Sorbus torminalis Species 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 2
- 230000006378 damage Effects 0.000 abstract description 5
- 208000027418 Wounds and injury Diseases 0.000 abstract description 4
- 230000009194 climbing Effects 0.000 abstract description 4
- 208000014674 injury Diseases 0.000 abstract description 4
- 238000003825 pressing Methods 0.000 abstract description 4
- 238000012423 maintenance Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Abstract
The utility model discloses a kind of high-speed rail station curtain wall overhauling scaffolds, including scaffold, the top of the scaffold is fixedly connected with construction plate, and the top corner of the construction plate is symmetrically fixedly connected with four groups of columns, and is fixedly connected with four groups of hand rods between four groups of column adjacent outer walls.The high-speed rail station curtain wall overhauling scaffold, construction personnel enters the top of construction plate by climbing scaffold, first baffle is inserted into the first card slot respectively, second baffle is inserted into the second card slot again, operator is by pressing down on every group of screw rod this moment, rotation hand wheel again, compressed spring under the action of cooperation positioning plate, it is threadedly connected to the bottom end of screw rod in the top internal thread hole of first baffle and second baffle, realize the fixation to first baffle and second baffle, prevent the tool of construction plate upper end storage from falling and causing the injury of pedestrian, its is easy to disassemble, convenient for assembling, it is time saving and energy saving to be worthy to be popularized.
Description
Technical field
The utility model belongs to scaffold technical field, and in particular to a kind of high-speed rail station curtain wall overhauling scaffold.
Background technique
Curtain wall is the exterior wall encirclement of building, is hung up as curtain, therefore also known as suspension wall, is modern large-scale and high
Layer building commonly has the lightweight wall of decorative effect.It is made of structural framing with plate is inlayed, does not undertake main structure load
The architectural exterior-protecting construction of lotus and effect.
The curtain wall at high-speed rail station needs periodically to carry out the maintenance on surface at present, since high-speed rail station crowd flowing is fast, and pedestrian
Quantity is more, and maintenance scaffold needs to carry many tools, in order to avoid unused tool is fallen on maintenance scaffold, damages
A kind of pedestrian, it is therefore desirable to high-speed rail station curtain wall overhauling scaffold.
Utility model content
The purpose of this utility model is to provide a kind of high-speed rail station curtain wall overhauling scaffolds, to solve in above-mentioned background technique
The problem of proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of high-speed rail station curtain wall overhauling scaffold, packet
Scaffold is included, the top of the scaffold is fixedly connected with construction plate, and the top corner of the construction plate is symmetrically fixedly connected
There are four groups of columns, and is fixedly connected with four groups of hand rods between four groups of column adjacent outer walls, the top side of the construction plate
Two group of first card slot symmetrically is offered, and is provided with first baffle in two group of first card slot, the top of the construction plate is another
Side symmetrically offers two group of second card slot, and second baffle is provided in two group of second card slot, and the bottom end of the hand rod is solid
Surely it is connected with positioning housing, the positioning housing is internally provided with screw rod, and screw rod runs through positioning plate, institute in positioning housing
It states and is cased with spring on the outside of screw rod.
This setting enters the top of construction plate for construction personnel by climbing scaffold, respectively inserts first baffle
Enter into the first card slot, then second baffle is inserted into the second card slot.
Preferably, the top of the screw rod sequentially passes through positioning housing and hand rod, and extend to the top of hand rod with
Handwheel is fixedly connected.
This is arranged for facilitating operator that screw rod is driven to rotate.
Preferably, positioning housing is run through in the bottom end of the screw rod, and extends to the Basolateral of positioning housing, and described first
The top of baffle and second baffle offers internal thread hole, and the bottom end of screw rod is threadedly connected to the inside of internal thread hole.
This setting, by pressing down on every group of screw rod, then rotation hand wheel, cooperates positioning plate for operator this moment
Lower compressed spring is acted on to realize until the bottom end of screw rod is threadedly connected in the top internal thread hole of first baffle and second baffle
Fixation to first baffle and second baffle prevents the tool of construction plate upper end storage from falling and causing the injury of pedestrian.
Preferably, the surface of the hand rod is fixedly connected to non-slip rubber set, and the both side ends of hand rod with
The lateral wall welding of four groups of columns.
Preferably, deep equality in the slot of first card slot and the second card slot, the first baffle and second baffle
It is highly equal.
Preferably, the top end surface of the construction plate is provided with anti-skid chequer.
The anti-skid safety that this setting is stood when constructing the maintenance construction of plate top for improving operator.
The technical effect and advantage of the utility model: the high-speed rail station curtain wall overhauling scaffold, construction personnel pass through climbing foot
Hand cradle enters the top of construction plate, first baffle is inserted into the first card slot respectively, then second baffle is inserted into second
In card slot, operator compresses bullet under the action of cooperation positioning plate by pressing down on every group of screw rod, then rotation hand wheel this moment
Spring, until the bottom end of screw rod is threadedly connected in the top internal thread hole of first baffle and second baffle, realize to first baffle with
The fixation of second baffle prevents the tool of construction plate upper end storage from falling and causing the injury of pedestrian, easy to disassemble, is convenient for group
Dress is time saving and energy saving to be worthy to be popularized.
Detailed description of the invention
Fig. 1 is the positive structure schematic of the utility model;
Fig. 2 is the utility model construction plate structural schematic diagram;
Fig. 3 is schematic enlarged-scale view at the A of the utility model.
In figure: 1, scaffold;2, construction plate;3, column;4, hand rod;5, the first card slot;6, first baffle;7, the second card
Slot;8, second baffle;9, positioning housing;91, screw rod;92, positioning plate;93, spring;10, internal thread hole;11, handwheel.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of high-speed rail station curtain wall overhauling scaffold as shown in Figs. 1-3, including scaffold 1, institute
The top for stating scaffold 1 is fixedly connected with construction plate 2, and the top corner of the construction plate 2 is symmetrically fixedly connected with four groups and stands
Column 3, and four groups of hand rods 4 are fixedly connected between four groups of 3 adjacent outer walls of column, the top side of the construction plate 2 is symmetrical
Two group of first card slot 5 is offered, and is provided with first baffle 6 in two group of first card slot 5, the top of the construction plate 2 is another
Side symmetrically offers two group of second card slot 7, and second baffle 8 is provided in two group of second card slot 7, the bottom of the hand rod 4
End is fixedly connected with positioning housing 9, and the positioning housing 9 is internally provided with screw rod 91, and screw rod 91 passes through in positioning housing 9
Positioning plate 92 is worn, the outside of the screw rod 91 is cased with spring 93.
Specifically, the top of the screw rod 91 sequentially passes through positioning housing 9 and hand rod 4, and extend to the top of hand rod 4
End is fixedly connected with handwheel 11.
Specifically, positioning housing 9 is run through in the bottom end of the screw rod 91, and the Basolateral of positioning housing 9 is extended to, it is described
The top of first baffle 6 and second baffle 8 offers internal thread hole 10, and the bottom end of screw rod 91 is threadedly connected to internal thread hole
10 inside.
Specifically, the surface of the hand rod 4 is fixedly connected to non-slip rubber set, and the both side ends of hand rod 4 are equal
It is welded with the lateral wall of four groups of columns 3.
Specifically, deep equality in the slot of first card slot 5 and the second card slot 7, the first baffle 6 and second baffle
8 height is equal.
Specifically, the top end surface of the construction plate 2 is provided with anti-skid chequer.
The high-speed rail station curtain wall overhauling scaffold, when in use, construction personnel enter construction plate 2 by climbing scaffold 1
Top, first baffle 6 is inserted into the first card slot 5 respectively, then second baffle 8 is inserted into the second card slot 7, is grasped this moment
Make personnel by pressing down on every group of screw rod 91, then rotation hand wheel 11, cooperates compressed spring 93 under the action of positioning plate 92, until silk
The bottom end of bar 91 is threadedly connected in the top internal thread hole 10 of first baffle 6 and second baffle 8, realize to first baffle 6 with
The fixation of second baffle 8 prevents the tool of construction 2 upper end of plate storage from falling and causing the injury of pedestrian, easy to disassemble, is convenient for
Assembling, it is time saving and energy saving to be worthy to be popularized.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic
It is equivalently replaced, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on,
It should be included within the scope of protection of this utility model.
Claims (6)
1. a kind of high-speed rail station curtain wall overhauling scaffold, including scaffold (1), it is characterised in that: the top of the scaffold (1) is solid
Surely it is connected with construction plate (2), the top corner of construction plate (2) is symmetrically fixedly connected with four groups of columns (3), and four groups vertical
Four groups of hand rods (4) are fixedly connected between column (3) adjacent outer wall, the top side of construction plate (2) symmetrically offers
Two group of first card slot (5), and be provided with first baffle (6) in two group of first card slot (5), the top of construction plate (2) is another
Side symmetrically offers two group of second card slot (7), and is provided with second baffle (8) in two group of second card slot (7), described hand steered
The bottom end of bar (4) is fixedly connected with positioning housing (9), and the positioning housing (9) is internally provided with screw rod (91), and screw rod
(91) run through positioning plate (92) in positioning housing (9), be cased with spring (93) on the outside of the screw rod (91).
2. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: the top of the screw rod (91)
End sequentially passes through positioning housing (9) and hand rod (4), and the top for extending to hand rod (4) is fixedly connected with handwheel (11).
3. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: the bottom of the screw rod (91)
Positioning housing (9) are run through at end, and extend to the Basolateral of positioning housing (9), the first baffle (6) and second baffle (8)
Top offer internal thread hole (10), and the bottom end of screw rod (91) is threadedly connected to the inside of internal thread hole (10).
4. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: the hand rod (4)
Surface is fixedly connected to non-slip rubber set, and the both side ends of hand rod (4) are welded with the lateral wall of four groups of columns (3).
5. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: first card slot (5)
With deep equality in the slot of the second card slot (7), the first baffle (6) is equal with the height of second baffle (8).
6. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: construction plate (2)
Top end surface is provided with anti-skid chequer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821837646.5U CN209468979U (en) | 2018-11-08 | 2018-11-08 | A kind of high-speed rail station curtain wall overhauling scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821837646.5U CN209468979U (en) | 2018-11-08 | 2018-11-08 | A kind of high-speed rail station curtain wall overhauling scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209468979U true CN209468979U (en) | 2019-10-08 |
Family
ID=68088520
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821837646.5U Expired - Fee Related CN209468979U (en) | 2018-11-08 | 2018-11-08 | A kind of high-speed rail station curtain wall overhauling scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209468979U (en) |
-
2018
- 2018-11-08 CN CN201821837646.5U patent/CN209468979U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207524927U (en) | A kind of lifting device for building | |
CN107514128A (en) | A kind of architectural engineering scaffold | |
CN206859620U (en) | A kind of good removable scaffold for building of security | |
CN209468979U (en) | A kind of high-speed rail station curtain wall overhauling scaffold | |
CN206784896U (en) | A kind of high-lift operation hanging cradle with aluminium sheet soldering | |
CN206888490U (en) | A kind of construction scaffold | |
CN207144427U (en) | A kind of construction Anti-dropping rack | |
CN206359210U (en) | A kind of processing of steel construction is with stablizing lowering or hoisting gear | |
CN209429487U (en) | A kind of scaffold of architectural engineering | |
CN209040530U (en) | A kind of construction operation hanging cage | |
CN203938973U (en) | Column | |
CN202953755U (en) | Novel anti-climbing safety device for tower crane | |
CN206971679U (en) | A kind of safe anti-falling scaffold | |
CN207538481U (en) | A kind of floor height changeable type input and output material platform | |
CN205396963U (en) | Base is put things in good order to whole steel pipe on scaffold | |
CN110899391A (en) | Steel pipe aligning device is used in construction scaffolding processing | |
CN206752996U (en) | One kind building adjustable scaffold | |
CN201923647U (en) | Pipe kicking device of oil-field derrick pipe conveying machine | |
CN205976389U (en) | Hanger rod installation tool | |
CN218061333U (en) | Fastener type scaffold with moving function | |
CN210508324U (en) | Oil tank inner wall construction hanging flower basket | |
CN212224577U (en) | Anti-falling device for building construction | |
CN214615326U (en) | Scaffold for building engineering construction | |
CN204940119U (en) | Bridge rhombus false work | |
CN210460069U (en) | Personnel up-and-down passage structure for road engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191008 |
|
CF01 | Termination of patent right due to non-payment of annual fee |