CN209468979U - A kind of high-speed rail station curtain wall overhauling scaffold - Google Patents

A kind of high-speed rail station curtain wall overhauling scaffold Download PDF

Info

Publication number
CN209468979U
CN209468979U CN201821837646.5U CN201821837646U CN209468979U CN 209468979 U CN209468979 U CN 209468979U CN 201821837646 U CN201821837646 U CN 201821837646U CN 209468979 U CN209468979 U CN 209468979U
Authority
CN
China
Prior art keywords
baffle
scaffold
card slot
curtain wall
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821837646.5U
Other languages
Chinese (zh)
Inventor
李应心
左京力
王晓晓
马俊峰
王吉英
杨鑫
何默
王天嘉
王志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201821837646.5U priority Critical patent/CN209468979U/en
Application granted granted Critical
Publication of CN209468979U publication Critical patent/CN209468979U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high-speed rail station curtain wall overhauling scaffolds, including scaffold, the top of the scaffold is fixedly connected with construction plate, and the top corner of the construction plate is symmetrically fixedly connected with four groups of columns, and is fixedly connected with four groups of hand rods between four groups of column adjacent outer walls.The high-speed rail station curtain wall overhauling scaffold, construction personnel enters the top of construction plate by climbing scaffold, first baffle is inserted into the first card slot respectively, second baffle is inserted into the second card slot again, operator is by pressing down on every group of screw rod this moment, rotation hand wheel again, compressed spring under the action of cooperation positioning plate, it is threadedly connected to the bottom end of screw rod in the top internal thread hole of first baffle and second baffle, realize the fixation to first baffle and second baffle, prevent the tool of construction plate upper end storage from falling and causing the injury of pedestrian, its is easy to disassemble, convenient for assembling, it is time saving and energy saving to be worthy to be popularized.

Description

A kind of high-speed rail station curtain wall overhauling scaffold
Technical field
The utility model belongs to scaffold technical field, and in particular to a kind of high-speed rail station curtain wall overhauling scaffold.
Background technique
Curtain wall is the exterior wall encirclement of building, is hung up as curtain, therefore also known as suspension wall, is modern large-scale and high Layer building commonly has the lightweight wall of decorative effect.It is made of structural framing with plate is inlayed, does not undertake main structure load The architectural exterior-protecting construction of lotus and effect.
The curtain wall at high-speed rail station needs periodically to carry out the maintenance on surface at present, since high-speed rail station crowd flowing is fast, and pedestrian Quantity is more, and maintenance scaffold needs to carry many tools, in order to avoid unused tool is fallen on maintenance scaffold, damages A kind of pedestrian, it is therefore desirable to high-speed rail station curtain wall overhauling scaffold.
Utility model content
The purpose of this utility model is to provide a kind of high-speed rail station curtain wall overhauling scaffolds, to solve in above-mentioned background technique The problem of proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of high-speed rail station curtain wall overhauling scaffold, packet Scaffold is included, the top of the scaffold is fixedly connected with construction plate, and the top corner of the construction plate is symmetrically fixedly connected There are four groups of columns, and is fixedly connected with four groups of hand rods between four groups of column adjacent outer walls, the top side of the construction plate Two group of first card slot symmetrically is offered, and is provided with first baffle in two group of first card slot, the top of the construction plate is another Side symmetrically offers two group of second card slot, and second baffle is provided in two group of second card slot, and the bottom end of the hand rod is solid Surely it is connected with positioning housing, the positioning housing is internally provided with screw rod, and screw rod runs through positioning plate, institute in positioning housing It states and is cased with spring on the outside of screw rod.
This setting enters the top of construction plate for construction personnel by climbing scaffold, respectively inserts first baffle Enter into the first card slot, then second baffle is inserted into the second card slot.
Preferably, the top of the screw rod sequentially passes through positioning housing and hand rod, and extend to the top of hand rod with Handwheel is fixedly connected.
This is arranged for facilitating operator that screw rod is driven to rotate.
Preferably, positioning housing is run through in the bottom end of the screw rod, and extends to the Basolateral of positioning housing, and described first The top of baffle and second baffle offers internal thread hole, and the bottom end of screw rod is threadedly connected to the inside of internal thread hole.
This setting, by pressing down on every group of screw rod, then rotation hand wheel, cooperates positioning plate for operator this moment Lower compressed spring is acted on to realize until the bottom end of screw rod is threadedly connected in the top internal thread hole of first baffle and second baffle Fixation to first baffle and second baffle prevents the tool of construction plate upper end storage from falling and causing the injury of pedestrian.
Preferably, the surface of the hand rod is fixedly connected to non-slip rubber set, and the both side ends of hand rod with The lateral wall welding of four groups of columns.
Preferably, deep equality in the slot of first card slot and the second card slot, the first baffle and second baffle It is highly equal.
Preferably, the top end surface of the construction plate is provided with anti-skid chequer.
The anti-skid safety that this setting is stood when constructing the maintenance construction of plate top for improving operator.
The technical effect and advantage of the utility model: the high-speed rail station curtain wall overhauling scaffold, construction personnel pass through climbing foot Hand cradle enters the top of construction plate, first baffle is inserted into the first card slot respectively, then second baffle is inserted into second In card slot, operator compresses bullet under the action of cooperation positioning plate by pressing down on every group of screw rod, then rotation hand wheel this moment Spring, until the bottom end of screw rod is threadedly connected in the top internal thread hole of first baffle and second baffle, realize to first baffle with The fixation of second baffle prevents the tool of construction plate upper end storage from falling and causing the injury of pedestrian, easy to disassemble, is convenient for group Dress is time saving and energy saving to be worthy to be popularized.
Detailed description of the invention
Fig. 1 is the positive structure schematic of the utility model;
Fig. 2 is the utility model construction plate structural schematic diagram;
Fig. 3 is schematic enlarged-scale view at the A of the utility model.
In figure: 1, scaffold;2, construction plate;3, column;4, hand rod;5, the first card slot;6, first baffle;7, the second card Slot;8, second baffle;9, positioning housing;91, screw rod;92, positioning plate;93, spring;10, internal thread hole;11, handwheel.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of high-speed rail station curtain wall overhauling scaffold as shown in Figs. 1-3, including scaffold 1, institute The top for stating scaffold 1 is fixedly connected with construction plate 2, and the top corner of the construction plate 2 is symmetrically fixedly connected with four groups and stands Column 3, and four groups of hand rods 4 are fixedly connected between four groups of 3 adjacent outer walls of column, the top side of the construction plate 2 is symmetrical Two group of first card slot 5 is offered, and is provided with first baffle 6 in two group of first card slot 5, the top of the construction plate 2 is another Side symmetrically offers two group of second card slot 7, and second baffle 8 is provided in two group of second card slot 7, the bottom of the hand rod 4 End is fixedly connected with positioning housing 9, and the positioning housing 9 is internally provided with screw rod 91, and screw rod 91 passes through in positioning housing 9 Positioning plate 92 is worn, the outside of the screw rod 91 is cased with spring 93.
Specifically, the top of the screw rod 91 sequentially passes through positioning housing 9 and hand rod 4, and extend to the top of hand rod 4 End is fixedly connected with handwheel 11.
Specifically, positioning housing 9 is run through in the bottom end of the screw rod 91, and the Basolateral of positioning housing 9 is extended to, it is described The top of first baffle 6 and second baffle 8 offers internal thread hole 10, and the bottom end of screw rod 91 is threadedly connected to internal thread hole 10 inside.
Specifically, the surface of the hand rod 4 is fixedly connected to non-slip rubber set, and the both side ends of hand rod 4 are equal It is welded with the lateral wall of four groups of columns 3.
Specifically, deep equality in the slot of first card slot 5 and the second card slot 7, the first baffle 6 and second baffle 8 height is equal.
Specifically, the top end surface of the construction plate 2 is provided with anti-skid chequer.
The high-speed rail station curtain wall overhauling scaffold, when in use, construction personnel enter construction plate 2 by climbing scaffold 1 Top, first baffle 6 is inserted into the first card slot 5 respectively, then second baffle 8 is inserted into the second card slot 7, is grasped this moment Make personnel by pressing down on every group of screw rod 91, then rotation hand wheel 11, cooperates compressed spring 93 under the action of positioning plate 92, until silk The bottom end of bar 91 is threadedly connected in the top internal thread hole 10 of first baffle 6 and second baffle 8, realize to first baffle 6 with The fixation of second baffle 8 prevents the tool of construction 2 upper end of plate storage from falling and causing the injury of pedestrian, easy to disassemble, is convenient for Assembling, it is time saving and energy saving to be worthy to be popularized.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (6)

1. a kind of high-speed rail station curtain wall overhauling scaffold, including scaffold (1), it is characterised in that: the top of the scaffold (1) is solid Surely it is connected with construction plate (2), the top corner of construction plate (2) is symmetrically fixedly connected with four groups of columns (3), and four groups vertical Four groups of hand rods (4) are fixedly connected between column (3) adjacent outer wall, the top side of construction plate (2) symmetrically offers Two group of first card slot (5), and be provided with first baffle (6) in two group of first card slot (5), the top of construction plate (2) is another Side symmetrically offers two group of second card slot (7), and is provided with second baffle (8) in two group of second card slot (7), described hand steered The bottom end of bar (4) is fixedly connected with positioning housing (9), and the positioning housing (9) is internally provided with screw rod (91), and screw rod (91) run through positioning plate (92) in positioning housing (9), be cased with spring (93) on the outside of the screw rod (91).
2. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: the top of the screw rod (91) End sequentially passes through positioning housing (9) and hand rod (4), and the top for extending to hand rod (4) is fixedly connected with handwheel (11).
3. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: the bottom of the screw rod (91) Positioning housing (9) are run through at end, and extend to the Basolateral of positioning housing (9), the first baffle (6) and second baffle (8) Top offer internal thread hole (10), and the bottom end of screw rod (91) is threadedly connected to the inside of internal thread hole (10).
4. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: the hand rod (4) Surface is fixedly connected to non-slip rubber set, and the both side ends of hand rod (4) are welded with the lateral wall of four groups of columns (3).
5. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: first card slot (5) With deep equality in the slot of the second card slot (7), the first baffle (6) is equal with the height of second baffle (8).
6. a kind of high-speed rail station curtain wall overhauling scaffold according to claim 1, it is characterised in that: construction plate (2) Top end surface is provided with anti-skid chequer.
CN201821837646.5U 2018-11-08 2018-11-08 A kind of high-speed rail station curtain wall overhauling scaffold Expired - Fee Related CN209468979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821837646.5U CN209468979U (en) 2018-11-08 2018-11-08 A kind of high-speed rail station curtain wall overhauling scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821837646.5U CN209468979U (en) 2018-11-08 2018-11-08 A kind of high-speed rail station curtain wall overhauling scaffold

Publications (1)

Publication Number Publication Date
CN209468979U true CN209468979U (en) 2019-10-08

Family

ID=68088520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821837646.5U Expired - Fee Related CN209468979U (en) 2018-11-08 2018-11-08 A kind of high-speed rail station curtain wall overhauling scaffold

Country Status (1)

Country Link
CN (1) CN209468979U (en)

Similar Documents

Publication Publication Date Title
CN207524927U (en) A kind of lifting device for building
CN107514128A (en) A kind of architectural engineering scaffold
CN206859620U (en) A kind of good removable scaffold for building of security
CN209468979U (en) A kind of high-speed rail station curtain wall overhauling scaffold
CN206784896U (en) A kind of high-lift operation hanging cradle with aluminium sheet soldering
CN206888490U (en) A kind of construction scaffold
CN207144427U (en) A kind of construction Anti-dropping rack
CN206359210U (en) A kind of processing of steel construction is with stablizing lowering or hoisting gear
CN209429487U (en) A kind of scaffold of architectural engineering
CN209040530U (en) A kind of construction operation hanging cage
CN203938973U (en) Column
CN202953755U (en) Novel anti-climbing safety device for tower crane
CN206971679U (en) A kind of safe anti-falling scaffold
CN207538481U (en) A kind of floor height changeable type input and output material platform
CN205396963U (en) Base is put things in good order to whole steel pipe on scaffold
CN110899391A (en) Steel pipe aligning device is used in construction scaffolding processing
CN206752996U (en) One kind building adjustable scaffold
CN201923647U (en) Pipe kicking device of oil-field derrick pipe conveying machine
CN205976389U (en) Hanger rod installation tool
CN218061333U (en) Fastener type scaffold with moving function
CN210508324U (en) Oil tank inner wall construction hanging flower basket
CN212224577U (en) Anti-falling device for building construction
CN214615326U (en) Scaffold for building engineering construction
CN204940119U (en) Bridge rhombus false work
CN210460069U (en) Personnel up-and-down passage structure for road engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191008

CF01 Termination of patent right due to non-payment of annual fee