CN205396963U - Base is put things in good order to whole steel pipe on scaffold - Google Patents
Base is put things in good order to whole steel pipe on scaffold Download PDFInfo
- Publication number
- CN205396963U CN205396963U CN201620127494.4U CN201620127494U CN205396963U CN 205396963 U CN205396963 U CN 205396963U CN 201620127494 U CN201620127494 U CN 201620127494U CN 205396963 U CN205396963 U CN 205396963U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- base
- good order
- scaffold
- support arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model discloses a base is put things in good order to whole steel pipe on scaffold, including the base crossbeam, base crossbeam both ends are equipped with left side stand, the right side stand of vertical setting respectively, are equipped with the support arm on the base crossbeam up end, and support arm outer wall and bottom are fixed in the opposite face and the base crossbeam upper end facial features of left side stand, right side stand respectively, have offered on the support arm and have put things in good order the groove, put things in good order the groove and are greater than the bottom width for trapezoidal open slot, the open end width of trapezoidal open slot. The utility model discloses structural design is novel, through with uses of mutually supporting of whole steel pipe sign indicating number mount, carry out layer and put, steel pipe quantity realization standardization is put things in good order in can convenient and fast put things in good order scaffold steel pipe, is convenient for make statistics of.
Description
Technical field:
This utility model relates to scaffolding steel pipe and piles up, and particularly relates to a kind of scaffold one integral piece steel pipe and piles up base.
Background technology:
Scaffold refers to that job site is operative and solves vertically and horizontally to transport the various supports set up.The generic term on building circle, refers to be used in the higher place that cannot directly construct of exterior wall, inside fitting or floor height on construction site.Mainly for the upper and lower operation of workmen or perimeter security net are gone along with sb. to guard him and high-altitude installation component etc..
Traditional operating type is that steel pipe is piled up scattered for a lot of steel pipes together according to the size of the same specification one by one, highly generally not can exceed that the chest of normal person, during outbound, the use of one one is artificial by these steel pipe entrucking outbounds, inefficiency, being not easy to carry out digital standard, statistics is inconvenience quite, typically requires design and pile up fixed mount and pile up base in the process of piling up, pile up the appropriate design of base, it is achieved the premise of statistics is piled up in standardization.
Utility model content:
In order to make up prior art problem, the purpose of this utility model is to provide a kind of scaffold one integral piece steel pipe and piles up base, conveniently to be piled up by scaffolding steel pipe, piles up steel pipe quantity and realizes standardization, it is simple to add up.
The technical solution of the utility model is as follows:
Base piled up by scaffold one integral piece steel pipe, it is characterized in that, including base crossbeam, base crossbeam is respectively arranged at two ends with longitudinally disposed left side column, right side uprights, base crossbeam upper surface is provided with support arm, support arm outer wall and bottom and fixes respectively at left side column, the opposite face of right side uprights and base crossbeam upper surface, support arm offers and piles up groove, piling up groove is trapezoid-shaped openings groove, and the open end width of trapezoid-shaped openings groove is more than bottom width.
Base piled up by described scaffold one integral piece steel pipe, it is characterised in that the turning outer cladding of described base crossbeam and left side column, right side uprights connection is provided with stable foot.
The utility model has the advantages that:
This utility model novel in structural design, by being used in conjunction with each other with one integral piece steel pipe code fixed mount, carries out layer and puts, it is possible to conveniently piled up by scaffolding steel pipe, pile up steel pipe quantity and realize standardization, it is simple to add up.
Accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention:
Referring to accompanying drawing:
Base piled up by scaffold one integral piece steel pipe, including base crossbeam 1, base crossbeam is respectively arranged at two ends with longitudinally disposed left side column 2, right side uprights 3, base crossbeam 1 upper surface is provided with support arm 4, support arm 4 outer wall and bottom fix respectively at left side column 2, the opposite face of right side uprights 3 and base crossbeam 1 upper surface, offering on support arm 4 and pile up groove 5, pile up groove 5 for trapezoid-shaped openings groove, the open end width of trapezoid-shaped openings groove is more than bottom width.
The turning outer cladding of base crossbeam 1 and left side column 2, right side uprights 3 connection is provided with stable foot 6, it is possible to improve the structural strength of connecting portion, it is ensured that coordinate stability when carrying out piling up steel pipe with steel pipe stand for piling up.
This utility model matches with one integral piece steel pipe stand for piling up, after a piece steel pipe is piled up according to the carrying out that the shape of code frame is orderly, base bottoming piled up by next layer steel pipe low, in layer upwards pile up with this utility model again, pile up the number of plies to determine according to site condition and stock's steel pipe quantity, during entrucking can entrucking outbound piecemeal, one steel pipe quantity of code frame is 91, identical with steel pipe quantity when dispatching from the factory, code frame is mainly used for upwards piling up more than one piece steel pipe piecemeal.
Claims (2)
1. base piled up by a scaffold one integral piece steel pipe, it is characterized in that, including base crossbeam, base crossbeam is respectively arranged at two ends with longitudinally disposed left side column, right side uprights, base crossbeam upper surface is provided with support arm, support arm outer wall and bottom and fixes respectively at left side column, the opposite face of right side uprights and base crossbeam upper surface, support arm offers and piles up groove, piling up groove is trapezoid-shaped openings groove, and the open end width of trapezoid-shaped openings groove is more than bottom width.
2. base piled up by scaffold one integral piece steel pipe according to claim 1, it is characterised in that the turning outer cladding of described base crossbeam and left side column, right side uprights connection is provided with stable foot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620127494.4U CN205396963U (en) | 2016-02-17 | 2016-02-17 | Base is put things in good order to whole steel pipe on scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620127494.4U CN205396963U (en) | 2016-02-17 | 2016-02-17 | Base is put things in good order to whole steel pipe on scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205396963U true CN205396963U (en) | 2016-07-27 |
Family
ID=56448757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620127494.4U Expired - Fee Related CN205396963U (en) | 2016-02-17 | 2016-02-17 | Base is put things in good order to whole steel pipe on scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205396963U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110356750A (en) * | 2019-07-11 | 2019-10-22 | 上海外高桥造船有限公司 | The device for pilling of pile legs of self-elevating drilling platform main shipboard tube |
-
2016
- 2016-02-17 CN CN201620127494.4U patent/CN205396963U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110356750A (en) * | 2019-07-11 | 2019-10-22 | 上海外高桥造船有限公司 | The device for pilling of pile legs of self-elevating drilling platform main shipboard tube |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205396963U (en) | Base is put things in good order to whole steel pipe on scaffold | |
CN111851982A (en) | Scaffold frame liftable prevents weighing down safety device | |
CN209011528U (en) | A kind of all steel attachment type raise scaffold | |
CN206957175U (en) | A kind of planar dimension and adjustable for height operating platform | |
CN205396962U (en) | Whole scaffold steel pipe puts things in good order frame | |
CN210763910U (en) | Auxiliary force application structure for hoisting steel structure | |
CN203795845U (en) | Portable support for hoisting form board for pipeline blocking | |
CN207749810U (en) | A kind of Novel moveable scaffold | |
CN202848868U (en) | Hanger hanging tool | |
CN207392720U (en) | A kind of architectural engineering scaffold bracing means | |
CN106917498A (en) | A kind of Portable scaffold | |
CN207228603U (en) | One kind is used for interior decoration scaffold | |
CN204531394U (en) | Steel bar truss floor support plate suspension type support system | |
CN204002511U (en) | A kind of three-dimensional arrangement ladder | |
CN204255360U (en) | A kind of wrap attachment | |
CN204645579U (en) | A kind of suspension bracket building use | |
CN205259558U (en) | Novel scaffold for fitment | |
CN215055177U (en) | Protection dress is built to irregular facade building scaffold | |
CN208763582U (en) | A kind of tripod being fixed on ladder | |
CN204163367U (en) | Cat ladder frame operating platform | |
CN214531787U (en) | Height-adjustable's scaffold frame | |
CN209040530U (en) | A kind of construction operation hanging cage | |
CN207686257U (en) | A kind of civil construction load-bearing hanger | |
CN216553728U (en) | Portable removes work platform | |
CN209276100U (en) | A kind of forklift hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160727 Termination date: 20180217 |
|
CF01 | Termination of patent right due to non-payment of annual fee |