CN204940119U - Bridge rhombus false work - Google Patents

Bridge rhombus false work Download PDF

Info

Publication number
CN204940119U
CN204940119U CN201520471942.8U CN201520471942U CN204940119U CN 204940119 U CN204940119 U CN 204940119U CN 201520471942 U CN201520471942 U CN 201520471942U CN 204940119 U CN204940119 U CN 204940119U
Authority
CN
China
Prior art keywords
reinforced sheet
connecting box
side plate
connecting rod
stiffener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520471942.8U
Other languages
Chinese (zh)
Inventor
金海亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520933948.2U priority Critical patent/CN205171384U/en
Priority to CN201520471942.8U priority patent/CN204940119U/en
Priority to CN201520935795.5U priority patent/CN205171385U/en
Application granted granted Critical
Publication of CN204940119U publication Critical patent/CN204940119U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge rhombus false work, comprise connecting box, connecting rod, described connecting box comprises the first connecting box, second connecting box, 3rd connecting box and the 4th connecting box, described connecting rod comprises head rod, second connecting rod, 3rd connecting rod, 4th connecting rod and the 5th connecting rod, described head rod two end is located on the first connecting box and the 4th connecting box respectively, the second described connecting rod two end is located on the first connecting box and the second connecting box respectively, the 3rd described connecting rod two end is located on the first connecting box and the 3rd connecting box respectively, the 4th described connecting rod two end is located on the 3rd connecting box and the 4th connecting box respectively, the 5th described connecting rod two end is located on the second connecting box and the 3rd connecting box respectively.

Description

Bridge rhombus false work
Technical field
The utility model relates to a kind of bridge rhombus false work, specifically a kind of main truss cradle bridge rhombus false work for bridge construction.
Technical background
The main truss cradle of bridge construction is formed by bridge rhombus false work connecting box and connect box connecting rod, but some bridges rhombus false work connecting box at present on existing market, design unreasonable, after connecting each parts of main truss cradle, to re-use if disassembled, its connecting hole (through hole) can destroy, and bridge rhombus false work connecting box mostly is a steel body structure, Heavy Weight, cost is high, time fixing, multiple workman is wanted to lift, assembling is inconvenient, and when installing main truss cradle, all in high-altitude, the parts of Heavy Weight, cause the workman of installation abnormally dangerous, fall down because of carelessness, considerable safety thing will be caused.
Summary of the invention
The utility model provides a kind of bridge rhombus false work.
The purpose of this utility model solves some the bridge rhombus false works on existing market, design unreasonable, after connecting each parts of main truss cradle, will from new utilization if disassembled, its connecting hole (through hole) can destroy, and bridge rhombus false work connecting box mostly is a steel body structure, Heavy Weight, cost is high, time fixing, multiple workman is wanted to lift, assembling is inconvenient, and when installing main truss cradle, all in high-altitude, the parts of Heavy Weight, cause the workman of installation abnormally dangerous, fall down because of carelessness, the problem of serious accident will be caused.
The utility model solves the technical scheme that its technical problem adopts: the utility model comprises connecting box, connecting rod, described connecting box comprises the first connecting box, second connecting box, 3rd connecting box and the 4th connecting box, described connecting rod comprises head rod, second connecting rod, 3rd connecting rod, 4th connecting rod and the 5th connecting rod, described head rod two end is located on the first connecting box and the 4th connecting box respectively, the second described connecting rod two end is located on the first connecting box and the second connecting box respectively, the 3rd described connecting rod two end is located on the first connecting box and the 3rd connecting box respectively, the 4th described connecting rod two end is located on the 3rd connecting box and the 4th connecting box respectively, the 5th described connecting rod two end is located on the second connecting box and the 3rd connecting box respectively, and described the second described connecting box comprises side plate, top board, stiffener, reinforced sheet and dividing plate, described side plate comprises the first side plate and the second side plate, and described stiffener comprises the first stiffener and the second stiffener, and the first described side plate and the second side plate are located on dividing plate dual side-edge outside, the first described stiffener, second stiffener is located at the lower partition respectively, and described reinforced sheet comprises the first reinforced sheet, second reinforced sheet, 3rd reinforced sheet, 4th reinforced sheet, 5th reinforced sheet, 6th reinforced sheet and the 7th reinforced sheet, the first described reinforced sheet, it is outside that second reinforced sheet and the 3rd reinforced sheet are located at the first side plate respectively, the 4th described reinforced sheet, it is outside that 5th reinforced sheet and the 6th reinforced sheet are located at the second side plate respectively, and the 7th described reinforced sheet is located on the side of the first stiffener, and described top board is located at the first side plate and the second side plate top.
The first described side plate is identical with the second lateral plate structure, the first angle of chamfer is respectively equipped with at the first described side plate and the second side plate upper left-hand, the first described side plate lower left side is provided with the second angle of chamfer, and the first described angle of chamfer and the second angle of chamfer form a bull's-nose.
The first described reinforced sheet, the second reinforced sheet, the 3rd reinforced sheet, the 4th reinforced sheet, the 5th reinforced sheet, the 6th reinforced sheet and the 7th reinforced sheet are respectively equipped with a through hole, and the first side plate, second side plate of its correspondence position are provided with the corresponding through hole be communicated with the first stiffener.
The beneficial effects of the utility model are: the utility model reasonable in design, and be particularly suitable for the connection of each parts of bridge hanging basket main truss, recycling rate of waterused is high.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is the structural representation of the utility model second connecting box.
Fig. 3 is the A-A structural representation of Fig. 2.
Fig. 4 is the B-B structural representation of Fig. 2.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated:
As shown in the figure, the utility model comprises connecting box, connecting rod, described connecting box comprises the first connecting box 211, second connecting box 212, 3rd connecting box 213 and the 4th connecting box 214, described connecting rod comprises head rod 311, second connecting rod 312, 3rd connecting rod 313, 4th connecting rod 314 and the 5th connecting rod 315, described head rod 311 2 end is located on the first connecting box 211 and the 4th connecting box 214 respectively, the second described connecting rod 312 2 end is located on the first connecting box 211 and the second connecting box 212 respectively, the 3rd described connecting rod 313 2 end is located on the first connecting box 211 and the 3rd connecting box 213 respectively, the 4th described connecting rod 314 2 end is located on the 3rd connecting box 213 and the 4th connecting box 214 respectively, the 5th described connecting rod 315 2 end is located on the second connecting box 212 and the 3rd connecting box 213 respectively, described second connects 212 boxes comprises side plate, top board 2, stiffener, reinforced sheet and dividing plate 5, described side plate comprises the first side plate 1 and the second side plate 13, described stiffener comprises the first stiffener 8 and the second stiffener 6, the first described side plate 1 and the second side plate 13 are located on dividing plate 5 dual side-edge outside, the first described stiffener 8, dividing plate 5 bottom is located at respectively by second stiffener 6, described reinforced sheet comprises the first reinforced sheet 9, second reinforced sheet 3, 3rd reinforced sheet 4, 4th reinforced sheet 14, 5th reinforced sheet 10, 6th reinforced sheet 12 and the 7th reinforced sheet 7, the first described reinforced sheet 9, second reinforced sheet 3 and the 3rd is strengthened 4 and is located at the first side plate 1 outside respectively, the 4th described reinforced sheet 14, it is outside that 5th reinforced sheet 10 and the 6th reinforced sheet 12 are located at the second side plate 13 respectively, the 7th described reinforced sheet 7 is located on the side of the first stiffener 8, the first side plate 1 and the second side plate 13 top is located at by described top board 2.
The first described side plate 1 is identical with the second side plate 13 structure, the first angle of chamfer is respectively equipped with at the first described side plate and the second side plate upper left-hand, the first described side plate lower left side is provided with the second angle of chamfer, and the first described angle of chamfer and the second angle of chamfer form a bull's-nose.
Described the first reinforced sheet 9, second reinforced sheet 3, the 3rd reinforced sheet 4, the 4th reinforced sheet 14, the 5th reinforced sheet 10, the 6th reinforced sheet 12 and the 7th reinforced sheet 7 are respectively equipped with a through hole 11, and the first side plate, second side plate of its correspondence position are provided with the corresponding through hole 11 be communicated with the first stiffener.
The utility model second connecting box 212 mode of occupation is: the first side plate, the second side plate inside division are become upper and lower two parts by dividing plate 5, form upper plenum and lower cavity, lower cavity is divided into three, left, center, right cavity by the first stiffener 8 and the second stiffener 6, described upper cavity is used for for fixing the 5th connecting rod 315, and the left side cavity of described bottom is used for fixing the second connecting rod 312.

Claims (3)

1. a bridge rhombus false work, is characterized in that comprising connecting box, connecting rod, described connecting box comprises the first connecting box, second connecting box, 3rd connecting box and the 4th connecting box, described connecting rod comprises head rod, second connecting rod, 3rd connecting rod, 4th connecting rod and the 5th connecting rod, described head rod two end is located on the first connecting box and the 4th connecting box respectively, the second described connecting rod two end is located on the first connecting box and the second connecting box respectively, the 3rd described connecting rod two end is located on the first connecting box and the 3rd connecting box respectively, the 4th described connecting rod two end is located on the 3rd connecting box and the 4th connecting box respectively, the 5th described connecting rod two end is located on the second connecting box and the 3rd connecting box respectively, and the second described connecting box comprises side plate, top board, stiffener, reinforced sheet and dividing plate, described side plate comprises the first side plate and the second side plate, and described stiffener comprises the first stiffener and the second stiffener, and the first described side plate and the second side plate are located on dividing plate dual side-edge outside, the first described stiffener, second stiffener is located at the lower partition respectively, and described reinforced sheet comprises the first reinforced sheet, second reinforced sheet, 3rd reinforced sheet, 4th reinforced sheet, 5th reinforced sheet, 6th reinforced sheet and the 7th reinforced sheet, the first described reinforced sheet, it is outside that second reinforced sheet and the 3rd reinforced sheet are located at the first side plate respectively, the 4th described reinforced sheet, it is outside that 5th reinforced sheet and the 6th reinforced sheet are located at the second side plate respectively, and the 7th described reinforced sheet is located on the side of the first stiffener, and described top board is located at the first side plate and the second side plate top.
2. bridge rhombus false work according to claim 1, it is characterized in that the first described side plate is identical with the second lateral plate structure, the first angle of chamfer is respectively equipped with at the first described side plate and the second side plate upper left-hand, the first described side plate lower left side is provided with the second angle of chamfer, and the first described angle of chamfer and the second angle of chamfer form a bull's-nose.
3. bridge rhombus false work according to claim 1, it is characterized in that the first described reinforced sheet, the second reinforced sheet, the 3rd reinforced sheet, the 4th reinforced sheet, the 5th reinforced sheet, the 6th reinforced sheet and the 7th reinforced sheet are respectively equipped with a through hole, the first side plate, second side plate of its correspondence position are provided with the corresponding through hole be communicated with the first stiffener.
CN201520471942.8U 2015-07-03 2015-07-03 Bridge rhombus false work Expired - Fee Related CN204940119U (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201520933948.2U CN205171384U (en) 2015-07-03 2015-07-03 Novel rhombus false work for bridge
CN201520471942.8U CN204940119U (en) 2015-07-03 2015-07-03 Bridge rhombus false work
CN201520935795.5U CN205171385U (en) 2015-07-03 2015-07-03 Rhombus false work for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520471942.8U CN204940119U (en) 2015-07-03 2015-07-03 Bridge rhombus false work

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201520933948.2U Division CN205171384U (en) 2015-07-03 2015-07-03 Novel rhombus false work for bridge
CN201520935795.5U Division CN205171385U (en) 2015-07-03 2015-07-03 Rhombus false work for bridge

Publications (1)

Publication Number Publication Date
CN204940119U true CN204940119U (en) 2016-01-06

Family

ID=55007561

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201520471942.8U Expired - Fee Related CN204940119U (en) 2015-07-03 2015-07-03 Bridge rhombus false work
CN201520933948.2U Expired - Fee Related CN205171384U (en) 2015-07-03 2015-07-03 Novel rhombus false work for bridge
CN201520935795.5U Expired - Fee Related CN205171385U (en) 2015-07-03 2015-07-03 Rhombus false work for bridge

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201520933948.2U Expired - Fee Related CN205171384U (en) 2015-07-03 2015-07-03 Novel rhombus false work for bridge
CN201520935795.5U Expired - Fee Related CN205171385U (en) 2015-07-03 2015-07-03 Rhombus false work for bridge

Country Status (1)

Country Link
CN (3) CN204940119U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040593A (en) * 2015-07-03 2015-11-11 金少平 Rhombus-shaped building frame for bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040593A (en) * 2015-07-03 2015-11-11 金少平 Rhombus-shaped building frame for bridge

Also Published As

Publication number Publication date
CN205171384U (en) 2016-04-20
CN205171385U (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN104088227A (en) Rear pull rod
CN104099877A (en) Connecting bar
CN204940119U (en) Bridge rhombus false work
CN204780619U (en) Rhombus connecting box for false work for bridge
CN204780621U (en) Rhombus false work
CN204875557U (en) Rhombus false work
CN204780620U (en) Rhombus is connecting box for false work
CN204753401U (en) Rhombus is connecting box for false work
CN204780637U (en) Novel rhombus false work
CN203938974U (en) Back stay
CN204780636U (en) Novel rhombus false work
CN203938973U (en) Column
CN104947595A (en) Connection box for rhombic building frame for bridge
CN105040593A (en) Rhombus-shaped building frame for bridge
CN204311352U (en) A kind of connection suspension bracket
CN204311356U (en) Connecting rod
CN204311353U (en) A kind of connecting rod
CN204311354U (en) Hanger box
CN203938975U (en) A kind of connecting rod
CN204311355U (en) Connect suspension bracket
CN204311357U (en) A kind of connecting rod side plate
CN204059715U (en) The locking syndeton of channel cross connecting piece
CN204325925U (en) A kind of suspension bracket
CN204311361U (en) A kind of hanger device
CN104947596A (en) Rhombic building frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

Termination date: 20160703

CF01 Termination of patent right due to non-payment of annual fee