CN107514128A - A kind of architectural engineering scaffold - Google Patents

A kind of architectural engineering scaffold Download PDF

Info

Publication number
CN107514128A
CN107514128A CN201710827168.3A CN201710827168A CN107514128A CN 107514128 A CN107514128 A CN 107514128A CN 201710827168 A CN201710827168 A CN 201710827168A CN 107514128 A CN107514128 A CN 107514128A
Authority
CN
China
Prior art keywords
bar
bottom plate
fixedly connected
vertical bar
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710827168.3A
Other languages
Chinese (zh)
Other versions
CN107514128B (en
Inventor
潘晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huabang Construction Group Co., Ltd.
Original Assignee
Anhui Golden Wealth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Golden Wealth Construction Engineering Co Ltd filed Critical Anhui Golden Wealth Construction Engineering Co Ltd
Priority to CN201710827168.3A priority Critical patent/CN107514128B/en
Publication of CN107514128A publication Critical patent/CN107514128A/en
Application granted granted Critical
Publication of CN107514128B publication Critical patent/CN107514128B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels

Abstract

The invention discloses a kind of architectural engineering scaffold, including the first vertical bar, the top of first vertical bar and low side are connected with transverse bar by bolt thread, the one end of transverse bar away from the first vertical bar is connected with the second vertical bar by bolt thread, the bottom of first vertical bar and the second vertical bar has been fixedly connected with bottom plate, the bottom of bottom plate offers rotation slot, the both sides of rotation slot inwall are rotatably connected to rotating bar by bearing, the outer surface of rotating bar is arranged with support bar, and the present invention relates to technical field of building construction.The architectural engineering scaffold, the support bar for being provided with roller can be put down out of rotation slot, scaffold can be made to move on the ground, the fixed installation of scaffold is not interfered with not only, and greatly facilitate workmen's carrying or movable Scaffold, the extensive work time of workmen is saved, improves the operating efficiency of workmen, the work to workmen is highly beneficial.

Description

A kind of architectural engineering scaffold
Technical field
The present invention relates to technical field of building construction, specially a kind of architectural engineering scaffold.
Background technology
Scaffold refers to job site as operation and solves vertically and horizontally to transport the various supports set up.Architecture field Generic term, refer to and exterior wall, inside fitting or the higher place that can not directly construct of floor height be used on construction site, mainly for Workmen up and down go along with sb. to guard him and high-altitude installation component etc. by operation or perimeter security net, and scaffold making material generally has:Bamboo and wood, Steel pipe or synthetic material etc., some engineerings are also with scaffold when template use, in addition in advertising, municipal administration, traffic road and bridge, mine Also used extensively Deng department.
Current architectural engineering scaffold, it is the common scaffold of steel pipe or wood composition mostly, is applied installed in building Work is constructed in scene, however, such scaffold volume is larger, and it is very hard during carrying and movement, no Conveniently carrying or Mobile guardrail can be realized, the extensive work time of workmen is wasted, not only reduces construction The operating efficiency of personnel, the also work to workmen are very unfavorable.
The content of the invention
In view of the shortcomings of the prior art, the invention provides a kind of architectural engineering scaffold, solve scaffold and removing The problem of very hard during fortune and movement.
To realize object above, the present invention is achieved by the following technical programs:A kind of architectural engineering scaffold, bag The first vertical bar is included, the top of first vertical bar and low side are connected with transverse bar, the transverse bar by bolt thread One end away from the first vertical bar is connected with the second vertical bar by bolt thread, first vertical bar and the second vertical bar Bottom has been fixedly connected with bottom plate, and the bottom of the bottom plate offers rotation slot, and the both sides of the rotation slot inwall pass through axle Hold and be rotatably connected to rotating bar, the outer surface of the rotating bar is arranged with support bar, and bottom plate is run through simultaneously in the bottom of the support bar The bottom of bottom plate is extended to, one end that the support bar extends to bottom base plate is provided with roller, the both sides of the base plate interior The first clamping slot is offered, fix bar is fixedly connected between the both sides of the first clamping slot inwall, the fix bar Outer surface is arranged with pressing plate, and the side of the pressing plate is fixedly connected by buffer spring with the side of the first clamping slot inwall, and Buffer spring is circumferentially positioned at the outer surface of fix bar, and the opposite side of the pressing plate is fixedly connected with dop, and the dop is remote One end of pressing plate is through bottom plate and extends to the inside of rotation slot, and the front of the pressing plate is fixedly connected with guide rod, and is oriented to The one end of bar away from pressing plate is through bottom plate and extends to the outside of bottom plate, and the outer surface of the support bar both sides offers and blocked The first neck for being adapted of head, the second clamping slot, the second clamping slot inner cavity top are offered at the top of the floor cavities Both sides be fixedly connected with the first buffer head, the both sides of the second clamping slot inner cavity top, which pass through extrusion spring, to be fixed and connects T-shaped jacking block is connected to, and the both sides at the top of T-shaped jacking block are fixedly connected with the second buffer head being adapted with the first buffer head, institute The outer surface that extrusion spring is circumferentially positioned at the first buffer head and the second buffer head respectively is stated, the bottom of the T-shaped jacking block is run through Bottom plate and the inside for extending to rotation slot, the outer surface of the support bar top offer the second card being adapted with T-shaped jacking block Groove.
Preferably, the both sides of the bottom plate have been fixedly connected with mounting blocks, and screw thread installation is offered at the top of mounting blocks Hole.
Preferably, the front of the bottom plate offers the guide groove being adapted with guide rod, and the guide rod extends to bottom One end outside plate, which is fixedly connected with, stirs head.
Preferably, it is fixedly connected with cat ladder between first vertical bar and the second vertical bar.
Preferably, it is fixedly connected with the slide rail being adapted with pressing plate at the top and bottom of the first clamping slot inner chamber.
Beneficial effect
The invention provides a kind of architectural engineering scaffold.Possesses following beneficial effect:
1st, the present invention has been fixedly connected with bottom plate by the bottom of the first vertical bar and the second vertical bar, then passes through bottom plate Both sides have been fixedly connected with mounting blocks, and threaded mounting hole is offered at the top of mounting blocks, can be achieved to be fixed on ground by scaffold On face, when needing carrying or movable Scaffold, the fixed installation of scaffold is not interfered with not only so, and significantly facilitate Workmen carries or movable Scaffold, saves the extensive work time of workmen, improves the work of workmen Efficiency, the work to workmen are highly beneficial.
2nd, the present invention is by offering the first clamping slot and the second clamping slot in the inside of bottom plate respectively, then respectively by the Being used cooperatively for the associated components such as one garter spring, the second garter spring, pressing plate, push rod and T-shaped jacking block, has reached support bar The purpose of dual clamping is carried out, the stability of support bar is so enhanced well, avoids support bar and slid in rotation slot, Roller is seted to occur from situation about rolling on the ground, so as to ensure that scaffold normally carrying or mobile.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is base plate interior sectional view of the present invention;
Fig. 3 is A-A partial enlarged drawings of the present invention;
Fig. 4 is B-B partial enlarged drawings of the present invention;
Fig. 5 is C-C partial enlarged drawings of the present invention.
In figure:The vertical bars of 1- first, 2- transverse bars, the vertical bars of 3- second, 4- bottom plates, 5- rotation slots, 6- rotating bars, 7- branch Strut, 8- rollers, the clamping slots of 9- first, 10- fix bars, 11- pressing plates, 12- buffer springs, 13- dops, 14- guide rods, 15- First neck, the clamping slots of 16- second, the buffer heads of 17- first, 18- extrusion springs, 19-T types jacking block, the buffer heads of 20- second, 21- Second neck, 22- mounting blocks, 23- threaded mounting holes, 24- guide grooves, 25- stir head, 26- cat ladders, 27- slide rails.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Fig. 1-5 are referred to, the present invention provides a kind of technical scheme:A kind of architectural engineering scaffold, including first is vertical Bar 1, cat ladder 26 is fixedly connected between the first vertical bar 1 and the second vertical bar 3, the effect of cat ladder 26 is that convenient construction personnel climb Upper scaffold highest point carries out operation, and the top of the first vertical bar 1 and low side are connected with transverse bar 2 by bolt thread, horizontal Second vertical bar 3 is connected with by bolt thread to the one end of bar 2 away from the first vertical bar 1, the first vertical bar 1 and second is vertical The bottom of bar 3 has been fixedly connected with bottom plate 4, and the both sides of bottom plate 4 have been fixedly connected with mounting blocks 22, and the top of mounting blocks 22 is opened Provided with threaded mounting hole 23, the front of bottom plate 4 offers the guide groove 24 being adapted with guide rod 14, and the effect of guide groove 24 is It is easy to the movement of guide rod 14, the bottom of bottom plate 4 offers rotation slot 5, and the both sides of the inwall of rotation slot 5 are rotated by bearing to be connected Rotating bar 6 is connected to, the outer surface of rotating bar 6 is arranged with support bar 7, and the bottom of support bar 7 through bottom plate 4 and extends to bottom plate 4 Bottom, one end that support bar 7 extends to the bottom of bottom plate 4 is provided with roller 8, and the both sides inside bottom plate 4 offer the first card Tight groove 9, the slide rail 27 being adapted with pressing plate 11 is fixedly connected with the top and bottom of the inner chamber of the first clamping slot 9, slide rail 27 Effect is to facilitate pressing plate 11 to be horizontally slipped in the first clamping slot 9, is fixedly connected between the both sides of the inwall of the first clamping slot 9 Fixed pole 10, the outer surface of fix bar 10 are arranged with pressing plate 11, and the side of pressing plate 11 passes through in the clamping slot 9 of buffer spring 12 and first The side of wall is fixedly connected, and buffer spring 12 is circumferentially positioned at the outer surface of fix bar 10, and the opposite side of pressing plate 11, which is fixed, to be connected Dop 13 is connected to, the one end of dop 13 away from pressing plate 11 is through bottom plate 4 and extends to the inside of rotation slot 5, the front of pressing plate 11 Guide rod 14 is fixedly connected with, and the one end of guide rod 14 away from pressing plate 11 through bottom plate 4 and extends to the outside of bottom plate 4, leads The one end extended to bar 14 outside bottom plate 4, which is fixedly connected with, stirs first 25, and the effect for stirring first 25 is that convenient construction personnel dial Action-oriented bar 14, the outer surface of the both sides of support bar 7 offer the first neck 15 being adapted with dop 13, the inner chamber of bottom plate 4 Top offers the second clamping slot 16, and the both sides of the inner cavity top of the second clamping slot 16 have been fixedly connected with the first buffer head 17, the The both sides of the inner cavity top of two clamping slot 16 are fixedly connected with T-shaped jacking block 19 by extrusion spring 18, and the top of T-shaped jacking block 19 Both sides are fixedly connected with the second buffer head 20 being adapted with the first buffer head 17, and extrusion spring 18 is circumferentially positioned at respectively The outer surface of one buffer head 17 and the second buffer head 20, the bottom of T-shaped jacking block 19 through bottom plate 4 and extend to the interior of rotation slot 5 Portion, the outer surface at the top of support bar 7 offer the second neck 21 being adapted with T-shaped jacking block 19.
In use, workmen elder generation rotary supporting rod 7, untill support bar 7 is turned to perpendicular to the ground, now push rod 13 blocks Enter in the first neck 15, T-shaped jacking block 19 is caught in the second neck 21, then promotes scaffold, shifts scaffold onto specified location Afterwards, hold and stir first 25, first 25 will be stirred and stirred to the direction away from support bar 7, now can be by support bar 7 from rotation slot 5 Produce, fixing bolt is passed through threaded mounting hole 23, mounting blocks 22 are fixedly mounted on the ground, this completes this The whole installation process of architectural engineering scaffold.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions.By sentence " including one ... the key element limited, it is not excluded that Other identical element in the process including the key element, method, article or equipment also be present ".
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of architectural engineering scaffold, including the first vertical bar (1), it is characterised in that:The top of first vertical bar (1) End and low side are connected with transverse bar (2) by bolt thread, and the one end of the transverse bar (2) away from the first vertical bar (1) leads to Cross bolt thread and be connected with the second vertical bar (3), the fixed company in bottom of first vertical bar (1) and the second vertical bar (3) Bottom plate (4) is connected to, the bottom of the bottom plate (4) offers rotation slot (5), and the both sides of rotation slot (5) inwall pass through axle Hold and be rotatably connected to rotating bar (6), the outer surface of the rotating bar (6) is arranged with support bar (7), the bottom of the support bar (7) End is through bottom plate (4) and extends to the bottom of bottom plate (4), and one end that the support bar (7) extends to bottom plate (4) bottom is provided with Roller (8), the internal both sides of the bottom plate (4) offer the first clamping slot (9), and the two of the first clamping slot (9) inwall Fix bar (10) is fixedly connected between side, the outer surface of the fix bar (10) is arranged with pressing plate (11), the pressing plate (11) Side be fixedly connected by buffer spring (12) with the side of the first clamping slot (9) inwall, and buffer spring (12) is around setting Put and be fixedly connected with dop (13) in the outer surface of fix bar (10), the opposite side of the pressing plate (11), the dop (13) is remote One end of tripping plate (11) is through bottom plate (4) and extends to the inside of rotation slot (5), and the front of the pressing plate (11) is fixedly connected There is guide rod (14), and the one end of guide rod (14) away from pressing plate (11) through bottom plate (4) and extends to the outside of bottom plate (4), The outer surface of support bar (7) both sides offers the first neck (15) being adapted with dop (13), and the bottom plate (4) is interior The second clamping slot (16) is offered at the top of chamber, the both sides of the second clamping slot (16) inner cavity top have been fixedly connected with first Buffer head (17), the both sides of the second clamping slot (16) inner cavity top are fixedly connected with T-shaped top by extrusion spring (18) Block (19), and the both sides at the top of T-shaped jacking block (19) are fixedly connected with the second buffer head being adapted with the first buffer head (17) (20), the extrusion spring (18) is circumferentially positioned at the outer surface of the first buffer head (17) and the second buffer head (20), institute respectively The bottom of T-shaped jacking block (19) is stated through bottom plate (4) and extends to the inside of rotation slot (5), the appearance at the top of the support bar (7) Face offers the second neck (21) being adapted with T-shaped jacking block (19).
A kind of 2. architectural engineering scaffold according to claim 1, it is characterised in that:The both sides of the bottom plate (4) are equal Mounting blocks (22) are fixedly connected with, and threaded mounting hole (23) is offered at the top of mounting blocks (22).
A kind of 3. architectural engineering scaffold according to claim 1, it is characterised in that:Open in the front of the bottom plate (4) Provided with the guide groove (24) being adapted with guide rod (14), the guide rod (14) extends to the outside one end of bottom plate (4) and fixed It is connected with and stirs head (25).
A kind of 4. architectural engineering scaffold according to claim 1, it is characterised in that:First vertical bar (1) with Cat ladder (26) is fixedly connected between second vertical bar (3).
A kind of 5. architectural engineering scaffold according to claim 1, it is characterised in that:In first clamping slot (9) The slide rail (27) being adapted with pressing plate (11) is fixedly connected with the top and bottom of chamber.
CN201710827168.3A 2017-09-14 2017-09-14 Scaffold for building engineering Active CN107514128B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710827168.3A CN107514128B (en) 2017-09-14 2017-09-14 Scaffold for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710827168.3A CN107514128B (en) 2017-09-14 2017-09-14 Scaffold for building engineering

Publications (2)

Publication Number Publication Date
CN107514128A true CN107514128A (en) 2017-12-26
CN107514128B CN107514128B (en) 2020-04-10

Family

ID=60724088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710827168.3A Active CN107514128B (en) 2017-09-14 2017-09-14 Scaffold for building engineering

Country Status (1)

Country Link
CN (1) CN107514128B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939033A (en) * 2017-12-29 2018-04-20 杭州中艺生态环境工程有限公司 A kind of instrument mobile device for eco-embankment Landscape construction
CN108560908A (en) * 2018-01-26 2018-09-21 东莞市九豪投资有限公司 A kind of support device of early stripping formwork system
CN108680315A (en) * 2018-07-05 2018-10-19 襄阳群龙汽车部件股份有限公司 A kind of detection method of the detecting instrument of high-voltage wiring harness air-tightness
CN108678392A (en) * 2018-04-26 2018-10-19 高文杰 A kind of high-rise transport device
CN109056590A (en) * 2018-09-17 2018-12-21 孙江花 A kind of convenient operation type traffic guardrail
CN111702883A (en) * 2020-06-29 2020-09-25 郭玲艳 Production and processing technology of anti-theft door

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2265653A (en) * 1992-03-25 1993-10-06 British Broadcasting Corp Temporary structure
CN204571248U (en) * 2015-03-19 2015-08-19 温州市腾方园林建设有限公司 A kind of construction work portable scaffold
CN205400009U (en) * 2016-03-03 2016-07-27 陕西建工第四建设集团有限公司 Scaffold is convenient for remove by interior decoration

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2265653A (en) * 1992-03-25 1993-10-06 British Broadcasting Corp Temporary structure
CN204571248U (en) * 2015-03-19 2015-08-19 温州市腾方园林建设有限公司 A kind of construction work portable scaffold
CN205400009U (en) * 2016-03-03 2016-07-27 陕西建工第四建设集团有限公司 Scaffold is convenient for remove by interior decoration

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939033A (en) * 2017-12-29 2018-04-20 杭州中艺生态环境工程有限公司 A kind of instrument mobile device for eco-embankment Landscape construction
CN108560908A (en) * 2018-01-26 2018-09-21 东莞市九豪投资有限公司 A kind of support device of early stripping formwork system
CN108678392A (en) * 2018-04-26 2018-10-19 高文杰 A kind of high-rise transport device
CN108680315A (en) * 2018-07-05 2018-10-19 襄阳群龙汽车部件股份有限公司 A kind of detection method of the detecting instrument of high-voltage wiring harness air-tightness
CN109056590A (en) * 2018-09-17 2018-12-21 孙江花 A kind of convenient operation type traffic guardrail
CN111702883A (en) * 2020-06-29 2020-09-25 郭玲艳 Production and processing technology of anti-theft door

Also Published As

Publication number Publication date
CN107514128B (en) 2020-04-10

Similar Documents

Publication Publication Date Title
CN107514128A (en) A kind of architectural engineering scaffold
CN206859620U (en) A kind of good removable scaffold for building of security
CN206205308U (en) A kind of balcony guard rail
CN206888490U (en) A kind of construction scaffold
CN208072912U (en) A kind of Easy opened scaffold that construction site auxiliary is built
CN207685736U (en) A kind of town road guardrail convenient for assembly and disassembly
CN213062847U (en) Scaffold frame of highway construction usefulness
CN213710269U (en) Prefabricated T roof beam construction operation platform
CN206873908U (en) A kind of insertion slot type self-locking scaffold
CN209429487U (en) A kind of scaffold of architectural engineering
CN210369827U (en) Scaffold for building external wall construction
CN208220153U (en) A kind of regulatable scaffold for building
CN208668899U (en) A kind of scaffold for building with fast construction function
CN206971143U (en) A kind of easy-to-mount municipal administration decoration guardrail
CN208267260U (en) A kind of architectural engineering adjustable protective fence
CN207017620U (en) A kind of constructing tunnel scaffold
CN207484936U (en) A kind of nacelle device of Landscape Lighting installation
CN207177251U (en) A kind of Portable scaffold for architectural engineering
CN206693066U (en) One kind, which builds a bridge, safeguards scaffold
CN217680370U (en) Scaffold frame convenient to adjust for building engineering
CN209468979U (en) A kind of high-speed rail station curtain wall overhauling scaffold
CN219261681U (en) Scaffold frame
CN206016232U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN214995730U (en) A remove handling frame for building engineering
CN208668825U (en) A kind of architectural engineering tool type stairs protection guardrail

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liu Qingyun

Inventor after: Zhuang Minglei

Inventor after: Pan Xiaoming

Inventor before: Pan Xiaoming

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200310

Address after: Yidu Street office Dong Zhang Cun 262500 Shandong city of Weifang province Qingzhou City

Applicant after: Shandong Huabang Construction Group Co., Ltd.

Address before: 230000 Jinxing Commercial City Phase II, 339 Shizhu Road, Hefei Economic and Technological Development Zone, Anhui Province, 2013

Applicant before: Anhui golden wealth Construction Engineering Co., Ltd.

GR01 Patent grant
GR01 Patent grant