CN213710269U - A prefabricated T beam construction operation platform - Google Patents

A prefabricated T beam construction operation platform Download PDF

Info

Publication number
CN213710269U
CN213710269U CN202022091314.0U CN202022091314U CN213710269U CN 213710269 U CN213710269 U CN 213710269U CN 202022091314 U CN202022091314 U CN 202022091314U CN 213710269 U CN213710269 U CN 213710269U
Authority
CN
China
Prior art keywords
block
groove
clamping
rectangular
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022091314.0U
Other languages
Chinese (zh)
Inventor
廉文斌
吕彦松
王红
郭苗苗
张立群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge South China Engineering Co Ltd
Priority to CN202022091314.0U priority Critical patent/CN213710269U/en
Application granted granted Critical
Publication of CN213710269U publication Critical patent/CN213710269U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

本实用新型提供一种预制T梁施工操作平台,涉及牵引支架技术领域,螺纹杆的表面螺纹连接有滑块,滑块的表面固定安装有卡块,卡块远离滑块的一端表面开设有插孔,矩形块的表面开设有卡槽,第一滑槽的内部滑动连接有活动块,活动块的表面固定安装有插杆,第一滑槽的内壁开设有通孔。本实用新型,通过设置固定装置,当需要更换或者拆卸立柱时,插孔和插杆分离导致卡块和卡槽失去固定,螺纹杆转动带动滑块在凹槽中向上滑动,直到卡块完全从卡槽的内部移出,这时立柱和平台板失去固定,达到了拆卸立柱的目的,解决了现有的施工操作平台,平台上的护栏与底板焊结为一体,当护栏损坏需要更换时,由于护栏焊结在底板上,拆卸困难浪费时间。

Figure 202022091314

The utility model provides a prefabricated T-beam construction operation platform, which relates to the technical field of traction brackets. A sliding block is threadedly connected to the surface of a threaded rod, a clamping block is fixedly installed on the surface of the sliding block, and a surface of one end of the clamping block away from the sliding block is provided with a socket. A slot is formed on the surface of the rectangular block, a movable block is slidably connected to the inside of the first chute, the surface of the movable block is fixedly installed with an insertion rod, and the inner wall of the first chute is provided with a through hole. In the utility model, by setting the fixing device, when the upright column needs to be replaced or disassembled, the separation of the jack and the insertion rod causes the clamping block and the clamping groove to lose their fixation, and the rotation of the threaded rod drives the slider to slide upward in the groove until the clamping block is completely removed from the groove. The interior of the card slot is removed, and the column and the platform plate are lost at this time, which achieves the purpose of dismantling the column and solves the problem of the existing construction operation platform. The guardrail on the platform is welded with the bottom plate. When the guardrail is damaged and needs to be replaced, due to The guardrail is welded to the base plate, and it is difficult and time-consuming to disassemble.

Figure 202022091314

Description

Prefabricated T roof beam construction operation platform
Technical Field
The utility model relates to a construction operation platform technical field especially relates to a prefabricated T roof beam construction operation platform.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, and construction workers must use an operation platform for construction when building a house.
And current construction operation platform, guardrail on the platform is as an organic whole with the bottom plate bonding, when the guardrail damages and need change, because the guardrail welds on the bottom plate, dismantles difficult waste time, finishes when the platform, can only abandon it, and then has caused the waste of resource.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the prefabricated T roof beam construction operation platform who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a prefabricated T-beam construction operation platform comprises a base and a fixing device, wherein four supporting rods are fixedly arranged on the surface of the base, the four supporting rods are symmetrically distributed on the surface of the base, a platform plate is fixedly arranged at one end, far away from the base, of each supporting rod, four stand columns are movably connected to the surface of the platform plate, every two stand columns are symmetrically distributed on the surface of the platform plate in a group, the fixing device is arranged on the surface of each stand column and comprises a groove, the groove is formed in the surface of each stand column, a threaded rod is rotatably connected inside the groove, a sliding block is in threaded connection with the surface of the threaded rod, a clamping block is fixedly arranged on the surface of the sliding block, a jack is formed in the surface of one end, far away from the groove, of the threaded rod, a rotating wheel is fixedly arranged at one end, far, four the rectangular block symmetric distribution is on the surface of landing slab, the draw-in groove has been seted up on the surface of rectangular block, the side fixed mounting of rectangular block has the extension board, first spout has been seted up on the surface of extension board, the inside sliding connection of first spout has the movable block, the fixed surface of movable block installs the inserted bar, the through-hole has been seted up to the inner wall of first spout.
Preferably, the first sliding groove is communicated with the clamping groove through a through hole, the sliding block is connected with the groove in a sliding mode through a threaded rod, and the clamping block is clamped with the sliding block and the clamping groove.
Preferably, the size of the inserted bar is matched with that of the through hole and the jack, and the inserted bar is inserted into the jack by means of the movable block.
Preferably, the side of the supporting rod is fixedly provided with a ladder stand, and a transverse plate is fixedly arranged between every two upright columns which are a group.
Preferably, the surface of diaphragm is equipped with auxiliary device, auxiliary device includes the rectangular channel, the surface at the diaphragm is seted up to the rectangular channel, the inside roll connection of rectangular channel has the gyro wheel, the fixed surface of gyro wheel installs U type piece, the inside hookup of U type piece has the hook, the one end fixed mounting who keeps away from U type piece of hook has the telescopic link, the one end fixed mounting that the hook was kept away from to the telescopic link has first clamp and second clamp, the port fixed mounting of first clamp has the fixed block, the threaded hole has been seted up on the surface of fixed block, the second spout has been seted up to the inner wall of second clamp, the surface of second clamp is inserted and is equipped with the bolt.
Preferably, first clamp and second clamp are rotated and are connected, the size of screw hole and the big or small looks adaptation of bolt, the second clamp is with the help of bolt and first clamp fixed connection.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. in the utility model, by arranging the fixing device, when the upright post needs to be replaced or disassembled, the slide block in the first chute is slid, the slide block slides to drive the inserted bar to move, the inserted bar moves to drive the inserted bar to separate from the jack, the jack and the inserted bar are separated to cause the fixture block and the clamping groove to lose fixation, when the fixture block and the clamping groove lose fixation, the rotating wheel is rotated, the rotating wheel rotates to drive the threaded rod to rotate, the threaded rod rotates to drive the slide block to slide upwards in the groove until the fixture block is completely moved out from the inside of the clamping groove, the rotating wheel stops rotating, at the moment, the upright post and the platform plate are not fixed, the aim of disassembling the upright post is achieved, the problem that the guardrail on the platform and the bottom plate are welded into a whole in the existing construction operation platform is solved, when the guardrail is damaged and needs to be replaced, because the guardrail welds on the bottom plate, dismantle the difficult waste time, when the platform finishes using, can only abandon it, and then caused the waste of resource.
2. In the utility model, by arranging the auxiliary device, when constructors need to carry out high-altitude operation, the constructors can tread on the platform plate through the ladder on the inner side of the support rod, the first clamp and the second clamp are clamped between the waists of the constructors, the first clamp is rotated, the fixed block can slide in the second chute according to the waistline of the constructors, when the fixed block slides to a proper position, the bolts are screwed down to fix the first clamp and the second clamp between the waists of the constructors, the telescopic rod is opened, the U-shaped plate is hooked by the hook on the telescopic rod, the roller can freely slide in the rectangular groove through the activity of the constructors, the operation of the constructors on the operation platform can not be restricted, the effects of convenient connection and fixation of the constructors and strong activity are achieved, the problem that the traditional construction operation platform can not flexibly protect the constructors during high-altitude operation is solved, the potential safety hazard exists.
Drawings
Fig. 1 is a schematic perspective view of the utility model providing a construction operation platform for prefabricated T-beam;
fig. 2 is a left side view structural schematic diagram of the prefabricated T-beam construction operation platform provided by the utility model;
fig. 3 is a schematic structural view of a point a in fig. 1 of the prefabricated T-beam construction operation platform provided by the utility model;
fig. 4 is a schematic structural view of a prefabricated T-beam construction operation platform shown at D in fig. 2;
fig. 5 is a schematic structural view of a portion B in fig. 1 of the prefabricated T-beam construction operation platform provided by the utility model;
fig. 6 is the utility model provides a structure schematic diagram of C department in prefabricated T roof beam construction operation platform figure 2.
Illustration of the drawings: 1. a base; 2. a support bar; 3. a platform plate; 4. climbing a ladder; 5. a fixing device; 501. a groove; 502. a threaded rod; 503. a slider; 504. a clamping block; 505. a jack; 506. a rotating wheel; 507. a rectangular block; 508. a card slot; 509. an extension plate; 510. a first chute; 511. a movable block; 512. inserting a rod; 513. A through hole; 6. an auxiliary device; 601. a rectangular groove; 602. a roller; 603. a U-shaped block; 604. a hook; 605. A telescopic rod; 606. a first clamp; 607. a second clamp; 608. a fixed block; 609. a threaded hole; 610. A second chute; 611. a bolt; 7. a column; 8. a transverse plate.
Detailed Description
In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the limitations of the specific embodiments of the present disclosure.
Embodiment 1, as shown in fig. 1-6, the utility model provides a prefabricated T roof beam construction operation platform, fixed surface including base 1 installs four bracing pieces 2, and 2 symmetric distributions of four bracing pieces are on base 1's surface, and the one end fixed mounting that base 1 was kept away from to bracing piece 2 has landing slab 3, and the side fixed mounting of bracing piece 2 has cat ladder 4, and landing slab 3's surface swing joint has four stands 7, and every two of four stands 7 are a set of symmetric distributions on landing slab 3's surface, and every two are fixed mounting between a set of stand 7 has diaphragm 8.
The specific arrangement and function of the fixing means 5 and the auxiliary means 6 will be described in detail below.
As shown in fig. 3 and 4, the device comprises a base 1 and a fixing device 5, the fixing device 5 is arranged on the surface of an upright post 7, the fixing device 5 comprises a groove 501, the groove 501 is arranged on the surface of the upright post 7, a threaded rod 502 is rotatably connected inside the groove 501, a sliding block 503 is in threaded connection with the surface of the threaded rod 502, a clamping block 504 is fixedly arranged on the surface of the sliding block 503, an insertion hole 505 is arranged on the surface of one end of the clamping block 504, which is far away from the sliding block 503, a rotating wheel 506 is fixedly arranged on one end of the threaded rod 502, which is far away from the groove 501, four rectangular blocks 507 are fixedly arranged on the surface of a platform plate 3, the four rectangular blocks 507 are symmetrically distributed on the surface of the platform plate 3, a clamping groove 508 is arranged on the surface of the rectangular block 507, an extension plate 509 is fixedly arranged on the side of the rectangular block 509, a, the fixture block 504 is clamped with the clamping groove 508 through the sliding block 503, the movable block 511 is connected inside the first sliding groove 510 in a sliding mode, the surface of the movable block 511 is fixedly provided with an insertion rod 512, the size of the insertion rod 512 is matched with that of the through hole 513, the size of the insertion hole 505 is matched with that of the through hole 513, the insertion rod 512 is inserted into the insertion hole 505 through the movable block 511, and the inner wall of the first sliding groove 510 is provided with the through hole 513.
The whole fixing device 5 achieves the effect that by arranging the fixing device 5, when the upright post 7 needs to be replaced or disassembled, the sliding block 503 in the first sliding groove 510 slides, the sliding block 503 slides to drive the inserted rod 512 to move, the inserted rod 512 moves to drive the inserted rod to separate from the inserted hole 505, the inserted hole 505 separates from the inserted rod 512 to cause the clamping block 504 and the clamping groove 508 to lose fixation, when the clamping block 504 and the clamping groove 508 lose fixation, the rotating wheel 506 rotates to drive the threaded rod 502 to rotate, the threaded rod 502 rotates to drive the sliding block 503 to upwards slide in the groove 501 until the clamping block 504 completely moves out of the clamping groove 508, the rotating wheel 506 stops rotating, at the moment, the upright post 7 and the flat plate 3 lose fixation, the purpose of disassembling the upright post 7 is achieved, the problem that the existing construction operation platform is solved, the guard rail on the platform is welded with the bottom plate into a whole, when the guard rail is damaged and needs, the disassembly is difficult and the time is wasted, and when the platform is used, the platform can only be discarded, thereby causing the waste of resources.
As shown in fig. 5 and 6, the surface of the transverse plate 8 is provided with the auxiliary device 6, the auxiliary device 6 includes a rectangular groove 601, the rectangular groove 601 is formed in the surface of the transverse plate 8, a roller 602 is connected to the inside of the rectangular groove 601 in a rolling manner, a U-shaped block 603 is fixedly installed on the surface of the roller 602, a hook 604 is hooked inside the U-shaped block 603, an expansion link 605 is fixedly installed at one end of the hook 604, which is far away from the U-shaped block 603, a first clamp 606 and a second clamp 607 are fixedly installed at one end of the expansion link 605, which is far away from the hook 604, the first clamp 606 and the second clamp 607 are rotatably connected, the size of the threaded hole 609 is matched with the size of the bolt 611, the second clamp 607 is fixedly connected with the first clamp 606 through the bolt 611, a fixed block 608 is fixedly installed at a port of the first clamp 606, a threaded hole 609 is formed in the surface of the fixed block 608, a second sliding.
The whole auxiliary device 6 has the effects that by arranging the auxiliary device 6, when a constructor needs to carry out high-altitude operation, the constructor treads on the upper platform plate 3 through the ladder stand 4 on the inner side of the support rod 2, clamps the first clamp 606 and the second clamp 607 at the waist of the constructor, rotates the first clamp 606, enables the fixed block 608 to slide in the second chute 610 according to the waist of the constructor, screws the bolt 611 to fix the first clamp 606 and the second clamp 607 at the waist of the constructor when the constructor slides to a proper position, opens the telescopic rod 605 to enable the hook 604 on the telescopic rod 605 to hook the U-shaped plate, enables the roller 602 to freely slide in the rectangular chute 601 through the movement of the constructor, cannot restrict the work of the constructor on the operation platform, achieves the effects of facilitating the connection and fixation of the constructor and strong mobility, the problem of traditional construction operation platform can not carry out nimble protection to constructor when high altitude construction, have the potential safety hazard is solved.
The whole working principle is that by arranging the fixing device 5, when the upright post 7 needs to be replaced or disassembled, the sliding block 503 in the first sliding groove 510 slides, the sliding block 503 slides to drive the inserted rod 512 to move, the inserted rod 512 moves to drive the inserted rod to separate from the inserted hole 505, the inserted hole 505 separates from the inserted rod 512 to cause the fixture block 504 and the clamping groove 508 to lose fixation, when the fixture block 504 and the clamping groove 508 lose fixation, the rotating wheel 506 rotates to drive the threaded rod 502 to rotate, the threaded rod 502 rotates to drive the sliding block 503 to upwards slide in the groove 501 until the fixture block 504 completely moves out of the clamping groove 508, the rotating wheel 506 stops rotating, at this time, the upright post 7 and the flat table plate 3 lose fixation, the purpose of disassembling the upright post 7 is achieved, the problem that the existing construction operation platform is that the guardrail on the platform is welded with the bottom plate into a whole is solved, the disassembly is difficult and the time is wasted, when the platform is used, the platform can only be discarded, and the resource waste is further caused, by arranging the auxiliary device 6, when a constructor needs to carry out high-altitude operation, the constructor treads on the platform plate 3 through the ladder stand 4 at the inner side of the support rod 2, clamps the first clamp 606 and the second clamp 607 at the waist of the constructor, rotates the first clamp 606, enables the fixed block 608 to slide in the second chute 610 according to the waist of the constructor, when the first clamp slides to a proper position, screws the bolt 611 to fix the first clamp 606 and the second clamp 607 at the waist of the constructor, opens the telescopic rod 605, enables the hook 604 on the telescopic rod 605 to hook the U-shaped plate, enables the roller 602 to freely slide in the rectangular groove 601 through the movement of the constructor, can not restrict the work of the constructor on the operation platform, and can conveniently connect and fix the constructor, the high-mobility effect solves the problems that the traditional construction operation platform cannot flexibly protect constructors during high-altitude operation and has potential safety hazards.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in other forms, and any person skilled in the art may use the above-mentioned technical contents to change or modify the equivalent embodiment into equivalent changes and apply to other fields, but any simple modification, equivalent change and modification made to the above embodiments according to the technical matters of the present invention will still fall within the protection scope of the technical solution of the present invention.

Claims (6)

1. The utility model provides a prefabricated T roof beam construction operation platform, includes base (1) and fixing device (5), its characterized in that: the surface fixing of base (1) installs four bracing pieces (2), four bracing pieces (2) symmetric distribution is on the surface of base (1), the one end fixed mounting that base (1) was kept away from in bracing piece (2) has a landing slab (3), the surface swing joint of landing slab (3) has four stand (7), four every two of stand (7) are the surface of a set of symmetric distribution at landing slab (3), the surface of stand (7) is equipped with fixing device (5), fixing device (5) include recess (501), the surface at stand (7) is seted up in recess (501), the inside rotation of recess (501) is connected with threaded rod (502), the surface threaded connection of threaded rod (502) has slider (503), the surface fixing of slider (503) installs fixture block (504), fixture block (504) keep away from the one end surface of slider (503) and seted up jack (505), threaded rod (502) keep away from the one end fixed mounting of recess (501) and have runner (506), the fixed surface of landing slab (3) installs four rectangular blocks (507), four rectangular block (507) symmetric distribution is on the surface of landing slab (3), draw-in groove (508) have been seted up on the surface of rectangular block (507), the side fixed mounting of rectangular block (507) has extension board (509), first spout (510) have been seted up on the surface of extension board (509), the inside sliding connection of first spout (510) has movable block (511), the fixed surface of movable block (511) installs inserted bar (512), through-hole (513) have been seted up to the inner wall of first spout (510).
2. The precast T beam construction work platform of claim 1, wherein: the first sliding groove (510) is communicated with the clamping groove (508) through a through hole (513), the sliding block (503) is in sliding connection with the groove (501) through the threaded rod (502), and the clamping block (504) is clamped with the clamping groove (508) through the sliding block (503).
3. The precast T beam construction work platform of claim 1, wherein: the size of the inserted bar (512) is matched with that of the through hole (513) and the jack (505), and the inserted bar (512) is inserted into the jack (505) through the movable block (511).
4. The precast T beam construction work platform of claim 1, wherein: the side of the supporting rod (2) is fixedly provided with a ladder stand (4), and a transverse plate (8) is fixedly arranged between the upright posts (7).
5. The precast T beam construction work platform of claim 4, wherein: the surface of the transverse plate (8) is provided with an auxiliary device (6), the auxiliary device (6) comprises a rectangular groove (601), the rectangular groove (601) is formed in the surface of the transverse plate (8), a roller (602) is connected to the inside of the rectangular groove (601) in a rolling manner, a U-shaped block (603) is fixedly mounted on the surface of the roller (602), a hook (604) is hooked inside the U-shaped block (603), a telescopic rod (605) is fixedly mounted at one end, far away from the U-shaped block (603), of the hook (604), a first clamp (606) and a second clamp (607) are fixedly mounted at one end, far away from the hook (604), of the telescopic rod (605), a fixed block (608) is fixedly mounted at a port of the first clamp (608), a threaded hole (609) is formed in the surface of the fixed block (608), and a second sliding groove (610) is formed in the inner wall of the second, and a bolt (611) is inserted into the surface of the second clamping hoop (607).
6. The precast T beam construction work platform of claim 5, wherein: the first clamping hoop (606) is rotatably connected with the second clamping hoop (607), the size of the threaded hole (609) is matched with that of the bolt (611), and the second clamping hoop (607) is fixedly connected with the first clamping hoop (606) through the bolt (611).
CN202022091314.0U 2020-09-22 2020-09-22 A prefabricated T beam construction operation platform Active CN213710269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022091314.0U CN213710269U (en) 2020-09-22 2020-09-22 A prefabricated T beam construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022091314.0U CN213710269U (en) 2020-09-22 2020-09-22 A prefabricated T beam construction operation platform

Publications (1)

Publication Number Publication Date
CN213710269U true CN213710269U (en) 2021-07-16

Family

ID=76794299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022091314.0U Active CN213710269U (en) 2020-09-22 2020-09-22 A prefabricated T beam construction operation platform

Country Status (1)

Country Link
CN (1) CN213710269U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000690A (en) * 2021-11-17 2022-02-01 中铁一局集团有限公司 Side wall reinforcing bar construction support body operation platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114000690A (en) * 2021-11-17 2022-02-01 中铁一局集团有限公司 Side wall reinforcing bar construction support body operation platform

Similar Documents

Publication Publication Date Title
CN103422663B (en) Attached lift scaffold
CN119266514A (en) A mobile scaffolding anti-overturning device and anti-overturning method
CN219773544U (en) Scaffolding for construction projects
CN110700538A (en) Building scaffold convenient to dismouting
CN213626572U (en) Tool type external cantilever operation platform
CN110847589A (en) Scaffold with safety protection mechanism and building method
CN223003705U (en) Scaffold for construction of building pitched roof
CN206438747U (en) It is a kind of to store integral scaffold
CN111255221B (en) Supporting structure for erecting pipe fittings
CN210976538U (en) A foldable scaffold
CN218991655U (en) Tunnel supporting device
CN207079953U (en) Edge protection rail structure
CN213297069U (en) Scaffold for architectural decoration
CN213979829U (en) Scaffold frame capable of being rapidly disassembled and assembled and scaffold
CN210396108U (en) Supporting mechanism for quickly mounting and dismounting concrete formwork
CN213806693U (en) Edge protection structure is faced in assembly type building construction
CN218346731U (en) Scaffold frame that can quick detach
CN117344964A (en) A kind of cantilever floor bottom formwork support structure
CN213806482U (en) A combined scaffolding for a construction site
CN223256417U (en) Scaffold frame of building engineering quick installation
CN210177919U (en) Civil engineering building construction support
CN219654350U (en) High-altitude protection guardrail
CN216157001U (en) But reutilization and remove convenient architectural decoration guardrail
CN113982205B (en) A combined house canopy structure and its construction method
CN220486857U (en) Suspension type curtain wall plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant