CN207017620U - A kind of constructing tunnel scaffold - Google Patents

A kind of constructing tunnel scaffold Download PDF

Info

Publication number
CN207017620U
CN207017620U CN201720865960.3U CN201720865960U CN207017620U CN 207017620 U CN207017620 U CN 207017620U CN 201720865960 U CN201720865960 U CN 201720865960U CN 207017620 U CN207017620 U CN 207017620U
Authority
CN
China
Prior art keywords
riser
stop
scaffold
connecting rod
guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720865960.3U
Other languages
Chinese (zh)
Inventor
田薛冬
丁婧婧
田雪丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Asahi Base Scaffolding Co Ltd
Original Assignee
Yangzhou Asahi Base Scaffolding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Asahi Base Scaffolding Co Ltd filed Critical Yangzhou Asahi Base Scaffolding Co Ltd
Priority to CN201720865960.3U priority Critical patent/CN207017620U/en
Application granted granted Critical
Publication of CN207017620U publication Critical patent/CN207017620U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of constructing tunnel scaffold, including first stop riser, the both sides at the top of the first stop riser are provided with the first guardrail, the side of the first stop riser is provided with second station riser, the opposite side of the first stop riser is provided with middle vertical rod, the side of the middle vertical rod is provided with connecting rod by hinge pin, one end of the connecting rod is provided with sucker, the obliquely downward of the connecting rod is provided with fixed mount, and the bottom of the first stop riser and second station riser is mounted on arm support.The both ends of scaffold of the present utility model are provided with connecting rod, sucker is installed in one end of connecting rod, device can be carried out by it laterally fixed, and the side of the supporting leg in the bottom of scaffold is provided with support frame, can be to the longitudinally fixed of device by support frame, fixation is prepared by both, significantly increases the stability of the fixation of scaffold.

Description

A kind of constructing tunnel scaffold
Technical field
Scaffold field is the utility model is related to, specifically a kind of constructing tunnel scaffold.
Background technology
Scaffold refers to job site as operation and solves vertically and horizontally to transport the various supports set up.Architecture field Generic term, refer to and exterior wall, inside fitting or the higher place that can not directly construct of floor height be used on construction site.Mainly for Workmen works up and down or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc., is exactly plainly to build a framework, scaffold makes Material generally has:Bamboo and wood, steel pipe or synthetic material etc..Some engineerings also with scaffold when template use, in addition advertising, The departments such as municipal administration, traffic road and bridge, mine are also used extensively, constructing tunnel, are the abbreviations of new Austrian method for tunnel construction, it It is Austrian scholar in the practice of long campaigns constructing tunnel, the one kind proposed from the viewpoint of rock mechanics is reasonably applied Work method, be using spray anchor technology, monitoring measurement etc. and with a system that rock mechanics theory is formed and one kind for being formed is new Engineering construction method.
A kind of constructing tunnel greatly facilitates constructing tunnel with the appearance of scaffold, but the scaffold of current stage is present Many weak points, for example, fixed stability is poor, security protection performance is poor, in-convenience in use.
Utility model content
The purpose of this utility model is to provide a kind of constructing tunnel scaffold, to solve fixation of the prior art Stability is poor, and security protection performance is poor, inconvenient problem with use.
To achieve the above object, the utility model provides following technical scheme:A kind of constructing tunnel scaffold, including the One standing plate, the both sides at the top of the first stop riser are provided with the first guardrail, and the side of the first stop riser is provided with Second station riser, the guardrail of both sides second at the top of the second station riser, the lower section of the side of the second station riser and Supporting leg is mounted on below the side of one standing plate, the bottom of the supporting leg is provided with Universal self-locking wheel, the support The side of the opening position of the close bottom of leg is provided with support frame, and the opposite side of the first stop riser is provided with middle vertical rod, institute The side for stating middle vertical rod is provided with connecting rod by hinge pin, and one end of the connecting rod is provided with sucker, the connecting rod Obliquely downward is provided with fixed mount, and the bottom of the first stop riser and second station riser is mounted on arm support.
Preferably, the side of support frame as described above and supporting leg is rotatablely connected by hinge.
Preferably, the connecting rod is retractable structure.
Preferably, second guardrail is connected with the first guardrail by middle vertical rod.
Compared with prior art, the beneficial effects of the utility model are:The both ends of scaffold of the present utility model are provided with Connecting rod, sucker is installed in one end of connecting rod, device can be carried out laterally to fix by it, and in the bottom of scaffold The side of supporting leg support frame is installed, fixation can be prepared, greatly by both to the longitudinally fixed of device by support frame The stability of the big fixation for increasing scaffold, and first stop riser and second station riser are provided with scaffold, by the One standing plate and second station riser can make workmen be constructed at various height, convenient use, and be stood first The first guardrail and the second guardrail are separately installed with the outside of plate and second station riser, can be right by the first guardrail and the second guardrail First stop riser and second station riser are protected.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is side view of the present utility model.
In figure:The guardrails of 1- first, 2- first stops riser, 3- suckers, 4- connecting rods, 5- fixed mounts, 6- hinge pins, 7- supports Vertical rod in frame, 8- supporting legs, 9- Universal self-lockings wheel, 10- arm supports, the guardrails of 11- second, 12- second stations riser, 13-.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to Fig. 1~2, in the utility model embodiment, a kind of constructing tunnel scaffold, including first stop riser 2, The both sides at the top of first stop riser 2 are provided with the first guardrail 1, and first stop riser 2 and second station riser 12 are used for constructor Member is stood, and the side of first stop riser 2 is provided with second station riser 12, and the both sides second at the top of second station riser 12 are protected Column 11, the second guardrail 11 are used for protecting standing plate with the first guardrail 1, the lower section of the side of second station riser 12 and first Supporting leg 8 is mounted on below the side of standing plate 2, supporting leg 8 is used for being supported scaffold, the bottom of supporting leg 8 Universal self-locking wheel 9 is installed, Universal self-locking wheel 9 facilitates the movement of scaffold, the side of the opening position of the close bottom of supporting leg 8 Support frame 7 is installed, support frame 7 is used for that scaffold is fixed, and the opposite side of first stop riser 2 is provided with middle vertical rod 13, The side of middle vertical rod 13 is provided with connecting rod 4 by hinge pin 6, and one end of connecting rod 4 is provided with sucker 3, and sucker 3 is used for will even Extension bar 4 is fixed, and the obliquely downward of connecting rod 4 is provided with fixed mount 5, and fixed mount 5 is used for supporting linkage 4, first stop riser 2 and The bottom of two standing plates 12 is mounted on arm support 10, and the side of support frame 7 and supporting leg 8 is rotatablely connected by hinge, even Extension bar 4 is retractable structure, and the second guardrail 11 is connected with the first guardrail 1 by middle vertical rod 13.
Operation principle of the present utility model is:The equipment is moved to tunnel by Universal self-locking wheel 9 when in use, by scaffold At road construction location, then support frame 7 is strutted, scaffold be fixed by it, while connecting rod 4 is deployed, makes suction Disk 3 is adsorbed in tunnel, and is supported by fixed mount 5, is used for pair by first stop riser 2 and second station riser 12 Workmen is stood, for being constructed to eminence.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.

Claims (4)

1. a kind of constructing tunnel scaffold, including:First stop riser (2), it is characterised in that:The first stop riser (2) The both sides at top are provided with the first guardrail (1), and the side of the first stop riser (2) is provided with second station riser (12), described The guardrail of both sides second (11) at the top of second station riser (12), the lower section of the side of the second station riser (12) and first stop Supporting leg (8) is mounted on below the side of riser (2), the bottom of the supporting leg (8) is provided with Universal self-locking wheel (9), The side of the opening position of the close bottom of the supporting leg (8) is provided with support frame (7), the first stop riser (2) it is another Side is provided with middle vertical rod (13), and the side of the middle vertical rod (13) is provided with connecting rod (4), the connection by hinge pin (6) One end of bar (4) is provided with sucker (3), and the obliquely downward of the connecting rod (4) is provided with fixed mount (5), the first stop riser (2) bottom with second station riser (12) is mounted on arm support (10).
A kind of 2. constructing tunnel scaffold according to claim 1, it is characterised in that:Support frame as described above (7) and support The side of leg (8) is rotatablely connected by hinge.
A kind of 3. constructing tunnel scaffold according to claim 1, it is characterised in that:The connecting rod (4) is to receive Shrinking structure.
A kind of 4. constructing tunnel scaffold according to claim 1, it is characterised in that:Second guardrail (11) and the One guardrail (1) is connected by middle vertical rod (13).
CN201720865960.3U 2017-07-17 2017-07-17 A kind of constructing tunnel scaffold Active CN207017620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720865960.3U CN207017620U (en) 2017-07-17 2017-07-17 A kind of constructing tunnel scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720865960.3U CN207017620U (en) 2017-07-17 2017-07-17 A kind of constructing tunnel scaffold

Publications (1)

Publication Number Publication Date
CN207017620U true CN207017620U (en) 2018-02-16

Family

ID=61484390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720865960.3U Active CN207017620U (en) 2017-07-17 2017-07-17 A kind of constructing tunnel scaffold

Country Status (1)

Country Link
CN (1) CN207017620U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417485A (en) * 2021-06-30 2021-09-21 浙江工业职业技术学院 Building support column adds muscle device
CN118361090A (en) * 2024-06-20 2024-07-19 八达防腐安装集团有限公司 Scaffold for building construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417485A (en) * 2021-06-30 2021-09-21 浙江工业职业技术学院 Building support column adds muscle device
CN118361090A (en) * 2024-06-20 2024-07-19 八达防腐安装集团有限公司 Scaffold for building construction
CN118361090B (en) * 2024-06-20 2024-09-20 八达防腐安装集团有限公司 Scaffold for building construction

Similar Documents

Publication Publication Date Title
CN206408920U (en) A kind of collapsible operating platform for narrow space
CN207017620U (en) A kind of constructing tunnel scaffold
CN209412699U (en) A kind of assembly type walking underslung trolley operation platform
CN204728738U (en) Building site protector
CN207597839U (en) A kind of construction platform easy to remove
CN211523849U (en) A kind of building guardrail for civil engineering
CN207553562U (en) A kind of combination moving type scaffold
CN207092504U (en) A kind of scaffold for building
CN206942105U (en) A kind of scaffold of folding easy to remove
CN208152532U (en) A kind of construction scaffold
CN206016232U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN204354853U (en) The auxiliary construction device that a kind of electrified railway is built
CN209339553U (en) An easy-to-assemble combined portal scaffold
CN206693590U (en) A kind of Quick-mounting aluminium alloy scaffold
CN209397897U (en) A kind of Multi-functional indoor scaffold
CN209261192U (en) A portable scaffolding
CN206987417U (en) A kind of construction safety guard rail bracing means
CN214170078U (en) A gas pipeline debugging maintenance work rack for eminence
CN207998795U (en) A kind of steel box-girder movable type Hanging Basket
CN207110439U (en) A kind of connection ladder on scaffold
CN205907996U (en) But folding mobile formula scaffold frame
CN222227889U (en) A construction frame for building construction
CN209194539U (en) A kind of railway engineering foundation pit construction bracket
CN104328900A (en) Gantry type scaffold
CN216476211U (en) Quick detach formula scaffold frame is used in building engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant