CN214615326U - Scaffold for building engineering construction - Google Patents

Scaffold for building engineering construction Download PDF

Info

Publication number
CN214615326U
CN214615326U CN202023177117.7U CN202023177117U CN214615326U CN 214615326 U CN214615326 U CN 214615326U CN 202023177117 U CN202023177117 U CN 202023177117U CN 214615326 U CN214615326 U CN 214615326U
Authority
CN
China
Prior art keywords
supports
plate
fixed
sleeves
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023177117.7U
Other languages
Chinese (zh)
Inventor
余红梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Tengwang Construction Engineering Co ltd
Original Assignee
Sichuan Tengwang Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Tengwang Construction Engineering Co ltd filed Critical Sichuan Tengwang Construction Engineering Co ltd
Priority to CN202023177117.7U priority Critical patent/CN214615326U/en
Application granted granted Critical
Publication of CN214615326U publication Critical patent/CN214615326U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold for building engineering construction, including roof, connecting piece, bottom plate and climbing frame, the brake gyro wheel is all installed at the four corners department of the bottom of bottom plate, the four corners department of the top of bottom plate all is fixed with the collet, the four corners department of the bottom of roof all is fixed with the top support, all is fixed with the connecting piece between two collets and two top supports that set up along the minor face direction of bottom plate, also is fixed with the connecting piece between the other two collets and top supports; four the tip that holds in the palm and four collet are in opposite directions all is constructed the slot with the stand adaptation, four the stand runs through four projections respectively, two projections that the minor face direction of following the roof set up all with riser integrated into one piece, all the other two projections all with another riser integrated into one piece, roof and four top support welding, four the collet all welds with the bottom plate. This scaffold frame for building engineering construction, convenient dismantlement has improved stability.

Description

Scaffold for building engineering construction
Technical Field
The utility model belongs to the technical field of the scaffold frame, concretely relates to scaffold frame for building engineering construction.
Background
Scaffolding (scaffold) is a temporary construction tool set up on the construction site for workers to handle and address vertical and horizontal transport. The high-rise building block is mainly used in places where external walls, interior decoration or high floor height cannot be directly constructed, and is mainly used for up-and-down dry work of constructors, maintenance of peripheral safety nets, high-altitude installation of components and the like. And (4) classification: 1. whether it is movable: the device is divided into a mobile device and a fixed device; 2. materials: is divided into wood, steel and rope ladders; 3. construction property: the method is divided into a building scaffold, an installation scaffold and the like. Scaffold frame for general building engineering construction adopts bolted connection, and it is comparatively inconvenient with the installation to dismantle, expends time.
Therefore, in view of the current situation, the design and production of a scaffold for construction engineering are urgently needed to meet the requirement of practical use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold frame is used in building engineering construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a scaffold for building engineering construction comprises a top plate, connecting pieces, a bottom plate and a climbing frame, wherein brake rollers are mounted at four corners of the bottom end of the bottom plate, bottom supports are fixed at four corners of the top end of the bottom plate, top supports are fixed at four corners of the bottom end of the top plate, the connecting pieces are fixed between the two bottom supports and the two top supports which are arranged along the direction of the short edge of the bottom plate, and the connecting pieces are fixed between the other two bottom supports and the top supports;
the connecting piece comprises a connecting plate, inserting columns and sleeves, wherein two sliding blocks are arranged on one side of the connecting plate, which is far away from a vertical plate, a transverse rod and a sleeve are respectively fixed on the opposite side walls of the two sliding blocks, one end of the transverse rod is inserted into the sleeve, a spring is arranged in the sleeve, the side walls of the two sliding blocks, which are far away from the transverse rod, are uniformly formed with the inserting columns, and the side walls of the four jacking supports, the four bottom supports and the four upright columns are respectively provided with slots matched with the inserting columns;
the four top supports and the opposite end parts of the four bottom supports are respectively provided with slots matched with the stand columns, the four stand columns respectively penetrate through the four convex columns, the side walls of the four convex columns and the stand columns are respectively provided with screw holes matched with the locking bolts, the two convex columns arranged along the direction of the short edge of the top plate are respectively integrally formed with a vertical plate, the other two convex columns are respectively integrally formed with another vertical plate, the opposite side walls of the two vertical plates are respectively fixed with two sleeves, two support rods are arranged between the two vertical plates, two ends of one support rod are respectively connected with the two sleeves, and two ends of the other support rod are respectively connected with the other two sleeves;
a plurality of hooks are fixed at the bottom end of one of the support rods, and a climbing frame is arranged on one side of each hook.
Preferably, climb the frame and include inserted block, montant and connecting rod, two be fixed with a plurality of connecting rod between the montant, two the montant has two inserted blocks towards the equal integrated into one piece of lateral wall of vaulting pole, the top of roof and bottom plate all is constructed two and the slot of inserted block adaptation.
Preferably, two dovetail grooves are formed in one side, facing the sleeve, of the connecting plate, and sliding blocks matched with the dovetail grooves are integrally formed in the side walls, facing the connecting plate, of the two sliding blocks.
Preferably, four screw holes matched with the bolts are formed in the side walls of the sleeves, and two thread grooves matched with the bolts are formed in the side walls of the support rods.
Preferably, the top plate is welded with four top supports, and the four bottom supports are welded with the bottom plate.
The utility model discloses a technological effect and advantage: according to the scaffold for building engineering construction, a climbing frame is convenient for constructors to go up to a top plate or go from the top plate to the ground from the bottom, the four insertion blocks are used for realizing the connection of the climbing frame with the top plate and a bottom plate, the climbing frame can be separated from the top plate only by lifting the climbing frame, and the climbing frame is convenient to move and is matched with other equipment for use; the vertical plates and the convex columns are integrally formed, so that the structural strength is improved, and the overall stability is improved by the two vertical plates, the two support rods and the four connecting pieces; make the horizontal pole and the sleeve pipe phase shift of four connecting pieces, can remove the fixed to four stands, make things convenient for four stands and four tops to hold in the palm and four stands and four collet's separation, convenient transportation, make the sleeve pipe and the horizontal pole of two connecting pieces remove in opposite directions, loosen the horizontal pole of two connecting pieces after inserting the slot of four collets respectively with the bottom of four stands, spring reset can make four insert the slot that the post inserted four stand lateral walls respectively, make things convenient for four stands and four collet fixed, this scaffold for building engineering construction, convenient dismantlement, and the stability is improved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the connecting member of the present invention;
fig. 3 is a schematic structural view of the climbing frame of the present invention;
fig. 4 is an enlarged view of the structure a in fig. 1 according to the present invention.
In the figure: the vertical type steel plate column locking device comprises a top plate 1, a top support 2, a connecting piece 3, a connecting plate 30, an inserting column 31, a sleeve 32, a cross rod 33, a sliding block 34, a bottom plate 4, a climbing frame 5, an inserting block 50, a vertical rod 51, a connecting rod 52, a support rod 6, a sleeve 60, a convex column 7, a vertical plate 8, an upright column 9, a locking bolt 90 and a bottom support 10.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Unless defined otherwise, all references to up, down, left, right, front, back, inner and outer directions herein are to be interpreted as referring to up, down, left, right, front, back, inner and outer directions in the drawings to which the invention is applied, and all references are hereby incorporated herein by reference.
The utility model provides a scaffold for building engineering construction as shown in figures 1-4, including roof 1, connecting piece 3, bottom plate 4 and climbing frame 5, the brake gyro wheel is all installed at the four corners department of the bottom of bottom plate 4, the four corners department of the top of bottom plate 4 all is fixed with collet 10, the four corners department of the bottom of roof 1 all is fixed with top support 2, all weld connecting piece 3 between two collet 10 and two top supports 2 that set up along the minor face direction of bottom plate 4, also weld connecting piece 3 between the other two collet 10 and top supports 2;
the connecting piece 3 comprises a connecting plate 30, inserting columns 31 and sleeves 32, two sliding blocks 34 are arranged on one side of the connecting plate 30, which is far away from the vertical plate 8, a cross rod 33 and the sleeves 32 are respectively welded on the opposite side walls of the two sliding blocks 34, one end of the cross rod 33 is inserted into the sleeves 32, springs are arranged in the sleeves 32, the inserting columns 31 are integrally formed on the side walls, which are far away from the cross rod 33, of the two sliding blocks 34, and the side walls of the four jacking supports 2, the four bottom supports 10 and the four upright posts 9 are respectively provided with a slot matched with the inserting columns 31;
the opposite end parts of the four top supports 2 and the four bottom supports 10 are respectively provided with a slot matched with an upright post 9, the four upright posts 9 respectively penetrate through four convex posts 7, the side walls of the four convex posts 7 and the upright posts 9 are respectively provided with a screw hole matched with a locking bolt 90, the two convex posts 7 arranged along the short edge direction of the top plate 1 are respectively integrally formed with a vertical plate 8, the other two convex posts 7 are respectively integrally formed with another vertical plate 8, the opposite side walls of the two vertical plates 8 are respectively welded with two sleeves 60, two support rods 6 are arranged between the two vertical plates 8, two ends of one support rod 6 are respectively connected with the two sleeves 60, and two ends of the other support rod 6 are respectively connected with the other two sleeves 60;
the bottom welding of one of them vaulting pole 6 has a plurality of couple, and one side of a plurality of couple is equipped with climbs frame 5.
Specifically, climb frame 5 including inserted block 50, montant 51 and connecting rod 52, two the welding has a plurality of connecting rod 52 between montant 51, two montant 51 has two inserted blocks 50 towards the homogeneous shaping of lateral wall of vaulting pole 6, roof 1 and bottom plate 4's top all is constructed two slots with inserted block 50 adaptation, climbs frame 5 and makes things convenient for constructor to go up on roof 1 or from roof 1 to ground from top to bottom, and four inserted blocks 50 realize climbing frame 5 and be connected of roof 1 and bottom plate 4, only need to lift climbing frame 5 and can make climbing frame 5 and roof 1 separate, conveniently climb frame 5's removal and cooperate other equipment uses.
Specifically, two dovetail grooves are formed in one side of the connecting plate 30 facing the sleeve 32, and two sliding blocks 34 facing the side wall of the connecting plate 30 are integrally formed with sliding blocks matched with the dovetail grooves.
Specifically, four screw holes matched with bolts are formed in the side wall of the sleeve 60, two thread grooves matched with the bolts are formed in the side wall of the support rod 6, and the sleeve 60 and the support rod 6 are conveniently separated.
Specifically, the top plate 1 is welded with four top supports 2, and the four bottom supports 10 are all welded with the bottom plate 4.
The working principle of the scaffold for building engineering construction is that the climbing frame 5 is convenient for constructors to go up to the top plate 1 or go down to the ground from the top plate 1, the four insertion blocks 50 realize the connection of the climbing frame 5 with the top plate 1 and the bottom plate 4, the climbing frame 5 can be separated from the top plate 1 only by lifting the climbing frame 5, the climbing frame 5 is convenient to move and is matched with other equipment for use, the vertical plates 8 and the convex columns 7 are integrally formed, the structural strength is improved, the two vertical plates 8, the two support rods 6 and the four connecting pieces 3 improve the integral stability, the cross rods 6 and the sleeves 32 of the four connecting pieces 3 move oppositely, the fixation of the four stand columns 9 can be released, the four stand columns 9 and the four top supports 2 are convenient to be separated from the four bottom supports 10, the sleeves 32 and the cross rods 33 of the two connecting pieces 3 are convenient to transport, the bottom ends of the four stand columns 9 are respectively inserted into the slots of the four bottom supports 10, and then the cross rods 33 of the two connecting pieces 3 are loosened, spring return can make four insert the post 31 and insert the slot of four stand 9 lateral walls respectively, makes things convenient for four stand 9 and four collet 10 fixed, repeats above-mentioned operation, conveniently is connected four stand 9 and four collet 2.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (5)

1. The utility model provides a scaffold frame for building engineering construction, includes roof (1), connecting piece (3), bottom plate (4) and climbs frame (5), its characterized in that: brake rollers are mounted at four corners of the bottom end of the bottom plate (4), bottom supports (10) are fixed at the four corners of the top end of the bottom plate (4), top supports (2) are fixed at the four corners of the bottom end of the top plate (1), connecting pieces (3) are fixed between the two bottom supports (10) and the two top supports (2) which are arranged along the short edge direction of the bottom plate (4), and connecting pieces (3) are fixed between the other two bottom supports (10) and the top supports (2);
the connecting piece (3) comprises a connecting plate (30), inserting columns (31) and sleeves (32), two sliding blocks (34) are arranged on one side, away from the vertical plate (8), of the connecting plate (30), the opposite side walls of the two sliding blocks (34) are respectively fixed with a cross rod (33) and the sleeves (32), one end of the cross rod (33) is inserted into the sleeves (32), springs are arranged in the sleeves (32), the side walls, away from the cross rod (33), of the two sliding blocks (34) are integrally formed with the inserting columns (31), and the side walls of the four top supports (2), the four bottom supports (10) and the four upright columns (9) are respectively provided with slots matched with the inserting columns (31);
the four jacking supports (2) and the four bottom supports (10) are provided with slots matched with the stand columns (9) at opposite ends, the four stand columns (9) penetrate through the four convex columns (7) respectively, screw holes matched with the locking bolts (90) are formed in the side walls of the four convex columns (7) and the stand columns (9), the two convex columns (7) arranged along the short side direction of the top plate (1) are integrally formed with the vertical plates (8), the other two convex columns (7) are integrally formed with the other vertical plate (8), two sleeves (60) are fixed on opposite side walls of the two vertical plates (8), two support rods (6) are arranged between the two vertical plates (8), two ends of one support rod (6) are connected with the two sleeves (60) respectively, and two ends of the other support rod (6) are connected with the other two sleeves (60) respectively;
a plurality of hooks are fixed at the bottom end of one of the support rods (6), and a climbing frame (5) is arranged on one side of each hook.
2. The scaffold for construction of construction engineering according to claim 1, wherein: climb frame (5) including inserted block (50), montant (51) and connecting rod (52), two be fixed with a plurality of connecting rod (52) between montant (51), two montant (51) have two inserted blocks (50) towards the equal integrated into one piece of lateral wall of vaulting pole (6), the top of roof (1) and bottom plate (4) all is constructed two and the slot of inserted block (50) adaptation.
3. The scaffold for construction of construction engineering according to claim 1, wherein: two dovetail grooves are formed in one side, facing the sleeve (32), of the connecting plate (30), and sliding blocks matched with the dovetail grooves are formed in the side wall, facing the connecting plate (30), of the sliding blocks (34) in an integrated mode.
4. The scaffold for construction of construction engineering according to claim 1, wherein: screw holes matched with the bolts are formed in the side walls of the four sleeves (60), and two thread grooves matched with the bolts are formed in the side walls of the two support rods (6).
5. The scaffold for construction of construction engineering according to claim 1, wherein: the top plate (1) is welded with the four top supports (2), and the four bottom supports (10) are welded with the bottom plate (4).
CN202023177117.7U 2020-12-25 2020-12-25 Scaffold for building engineering construction Active CN214615326U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023177117.7U CN214615326U (en) 2020-12-25 2020-12-25 Scaffold for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023177117.7U CN214615326U (en) 2020-12-25 2020-12-25 Scaffold for building engineering construction

Publications (1)

Publication Number Publication Date
CN214615326U true CN214615326U (en) 2021-11-05

Family

ID=78432140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023177117.7U Active CN214615326U (en) 2020-12-25 2020-12-25 Scaffold for building engineering construction

Country Status (1)

Country Link
CN (1) CN214615326U (en)

Similar Documents

Publication Publication Date Title
CN214615326U (en) Scaffold for building engineering construction
CN210239090U (en) Movable operating platform
CN104278830A (en) Integrated combined scaffold
CN209429487U (en) A kind of scaffold of architectural engineering
CN208668903U (en) A kind of fabricated scaffold
CN215670909U (en) High security scaffold frame
CN210888118U (en) Building faces limit structure post construction protection frame
CN211143685U (en) Scaffold for building
CN213143808U (en) Scaffold for constructional engineering
CN214195490U (en) Hanging flower basket convenient to install for building engineering
CN213572954U (en) Gable external scaffolding counterfort structure with adjustable pre-buried formula
CN212176482U (en) Scaffold for building construction
CN212897455U (en) Prevent portable scaffold frame that topples
CN210500860U (en) Secondary structure constructional column top bar planting assistor
CN210828286U (en) Overturn-preventing protection device for lifting scaffold
CN204212388U (en) Monolithic combined scaffold
CN114086752A (en) Movable cantilever platform device for roof structure
CN218933794U (en) Detachable back-shaped hanging basket with column holding steel structure
CN213926693U (en) Movable frame for building construction
CN218406331U (en) Anti-tilting scaffold
CN211647199U (en) Scaffold for plastering interior wall of building
CN220319106U (en) Antiskid type construction support
CN217812226U (en) Construction scaffold
CN219298746U (en) Scaffold for building decoration
CN215407331U (en) Safety hanging basket for high-altitude operation installation in building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant