CN205976389U - Hanger rod installation tool - Google Patents

Hanger rod installation tool Download PDF

Info

Publication number
CN205976389U
CN205976389U CN201620894382.1U CN201620894382U CN205976389U CN 205976389 U CN205976389 U CN 205976389U CN 201620894382 U CN201620894382 U CN 201620894382U CN 205976389 U CN205976389 U CN 205976389U
Authority
CN
China
Prior art keywords
suspension rod
connecting rod
securing member
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620894382.1U
Other languages
Chinese (zh)
Inventor
鲁兴社
任亮
罗南刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Engineering Group Co Ltd
Original Assignee
Shaanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Engineering Group Co Ltd filed Critical Shaanxi Construction Engineering Group Co Ltd
Priority to CN201620894382.1U priority Critical patent/CN205976389U/en
Application granted granted Critical
Publication of CN205976389U publication Critical patent/CN205976389U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a hanger rod installation tool, including connecting rod and the rotatory handle of setting in connecting rod one end, fixedly connected with is used for connecting the fastener of jib on the other end lateral wall of connecting rod, the fastener is the hollow cylinder structure, set up jaggedly on the fastener, the fastener internal surface is provided with and prevents the not hard up vertical stripe of jib. The utility model has the advantages of simple structure and reasonable design, only needing single handheld rotatory handle to operate during the installation jib, trunning into high altitude construction in the past to the ground operation, guaranteed the security in the work progress, improved construction speed, reduced construction cost, use convenient operation, the practicality is strong, convenient to popularize and use.

Description

A kind of suspension rod mounting tool
Technical field
This utility model belongs to architectural engineering ceiling construction technical field of tools and in particular to a kind of suspension rod mounting tool.
Background technology
During installation, decoration construction, furred ceiling is the important engineering of one of which, and suspension rod is as the connection of structure and furred ceiling Medium, its installation quality directly influences the installation quality of whole furred ceiling, and hanger erection has according to the height of furred ceiling and weight etc. Multiple installation methods, length of boom determines according to actual demands of engineering.Most common method is at plate bottom using machinery at this stage After punching, workmen, by fork ladder or scaffold, is fastened with spanner after installing expansion bolt suspension rod again.Deposit in engineering Operation side narrow and small, each specialty is interspersed situations such as, workmen cannot be carried out operating, and the suspension rod due to a position After the completion of, need workmen to climb down fork ladder or scaffold, shift fork is terraced or scaffold is to after next installation site, Reappear again and climb up fork ladder or scaffold, process loaded down with trivial details impact construction speed, and poor stability, set up scaffold time-consuming expense again Power.It is thus desirable to a kind of structure suspension rod simple, reasonable in design and its installation tool, easy to operate, only need list when suspension rod is installed People operates, and the operation that installation personnel can carry out top board suspension rod all the time on floor is installed, and conventional work high above the ground is switched to ground Face operates, and improves the safety in work progress.
Utility model content
Technical problem to be solved in the utility model is, for above-mentioned deficiency of the prior art, to provide a kind of suspension rod Installation tool, its structure is simple, reasonable in design, only needs single hand-held rotating handles to be operated when installing suspension rod, will be conventional Work high above the ground switchs to terrestrial operation it is ensured that safety in work progress, improves speed of application, reduces construction cost, Using easy to operate, practical, it is easy to promote the use of.
For solving above-mentioned technical problem, the technical solution adopted in the utility model is:A kind of suspension rod mounting tool, its feature It is:Including connecting rod and the rotating handles being arranged on connecting rod one end, the another side wall of described connecting rod is fixedly connected There is the securing member for connecting suspension rod, described securing member is hollow cylindrical structure, described securing member opens up jagged, described Securing member inner surface setting has the vertical striped preventing suspension rod from loosening.
A kind of above-mentioned suspension rod mounting tool it is characterised in that:Described rotating handles is T-shaped handle.
A kind of above-mentioned suspension rod mounting tool it is characterised in that:Described connecting rod is lumps of wood bar or stainless steel.
A kind of above-mentioned suspension rod mounting tool it is characterised in that:The length of described connecting rod is more than the length of suspension rod.
This utility model compared with prior art has advantages below:
1st, structure of the present utility model is simple, reasonable in design, realizes and using easy to operate.
2nd, this utility model adopts connecting rod and securing member to connect suspension rod, only needs single hand-held rotating handles when installing suspension rod Operated, conventional work high above the ground is switched to terrestrial operation, both decreased the inconvenience of workmen's upper lower fork ladder, decreased Scaffold building loaded down with trivial details, it is ensured that safety in work progress, improves speed of application, reduces construction cost.
3rd, this utility model bottom of the pipe is provided with rotating handles, and convenient construction personnel exert a force.
4th, it is provided with vertical striped in securing member of the present utility model, it is to avoid the vibrations in work progress cause suspension rod pine Dynamic, using effect is good.
In sum, this utility model structure is simple, reasonable in design, only needs single hand-held rotating handles to enter when installing suspension rod Row operation, conventional work high above the ground is switched to terrestrial operation it is ensured that safety in work progress, improves speed of application, Reduce construction cost, using easy to operate, practical, it is easy to promote the use of.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Brief description
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the enlarged drawing at A in Fig. 1.
Description of reference numerals:
1 body;2 rotating handleses;3 securing members;
4 vertical stripeds.
Specific embodiment
As depicted in figs. 1 and 2, this utility model includes connecting rod 1 and the rotating handles 2 being arranged on connecting rod 1 one end, institute The securing member 3 being fixedly connected with for connecting suspension rod is stated on the another side wall of connecting rod 1, described securing member 3 is hollow cylinder Body structure, described securing member 3 opens up jagged, and described securing member 3 inner surface setting has the vertical striped preventing suspension rod from loosening 4.
As shown in figure 1, in the present embodiment, described rotating handles 2 is T-shaped handle.
In the present embodiment, described connecting rod 1 is lumps of wood bar or stainless steel.
In the present embodiment, the length of described connecting rod 1 is more than the length of suspension rod.
When being embodied as, suspension rod includes harness cord screw rod and the nut with the cooperation of harness cord screw rod, harness cord screw rod is provided with swollen Swollen screw, when installing suspension rod body, first needs to get, at position to be mounted, the installing hole that can accommodate setscrew at plate bottom, will Suspension rod inserts securing member 3, and on securing member 3, breach facilitates suspension rod to insert, and securing member 3 is used for blocking the nut on suspension rod, vertical bar Stricture of vagina 4 is used for preventing nut loosening.Then lift connecting rod 1, setscrew is pierced into installing hole, rotating handles 2 is arranged on connection On bar 1, only need when installing suspension rod single be rotatably connected bar 1 by hand-held rotating handles 2, thus driving suspension rod swing arm, make swollen Swollen screw completes expansion process, and setscrew is fixed on installing hole, after installation, is pulled downward on by rotating handles 2 Connecting rod 1 so that it may separate the nut on suspension rod with the securing member 3 in connecting rod 1, you can carries out the peace of next suspension rod Dress.
The above, be only embodiment of the present utility model, not this utility model imposed any restrictions, every according to this Any simple modification, change and equivalent structure change that utility model technical spirit is made to above example, all still fall within In the protection domain of technical solutions of the utility model.

Claims (4)

1. a kind of suspension rod mounting tool it is characterised in that:Including connecting rod (1) with the rotation handle that is arranged on connecting rod (1) one end Handss (2), the another side wall of described connecting rod (1) is fixedly connected with the securing member (3) for connecting suspension rod, described securing member (3) it is hollow cylindrical structure, described securing member (3) opens up jagged, described securing member (3) inner surface setting prevents from hanging The vertical striped (4) that bar loosens.
2. according to a kind of suspension rod mounting tool described in claim 1 it is characterised in that:Described rotating handles (2) is T-shaped Handss.
3. according to a kind of suspension rod mounting tool described in claim 1 it is characterised in that:Described connecting rod (1) be lumps of wood bar or Stainless steel.
4. according to a kind of suspension rod mounting tool described in claim 1 it is characterised in that:The length of described connecting rod (1) is more than The length of suspension rod.
CN201620894382.1U 2016-08-17 2016-08-17 Hanger rod installation tool Expired - Fee Related CN205976389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620894382.1U CN205976389U (en) 2016-08-17 2016-08-17 Hanger rod installation tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620894382.1U CN205976389U (en) 2016-08-17 2016-08-17 Hanger rod installation tool

Publications (1)

Publication Number Publication Date
CN205976389U true CN205976389U (en) 2017-02-22

Family

ID=58031028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620894382.1U Expired - Fee Related CN205976389U (en) 2016-08-17 2016-08-17 Hanger rod installation tool

Country Status (1)

Country Link
CN (1) CN205976389U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760135A (en) * 2017-02-24 2017-05-31 中国十七冶集团有限公司 A kind of furred ceiling hanger erection method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760135A (en) * 2017-02-24 2017-05-31 中国十七冶集团有限公司 A kind of furred ceiling hanger erection method

Similar Documents

Publication Publication Date Title
CN103521807B (en) A kind of liftable laser positioning high spatial suspension rod punching erecting device and method of operating
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN205096590U (en) Simple and easy auxiliary device of ceiling punching operation
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN204492134U (en) Be convenient to the height scaffolding installed
CN205976389U (en) Hanger rod installation tool
CN205955171U (en) Fall to ground scaffold collet device
CN210127644U (en) A telescopic crowbar for construction engineering template demolishs construction
CN202090577U (en) Template supporting construction platform for lift wells in high-rise buildings
CN204059901U (en) A kind of high-altitude construction operation platform
CN110778095A (en) External protection frame of assembled structure
CN204456813U (en) A kind of single support operation platform for elevator hoistways
CN105442817A (en) Liftable laser positioning high-space suspender punching installation device and construction method
CN205977241U (en) A steel shotcrete for native tunnel
CN202055763U (en) Building roof precise boring device
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN204754150U (en) Dish -type node formula scaffold
CN209780200U (en) Operation platform for construction of steel structure roof suspended ceiling plate
CN204252496U (en) Convenient installation device for constructional engineering suspender
CN203156100U (en) Drilling instrument for suspended ceiling construction
CN202556295U (en) Lengthened wrench
CN209760747U (en) Bearing frame for building construction operation
CN204401619U (en) precast pile fixing device
CN206083309U (en) Pre -buried PVC of wall body pipe clearance instrument
CN207982381U (en) Quick-dismantling combined type bar-planting drilling support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 710003 Xi'an, Lianhu District, Shaanxi, North Street, No. 199

Patentee after: Shaanxi Construction Engineering Group Co.,Ltd.

Address before: 710003 Xi'an, Lianhu District, Shaanxi, North Street, No. 199

Patentee before: SHAANXI CONSTRUCTION ENGINEERING GROUP Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222