CN202055763U - Building roof precise boring device - Google Patents

Building roof precise boring device Download PDF

Info

Publication number
CN202055763U
CN202055763U CN2011201888587U CN201120188858U CN202055763U CN 202055763 U CN202055763 U CN 202055763U CN 2011201888587 U CN2011201888587 U CN 2011201888587U CN 201120188858 U CN201120188858 U CN 201120188858U CN 202055763 U CN202055763 U CN 202055763U
Authority
CN
China
Prior art keywords
boring
rod
vertical rod
building
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201888587U
Other languages
Chinese (zh)
Inventor
李振峰
刘文清
王立泉
胡小川
胡良平
李新永
马广祜
高志勇
杨红艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Original Assignee
Shengli Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengli Engineering Construction Group Co Ltd filed Critical Shengli Engineering Construction Group Co Ltd
Priority to CN2011201888587U priority Critical patent/CN202055763U/en
Application granted granted Critical
Publication of CN202055763U publication Critical patent/CN202055763U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses a building roof precise boring device, which is used for fixing an electric drill and for boring a building roof. The boring device comprises a crossbar, wherein an operational rod and the crossbar are fixed on an upright post, a power transmission rod passes through and sleeved on the other end of the operation rod and the crossbar, one end of a power lever is hinged with the upright post, and the other end of the power lever is connected with the bottom part of the power transmission rod. The electric drill is fixed on the top part of the power transmission rod, and the power lever is used for pushing upwards the power transmission rod so as to boring the building roof. The building roof precise boring device has a light weight, raw materials are convenient to fetch, the boring device is easy to move, the boring device can be moved and constructed generally by one person, main parts of the boring device are detachably connected with each other, the structure is simple and reasonable, and the boring device is convenient to install and disassemble. The boring device is proved by on-site experiment that time and labor can be saved when the boring device is used for boring a hole, the precision of the verticality and the depth of the hole is high, the construction requirement of particular positions such as shear wall edge, floor limb and the like can be satisfied, and the boring device is suitable for different building roof boring operations of building construction.

Description

The accurate drilling equipment of building top board
Technical field
The utility model relates to the building top board auxiliary workpiece for drilling tool of building trade, particularly builds the accurate drilling equipment of top board, is used for fixing electric drill, and the building top board is implemented bore operation.
Background technology
The boring of structural engineering masonry constructional column chemically-planted steel bar, the boring of decorative engineering furred ceiling suspension rod, the boring of installing engineering pipeline suspension rod or the like often need be bored a large amount of holes on concrete roof in construction.Traditional construction technology is that the people climbs to manual operations on the ladder at present, and arm is upwards exerted oneself, and labour intensity is big, inefficiency, and drilling depth and verticality are wayward.Highly generally all greater than 2m, there is potential safety hazard in workman's operation in addition, and then danger is bigger as if holing on the floor limit.The drilling equipment that the steel pipe vertical rod that occurs is afterwards made from great, be difficult for the floor gap carrying, and base must be set, because the existence of base, having determined can't be to the shear wall limit, the drilling operation on floor and limit, hole; Also because of the existence of base, the verticality of boring is subjected to the influence of ground flat degree very big.The on-the-spot simple and easy drilling equipment of building that also uses the stressed principle of a kind of parallelogram to make because the parallelogram force mechanism of self, determined this device can't avoid to hole be the drawback of inclined hole.
Summary of the invention
The purpose of this utility model provides the accurate drilling equipment of building top board, for the bore operation of building top board provides a kind of accurate auxiliary workpiece for drilling tool, overcomes the drawback of conventional borehole method of operating and existing boring servicing unit, guarantees the verticality of boring.Change the high-altitude bore operation into terrestrial operation boring, reduce working strength of workers, increase work efficiency and drilling quality.
The present technique solution can reach above-mentioned purpose: the accurate drilling equipment of building top board comprises cross bar, control stick and cross bar are fixed in the vertical rod, the power driven rod is set on the other end of control stick and cross bar, and power lever one end and vertical rod are hinged, and the other end is connected with the bottom of power driven rod.Electric drill is fixed on the top of power driven rod,, the building top board is implemented boring with pushing the power driven rod on the power lever.
Compared with prior art the utlity model has following useful effect:
1, the time need not the frame height in the boring of building top board and can finish building top board bore operation, change terrestrial operation into, reduced labour intensity, improved operating efficiency and security reliability by in the past overhead operation in floor ground.
2, brill dark gag lever post, effectively the keyhole degree of depth have been added.
3, adopt the lever stress principle to make, do not establish base, solved the technical barrier of the insurmountable rat holing of on-the-spot use parallelogram auxiliary workpiece for drilling tool.By observing the verticality that vertical mark post can be adjusted, grasp electric drill, time saving and energy saving, convenient and swift.
4, the mode that adopts pin to trample utilizes power lever that lever force is provided, and has reduced labour intensity, has liberated both hands, can with the hands control and manipulation is stablized this device, and drilling quality is more guaranteed.
5, main rod member is made by timber and aluminum alloy materials, draws materials conveniently, can gather materials on the spot in general building site; Simple structure, simple and direct from heavy and light, power transmission; Also can all use aluminum alloy materials to produce in batches, for the construction site is equipped with.
6, because installation weight is light, vertical rod when not working, power driven rod all can land.Stable by the both hands control device, base need not be set, so be not subjected to the influence of ground flat degree, can satisfy the requirement that specific position constructions such as limit are faced on shear wall limit, floor.The position of operating personnel's handcontrolled manipulation bar and boring distance is bigger, when facing hole, limit drilling construction, has increased safety factor.
7, conveniently moving, transfer and constructing operation that a general people just can finishing device, each main member all adopts removable connection, and is simple and reasonable, and peace is torn open conveniently.
This device shows through field experiment, simple operation, time saving and energy saving, the verticality of boring and the precision height of the degree of depth, can satisfy the construction requirement that specific positions such as limit are faced on shear wall limit, floor, be fit to very much the various building top board bore operations of building operations, have tangible economic benefit and social benefit.
Description of drawings
Accompanying drawing is a structural representation of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done further detailed description: referring to accompanying drawing, the accurate drilling equipment of building top board comprises cross bar 2, control stick 1 and cross bar 2 are fixed in the vertical rod 3, the power driven rod is set on the other end of control stick 1 and cross bar 2, power lever 6 one ends and vertical rod 3 are hinged, and the other end is connected with the bottom of power driven rod.The power driven rod comprises bottom vertical rod 7, expansion link 8 and push rod 9, and the link of bottom vertical rod 7, expansion link 8 and push rod 9 is provided with connecting hole, and connecting bolt is installed, and bottom vertical rod 7 is connected by expansion link 8 with push rod 9.The end that control stick 1 and cross bar 2 wear the power driven rod is provided with stop collar 12, and the inner-cavity structure of stop collar 12 conforms to the contour structures of bottom vertical rod 7.Stop collar 12 can be manufactured separately, and is fixing by bolt and control stick 1 and cross bar 2, or manufactures with control stick 1 and cross bar 2 integral body.Vertical rod 3 is parallel with the power driven rod, and control stick 1 is parallel with cross bar 2; A side of vertical rod 3 is control stick 1 and cross bar 2 fixedly, and another side and power lever 6 are hinged.Spacing between the bottom vertical rod 7 of vertical rod 3 and power driven rod is between 400mm-600mm; The total length of control stick 1 is between 1500mm-1700mm; The height of vertical rod 3 is between 1300mm-1600mm.Staggered fixedly hound 4 and hound 5 between vertical rod 3 and control stick 1 and cross bar 2, be that hound 4 and hound 5 fixed point on control stick 1 and cross bar 2 is positioned at fixed point in the vertical rod 3 not in the same side of control stick 1, cross bar 2 with vertical rod 3 with it, its fixed form can adopt bolt.As use flitch to manufacture and can adopt the nail stickfast, but stop collar 12 and power driven rod need use aluminum alloy materials to manufacture, and guarantee the rigidity and the portability of its material.Power lever 6 flexibly connects with the bottom of bottom vertical rod 7, and its length that flexibly connects rope guarantees the mobile smooth and easy of easy to operate and power driven rod between 100mm-150mm.The top of vertical rod 3 hangs vertical mark post 13, and vertical mark post 13 uses the heavy Metallic rod of matter, at the mark line of the upper design band look of vertical rod 3, as horizontal line or vertical line, makes vertical mark post 13 perpendicular or straight.If deviation then needs smooth ground is adjusted in vertical rod 3, or the manual verticality of grasping vertical rod 3.The top of the push rod 9 of power driven rod is provided with electric drill fixed mount 11 and bores dark gag lever post 10, also electric drill directly can be strapped in the top of push rod 9.Bore and be provided with two fixing holes on the dark gag lever post 10 at least, can design a plurality of fixing holes, be convenient to regulate, limit the hole depth of multiple size.When the building top board touched the top of boring dark gag lever post 10, electric drill also just can't continue boring, makes the hole depth unanimity.
Using method of the present utility model:
During operation,, regulate and bore dark gag lever post 10 at first according to the drilling depth technical data of engineering; According to absolute altitude situation of change at the bottom of floor absolute altitude and the beam, regulate the length of power driven rod then, fix electric drill and electric drill switch 14.To install in placely then, after electric drill was aimed at boring, operating personnel's both hands buttressed control stick 1, vertical by vertical mark post 13 control vertical rods 3.Open electric drill switch 14 then, slowly trample with pin and be hinged on the power lever 6 that a is ordered in the vertical rod 3, under produce a power F, power lever 6 drives to move on the power driven rod and can finish boring work by flexibly connecting a b.

Claims (9)

1. build the accurate drilling equipment of top board, comprise cross bar (2), it is characterized in that control stick (1) and cross bar (2) are fixed in the vertical rod (3), the power driven rod is set on the other end of control stick (1) and cross bar (2), power lever (6) one ends and vertical rod (3) are hinged, and the other end is connected with the bottom of power driven rod.
2. the accurate drilling equipment of building top board according to claim 1, it is characterized in that described power driven rod comprises bottom vertical rod (7), expansion link (8) and push rod (9), the link of bottom vertical rod (7), expansion link (8) and push rod (9) is provided with connecting hole, and bottom vertical rod (7) is connected by expansion link (8) with push rod (9).
3. the accurate drilling equipment of building top board according to claim 1, it is characterized in that the end that described control stick (1) and cross bar (2) wear the power driven rod is provided with stop collar (12), the inner-cavity structure of stop collar (12) conforms to the contour structures of bottom vertical rod (7).
4. the accurate drilling equipment of building top board according to claim 1 is characterized in that described vertical rod (3) is parallel with the power driven rod, and control stick (1) is parallel with cross bar (2); A side of vertical rod (3) is control stick (1) and cross bar (2) fixedly, and another side and power lever (6) are hinged.
5. according to claim 1 or the accurate drilling equipment of 4 described building top boards, it is characterized in that spacing between the bottom vertical rod (7) of described vertical rod (3) and power driven rod is between 400mm-600mm; The total length of control stick (1) is between 1500mm-1700mm; The height of vertical rod (3) is between 1300mm-1600mm; Staggered fixedly hound (4) and hound (5) between vertical rod (3) and control stick (1) and cross bar (2).
6. according to claim 1 or the accurate drilling equipment of 4 described building top boards, it is characterized in that the described power lever (6) and the bottom of bottom vertical rod (7) flexibly connect, its length that flexibly connects rope is between 100mm-150mm.
7. according to claim 1 or the accurate drilling equipment of 4 described building top boards, it is characterized in that the top of described vertical rod (3) hangs vertical mark post (13), at the mark line of the upper design band look of vertical rod (3).
8. the accurate drilling equipment of building top board according to claim 1 and 2 is characterized in that the top of the push rod (9) of described power driven rod is provided with electric drill fixed mount (11) and bores dark gag lever post (10).
9. the accurate drilling equipment of building top board according to claim 8 is characterized in that being provided with at least on the dark gag lever post of described brill (10) two fixing holes.
CN2011201888587U 2011-05-23 2011-05-23 Building roof precise boring device Expired - Lifetime CN202055763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201888587U CN202055763U (en) 2011-05-23 2011-05-23 Building roof precise boring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201888587U CN202055763U (en) 2011-05-23 2011-05-23 Building roof precise boring device

Publications (1)

Publication Number Publication Date
CN202055763U true CN202055763U (en) 2011-11-30

Family

ID=45015739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201888587U Expired - Lifetime CN202055763U (en) 2011-05-23 2011-05-23 Building roof precise boring device

Country Status (1)

Country Link
CN (1) CN202055763U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527102A (en) * 2013-01-16 2014-01-22 深圳市华南装饰设计工程有限公司 Mechanical device capable of being used for carrying out ceiling drilling operation on ground
CN107538046A (en) * 2016-06-24 2018-01-05 中建六局建设发展有限公司 A kind of portable beam bottom laser positioning bar planting is bored

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103527102A (en) * 2013-01-16 2014-01-22 深圳市华南装饰设计工程有限公司 Mechanical device capable of being used for carrying out ceiling drilling operation on ground
CN103527102B (en) * 2013-01-16 2017-05-17 深圳市华南装饰设计工程有限公司 Mechanical device capable of being used for carrying out ceiling drilling operation on ground
CN107538046A (en) * 2016-06-24 2018-01-05 中建六局建设发展有限公司 A kind of portable beam bottom laser positioning bar planting is bored

Similar Documents

Publication Publication Date Title
CN103521807B (en) A kind of liftable laser positioning high spatial suspension rod punching erecting device and method of operating
CN102962494A (en) Face-up impacting and drilling device for ceiling
CN205096590U (en) Simple and easy auxiliary device of ceiling punching operation
CN202055763U (en) Building roof precise boring device
CN203696028U (en) Liftable laser-positioning high-space suspender punching device
CN201679218U (en) Top plate drilling device for ceiling construction inside building
CN202055502U (en) Basket-type operating platform for construction of high-rise building construction
CN201427197Y (en) Upward drilling punching device
CN107653986B (en) A kind of the limit energy-consuming device and its installation method of assembled Special-Shaped Column
CN205165973U (en) Top bar planting dowelling jig hole strutting arrangement
CN202921967U (en) Ceiling faceup impacting and drilling device
CN204059901U (en) A kind of high-altitude construction operation platform
CN208456185U (en) A kind of tower crane wall-connecting piece safe walkway
CN202528152U (en) Vertical operation rack
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN206839615U (en) A kind of boring device of top plate
CN102691404A (en) Percussion drill support for overhead drilling construction
CN204934670U (en) A kind of electric drill auxiliary stand
CN205976389U (en) Hanger rod installation tool
CN105525755A (en) Steel bar planting hole drilling mechanical hand
CN204125116U (en) Wellhead blowout preventor checking maintenance platform
CN203401104U (en) Beam slab bottom drilling tool
CN204975422U (en) A lift drilling equipment for install expansion bolts on roof boarding
CN202627980U (en) Simple dowel bracket for drilled hole of electric hammer
CN204800006U (en) Ceiling drilling appurtenance

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
TR01 Transfer of patent right

Effective date of registration: 20150204

Address after: 100029 Beijing City, Chaoyang District Hui Street No. six twelfth floor

Patentee after: SINOPEC OILFIELD SERVICE CORPORATION

Address before: 257000 No. two, 755 North Road, Dongying District, Shandong, Dongying

Patentee before: Shengli Engineering Construction (Group) Co.,Ltd.

Effective date of registration: 20150204

Address after: 100029 Beijing City, Chaoyang District Hui Street No. six twelfth floor

Patentee after: SINOPEC OILFIELD SERVICE CORPORATION

Address before: 257000 No. two, 755 North Road, Dongying District, Shandong, Dongying

Patentee before: Shengli Engineering Construction (Group) Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 257000 DONGYING, SHANDONG PROVINCE TO: 100029 CHAOYANG, BEIJING

ASS Succession or assignment of patent right

Owner name: SINOPEC OILFIELD SERVICE CORPORATION

Free format text: FORMER OWNER: SHENGLI ENGINEERING CONSTRUCTION (GROUP) CORPORATION LTD. OF SHENGLI OIL FIELD

Effective date: 20150204

C41 Transfer of patent application or patent right or utility model
CX01 Expiry of patent term

Granted publication date: 20111130

CX01 Expiry of patent term