CN106760135A - A kind of furred ceiling hanger erection method - Google Patents
A kind of furred ceiling hanger erection method Download PDFInfo
- Publication number
- CN106760135A CN106760135A CN201710102892.XA CN201710102892A CN106760135A CN 106760135 A CN106760135 A CN 106760135A CN 201710102892 A CN201710102892 A CN 201710102892A CN 106760135 A CN106760135 A CN 106760135A
- Authority
- CN
- China
- Prior art keywords
- suspension rod
- hanger erection
- row
- hanger
- erection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of furred ceiling hanger erection method, belong to furred ceiling suspension rod technical field.Step of the invention is:Step one:Make suspension rod special implement:Cutting 10mm Hexagonal jackets wide in side are welded on square steel tube, square wood strip end is then attached to;Step 2:Survey sets hanger erection datum line in length and breadth:Surveyed on ceiling and set hanger erection datum line in length and breadth, with line of ink marker mark hanger erection position, need to be qualified through checking;Step 3:The drilling of first row suspension rod, borehole cleaning;Step 4:First row suspension rod is installed:In the band expanding screw suspension rod insertion hanger erection specific purpose tool hole of first end, in the suspension rod insertion mounting hole that will be installed, expansion bolt nut on suspension rod is tightened by row, then unload hanger erection specific purpose tool.The method convenient and reliable operation, standardized construction, energy-conservation reduces hand labor intensity, has saved cost, improves hanger erection quality and effect, shortens the hanger erection construction period.
Description
Technical field
The present invention relates to furred ceiling suspension rod technical field, more specifically to a kind of furred ceiling hanger erection method.
Background technology
At present, large area furred ceiling hanger erection method to ceiling furred ceiling installation effects higher such as Conference Hall, indoor aisle not
Substantially, it is uneconomical, it is necessary to set up full hall scaffold or tool type scaffold, easily occur suspension rod anchoring loosely, loosen, there is shadow
Ring construction safety, quality, progress hidden danger.
The content of the invention
1. the invention technical problem to be solved
For the shortcomings and deficiencies that prior art is present, the invention provides a kind of furred ceiling hanger erection method, operation side
Just reliable, standardized construction, energy-conservation reduces hand labor intensity, has saved cost, improves hanger erection quality and effect,
Shorten the hanger erection construction period.
2. technical scheme
To reach above-mentioned purpose, the technical scheme that the present invention is provided is:
A kind of furred ceiling hanger erection method of the invention, its step is:
Step one:Make suspension rod special implement:Cutting 10mm Hexagonal jackets wide in side are welded on square steel tube, weld seam
Height 3mm, is then attached to square wood strip end;
Step 2:Survey sets hanger erection datum line in length and breadth:Surveyed on ceiling and set hanger erection datum line in length and breadth, use line of ink marker mark
Know hanger erection position, need to be qualified through checking;
Step 3:The drilling of first row suspension rod, borehole cleaning:The suspension rod determined according to decoration drawing and scheme using electric boring machine
Position and depth carry out first row suspension rod drilling, are by row purged totally dust in hole using compressed air after pore-forming;
Step 4:First row suspension rod is installed:In the band expanding screw suspension rod insertion hanger erection specific purpose tool hole of first end,
In the suspension rod insertion mounting hole that will be installed, expansion bolt nut on suspension rod is tightened by row, then unload hanger erection specific purpose tool,
Other each row's ceiling hanger erections are carried out by that analogy.
3. beneficial effect
The technical scheme provided using the present invention, compared with prior art, is had the advantages that:
Convenient and reliable operation of the present invention, standardized construction, energy-conservation reduces hand labor intensity, has saved cost, improves
Hanger erection quality and effect, shorten the hanger erection construction period.
Specific embodiment
With reference to embodiment, the invention will be further described:
Embodiment 1
A kind of furred ceiling hanger erection method of the present embodiment, its step is:
Step one:Make suspension rod special implement:Cutting 10mm Hexagonal jackets wide in side are welded on square steel tube, weld seam
Height 3mm, is then attached to square wood strip end;
Step 2:Survey sets hanger erection datum line in length and breadth:Surveyed on ceiling and set hanger erection datum line in length and breadth, use line of ink marker mark
Know hanger erection position, need to be qualified through checking;
Step 3:The drilling of first row suspension rod, borehole cleaning:The suspension rod determined according to decoration drawing and scheme using electric boring machine
Position and depth carry out first row suspension rod drilling, are by row purged totally dust in hole using compressed air after pore-forming;
Step 4:First row suspension rod is installed:In the band expanding screw suspension rod insertion hanger erection specific purpose tool hole of first end,
In the suspension rod insertion mounting hole that will be installed, expansion bolt nut on suspension rod is tightened by row, then unload hanger erection specific purpose tool,
Other each row's ceiling hanger erections are carried out by that analogy.
A kind of furred ceiling hanger erection method of the present embodiment, convenient and reliable operation, standardized construction, energy-conservation reduces people
Work labour intensity, has saved cost, improves hanger erection quality and effect, shortens the hanger erection construction period.
Schematical above that the present invention and embodiments thereof are described, the description does not have restricted, actual side
Method is not limited thereto.So, if one of ordinary skill in the art is enlightened by it, do not departing from the invention objective
In the case of, frame mode and the embodiment similar to the technical scheme being designed without creative, all should belong to of the invention
Protection domain.
Claims (1)
1. a kind of furred ceiling hanger erection method, it is characterised in that:Its step is:
Step one:Make suspension rod special implement:Cutting 10mm Hexagonal jackets wide in side are welded on square steel tube, weld bead height
3mm, is then attached to square wood strip end;
Step 2:Survey sets hanger erection datum line in length and breadth:Surveyed on ceiling and set hanger erection datum line in length and breadth, hung with line of ink marker mark
Bar mounting arrangements position, need to be qualified through checking;
Step 3:The drilling of first row suspension rod, borehole cleaning:Arranged according to the suspension rod that decoration drawing and scheme determine using electric boring machine
Position and depth carry out first row suspension rod drilling, are by row purged totally dust in hole using compressed air after pore-forming;
Step 4:First row suspension rod is installed:In the band expanding screw suspension rod insertion hanger erection specific purpose tool hole of first end, will fill
In good suspension rod insertion mounting hole, expansion bolt nut on suspension rod is tightened by row, hanger erection specific purpose tool is then unloaded, with this
Analogizing carries out other each row's ceiling hanger erections.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710102892.XA CN106760135A (en) | 2017-02-24 | 2017-02-24 | A kind of furred ceiling hanger erection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710102892.XA CN106760135A (en) | 2017-02-24 | 2017-02-24 | A kind of furred ceiling hanger erection method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106760135A true CN106760135A (en) | 2017-05-31 |
Family
ID=58960448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710102892.XA Pending CN106760135A (en) | 2017-02-24 | 2017-02-24 | A kind of furred ceiling hanger erection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760135A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202416664U (en) * | 2011-11-28 | 2012-09-05 | 中国华冶科工集团有限公司 | Tool for installing suspender in construction of suspended ceiling |
CN102661031A (en) * | 2012-05-18 | 2012-09-12 | 中建一局集团第三建筑有限公司 | Simple and easy tool for mounting bracket hanging rod of roof and application method thereof |
KR20140065799A (en) * | 2012-11-22 | 2014-05-30 | 현대중공업 주식회사 | Zig for mounting ceiling panel of cabin |
CN205976389U (en) * | 2016-08-17 | 2017-02-22 | 陕西建工集团有限公司 | Hanger rod installation tool |
-
2017
- 2017-02-24 CN CN201710102892.XA patent/CN106760135A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202416664U (en) * | 2011-11-28 | 2012-09-05 | 中国华冶科工集团有限公司 | Tool for installing suspender in construction of suspended ceiling |
CN102661031A (en) * | 2012-05-18 | 2012-09-12 | 中建一局集团第三建筑有限公司 | Simple and easy tool for mounting bracket hanging rod of roof and application method thereof |
KR20140065799A (en) * | 2012-11-22 | 2014-05-30 | 현대중공업 주식회사 | Zig for mounting ceiling panel of cabin |
CN205976389U (en) * | 2016-08-17 | 2017-02-22 | 陕西建工集团有限公司 | Hanger rod installation tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201292587Y (en) | Combined stone curtain wall connecting piece for high-rise building | |
CN105507539A (en) | Light external wall point-hang heat-insulation and decorative plate combined anchoring system and method for constructing same | |
CN110984446A (en) | Efficient curtain wall installation method | |
CN104060704A (en) | Mechanical repairing method and structure for hollowing of thermal insulation mortar of outer wall | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN105370315B (en) | A kind of frost zone tunnel drainage construction technology | |
CN204295000U (en) | A kind of ceiling suspended ceiling hangs muscle drilling equipment | |
CN205362751U (en) | Processing frock suitable for coupling hole | |
CN106761846A (en) | A kind of grid steel frame for tunnel just branch construction exempts to weld pin-connected panel supporting construction | |
CN106760135A (en) | A kind of furred ceiling hanger erection method | |
CN104234361A (en) | Assembling method of facade stones | |
CN207436424U (en) | A kind of decoration panel cladding system | |
CN106836577B (en) | A kind of method of building stone curtain wall dried hanging | |
CN106812233A (en) | A kind of construction method of building abnormity wall decorative curtain wall | |
CN214462463U (en) | Combined type wall connecting piece for erecting external scaffold of shear wall | |
CN212358610U (en) | Mounting structure of top surface spherical net rack | |
CN204876448U (en) | Two back ofs body of stone material are tied two expanding and are tied integration steel pendant | |
CN103628602A (en) | Building curtain wall glass fiber reinforcement composite board mounting assembly and method | |
CN210059892U (en) | Drilling auxiliary device of chassis girder | |
CN204876450U (en) | Stone material back of body is tied two expanding of hook and is tied integration aluminum alloy pendant | |
CN206408784U (en) | New and old wall joint connecting device | |
CN104907980A (en) | Device and method for tightening ceiling rib expansion bolt | |
CN213308912U (en) | Hollow brick wall fixing part | |
CN206632937U (en) | A kind of top plate nut locking apparatus | |
CN105298144B (en) | High-rise glass curtain wall interlayer fireproof partition construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |