CN104234361A - Assembling method of facade stones - Google Patents

Assembling method of facade stones Download PDF

Info

Publication number
CN104234361A
CN104234361A CN201410491999.4A CN201410491999A CN104234361A CN 104234361 A CN104234361 A CN 104234361A CN 201410491999 A CN201410491999 A CN 201410491999A CN 104234361 A CN104234361 A CN 104234361A
Authority
CN
China
Prior art keywords
dry hanging
keel
stone material
hanging article
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410491999.4A
Other languages
Chinese (zh)
Inventor
杨天武
王学军
卞朱彬
赵春
王心刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Merud Building Decoration Co Ltd
Original Assignee
Suzhou Merud Building Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Merud Building Decoration Co Ltd filed Critical Suzhou Merud Building Decoration Co Ltd
Priority to CN201410491999.4A priority Critical patent/CN104234361A/en
Publication of CN104234361A publication Critical patent/CN104234361A/en
Pending legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention discloses an assembling method of facade stones. The assembling method comprises the steps of fixedly installing the facade stones by adopting light steel keels and adjustable dry hanging pieces, and controlling seams of the facade stones through adjusting the positions of the dry hanging pieces on the light steel keels, wherein a light steel keel grid comprises longitudinal keels and transverse keels, the longitudinal keels and the transverse keels are arranged in a crossing way and are fixedly connected through connecting pieces, groove holes which are used for installing the dry hanging pieces are formed in positions, which correspond to the dry hanging pieces, of the keels, one end of each dry hanging piece is fixedly connected with the corresponding keel through a fastening screw, and the other end of each dry hanging piece is used for connecting a stone plate block.

Description

A kind of facade stone material assembling method
Technical field:
The present invention relates to a kind of assembling method of construction work neutral surface stone material, particularly a kind of facade stone material assembling method that can control the position of the assembled seam of stone material and width.
Background technology:
In recent years, along with the quickening of Chinese Urbanization construction process, facilitate the development of builing industry, building is on the increase thereupon.Current building adopts curtain wall as the decoration of alien invasion mostly.But curtain wall itself has printing opacity and the characteristic such as reflective, although therefore can reach good visual effect, can bring the consequence such as highly energy-consuming and light pollution.Adopt stone material can avoid the problems referred to above as the decoration of outside vertical surface of building, and there is visual effect elegant in appearance.
The existing method at the assembled stone material of facade mainly comprises wet combining method and dry-hanging method two kinds.The latter is by being fixed on metope by keel, then is connected on keel by stone material by dry hanging article.Dry-hanging method has easy for installation, quick and relatively accurate specific, obtains using more and more widely.
But, along with the variation of building profile, the pattern that the assembled seam of elevation of building material is formed may be regular pattern, also may be irregular pattern, when the ornament materials adopting stone material as alien invasion, due to may deviation be there is in processing of stone and keel manufacturing process, sometimes joint pattern needs to adjust temporarily, or operant level is limited etc. in elevation construction process, there is skew in the seaming position that stone material can be caused assembled, or the width of seam is inconsistent, the aesthetic measure of outside vertical surface of building is impacted.
Summary of the invention:
The invention provides a kind of method, they can for the deficiencies in the prior art, control, effectively avoid the problem that seaming position offsets and width is inconsistent to the position of the assembled seam of stone material and width.
The object of the present invention is achieved like this:
A kind of facade stone material assembling method, controlled by the seam of position to stone material of dry hanging article on adjustment keel, the method comprises the following steps: (1) facade base cleaning; (2) keel line setting; (3) keel and adjustable dry hanging part are installed; (4) dry hanging article position adjustments; (5) stone material is assembled; (6) joint treatment; (7) delivery receiving acceptance.
Preferably, the base cleaning described in step (1) removes the scum silica frost of substrate surface, burr and foreign material by machinery or manual type, then with the dust of hairbrush cleaning substrate surface; Keel line setting described in step (2), is utilize the total powerstation be located on ground or surveying setting-out platform, measures, marked the installation site line of keel by control point coordinate in basic unit according to design drawing to construction plant; Keel described in step (3) and adjustable dry hanging part are installed, utilize rig to punch continuously at the positional punch position of basic unit, described hole is vertical with substrate surface, by bearing and expansion bolt, the lightgage steel joist grid with adjustable dry hanging part is arranged on substrate surface by described hole; Dry hanging article position adjustments described in step (4), according to the groove location of stone surface and the seaming position of required control and width, by calculating the correspondence position determining dry hanging article, regulating dry hanging article and fix by adjusting device, the seam after stone material is installed meets the requirements; Stone material described in step (5) is assembled, be the sequence of construction taked from the bottom to top, lift by crane stone material by boom hoisting, the dry hanging article of correspondence is embedded one by one in the groove of corresponding stone surface, stone material is fixed on keel, assembled formation facade stone curtain wall; Joint treatment described in step (6) is after stone material is assembled, and clog foam strips in the gap between adjacent stone material plate, surrounding paper self-adhesive tape does safe edge process, then fills in silicone weatherproof sealant with glue rifle, is finally removed by paper self-adhesive tape.
Further preferably, the described lightgage steel joist grid with adjustable dry hanging part comprises: longitudinal keel and lateral keel, described longitudinal keel are arranged in a crossed manner with lateral keel and be fixedly connected with by connector, position corresponding with dry hanging article on described keel offers the slotted eye installing dry hanging article, one end of described dry hanging article is fixedly connected with described keel by holding screw, and the other end of described dry hanging article is for connecting stone material plate.
Further preferably, described adjustable dry hanging part comprises front L shape part and rear L shape part, front L shape part is for connecting keel, rear L shape part is for connecting stone material plate, front L shape part and the superimposed position of rear L shape part have the horizontal, vertical line of rabbet joint, connecting screw in order to install, connecting by regulating the adjustment that the position of screw in the horizontal, vertical line of rabbet joint realizes dry hanging article.
Further preferably, on described adjustable dry hanging part, the length of the line of rabbet joint is 20-60mm, and width is 5-20mm, and the pattern that the assembled seam of described stone material is formed is regular pattern or irregular pattern, and joint gap controls at 2-20mm.
The present invention compared with prior art, has following beneficial effect:
(1) the present invention adopts dry hanging article mounting vertical plane stone material, can realize standardized work, simplify erection procedure, improve installation effectiveness, has saved a large amount of man power and material, has reduced engineering cost, accelerate speed of application.
(2) the present invention has good engineering adaptability, when occurring deviation in processing of stone and keel manufacturing process, or when joint pattern needs to adjust temporarily, can normally be constructed by the position adjusting dry hanging article.
(3) facade stone material assembling method of the present invention, without the need to welding, decreasing work with torches, eliminating the potential safety hazard that may exist in work progress.
Detailed description of the invention:
Certain mansion, its alien invasion uses stone material as ornament materials, forms irregular pattern by the assembled seam of stone material.By comparing and preferably, finally determining that the installation adopting lightgage steel joist and adjustable dry hanging part to carry out facade stone material is fixed.
Its facade stone material assembling method comprises the following steps: (1) base cleaning: remove the scum silica frost of substrate surface, burr and foreign material by machinery or manual type, then with the dust of hairbrush cleaning substrate surface; (2) keel line setting: utilize the total powerstation be located on ground or surveying setting-out platform, according to design drawing, construction plant is measured, marked the installation site line of keel by control point coordinate in basic unit; (3) keel and adjustable dry hanging part are installed: utilize rig to punch continuously at the positional punch position of basic unit, described hole is vertical with substrate surface, by bearing and expansion bolt, the lightgage steel joist grid with adjustable dry hanging part is arranged on substrate surface by described hole; (4) dry hanging article position adjustments: according to the groove location of stone surface and the seaming position of required control and width, by calculating the correspondence position determining dry hanging article, regulate dry hanging article by adjusting device and fix, the seam after stone material is installed meets the requirements; (5) stone material is assembled: take sequence of construction from the bottom to top, lift by crane stone material by boom hoisting, is embedded by the dry hanging article of correspondence in the groove of corresponding stone surface one by one, is fixed on by stone material on keel, assembled formation facade stone curtain wall; (6) joint treatment: after stone material is assembled, clog foam strips in the gap between adjacent stone material plate, surrounding paper self-adhesive tape does safe edge process, then fills in silicone weatherproof sealant with glue rifle, is finally removed by paper self-adhesive tape; (7) delivery receiving acceptance.
Its lightgage steel joist grid comprises: longitudinal keel and lateral keel, described longitudinal keel are arranged in a crossed manner with lateral keel and be fixedly connected with by connector, position corresponding with dry hanging article on described keel offers the slotted eye installing dry hanging article, one end of described dry hanging article is fixedly connected with described keel by holding screw, and the other end of described dry hanging article is for connecting stone material plate.
Its adjustable dry hanging part comprises front L shape part and rear L shape part, front L shape part is for connecting keel, rear L shape part is for connecting stone material plate, front L shape part and the superimposed position of rear L shape part have the horizontal, vertical line of rabbet joint, connecting screw in order to install, connecting by regulating the adjustment that the position of screw in the horizontal, vertical line of rabbet joint realizes dry hanging article.On adjustable dry hanging part, the length of the line of rabbet joint is 20-60mm, and width is 5-20mm, and the width control system of the assembled seam of stone material is at 2-20mm.

Claims (6)

1. a facade stone material assembling method, controlled by the seam of position to stone material of dry hanging article on adjustment keel, the method comprises the following steps:
(1) facade base cleaning;
(2) keel line setting;
(3) keel and adjustable dry hanging part are installed;
(4) dry hanging article position adjustments;
(5) stone material is assembled;
(6) joint treatment;
(7) delivery receiving acceptance.
2. method according to claim 1, is characterized in that:
Base cleaning described in step (1) removes the scum silica frost of substrate surface, burr and foreign material by machinery or manual type, then with the dust of hairbrush cleaning substrate surface;
Keel line setting described in step (2), is utilize the total powerstation be located on ground or surveying setting-out platform, measures, marked the installation site line of keel by control point coordinate in basic unit according to design drawing to construction plant;
Keel described in step (3) and adjustable dry hanging part are installed, utilize rig to punch continuously at the positional punch position of basic unit, described hole is vertical with substrate surface, by bearing and expansion bolt, the lightgage steel joist grid with adjustable dry hanging part is arranged on substrate surface by described hole;
Dry hanging article position adjustments described in step (4), according to the groove location of stone surface and the seaming position of required control and width, by calculating the correspondence position determining dry hanging article, regulating dry hanging article and fix by adjusting device, the seam after stone material is installed meets the requirements;
Stone material described in step (5) is assembled, be the sequence of construction taked from the bottom to top, lift by crane stone material by boom hoisting, the dry hanging article of correspondence is embedded one by one in the groove of corresponding stone surface, stone material is fixed on keel, assembled formation facade stone curtain wall;
Joint treatment described in step (6) is after stone material is assembled, and clog foam strips in the gap between adjacent stone material plate, surrounding paper self-adhesive tape does safe edge process, then fills in silicone weatherproof sealant with glue rifle, is finally removed by paper self-adhesive tape.
3. method according to claim 2, it is characterized in that, the described lightgage steel joist grid with adjustable dry hanging part comprises: longitudinal keel and lateral keel, described longitudinal keel are arranged in a crossed manner with lateral keel and be fixedly connected with by connector, position corresponding with dry hanging article on described keel offers the slotted eye installing dry hanging article, one end of described dry hanging article is fixedly connected with described keel by holding screw, and the other end of described dry hanging article is for connecting stone material plate.
4. method according to claim 3, it is characterized in that, described adjustable dry hanging part comprises front L shape part and rear L shape part, front L shape part is for connecting keel, rear L shape part is for connecting stone material plate, front L shape part and the superimposed position of rear L shape part have the horizontal, vertical line of rabbet joint, connect screw, by the adjustment regulating the connection position of screw in the horizontal, vertical line of rabbet joint to realize dry hanging article in order to install.
5. method according to claim 4, is characterized in that, on described adjustable dry hanging part, the length of the line of rabbet joint is 20-60mm, and width is 5-20mm.
6. method according to claim 5, is characterized in that, the pattern that the assembled seam of described stone material is formed is regular pattern or irregular pattern, and joint gap controls at 2-20mm.
CN201410491999.4A 2014-09-24 2014-09-24 Assembling method of facade stones Pending CN104234361A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410491999.4A CN104234361A (en) 2014-09-24 2014-09-24 Assembling method of facade stones

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410491999.4A CN104234361A (en) 2014-09-24 2014-09-24 Assembling method of facade stones

Publications (1)

Publication Number Publication Date
CN104234361A true CN104234361A (en) 2014-12-24

Family

ID=52223185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410491999.4A Pending CN104234361A (en) 2014-09-24 2014-09-24 Assembling method of facade stones

Country Status (1)

Country Link
CN (1) CN104234361A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256928A (en) * 2015-11-17 2016-01-20 刘卫东 Wall stone dry hanging method
CN108331216A (en) * 2018-01-25 2018-07-27 江苏南通三建建筑装饰有限公司 A kind of installation method of large size carving stone curtain wall
CN108756181A (en) * 2018-03-30 2018-11-06 广东依来德建材有限公司 A kind of processing method of assembled architecture overlapping the slot
CN110656742A (en) * 2019-10-18 2020-01-07 中信建设有限责任公司 Masonry wall surface masonry process
CN111173222A (en) * 2020-01-06 2020-05-19 佛山宏润美嘉建材有限公司 Marble facade construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2320707Y (en) * 1997-07-18 1999-05-26 冯义忠 Outer wall stone dry hanging pendant
CN200964642Y (en) * 2006-09-30 2007-10-24 王召鹏 Stone-curtain-wall dry-hanging-fixing device
DE102007058771A1 (en) * 2007-12-06 2009-06-10 Fischerwerke Gmbh & Co. Kg Device for fixing plate-like facing elements with carrier and hanging element which can be applied to and hanged on facing element useful in facade construction minimizes constrain forces and facing element is simple to install
CN102003077A (en) * 2010-12-05 2011-04-06 中建六局第三建筑工程有限公司 Stone curtain wall construction method
CN201901964U (en) * 2010-12-22 2011-07-20 泛华建设集团有限公司 Three-dimensional adjustable and disconnectable curtain wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2320707Y (en) * 1997-07-18 1999-05-26 冯义忠 Outer wall stone dry hanging pendant
CN200964642Y (en) * 2006-09-30 2007-10-24 王召鹏 Stone-curtain-wall dry-hanging-fixing device
DE102007058771A1 (en) * 2007-12-06 2009-06-10 Fischerwerke Gmbh & Co. Kg Device for fixing plate-like facing elements with carrier and hanging element which can be applied to and hanged on facing element useful in facade construction minimizes constrain forces and facing element is simple to install
CN102003077A (en) * 2010-12-05 2011-04-06 中建六局第三建筑工程有限公司 Stone curtain wall construction method
CN201901964U (en) * 2010-12-22 2011-07-20 泛华建设集团有限公司 Three-dimensional adjustable and disconnectable curtain wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘元勋: "背挂式石材干挂件在幕墙工程中的应用", 《黑龙江科技信息》, 30 September 2004 (2004-09-30), pages 211 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256928A (en) * 2015-11-17 2016-01-20 刘卫东 Wall stone dry hanging method
CN105256928B (en) * 2015-11-17 2018-06-12 温岭一动机械科技有限公司 Wall-surface stone dry-hanging method
CN108331216A (en) * 2018-01-25 2018-07-27 江苏南通三建建筑装饰有限公司 A kind of installation method of large size carving stone curtain wall
CN108756181A (en) * 2018-03-30 2018-11-06 广东依来德建材有限公司 A kind of processing method of assembled architecture overlapping the slot
CN110656742A (en) * 2019-10-18 2020-01-07 中信建设有限责任公司 Masonry wall surface masonry process
CN111173222A (en) * 2020-01-06 2020-05-19 佛山宏润美嘉建材有限公司 Marble facade construction process

Similar Documents

Publication Publication Date Title
CN104234361A (en) Assembling method of facade stones
CN210857803U (en) Circular stone decorative column
CN110424661A (en) The construction method of dry hanging granite plate
CN104895193A (en) Precast outer wallboard connecting box and connecting joint
CN104895279A (en) Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure
CN204401952U (en) A kind of push-in type hanging part for locating installs the textural association of masonry slab
CN205046791U (en) Artificial stone plate material connection structure convenient to hang dress
CN104153495A (en) Multifunctional lightweight concrete curtain wall connecting structure
CN104912231A (en) Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same
CN204571055U (en) Insulation ceiling structure
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN101519906B (en) Implanted pottery-stone connector for building decorative plates, and dry-hanging installation technique thereof
CN104405115A (en) Wall plastering flatness and perpendicularity control device and construction method
CN205063248U (en) Prefabricated exterior wall board and precast beam hang connection structure futilely
CN103924786A (en) Installation support for large-span out-extended GRC plates and lifting construction method
CN207245074U (en) Coupling type dry hanging stone structure and stone curtain wall
CN204098298U (en) A kind of metal energy-saving curtain wall
CN204001496U (en) A kind of steel structure stairway
CN211850215U (en) Efficient energy-saving decorative stone curtain wall system
CN204645661U (en) Adjustable angle steel template
CN204960251U (en) Paint layer gauge control device
CN210616878U (en) Flat prosthetic devices of face
CN204637364U (en) Building smoke-proof pendant wall mounting structure
CN205531058U (en) Lightning protection support mounting structure
CN208202203U (en) A kind of toilet wall body structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141224

RJ01 Rejection of invention patent application after publication