CN208202203U - A kind of toilet wall body structure - Google Patents

A kind of toilet wall body structure Download PDF

Info

Publication number
CN208202203U
CN208202203U CN201721326002.5U CN201721326002U CN208202203U CN 208202203 U CN208202203 U CN 208202203U CN 201721326002 U CN201721326002 U CN 201721326002U CN 208202203 U CN208202203 U CN 208202203U
Authority
CN
China
Prior art keywords
component
extension
wall
layer
brick layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721326002.5U
Other languages
Chinese (zh)
Inventor
张跃东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jian Ge Technology Co Ltd
Original Assignee
Hangzhou Jian Ge Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jian Ge Technology Co Ltd filed Critical Hangzhou Jian Ge Technology Co Ltd
Priority to CN201721326002.5U priority Critical patent/CN208202203U/en
Application granted granted Critical
Publication of CN208202203U publication Critical patent/CN208202203U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a kind of toilet wall body structures, including ground, top surface and side wall;The side wall includes side wall and wall brick layer;First component and second component are equipped between the side wall and wall brick layer, the first component and second component are in distribution up and down.The case where the utility model passes through the cooperation of first component and second component, effectively determines the height of wall brick layer, avoids the occurrence of cutting tile, difficulty of construction is low, high-efficient, and guarantees that the decorative pattern of ceramic tile is coherent, good appearance;Meanwhile the installation of first component and second component, the installation of ceramic tile is simplified, the requirement to worker's technology is reduced, recruitment cost is reduced, improves work efficiency.

Description

A kind of toilet wall body structure
Technical field
The utility model belongs to interior decoration technology, more particularly, to a kind of toilet wall body structure.
Background technique
Existing toilet metope is in tiling, since the specific height of wall brick layer can not count, thus in construction, The specification of ceramic tile is often mismatched with the height of wall brick layer, when being attached to the ceramic tile of last position, it usually needs cut Or progress joint filling supplements and carrys out matching position, trivial operations, construction period is very long.And when tiling, the flatness of ceramic tile and The verticality on ceramic tile and ground carries out control by installation master worker, recruitment very high for the technical requirements of construction worker It is costly and inefficient down.
Utility model content
The utility model for overcome the deficiencies in the prior art, provides that a kind of constructing operation is simple, construction efficiency is high defends Wall body structure between life.
To achieve the goals above, the utility model uses following technical scheme: a kind of toilet wall body structure, including side Face wall body and the wall brick layer external set on flank wall;Side wall lower part is equipped with the first component matched with wall brick layer, Side wall top is equipped with the second component matched with wall brick layer.The utility model installs first before installing wall brick layer in advance Component and second component, by the cooperation of first component and second component, so that the height of wall brick layer determines (first component and the The distance between two components), so that corresponding tile specification can highly be determined according to this, directly transported after factory process It is assembled to scene, since specification adapts to the height of wall brick layer completely, the case where from without needing cutting tile, is subtracted Lack procedure of processing, improved construction efficiency, while ensure that the decorative pattern of ceramic tile is coherent, it is also more aesthetically pleasing in shape;And the One component and second component can remain perpendicular to the state of horizontal plane during installation, guarantee the verticality and flatness of wall brick layer; And control and detection are carried out without artificial in the construction process, the installation of ceramic tile is simplified, the requirement to worker's technology is reduced, Recruitment cost is reduced, is improved work efficiency.
Further, the first component side and the flank wall mates, the other side are equipped with the first extension; First extension plays support and levelling effect, in tiling, it is only necessary to the blocks of stacking porcelain on the first extension Brick, the requirement for simplifying installation, reducing to worker's technology of high degree, reduces recruitment cost, improves working efficiency.
Further, the second component side and the flank wall mates, the other side are equipped with the second extension; Realize that the top surface structure to the levelling of top surface structure, after being installed keeps surfacing by the second extension, to improve Flatness at inner corner trim, the case where avoiding junction out-of-flatness generation, wall shape are more aesthetically pleasing.
Further, the wall brick layer is set between first extension and the second extension;Pass through the second extension With the cooperation of the first extension, the precise measurement to wall brick layer height is realized, calculate precisely, guarantee hence for the specification of ceramic tile The case where being not in cutting tile
Further, the first component is equipped with the third extension matched with ground, and the third extension is vertical It is arranged in first component;Provided with third extension, it can be achieved that the quick levelling of ground structure;When installing connecting elements simultaneously It after guaranteeing that extension is parallel to the horizontal plane, directly lays cement in ground structure, is paved with after cement to extension position, lead to It crosses plank or steel bar strikes off extra cement;When striking off, plank or steel bar both ends are respectively placed in the connecting elements of left and right two It on extension, is moved later along extension, that is, can guarantee and cement is struck off along horizontal line completely, thus after the completion of can guarantee Ground structure it is substantially flat and horizontal;Under this kind of mode, the ground structure after striking off has absolute flatness, without applying The measurement of blanket type is carried out during work, the workload for reducing worker of high degree is time saving and energy saving;Directly in blank It is laid with cement in the structure of face and strikes off, constructing operation is simple, and high degree shortens construction period, improves construction effect Rate;And since third extension is vertical with member bodies, it is ensured that the wall brick layer after being installed is vertical with ground holding.
Further, the ground structure includes screed-coat and the surface layer on screed-coat, the third extension with The screed-coat matches;Third extension upper surface is concordant with screed-coat upper surface, so that third extension is directly given and looked for Leveling provides datum plane, and for the levelling mode compared to traditional mistake object of reference, the Pingdu of screed-coat upper surface is high;And by In with the presence of benchmark, so that without repeating multiple measurement, the work for reducing worker of high degree in leveling procedures The technical difficulty of amount and construction improves construction efficiency
Further, the face that first extension is matched with wall brick layer is rough surface setting;Due to setting for rough surface Set so that glue coating on a surface when, glue can high degree remain on rough surface, it is viscous to compare traditional plane For connecing, adhesive effect is more preferable, so that the first extension is securely connect with wall brick layer;Meanwhile the setting of rough surface also adds Bonding plane and the direct frictional force of metope guarantee the phenomenon that the two is not in skidding in bonding.
Further, first extension is arranged in parallel with the third extension.
Further, second extension is arranged perpendicular to the member bodies.
Further, first extension surface is evenly spaced forms the rough surface equipped with multiple grooves; Groove is more preferable for the retention effect of glue, so that the connection between the first extension and wall brick layer is more secured.
In conclusion the utility model has the advantage that the cooperation by first component and second component, effectively determine The height of wall brick layer, the case where avoiding the occurrence of cutting tile, difficulty of construction is low, high-efficient, and guarantees that the decorative pattern of ceramic tile is coherent, outside Shape is beautiful;Meanwhile the installation of first component and second component, the installation of ceramic tile is simplified, the requirement to worker's technology is reduced, Recruitment cost is reduced, is improved work efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram one of the utility model.
Fig. 2 is the structural schematic diagram two of the utility model.
Fig. 3 is the partial schematic diagram one in Fig. 2.
Fig. 4 is the partial schematic diagram two in Fig. 2.
Fig. 5 is the structural schematic diagram one of leakproof slotware in the utility model.
Fig. 6 is the structural schematic diagram two of leakproof slotware in the utility model.
Fig. 7 is the partial schematic diagram of wall in the utility model.
Specific embodiment
In order to make those skilled in the art better understand the utility model, below in conjunction with the utility model reality The attached drawing in example is applied, the technical solutions in the embodiments of the present invention are clearly and completely described.
As shown in figures 1 to 6, a kind of toilet wall body structure, the wall brick including side wall 11 and outside side wall 11 Layer 12, the side wall 11 are equipped with the first component 13 matched respectively with the wall brick layer and second component 14, and institute First component 13 is stated set on 11 lower part of side wall, the second component 14 is set to 11 top of side wall;Pass through The case where cooperation of first component and second component effectively determines the height of wall brick layer, avoids the occurrence of cutting tile improves work Efficiency, and guarantee that the decorative pattern of ceramic tile is coherent, good appearance.
Specifically, the side wall 11 can be cement wall, brick wall, lightgage steel joist wall etc.;It, can also in other embodiments To be cement wall, brick wall etc. by base after flat;In other embodiments, it can also be in cement wall, brick wall, lightgage steel joist Wall after setting metope screed-coat 15 is levelling on former wall after the completion of the buildings such as wall;Wall brick layer 12 is straight on the market The ceramic tile patch of purchase is connect, the model and material of ceramic tile are not specifically limited;Carpenter can be used in the metope screed-coat 15 Plate, plasterboard, calcium silicate board or other one of materials for wall construction, wherein calcium silicate board is preferably used, it can Metope is set to have the effect of good fire prevention, moisture-proof, sound insulation, heat-insulated;Certainly, above-mentioned material is not the limit to protection scope System, other, which meet the material of condition or material, can be used.
The first component 13 is made of aluminium alloy or stainless steel, and entire first component 13 is integrally formed and is made, and makes It is big to make easy and secured intensity;13 side of first component is matched with the side wall 11, and the other side is equipped with first Extension 132, the first component 13 are equipped with screw hole, so as to which first component 13 is mounted on the wall of side by screw; First extension 132 is directed out by the first component 13 and is extended to form, and the first extension 132 is perpendicular to described first Component 13 is arranged;As shown in figure 3, the second component 14 is made of aluminium alloy or stainless steel, entire second component 14 is integrated Molding is made, and manufacture is easy and securely intensity is big;14 side of second component is matched with the side wall 11, the other side It is equipped with the second extension 142;The second component 14 is equipped with screw hole, so as to be mounted on second component 14 by screw On the wall of side, second extension 142 is directed out by second component 14 to be extended to form, and the second extension 142 is vertical It is arranged in second component 14;The wall brick layer is set between first extension 132 and the second extension 142, thus to wall The height determination of brick layer is more accurate.
Further, needed between wall brick layer 12 and first extension 132 it is be bonded, for the bonding effect both enhanced Fruit, the face that the first extension 132 is matched with wall brick layer 12 is set rough surface by we;Specifically, first extension 132 upper surfaces are equipped with multiple grooves to form the rough surface, and multiple groove is strip, and along the first extension 132 Width direction on evenly spaced distribution;More glue can be held in groove, to ensure that wall brick layer 12 and first extends Firm connection is able to carry out between portion 132.
In other embodiments, as Figure 2-3, the first component 13 is equipped with the third matched with ground and extends Portion 133, the third extension 133 are located at the lower section of first extension, and direct out extension by the first component 13; The third extension 133 is arranged perpendicular to the first component 13, thus third extension 133 and the first extension phase In parallel;Specifically, the ground structure includes screed-coat 21 and the surface layer 22 on screed-coat, the third extension 133 It is matched with the screed-coat 21, and the upper surface of third extension 133 is parallel with the upper surface of screed-coat 21, the screed-coat It can be cement production systD, can also be made of other for levelling material;The surface layer 22 is ceramic tile or other are used for ground surface finishing Material;Third extension 133, as the reference section of screed-coat, can realize screed-coat upper surface during floor leveling It is substantially flat;Specifically, directly laying cement on original ground after first component is installed, it is paved with to cement to It behind three extension positions, is erected on third extension by plank or steel bar, is moved along third extension, scraped more Remaining cement (other materials such as gypsum can also be used), can be realized and strike off to cement, thus the water after the completion of can guarantee Mud layer surface is substantially flat, and above-mentioned cement layer becomes screed-coat.
There is spacing, which can be directly used for installation surface layer between first extension 132 and the screed-coat 21 22;In other embodiments, as shown in Fig. 2, the structure in shower house can as in the case where being individually separated out shower house in toilet What is be arranged is different;Specifically, shower house is formed after being separated out in the bathroom certain region by bath door 5, the bath Door 5 is made of glass;Shower house includes leakproof slotware 6, the drainage outlet 65 on leakproof slotware 6 and is layed in the leakproof Surface layer 22 on slotware;The leakproof slotware 6 be metal slot structure, metal slot structure therein refer to leakproof slotware 6 be by Metal material is integrally formed the slot that manufactured top is opening, and preferably stainless steel sink is made;As shown in Fig. 2, the ground of toilet Face 8 is equipped with the installation position matched with the leakproof slotware 6, specifically, the installation position is by one on accomodation ground A groove, and the groove is by recess is formed downwards on accomodation ground, it is therein to refer to that the bottom surface of groove is compared to lower recess It is low in the floor tile layer surface of accomodation ground, but formation is excavated not necessarily on accomodation ground;In the present embodiment, Above-mentioned installation position is the spacing between the first extension 132 and the screed-coat 21;By the setting of leakproof slotware, so that leaching The entire bottom of bath room is leakproof slotware, and the water generated in shower house is collected into leakproof slotware, guarantees that shower house exists It is not in the case where toilet leak elsewhere after long-time service, waterproof layer is less prone to leakage, toilet leakproof Effect is good;And effectively prevent water and leak to cement layer and the case where cement layer water storage occur, guarantee toilet when unused It can Quick-return drying regime;And pass through the setting of leakproof slotware, so that entire shower house can realize that modularization is installed, installation High-efficient, construction period is short.
Specifically, as seen in figs. 5-6, the leakproof slotware 6 has first area 61 and second area 62, it is preferred that institute It states and is equipped with a separator 64 in leakproof slotware 6 to which leakproof slotware 6 is divided into first area 61 and second area, it is preferred that The separator 64 is a stainless steel plate, can be directly anchored in leakproof slotware by welding, can also be with leakproof slotware direct one It is body formed;The surface layer 22 includes first layer body 221 and second layer body 222, and the first layer body 221 is set to the first area In 61, it is preferred that the first layer body 221 is installed in first area 61, can be realized first layer body 221 by glue or cement and be prevented Being connected between bakie part;The drainage outlet is set in the second area, specifically, drainage outlet is to be set as leakproof slotware bottom Circular open on face;Preferably, drainage outlet 65 is downwardly extending a circle interconnecting piece, and interconnecting piece is inserted into down during installation In water channel, prevent from draining being the case where leak occur;The second layer body 222 is movably disposed in the second area 62 Interior, here removable refers to that second layer body 222 is directly placed in second area 62, is not through glue or cement etc. and anti- Bakie part is connected, and when needing to take out second layer body 222, second layer body 222 is directly taken out, hence for the maintenance of drainage outlet It is more easy.
Further, the second layer body 222 is made of one piece of brick body, when repairing drainage outlet, is dismounted more square Just;The first layer body 221 is equally made of the brick body of a monolith, easy for installation;Certainly, in other embodiments, described One layer of body 221 can also be formed by muti-piece spreading bricks, be fixed together between mutual brick body;Above-mentioned brick body is preferably ceramic tile, when Other finishing materials for accomodation ground so can also be used, will not enumerate herein.
Further, the surface layer structure 2 is to be arranged from first area to second area to be obliquely installed, and preferably, That is low side is close to the position of drainage outlet 65;Preferably, the side of the second layer body 222 and the leakproof There is gap, which forms a leak gap, that is to say, that the lower side of surface layer structure 2 and leakproof between 6 inner wall of slotware There is leak gap between 6 inner surface of slotware;To which most of water in modularization shower house is flowed to along inclined surface layer structure Leak gap, then be left at drainage outlet via leak gap, it discharges.
Specifically, the lower part of the bath door is penetrated to sliding slot as shown in fig. 7, the leakproof slotware 6 is equipped with sliding slot 63 It is interior, wherein a fan glass door can slide in sliding slot;Preferably, the sliding slot is integrated with leakproof slotware 6 when leakproof slotware 6 is manufactured Molding is made, and manufactures more easy;Preferably, as shown in figure 5, being additionally provided with connecting elements 8 on the metope 5 of toilet, the company Connection member 8 is equipped with the mounting groove 81 matched with the bath door 5, and bath door can be caught in the mounting groove, realizes to bath door Positioning;Specifically, the connecting elements 8 includes member bodies 82 and two extension edges 83 in member bodies, member bodies 82 are equipped with screw hole, so as to which member bodies 82 are mounted in the wall layers of bottom by screw;Two extension edge 83 is by component sheet 82 surface of body, which directs out, to be extended to form, and member bodies 82 are respectively perpendicular to member bodies 82, and have between two extension edges 83 Spacing, and then form the mounting groove 81.
In other embodiments, the second component 14 is matched with the top surface of toilet, and the top surface includes top surface knot Structure 31 and the top surface surface layer 33 outside top surface structure 31, top surface surface layer 33 are connected by keel with top surface structure 31;Specifically, The top surface structure 31 is the former wall before carrying out interior decoration, such as cement wall, brick wall, lightgage steel joist wall;The top surface face Layer 33 is plasterboard, calcium silicate board, ceiling board or other one of materials for wall construction, wherein preferably using silicon Sour calcium plate can make metope have the effect of good fire prevention, moisture-proof, sound insulation, heat-insulated;Certainly, above-mentioned material is not to protection The limitation of range, other, which meet the material of condition or material, can be used;The upper surface and the top of second extension 142 Face surface layer 33 matches, thus by the second extension 142 to top surface surface layer 33 haved the function that support and it is levelling, and due to Second extension 142 and second component are perpendicular, to ensure that the right angle that the inner corner trim between side wall and top surface is 90 °, structure Stablize, is less prone to and cracks, and good appearance;Preferably, can also carry out furred ceiling on 33 lower surface of top surface surface layer, have Body construction process is the prior art, is repeated no more.
It is first levelling to the flat simultaneously plus side wall screed-coat progress of flank wall body progress base when construction, in the top and the bottom of screed-coat Do not draw a horizontal line, later install first component to the position with lower horizontal line overlap, by second component install to With the position of upper level line overlap;It directly lays cement, is paved with to cement to third extension position on the ground later Afterwards, it is struck off extra cement (other materials such as gypsum can also be used) by plank or steel bar, forms screed-coat;It later will connection Component keeps the state of vertical level to install to the wall of side, and the installation site of connector is true according to the position of bath door in advance It sets;Wall brick layer is sticked later, a mounting groove is just left on wall brick layer, and the lower part that wall brick layer corresponds to shower house position is reserved The space of leakproof slotware is installed out;Two top surface surface layers are mounted respectively on two second extensions later;It later will by keel Top surface surface layer is connected on top surface structure, is later supplemented the top surface surface layer of remaining central part complete;Leakproof slotware is existed again Transport is packed into the space of wall brick layer lower part to finishing ground, is laid with floor tile later, finally installs bath door after factory assembles And it is laid with the floor tile of toilet elsewhere.
Obviously, described embodiment is only a part of the embodiment of the utility model, instead of all the embodiments. Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts The range of the utility model protection all should belong in every other embodiment.

Claims (10)

1. a kind of toilet wall body structure, including side wall (11) and the wall brick layer (12) external set on flank wall;Its feature Be: side wall (11) lower part is equipped with the first component (13) that matches with wall brick layer (12), on side wall (11) Portion is equipped with the second component (14) matched with wall brick layer (12).
2. a kind of toilet wall body structure according to claim 1, it is characterised in that: first component (13) side with The side wall (11) matches, and the other side is equipped with the first extension (132).
3. a kind of toilet wall body structure according to claim 2, it is characterised in that: second component (14) side with The side wall (11) matches, and the other side is equipped with the second extension (142).
4. a kind of toilet wall body structure according to claim 3, it is characterised in that: the wall brick layer is set to described first Between extension (132) and the second extension (142).
5. a kind of toilet wall body structure according to claim 2, it is characterised in that: the first component (13) is equipped with The third extension (133) matched with ground.
6. a kind of toilet wall body structure according to claim 5, it is characterised in that: further include being set to looking on ground Leveling (21) and the surface layer (22) on screed-coat, the third extension (133) match with the screed-coat (21).
7. a kind of toilet wall body structure according to claim 6, it is characterised in that: first extension (132) with The third extension (133) is arranged in parallel.
8. a kind of toilet wall body structure according to claim 3, it is characterised in that: second extension (142) is hung down Directly it is arranged in member bodies.
9. a kind of toilet wall body structure according to claim 5, it is characterised in that: the third extension (133) is hung down Directly it is arranged in first component (13).
10. a kind of toilet wall body structure according to claim 2, it is characterised in that: first extension (132) One side is rough surface structure at least within.
CN201721326002.5U 2017-10-13 2017-10-13 A kind of toilet wall body structure Active CN208202203U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721326002.5U CN208202203U (en) 2017-10-13 2017-10-13 A kind of toilet wall body structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721326002.5U CN208202203U (en) 2017-10-13 2017-10-13 A kind of toilet wall body structure

Publications (1)

Publication Number Publication Date
CN208202203U true CN208202203U (en) 2018-12-07

Family

ID=64490168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721326002.5U Active CN208202203U (en) 2017-10-13 2017-10-13 A kind of toilet wall body structure

Country Status (1)

Country Link
CN (1) CN208202203U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528912A (en) * 2019-08-13 2019-12-03 广东良固住工科技有限公司 A kind of construction method of monoblock type bathroom

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528912A (en) * 2019-08-13 2019-12-03 广东良固住工科技有限公司 A kind of construction method of monoblock type bathroom
CN110528912B (en) * 2019-08-13 2021-07-13 广东良固住工科技有限公司 Construction method of integral bathroom

Similar Documents

Publication Publication Date Title
CN208792663U (en) A kind of room finishing system
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN212271498U (en) Assembly decoration system and ground system thereof
CN104878901B (en) Construction technology of wood-decorated wall
CN103046714A (en) Construction method for double-sided inorganic composite phenolic aldehyde fire-proof heat-insulating decorating integration plates
EP0754811B1 (en) Improvements to the systems for constructing partition walls, walls and extradoses
CN104499614B (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN208202203U (en) A kind of toilet wall body structure
CN203905374U (en) Hanging piece for hanging stones or tiles in wet hanging mode
CN204225324U (en) Wall thermal insulating integration point extension system
CN106437093A (en) Architectural decoration and finishing concealed installation tile skirting structure and construction technology thereof
CN102605897B (en) Rainproof outer wall board and construction method of rainproof outer wall
CN208347208U (en) A kind of new indoor walling system
CN108978851A (en) A kind of improvement room finishing system and decoration method
CN105604287A (en) Paving method of prefabricated composite wallboards
CN207878784U (en) A kind of assembly wall
CN207332617U (en) A kind of doorframe structure
CN207739427U (en) A kind of walling system
CN207739536U (en) A kind of indoor wall system
CN205637443U (en) Installation device of movable decorative board
CN208105602U (en) A kind of novel wall structure
CN211923050U (en) Face and build various steel sheet house waterproof board
CN211817486U (en) Plaster olecranon drip
CN204040284U (en) A kind of stone material composite honeycomb board installation of ceiling system
CN213572493U (en) Aerated concrete block wall with anti-cracking structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant