CN108978851A - A kind of improvement room finishing system and decoration method - Google Patents
A kind of improvement room finishing system and decoration method Download PDFInfo
- Publication number
- CN108978851A CN108978851A CN201811037031.9A CN201811037031A CN108978851A CN 108978851 A CN108978851 A CN 108978851A CN 201811037031 A CN201811037031 A CN 201811037031A CN 108978851 A CN108978851 A CN 108978851A
- Authority
- CN
- China
- Prior art keywords
- component
- side wall
- extension
- coat
- screed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005034 decoration Methods 0.000 title claims abstract description 49
- 238000000034 method Methods 0.000 title claims abstract description 17
- 230000006872 improvement Effects 0.000 title claims abstract description 11
- 238000009434 installation Methods 0.000 claims abstract description 16
- 239000004568 cement Substances 0.000 claims description 29
- 239000010410 layer Substances 0.000 claims description 26
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 239000002344 surface layer Substances 0.000 claims description 12
- 238000000338 in vitro Methods 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 38
- 239000000463 material Substances 0.000 description 15
- 239000003292 glue Substances 0.000 description 13
- 238000010586 diagram Methods 0.000 description 9
- 239000011449 brick Substances 0.000 description 4
- 229910052918 calcium silicate Inorganic materials 0.000 description 4
- 239000000378 calcium silicate Substances 0.000 description 4
- OYACROKNLOSFPA-UHFFFAOYSA-N calcium;dioxido(oxo)silane Chemical compound [Ca+2].[O-][Si]([O-])=O OYACROKNLOSFPA-UHFFFAOYSA-N 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 239000000919 ceramic Substances 0.000 description 3
- 238000009826 distribution Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 229910000838 Al alloy Inorganic materials 0.000 description 2
- 230000003796 beauty Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 230000001427 coherent effect Effects 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000010935 stainless steel Substances 0.000 description 2
- 229910001220 stainless steel Inorganic materials 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052602 gypsum Inorganic materials 0.000 description 1
- 239000010440 gypsum Substances 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000007115 recruitment Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/072—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of improvement room finishing system and decoration methods, including ground structure, top surface structure and side wall;Side wall lower part, which is equipped with, matches first component with the ground structure, and side wall top, which is equipped with, matches second component with the top surface structure.The present invention is by the connection between first component realization architectural surface and ground and to the levelling of ground, and the installation of skirting is very convenient, and high degree reduces difficulty of construction;It is directly attached by second component between side wall and top surface structure, the stable structure of junction is not easy to crack;The constructing operation of junction is very easy, and high degree reduces difficulty of construction, improves construction efficiency, shortens construction period.
Description
Technical field
The invention belongs to interior decoration technologies, more particularly, to a kind of improvement room finishing system and decoration method.
Background technique
Building is fitted up, after completing construction to meet people's lives demand.When being fitted up, side
Wall, top surface, ground are required to be fitted up, and surface layer is arranged to achieve the effect that decoration.But during finishing, decoration
Difficulty of construction at the junction of surface layer and top surface, architectural surface and ground cooperation is larger, influences construction efficiency.Firstly, decoration
Surface layer and the junction connection effect of top surface are poor, and flatness is low, and phenomenon of cracking easily occur after being used for a long time.Secondly, decoration
Surface layer is difficult to ensure the case where skirting can not be installed often occur with the depth of parallelism at the cooperation of ground.
Summary of the invention
The present invention for overcome the deficiencies in the prior art, provide it is a kind of construction be easy, high-efficient room finishing system and
Decoration method.
To achieve the goals above, the invention adopts the following technical scheme: a kind of improvement interior decoration method, including ground
Structure, top surface structure and side wall;Side wall lower part, which is equipped with, matches first component with the ground structure, described
Side wall top is equipped with and matches second component with the top surface structure, sets between the side wall and the first component
There is architectural surface screed-coat.The connection between architectural surface and ground is realized by first component in the present invention, and passes through first
Component realizes that, to the levelling of ground, without carrying out the measurement of blanket type during construction, high degree reduces worker
Workload, it is time saving and energy saving;It is laid with cement directly on blank ground structure and strikes off, constructing operation is simple, very big journey
Degree shortens construction period, improves construction efficiency;Secondly as ground structure flatness has obtained effective guarantee, work as decoration
It can be achieved parallel when embedded skirting, between ground structure and side wall bottom surface, realize and the space of skirting is installed everywhere etc.
Away from, effectively prevent skirting can not install or skirting and side wall bottom surface between need the occurrence of carrying out joint filling, for
The installation of skirting is very convenient, and high degree reduces difficulty of construction;
It is directly attached by second component between side wall and top surface structure, the constructing operation letter to junction
Just, high degree reduces difficulty of construction;And the stable structure of junction, even if will not crack after being used for a long time
The case where;Meanwhile when the color of side wall and connecting elements is inconsistent, between the two without carrying out bonding operation, to even
The constructing operation for meeting place is very easy, and high degree reduces difficulty of construction, improves construction efficiency, shortens engineering week
Phase.
Further, the ground structure includes screed-coat and the surface layer on screed-coat, the first component and institute
Screed-coat is stated to match;First component directly gives screed-coat and provides datum plane, levelling compared to traditional mistake object of reference
For mode, the Pingdu degree of screed-coat upper surface is high;And due to the presence of benchmark, so that more without repeating in leveling procedures
Secondary measurement, the workload for reducing worker of high degree and the technical difficulty of construction improve construction efficiency.
Further, the flank wall is equipped with architectural surface in vitro, and the first component is equipped with and the architectural surface phase
The third extension of cooperation;The face that the third extension is matched with architectural surface is set as rough surface;The third extension
Upper surface is equipped with multiple grooves to form the rough surface;By the setting of third extension, so that the dress on the wall of side
Finish coat is installed using layer or hardened structure, has abandoned the flat process of traditional multiple painting wall, base, architectural surface can directly exist
It buys, can also directly transport after the completion of factory process to construction site on the market, so that high degree shortens engineering week
Phase improves construction efficiency;It, only need to be by layer or hardened structure after the position of connecting elements is fixed and when installation architectural surface
Architectural surface be directly stacked on the first extension, it is low for the construction technical requirement of worker, reduce to technical staff
Man's Demands, the reduction recruitment cost of high degree;Meanwhile architectural surface surfacing, it ensure that the decoration after being installed
Surface layer has good flatness, and eliminates in work progress to the artificial levelling process of architectural surface, further increases and applies
Work efficiency rate.
The invention also discloses a kind of interior decoration methods, comprising the following steps:
(1) it is flat or levelling by the progress of architectural surface screed-coat to carry out base for counter-lateral quadrents wall, and on two opposites of left and right
The first connecting elements is installed in side wall lower part respectively, has spacing between the first connecting elements lower part and ground;
(2) architectural surface is installed to the wall of side, the bottom of architectural surface is supported by the first connecting elements;
(3) cement is laid with until being paved with to the first connecting elements position on ground, connected later by tool with first
Cement layer is struck off on the basis of connection member, so that cement layer forms screed-coat;
(4) floor is laid with to screed-coat, and skirting is packed between floor and the first connecting elements.
In the present invention benchmark is served as by setting connecting elements, datum level is served as with the bottom surface of connecting elements, thus
After completing cement, extra cement is struck off, guarantees that the bottom surface holding of cement layer upper surface and connecting elements is smooth i.e.
It can be achieved to the levelling of ground, levelling quick, work efficiency is high;Ground structure after striking off has absolute flatness, is not necessarily to
The measurement of blanket type is carried out during construction, the workload for reducing worker of high degree is time saving and energy saving;Directly in hair
It is laid with cement on base ground structure and strikes off, constructing operation is simple, and high degree shortens construction period, improves construction
Efficiency;
Secondly as ground structure flatness has obtained effective guarantee, and when decorating embedded skirting, ground structure
It is achievable parallel between side wall bottom surface, realize that the space of installation skirting is equidistant everywhere, effectively preventing skirting can not pacify
The occurrence of carrying out joint filling is needed between dress or skirting and side wall bottom surface, it is very convenient for the installation of skirting, greatly
Degree reduces difficulty of construction.
Further, the connecting elements includes member bodies, the member bodies side and the flank wall mates,
The other side is equipped with the first extension matched with the screed-coat;When being constructed, as long as guaranteeing extension and level
Face keeps horizontal, can be realized to the levelling of ground, and leveling operations is easy, and precision is high, it is ensured that ground knot after the completion
Structure is substantially flat and horizontal.
Further, when carrying out striking off cement layer, plank or steel bar is taken and the both ends of plank or steel bar are respectively placed in a left side
On first extension of two the first connecting elements on right side wall, control later plank or steel bar along extension length direction into
Row movement, that is, can guarantee and strike off completely along horizontal line to cement.
Further, when first connecting elements is installed, first side wall or architectural surface screed-coat after base is flat
On draw a horizontal line, connecting elements is held in the parallel state of the horizontal line with the first extension later and is fixed on side
On wall;Horizontal line can be obtained by processing such as the lines of ink marker, be parallel so as to easily adjust the horizontal line drawn with horizontal plane
State realizes that extension is parallel with level ground, guarantees to pass through so that connecting elements can be installed on the basis of horizontal line
The levelling screed-coat of extension has good flatness, and error rate is low.
Further, further include step (5):
A: second component is installed on the top of four sides side wall indoors respectively, and the position between four second components keeps one
It causes, and there is spacing between the top and top surface of second component;
B: the part that ceiling decoration board corresponds on the wall of four sides is first installed to second component, will be above-mentioned by keel
Ceiling decoration board is connected with top surface wall;
C: the ceiling decoration board of middle section vacancy is supplemented complete.
Under this kind operation, directly it is attached by second component between side wall and top surface, the construction to junction
Easy to operate, high degree reduces difficulty of construction;And the stable structure of junction, even if will not go out after being used for a long time
The case where now cracking;Meanwhile when the color of side wall and connecting elements is inconsistent, between the two without carrying out bonding behaviour
Make, very easy to the constructing operation of junction, high degree reduces difficulty of construction, improves construction efficiency, shortens
Construction period.
The invention has the advantages that:
1, the junction constructing operation between architectural surface and top surface, ground is simple, reduces difficulty of construction, shortens work
The journey period improves construction efficiency;2, the ground flat degree after striking off is high, is less prone to error;3, constructing operation is simple, engineering week
Phase is short;4, skirting is easy for installation, reduces difficulty of construction.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram of side wall and the first fit system of ground in the present invention.
Fig. 3 is the structural schematic diagram of side wall and second of ground fit system in the present invention.
Fig. 4 is the structural schematic diagram of first component in Fig. 3.
Fig. 5 is the structural schematic diagram of side wall and the first fit system of top surface in the present invention.
Fig. 6 is the structural schematic diagram of side wall and second of top surface fit system in the present invention.
Fig. 7 is the structural schematic diagram of second component in Fig. 6.
Fig. 8 is the structural schematic diagram of side wall and the third fit system of top surface in the present invention.
Fig. 9 is the structural schematic diagram of second component in Fig. 8.
Specific embodiment
In order to make those skilled in the art better understand the present invention program, below in conjunction in the embodiment of the present invention
Attached drawing, the technical scheme in the embodiment of the invention is clearly and completely described.
As shown in figures 1-8, a kind of room finishing system, including ground structure, top surface structure, side wall 11 and be set to
Architectural surface 12 outside side wall 11;The side wall 11 is equipped with first component 13 and second component 14, and described the
One component 13 is set to 11 lower part of side wall, matches with the ground structure;The second component 14 is set to the side
11 top of face wall body, matches with the top surface structure;By first component realize the connection between architectural surface and ground with
And to the levelling of ground, the installation of skirting is very convenient, high degree reduces difficulty of construction;Side wall and top surface are tied
It is directly attached by second component between structure, the stable structure of junction is not easy to crack;The constructing operation of junction is very
Simplicity, high degree reduce difficulty of construction, improve construction efficiency, shorten construction period.
Specifically, the side wall 11 can be cement wall, brick wall, lightgage steel joist wall etc.;It, can also in other embodiments
To be cement wall, brick wall etc. by base after flat;In other embodiments, it can also be in cement wall, brick wall, lightgage steel joist
Wall after setting architectural surface screed-coat 15 is levelling on former wall after the completion of the buildings such as wall;Architectural surface 12 is city
The ceramic tile patch directly bought on face, the model and material of ceramic tile are not specifically limited;The architectural surface screed-coat 15
One of woodwork plate, plasterboard, calcium silicate board or other materials constructed for architectural surface can be used, wherein preferably adopting
With calcium silicate board, architectural surface can be made to have the effect of good fire prevention, moisture-proof, sound insulation, heat-insulated;Certainly, above-mentioned material is not
It is limiting of its scope, other, which meet the material of condition or material, can be used.
As shown in Fig. 2, the ground structure includes surface layer 22, screed-coat 21 and ground layer 23, the surface layer is set to institute
It states on screed-coat;The first component 13 is made of aluminium alloy or stainless steel, and entire first component 13 is integrally formed and is made,
Manufacture is easy and securely intensity is big;The first component 13 is made of aluminium alloy or stainless steel, and entire first component 13 is one
Body formed to be made, manufacture is easy and securely intensity is big;13 side of first component is matched with the side wall 11, another
Side is equipped with the first extension 132, which is equipped with screw hole, so as to be mounted on first component 13 by screw
On the wall of side;First extension 132 is directed out by the first component 13 and is extended to form, and the first extension 132 hangs down
Directly it is arranged in the first component 13;First extension 132 is matched with the screed-coat 21, and the upper surface of screed-coat
Concordant with 132 upper surface of the first extension, which can also be made of other for levelling material of cement production systD.
The surface layer 22 can be one such for floor, ceramic tile, stone material, rock beam etc.;Further, the first component 13
It is equipped with skirting 10, the junction between architectural surface and ground is protected by the skirting 10;The skirting
The materials such as metal, the wooden facing, stone material, rock material can be used to be made.
In other embodiments, as shown in figure 3, we are in the first component 13 in order to preferably fix skirting
Provided with two Connection protrusions 134 matched with the skirting, when installing skirting, the side wall and Connection protrusion of skirting
134 are connected, and realize the firm installation to skirting;In order to enable skirting is bonding with Connection protrusion more secured, we will
The Connection protrusion is set as hollow, so that foring the chamber for accommodating glue in Connection protrusion, can store more
Opening is arranged on Connection protrusion side wall for glue, and glue can be Nian Jie with skirting by the opening, realizes it between skirting
Securely connection.
Preferably, the first component 13 is equipped with the first positioning region 135 and the second positioning region 136, and this is second fixed
Position portion 136 is located at 135 lower section of the first positioning region;Between between first positioning region 135 and first extension 132
Away from for 15mm, the spacing between second positioning region 136 and first positioning region 135 is 12mm;Certainly, in other implementations
In example, the spacing between first positioning region 135 and first extension 132 can also be directly disposed as 12mm, thus not
Second positioning region 136 is set;Certainly, the above-mentioned numerical value being mentioned to is optimal case, not for the restriction of protection scope, tool
Body numerical value can need voluntarily to be adjusted according to construction.
In other embodiments, as illustrated in figures 4-5, the first component 13 is equipped with third extension 133, and third extends
Portion 133 is equally directed out by 13 side of first component and is extended to form;Preferably, the third extension 133 and described the
One extension 132 is arranged in parallel;The third extension 133 is arranged above the first extension 132, and third extension 133
There is spacing between first extension 132, be used for installation floor and skirting;The interconnecting piece 134, first positions
Portion 135, the second positioning region 136 are arranged between third extension 133 and first extension 132.
The architectural surface is set on the third extension 133, due to needing to be bonded between the two, in order to enhance the two
Adhesive effect, the face that third extension 133 is matched with architectural surface is set rough surface by we;Specifically, the third
133 upper surface of extension is equipped with multiple grooves to form the rough surface, and multiple groove is strip, and extends along third
Evenly spaced distribution in the width direction in portion 133;More glue can be held in groove, to ensure that architectural surface and third
Firm connection is able to carry out between extension 133.
Preferably, 133 lower surface of third extension is equipped with a stopper 138, set in the first component 13
There are two Connection protrusions 134, when installing skirting, skirting room upper end is inserted into the gap between stopper 138 and first component 13
Interior, side wall is connected with the Connection protrusion 134, realizes the firm installation to skirting.
When construction, first counter-lateral quadrents wall 4 carries out that base is flat or carry out levelling, and installation connects respectively on the wall on two opposites of left and right
Connection member is needed to draw a horizontal line on the side wall after base is flat before installation, is later protected connecting elements with extension
It is held in the parallel state of the horizontal line and is fixed on side wall, later install architectural surface to the wall of side;Later directly
It lays cement in ground layer, is paved with after cement to extension position, striking off extra cement by plank or steel bar (can also
Using other materials such as gypsum);When striking off, plank or steel bar both ends are respectively placed on two extensions in left and right, edge is prolonged later
Extending portion is mobile, that is, can guarantee and strike off completely along horizontal line to cement, so that the cement layer after the completion of can guarantee is substantially flat
And level, above-mentioned cement layer become screed-coat;After band cement layer is dry, surface layer 22 is directly laid with to screed-coat, to
After the completion of floor is laid with, skirting 10 is installed in the space between floor and architectural surface.
As shown in figures 5-9, the top surface structure includes top surface wall 31 and ceiling decoration board 32, and ceiling decoration board 32 is set
It is set to one layer, ceiling decoration board 32 is connected by keel with top surface wall;Wherein, the top surface wall 31 is to carry out interior decoration
Former wall before, such as cement wall, brick wall, lightgage steel joist wall;The ceiling decoration board 32 can for plasterboard, calcium silicate board,
Ceiling board or other one of materials constructed for architectural surface can make decorative cover wherein preferably using calcium silicate board
Layer has the effect of good fire prevention, moisture-proof, sound insulation, heat-insulated;Certainly, above-mentioned material is not limiting of its scope,
The material or material that he meets condition can be used.
The inside of the second component 14 is matched with the side wall 11, and outside extends outward to form one second extension
Portion 142, and it is preferred, which is vertically arranged with second component 14, to guarantee that inner corner trim is 90 ° of right angle;Institute
Second component 14 is stated equipped with screw hole, second component 14 can be mounted on the wall of side by screw.
As shown in fig. 6, we are described second in order to enable second component 14 is more stable to the positioning of ceiling decoration board
A positioning side 143 is additionally provided on component 14, which is set to above the extension, and by the second component 14
Outside direct out and extend to form;Spacing between positioning side 143 and extension is just equal to the thickness of ceiling decoration board, from
And by positioning side 143 and extension can the upper and lower surface to ceiling decoration board position, further ensured top surface knot
The flatness and levelness of structure.
The architectural surface upper end is in contact with 142 lower surface of the second extension, when architectural surface be white when, need by
The upper end of architectural surface 12 is connected with 142 lower surface of the second extension, prevents gap, exposes the original of second component 14
Color and the beauty for influencing entire architectural surface;Accordingly it is desirable to by between the upper end of architectural surface 12 and second extension 142
It is bonded by glue, it is preferred that we are set as coarse for what second extension 142 was connected with architectural surface 12 on one side
Face;Specifically, 142 lower surface of the second extension is equipped with multiple open slots to form the rough surface, multiple opening
Slot is strip, and the evenly spaced distribution in the width direction of the second extension 142;More glue can be held in open slot
Water is able to carry out firm connection between architectural surface 12 and the second extension 142 to ensure that.
In other embodiments, as shown in Fig. 6,8, the ceiling decoration board 32 be may be alternatively provided as two layers, two top surfaces decoration
Plate 32 is respectively arranged on the upper and lower sides of extension, and is connected with each other between two ceiling decoration boards 32 by screw;Preferably, screw is worn
The extension is crossed, is connected more secured.
In other embodiments, as Figure 6-9, the second component 14 is equipped with the company matched with the decorative layer 12
Socket part 144, the interconnecting piece 144 are directed out by the second component 14 and are extended to form, and interconnecting piece 144 is vertically and second component
14;The upper surface of the decorative layer offsets or be bonded with the interconnecting piece 144, when architectural surface is white, needs decorative cover
The upper end of layer 12 is connected with 144 lower surface of interconnecting piece, prevents gap, exposes the primary colors of second component 14 and influences whole
The beauty of a architectural surface;Accordingly it is desirable to it is Nian Jie by glue is passed through between the upper end of architectural surface 12 and the interconnecting piece 144,
Preferably, we set rough surface with what architectural surface 12 was connected for the interconnecting piece 144 on one side;Specifically, the connection
144 lower surface of portion is equipped with multiple open slots to form the rough surface, and multiple open slot is strip, and along interconnecting piece
Evenly spaced distribution in 144 width direction;More glue can be held in open slot, to ensure that architectural surface 12 and connect
Firm connection is able to carry out between socket part 144.
In order to enhance aesthetics, as Figure 8-9, second extension 142 is set two by we, and the of lower part
Two extensions 142 are adjacent with the interconnecting piece 144, and gap is provided between second extension 142 and interconnecting piece 144 with shape
At a decorative groove 145, so that side wall top there will be a horizontal straight-line groove after the assembly is completed, meet decoration need
It asks, good appearance;Preferably, the outer end of the interconnecting piece 144, which is folded upward at, forms the first bending part 146, it is described
The outer end of second extension 142 of lower part bends downward the second bending part 147 to be formed, so that the shape of decorative groove is more
It is beautiful;Certainly, the number of the second extension 142 is not limited thereto, or and it is more than two, it will not enumerate.
When installation, it is flat that base first is carried out to the side wall of four sides, or add screed-coat progress levelling on the wall of side;It
Draw a horizontal line respectively on the base of four sides flat side wall or screed-coat afterwards, and the horizontal line of four sides keeps coherent;
And the top surface of second component 14 is overlapped to the horizontal line, and second component 14 is fixed on side wall or screed-coat,
So that 14 holding position of second component of four sides is consistent;Ceiling decoration board is placed in later on the extension of second component 14, and
It is connected with keel with top surface wall, and the ceiling decoration board of remaining central part is supplemented completely, between adjacent ceiling decoration board
Using bonding connection;The outside of architectural surface alignment second component 14 is installed to the wall of side later, and guarantees decorative cover
Layer top surface offsets or parallel with extension lower surface.
A kind of room finishing system and decoration method, comprising the following steps:
(1) counter-lateral quadrents wall 11 carry out base it is flat or carried out by architectural surface screed-coat 15 it is levelling, and two pairs of left and right
The side wall lower part in face is installed by the first connecting elements 13 respectively;Specifically, first the side wall 11 after base is flat or architectural surface are looked for
A horizontal line is drawn on leveling 15, and connecting elements is held in the parallel state of the horizontal line with the first extension 132 later
Be fixed on the wall of side, 13 lower part of the first connecting elements after being installed and between ground have spacing;
(2) architectural surface 12 is installed to side wall 11, the bottom of architectural surface 12 is carried out by third extension 133
Support, it is Nian Jie that the lower end surface of the architectural surface and the third extension 133 pass through glue, the side of architectural surface 12 with it is described
Side wall 11 or architectural surface screed-coat 15 are bonded;
(3) cement is laid with until being paved with to 132 position of the first extension on ground, take plank or steel bar later and incite somebody to action
The both ends of plank or steel bar are respectively placed on the first extension 132 of two the first connecting elements 13 in left and right sidewall, later
Control plank or steel bar are moved along extension length direction, and guarantee completely strikes off cement along horizontal line, so that
Cement layer forms screed-coat 21;
(4) floor is laid with to screed-coat 21, and skirting 10 is packed between floor and the first connecting elements 13;
Further, the skirting 10 and the Connection protrusion 134 are Nian Jie by glue, and part glue is received to chamber when bonding
It is interior, and glue is Nian Jie with skirting by the opening in Connection protrusion, positions to skirting;
(5) it a: is put down in base or the second structure is installed on the top of the four sides side wall by architectural surface screed-coat after levelling respectively
Part 14, the position between four second components 14 are consistent, and have spacing between the top and top surface of second component 14;Tool
Body, when installation, first draws a horizontal line, and the level of four sides on the base of four sides flat side wall or screed-coat respectively
Line keeps coherent;The top surface of second component 14 is overlapped to the horizontal line later, and second component 14 is fixed on flank wall
On body or screed-coat, so that 14 holding position of second component of four sides is consistent;
B: the part that ceiling decoration board 32 corresponds on the wall of four sides is first installed to second component 14, will by keel
Above-mentioned ceiling decoration board 32 is connected with top surface wall 31;
C: the ceiling decoration board of middle section vacancy is supplemented completely, for filling up the ceiling decoration board of middle section vacancy
32 are equally lifted on top surface wall 31 using keel, are bonded between adjacent ceiling decoration board by glue.
Preferably, the ceiling decoration board 32 may be configured as two layers, that is to say, that can be in the top surface that assembly is completed
One layer of ceiling decoration board 32 is re-layed on decorative panel 32, is connected between two layers of ceiling decoration board 32 by screw.
Obviously, described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment should fall within the scope of the present invention.
Claims (7)
1. a kind of improvement room finishing system, including ground structure, top surface structure and side wall (11);It is characterized by: institute
Side wall (11) lower part is stated equipped with matching with the ground structure first component (13), side wall (11) top is set
Have and matches second component (14) with the top surface structure;Decoration is equipped between the side wall and the first component (13)
Surface layer screed-coat (15).
2. a kind of improvement room finishing system according to claim 1, it is characterised in that: the ground structure includes levelling
Layer (21) and the surface layer (22) on screed-coat, the first component (13) match with the screed-coat (21);Described
One component (13) has the first extension (132) matched with the screed-coat (21).
3. a kind of improvement room finishing system according to claim 1, it is characterised in that: the flank wall is equipped with dress in vitro
Finish coat (12), the first component (13) are equipped with the third extension (133) that matches with the architectural surface (12), this
The face that three extensions (133) are matched with architectural surface (12) is set as rough surface;Third extension (133) upper surface is set
There are multiple grooves to form the rough surface.
4. a kind of for improveing the decoration method of room finishing system, feature described in any one of the claims 1-3
It is: the following steps are included:
It is flat or levelling by architectural surface screed-coat (15) progress that counter-lateral quadrents wall (11) carries out base, and on two opposites of left and right
Side wall lower part is installed the first connecting elements (13) respectively, and the first connecting elements (13) has spacing between lower part and ground;
By architectural surface (12) installation on side wall (11), the bottom of architectural surface (12) by the first connecting elements (13) into
Row support;
Cement is laid on ground until being paved with to the first connecting elements (13) position, later by tool with the first connection structure
Part strikes off cement layer on the basis of (13), so that cement layer forms screed-coat (21);
Floor is laid on screed-coat (21), and skirting (10) are packed between floor and the first connecting elements (13).
5. improvement interior decoration method according to claim 4, it is characterised in that: when carrying out striking off cement layer, take plank
Or the first extension of steel bar and two the first connecting elements (13) being respectively placed in the both ends of plank or steel bar in left and right sidewall
It in portion (132), controls plank later or steel bar is moved along extension length direction, that is, can guarantee completely along horizontal line to water
Mud is struck off.
6. improvement interior decoration method according to claim 4, it is characterised in that: installation first connecting elements (13)
When, a horizontal line first is drawn on the side wall (11) or architectural surface screed-coat (15) after base is flat, structure will be connected later
Part is held in the parallel state of the horizontal line with the first extension (132) and is fixed on the wall of side.
7. improvement interior decoration method according to claim 4, it is characterised in that: further include step (5):
A: the top of four sides side wall indoors is installed second component (14) respectively, and the position between four second components (14) is protected
It holds unanimously, and there is spacing between the top and top surface of second component (14);
B: the part that ceiling decoration board corresponds on the wall of four sides is first installed on second component (14), will be above-mentioned by keel
Ceiling decoration board is connected with top surface wall;
C: the ceiling decoration board of middle section vacancy is supplemented complete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811037031.9A CN108978851A (en) | 2018-09-06 | 2018-09-06 | A kind of improvement room finishing system and decoration method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811037031.9A CN108978851A (en) | 2018-09-06 | 2018-09-06 | A kind of improvement room finishing system and decoration method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108978851A true CN108978851A (en) | 2018-12-11 |
Family
ID=64545978
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811037031.9A Pending CN108978851A (en) | 2018-09-06 | 2018-09-06 | A kind of improvement room finishing system and decoration method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108978851A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112922248A (en) * | 2021-02-25 | 2021-06-08 | 和湜(上海)建筑科技有限公司 | Indoor pretreatment decoration method |
-
2018
- 2018-09-06 CN CN201811037031.9A patent/CN108978851A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112922248A (en) * | 2021-02-25 | 2021-06-08 | 和湜(上海)建筑科技有限公司 | Indoor pretreatment decoration method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208792663U (en) | A kind of room finishing system | |
CN105804353A (en) | Architectural finish material capable of being installed rapidly | |
CN105298071A (en) | Aluminum alloy profile embedded in wall, floor and roof | |
EP2255045A1 (en) | Aluminium facade cladding with brick or ceramic appearance | |
CN204662719U (en) | A kind of indoor seamless spliced secondary light partition wall system | |
CN108978851A (en) | A kind of improvement room finishing system and decoration method | |
CN106437093A (en) | Architectural decoration and finishing concealed installation tile skirting structure and construction technology thereof | |
CN203499216U (en) | Embedded wall solid wood skirting line wood base layer structure | |
CN102383507A (en) | Light steel keel and plasterboard vitrified tile decoration wall and method for constructing same | |
CN102535807A (en) | Modular wall tile pre-bonding structure and construction method thereof | |
CN208347208U (en) | A kind of new indoor walling system | |
CN211037664U (en) | Stone material ground and ceramic tile ground handing-over department node structure | |
CN2934449Y (en) | Combined type natural sandstone board wall surface | |
CN207739427U (en) | A kind of walling system | |
CN207739536U (en) | A kind of indoor wall system | |
CN208202203U (en) | A kind of toilet wall body structure | |
CN202248387U (en) | Light steel keel gypsum board vitrified tile decorative wall | |
CN108316481A (en) | Can quick assembling wall body decoration system | |
CN102359238A (en) | Staggered waterproof heat insulation outer wall brick | |
CN207332617U (en) | A kind of doorframe structure | |
CN208105602U (en) | A kind of novel wall structure | |
CN207878784U (en) | A kind of assembly wall | |
CN207332181U (en) | A kind of wall body structure | |
CN109184006A (en) | Metope expansion joint lightgage steel joist sliding system and its installation method | |
CN221372722U (en) | Calcium silicate board base layer local putty cracking-resistant system for interior wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181211 |
|
WD01 | Invention patent application deemed withdrawn after publication |