CN207332617U - A kind of doorframe structure - Google Patents
A kind of doorframe structure Download PDFInfo
- Publication number
- CN207332617U CN207332617U CN201721326342.8U CN201721326342U CN207332617U CN 207332617 U CN207332617 U CN 207332617U CN 201721326342 U CN201721326342 U CN 201721326342U CN 207332617 U CN207332617 U CN 207332617U
- Authority
- CN
- China
- Prior art keywords
- doorframe
- sidepiece
- wall
- connector
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Wing Frames And Configurations (AREA)
- Joining Of Corner Units Of Frames Or Wings (AREA)
Abstract
The utility model discloses a kind of doorframe structure, coordinates with wall, and the doorframe includes doorframe body, connector is equipped between the doorframe body and the wall, and interstitital texture is equipped between the connector and the wall.The utility model in assembling, can carry out joint filling operation between connector and wall, after ensureing connector and horizontal plane, then install doorframe body by the setting of connector;So as to which the joint filling between connector and wall will be blocked directly by doorframe body, ensure good appearance;And since connector and horizontal plane are completely vertical, so as to ensure that doorframe body is not in crooked situation, ensure installation accuracy.
Description
Technical field
The utility model belongs to decoration technology field, more particularly, to a kind of doorframe structure.
Background technology
At present, traditional doorframe mounting means is that first the installation site of doorframe is measured, and ensures that doorframe is in vertical
The state on ground;When mounted, joint filling is carried out between wall and doorframe by auxiliary material, so as to ensure the doorframe after installation
Can be perpendicular to ground.But under this kind of mode, door frame surface will protrude from surface of wall, and the material of joint filling can be from
Doorframe sidepiece is seen, and influences beauty.If being blocked by other materials to the junction of doorframe and wall, work is increased
The input of work amount and material, not only reduces work efficiency, also improves construction cost.
Utility model content
A kind of efficiency of assembling is high, aesthetics after the completion of assembling in order to overcome the deficiencies of the prior art and provide for the utility model
High doorframe structure.
To achieve these goals, the utility model uses following technical scheme:A kind of doorframe structure, coordinates with wall,
The doorframe includes doorframe body, and connector, the connector and the wall are equipped between the doorframe body and the wall
Between be equipped with interstitital texture.The utility model, in assembling, can be carried out by the setting of connector between connector and wall
Joint filling operates, and after ensureing connector and horizontal plane, then installs doorframe body, so that, the joint filling between connector and wall
To directly it be blocked by doorframe body, without using the materials such as door sleeve again, to being blocked at joint filling, high degree reduces
Consumptive material, shortens construction period, improves work efficiency;And since connector and horizontal plane are completely vertical, so as to ensure
Doorframe body is not in crooked situation, ensure that installation accuracy;
Secondly, in existing doorframe, there are the structure of steel framework, it is provided with secondary frame, in secondary frame and wall during assembling
Joints cement between body, leaks out to avoid cement from doorframe both sides;But the assembling of this kind of doorframe belongs to building field, not
Furnishing fields, can not be by simply assembling or the fixed stabilization for realizing structure, between secondary frame and wall, between doorframe and secondary frame
It is required to firmly be connected by steel nail, trivial operations, low construction efficiency, part is various;And secondary frame and wall after theing cement solidifies
It can not be dismantled between body, later period maintenance or the secondary frame of replacement are difficult;And pass through in the utility model between connector and wall
Object is clogged to be attached the leveling of part, convenient disassembly between connector and wall, even if connector position occurs partially
When poor, it can easily also be adjusted, difficulty of construction is low;And without by substantial amounts of screw, steel nail etc. to connector and wall,
Doorframe and connector are attached, and integrated engineering amount is small, and construction efficiency is high.
Further, the connector has the first sidepiece and the second sidepiece, and first sidepiece and the second sidepiece are formed
" L " character form structure;The setting of L word structures so that connector has certain enabling capabilities, is not susceptible to deformation, structure is more
Stablize, locating effect is more preferable.
Further, the wall outer side is equipped with architectural surface;Decorative cover is Rotating fields, can directly bought on the market,
Or transport directly after the completion of factory process and installed to construction site, for comparing traditional base painting mode, high degree
Shorten the construction period.
Further, the inner side of first sidepiece is engaged with the wall, the outside of the first sidepiece at least partly with
Described this mates of doorframe;Pass through the adjusting of the first sidepiece, it is ensured that the verticality between doorframe and ground, ensures doorframe table
The flatness in face.
Further, the inner side of second sidepiece is engaged with the wall, the outside of the second sidepiece at least partly with
The architectural surface is engaged;By the second sidepiece and horizontal plane, the verticality on guarantee architectural surface and ground;Only need by
Architectural surface is directly directed at the installation of the second sidepiece, you can the metope after the completion of guarantee, it is completely vertical with ground, and realize ground and wall
Face it is quick levelling;And architectural surface itself is Rotating fields, surface is flat surface, the metope after the completion of further ensuring
Flatness;This kind of mode has abandoned traditional Installation Modes, and without carrying out multiple painting wall on metope, base is put down, levelling, school
It is right, the architectural surface of Rotating fields need to be only directly mounted on the second sidepiece, the work for reducing worker of high degree
Amount, reduces the construction error being likely to occur, without carrying out rework operation, the raising work efficiency of high degree;Furthermore decorate
Surface layer can directly bought on the market, or transport to construction site is installed directly after the completion of factory process, so that greatly
Degree shortens the construction period;Assembled simultaneously as architectural surface coordinates with doorframe body with connector, so as to install
After the completion of, metope and door frame surface are a burnishing surface, and the situation that doorframe protrudes metope is not present, more aesthetically pleasing in shape.
Further, the inner side of second sidepiece is engaged with the wall, the outside of the second sidepiece at least partly with
Described this mates of doorframe;First sidepiece, the second sidepiece position doorframe body, further improve the installation of doorframe
Precision.
Further, second sidepiece is equipped with the extension edge perpendicular to second sidepiece;By the setting of extension edge,
Installation site at left and right sides of architectural surface can be defined, prevent architectural surface from occurring crooked situation when mounted, into
One step ensures architectural surface upper and lower ends face and horizontal plane keeping parallelism, so as to facilitate the construction of later stage ground and top surface.
Further, the extension edge is equipped with stopper protrusion, and the architectural surface is equipped with to match with the stopper protrusion
The first recess closed;By the cooperation between stopper protrusion and the first recess, architectural surface installation site can be defined, into
One step improves installation accuracy.
Further, the doorframe body is equipped with and matched second recess of the stopper protrusion;Pass through stopper protrusion
With the cooperation between the second recess, the installation site of doorframe body can be defined, further improve installation accuracy.
Preferably, the one side at least within of the extension edge is rough surface structure;Due to the setting of rough surface so that glue
Coating on a surface when, glue can high degree remain on rough surface, for comparing traditional plane adhesion, bonding
Effect is more preferable;Meanwhile the setting of rough surface also add the frictional force between architectural surface and extension edge, ensure that both are being bonded
When be not in skidding phenomenon.
Further, the extension edge surface is evenly spaced is equipped with multiple grooves to form the rough surface;Groove
Retention effect for glue is more preferable so that the connection between architectural surface and extension edge is more firm.
In conclusion the utility model has the following advantages:By the setting of connector, ensure that rear door frame sheet is completed in assembling
The verticality of body, installation accuracy are high;And joint filling will not expose, good appearance degree is high;Convenient disassembly between connector and wall, i.e.,
When the connector position deviation is occurred, it can easily also be adjusted, difficulty of construction is low.
Brief description of the drawings
Fig. 1 is the structure diagram one of the utility model embodiment one.
Fig. 2 is the side sectional view of the utility model embodiment one.
Fig. 3 is the structure diagram of connector in the utility model embodiment one.
Fig. 4 is the structure diagram two of the utility model embodiment one.
Fig. 5 is the structure diagram one of the utility model embodiment two.
Fig. 6 is the structure diagram of connector in the utility model embodiment two.
Fig. 7 is the structure diagram two of the utility model embodiment two.
Fig. 8 is the structure diagram one of member embodiment three in the utility model.
Fig. 9 is the structure diagram of connector in the utility model embodiment three.
Figure 10 is the structure diagram two of member embodiment three in the utility model.
Embodiment
It is real below in conjunction with the utility model in order to make those skilled in the art be better understood from the utility model
The attached drawing in example is applied, clear, complete description is carried out to the technical scheme in the embodiment of the utility model.
Embodiment 1
As shown in Figs 1-4, a kind of doorframe structure, coordinates with wall, and the wall 11 is externally provided with architectural surface 12;The door
Mount structure includes doorframe body 2, and connector 3 is equipped between doorframe body 2 and wall 11, and the connector 3 has stainless steel or aluminium
Alloy is made, and whole connector 3 is integrally formed and is made, and structure is more firm;The connector 3 includes what is be arranged in a mutually vertical manner
Second sidepiece 32 and the second sidepiece 32, it is preferred that and the second sidepiece 32 and the second sidepiece 32 form the structure of " L " font, structure
It is more stable;In order to ensure the verticality of connector and horizontal plane, we are provided between wall 11 and the connector 3 and fill out
Structure 5 is filled, the interstitital texture 5 can use woodwork plate, plasterboard, calcium silicate board, foamed glue, cement gel etc.;Preferably, institute
State and be equipped with interstitital texture 5 between the second sidepiece 32, the second sidepiece 32 and the wall;Wherein, the wall 11 is brick wall, water
Mud wall, light steel keel partition, prefabricated partition board etc.;The architectural surface 12 can use metal, wooden facing, artistic paint, emulsion paint,
The finishing materials such as stone material, rock beam, ceramic tile are made;Also can on plank, plasterboard, calcium silicate board etc. decorative leather, fabrics, silk
Formed after the facings such as silk fabric, wallpaper;The doorframe body is made of timber or metal material.
During assembling, first by 3 sets of connector to wall, and the position of connector 3 is adjusted, ensures that connector is vertical
After the distance between horizontal plane and adjustment door opening left and right sides connector to designated value, 3 location determination of band connection part, inciting somebody to action
Interstitital texture is inserted to the gap between connector 3 and wall, and connector is fixed on wall by screw;Afterwards will
Two groups of left and right door pocket assembles, and is set with to door opening, is provide with to outside the connector at left and right sides of door opening, left and right two
Between group door pocket, use and be glued between door pocket and connector;Finally architectural surface is installed to outside wall.
After the completion of assembling, second sidepiece 32 is arranged between doorframe body 2 and wall 11, and second sidepiece 32 is arranged on
Between wall 11 and architectural surface 12;The inner side of i.e. described second sidepiece 32 is engaged with the wall 11, the second sidepiece 32
Outside is at least partly connected with the doorframe body 2;The inner side of second sidepiece 32 is engaged with the wall 11, the second side
The outboard section in portion 32 is connected with the architectural surface 12, and the doorframe body side is extended on second sidepiece 32, from
And 32 part of the second sidepiece is connected with the doorframe body;Under this kind of structure, architectural surface 12 can be to the second sidepiece
Directly blocked at 32 joint filling so that good appearance;And when installing architectural surface 12, can directly it be made with the second sidepiece 32
On the basis of, realize the flatness after the installation of architectural surface 12;And under this kind of mode, architectural surface 12 can purchased directly on the market
Buy, or transport to construction site is installed directly after the completion of factory process, so that high degree shortens the construction period.
Certainly, in other embodiment, doorframe may be configured as platy structure, and there is no extend on the second sidepiece 32
Extended structure, the architectural surface 12 cover whole second sidepiece 32;In other embodiment, it can also use doorframe body complete
The structure of the connector is coated, i.e. the sidepiece of doorframe body is extended on second sidepiece 32, and the second sidepiece 32 is complete
Portion covers, and the architectural surface 12 do not covered to the second sidepiece 32, but end and the side of the second sidepiece 32 offset or
Person is bonded, same to can be achieved to being blocked at joint filling.
In other embodiment, as shown in figure 4, can not also use filling between second sidepiece 32 and the wall 11
Structure 5 carries out joint filling, but a screed-coat 4 is directly set directly on wall 11, passes through the peace of 4 decorative layer of screed-coat
Dress face keeps smooth;Specifically, the screed-coat 4 can use woodwork plate, plasterboard, calcium silicate board or other be used for wall construction
Material in one kind, wherein be preferably use calcium silicate board, can make metope that there is preventing fires, is moisture-proof, is sound insulation, heat-insulated well
Effect.
Embodiment 2
As illustrated in figs. 5-7, the present embodiment and embodiment 1 difference lies in:Second sidepiece 32 is equipped with an extension edge
321, which is directed out by 32 outer surface of the second sidepiece and extended to form, and is set perpendicular to second sidepiece 32
Put;During installation, the architectural surface side is bonded on the extension edge 321 by glue, the end face of doorframe body 2 and the extension
Gap is left between 321 side wall of side and forms decorative groove 7, plays certain decoration function, more meets letter in modern decoration style
The single, style of air;And decorative groove directly obtains in installation process, for comparing the mode that groove is buried on metope, dress
Adoring the width of groove, flatness, levelness, verticality etc. can accurately be held, accuracy higher of constructing, the shape of decorative groove
Also it is more aesthetically pleasing;In order to enable the connection of architectural surface and extension edge 321 is more firm, we are by extension edge 321 and decorative cover
The connected side side of layer is arranged to rough surface, specifically, 321 side of the extension edge is equipped with multiple grooves 6 to be formed
The rough surface stated, these grooves are set for strip, and the evenly spaced distribution along the width of the extension edge 321;It is recessed
More glue can be held in groove, so that ensure that can firmly be connected between architectural surface and extension edge.
Other structures are same as Example 1, repeat no more.
Embodiment 3
As seen in figs. 8-10, the present embodiment and embodiment 2 difference lies in:The 321 end both sides of extension edge respectively to
Outer to extend to form a stopper protrusion 322, the architectural surface 12 is equipped with and matched first recess 121 of the stopper protrusion;
The doorframe body 2 is equipped with and matched second recess 21 of the stopper protrusion 322;When assembling is completed, the stopper protrusion
322 can be caught in spacing recess 121 and location indentations 21, carry out good positioning to doorframe body and architectural surface, effectively
Loosened after preventing doorframe body long-time service;And the junction of doorframe body and architectural surface can be bonded to each other, connector
It will not be seen, further improve the good appearance degree of doorframe and metope.
Other structures are same as Example 2, repeat no more.
Obviously, described embodiment is only the part of the embodiment of the utility model, instead of all the embodiments.
Based on the embodiment in the utility model, what those of ordinary skill in the art were obtained without making creative work
Every other embodiment, should all belong to the scope of the utility model protection.
Claims (10)
1. a kind of doorframe structure, coordinates with wall, the doorframe includes doorframe body(2), it is characterised in that:The doorframe body
(2)With the wall(11)Between be equipped with connector(3), the connector(3)With the wall(11)Between be equipped with interstitital texture
(5).
A kind of 2. doorframe structure according to claim 1, it is characterised in that:The connector(3)With the first sidepiece
(31)With the second sidepiece(32), first sidepiece(31)With the second sidepiece(32)Form " L " character form structure.
A kind of 3. doorframe structure according to claim 2, it is characterised in that:The wall(11)Outside is equipped with architectural surface
(12).
A kind of 4. doorframe structure according to claim 3, it is characterised in that:First sidepiece(31)Inner side with it is described
Wall(11)It is engaged, the first sidepiece(31)Outside at least partly and the doorframe body(2)It is engaged.
A kind of 5. doorframe structure according to claim 3 or 4, it is characterised in that:Second sidepiece(32)Inner side with
The wall(11)It is engaged, the second sidepiece(32)Outside at least partly and the architectural surface(12)It is engaged.
A kind of 6. doorframe structure according to claim 3 or 4, it is characterised in that:Second sidepiece(32)Inner side with
The wall(11)It is engaged, the second sidepiece(32)Outside at least partly and the doorframe body(2)It is engaged.
A kind of 7. doorframe structure according to claim 3, it is characterised in that:Second sidepiece(32)Be equipped with perpendicular to
Second sidepiece(32)Extension edge(321).
A kind of 8. doorframe structure according to claim 7, it is characterised in that:The extension edge(321)It is equipped with limit convex
Portion(322), the architectural surface(12)It is equipped with and matched first recess of the stopper protrusion(121).
A kind of 9. doorframe structure according to claim 8, it is characterised in that:The doorframe body(2)It is equipped with and the limit
Position convex portion(322)Matched second recess(21).
A kind of 10. doorframe structure according to claim 7, it is characterised in that:The extension edge(321)It is at least one of
Face is rough surface structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721326342.8U CN207332617U (en) | 2017-10-13 | 2017-10-13 | A kind of doorframe structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721326342.8U CN207332617U (en) | 2017-10-13 | 2017-10-13 | A kind of doorframe structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207332617U true CN207332617U (en) | 2018-05-08 |
Family
ID=62364911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721326342.8U Active CN207332617U (en) | 2017-10-13 | 2017-10-13 | A kind of doorframe structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207332617U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287488A (en) * | 2020-03-25 | 2020-06-16 | 深圳市维业装饰集团股份有限公司 | Light steel keel gypsum board partition wall door opening reinforcing device |
-
2017
- 2017-10-13 CN CN201721326342.8U patent/CN207332617U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287488A (en) * | 2020-03-25 | 2020-06-16 | 深圳市维业装饰集团股份有限公司 | Light steel keel gypsum board partition wall door opening reinforcing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109162582A (en) | A kind of installation method of doorframe | |
CN101761286A (en) | Installation method of aluminum alloy door/window | |
CN206428924U (en) | A kind of assembled Decorative hanging board | |
CN109594735A (en) | Kitchen assembly and installation method | |
CN108952053A (en) | Shingle nail installation assembly and its installation method | |
CN207332617U (en) | A kind of doorframe structure | |
CN204326432U (en) | Track insertion hanging type wood decorations link plate | |
CN207063436U (en) | A kind of skirting line structure using wedge leveling | |
CN210264320U (en) | Hidden auxiliary sleeve section bar and hidden auxiliary sleeve | |
CN108005327A (en) | A kind of clear water concrete metope groove profile stereo wood pattern decoration construction method | |
CN210117877U (en) | Assembled composite decorative plate | |
CN109930944B (en) | Mounting method of hidden auxiliary sleeve | |
CN208202203U (en) | A kind of toilet wall body structure | |
CN211341616U (en) | Concealed skirting line assembly | |
CN205857599U (en) | A kind of skirting mounting assembly | |
CN208105602U (en) | A kind of novel wall structure | |
CN204781759U (en) | House outer wall stand decorative aluminum buckle | |
CN108978851A (en) | A kind of improvement room finishing system and decoration method | |
CN105544781A (en) | Novel heat-preservation decorative wall and construction method thereof | |
CN207332181U (en) | A kind of wall body structure | |
CN207739427U (en) | A kind of walling system | |
CN205777216U (en) | A kind of press strip anchoring type integration is combined veneer construction assembling structure | |
CN206722276U (en) | A kind of heat insulating decorative board of alternative dry close plating curtain wall | |
CN208456014U (en) | A kind of decorating wall structure | |
CN207739536U (en) | A kind of indoor wall system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181022 Address after: 310000 Zhejiang, Hangzhou, Binjiang District, Changhe street, Yueda Lane 79, 2, 3, 306 rooms. Patentee after: Hangzhou Jian Ge Technology Co., Ltd. Address before: 314512 2 2, Sheng Yuan Road, lambs Town, Shimen Town, Tongxiang, Jiaxing, Zhejiang Patentee before: Tongxiang Jian Jia home Co., Ltd. |