CN109594735A - Kitchen assembly and installation method - Google Patents
Kitchen assembly and installation method Download PDFInfo
- Publication number
- CN109594735A CN109594735A CN201811558164.0A CN201811558164A CN109594735A CN 109594735 A CN109594735 A CN 109594735A CN 201811558164 A CN201811558164 A CN 201811558164A CN 109594735 A CN109594735 A CN 109594735A
- Authority
- CN
- China
- Prior art keywords
- plate
- wallboard
- leveling
- face
- riser
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 71
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000003032 molecular docking Methods 0.000 claims abstract description 24
- 239000011120 plywood Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 32
- 230000000694 effects Effects 0.000 abstract description 23
- 238000010586 diagram Methods 0.000 description 22
- 238000005034 decoration Methods 0.000 description 9
- RKTYLMNFRDHKIL-UHFFFAOYSA-N copper;5,10,15,20-tetraphenylporphyrin-22,24-diide Chemical compound [Cu+2].C1=CC(C(=C2C=CC([N-]2)=C(C=2C=CC=CC=2)C=2C=CC(N=2)=C(C=2C=CC=CC=2)C2=CC=C3[N-]2)C=2C=CC=CC=2)=NC1=C3C1=CC=CC=C1 RKTYLMNFRDHKIL-UHFFFAOYSA-N 0.000 description 7
- 238000003912 environmental pollution Methods 0.000 description 7
- 239000003292 glue Substances 0.000 description 7
- 229920000297 Rayon Polymers 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- WSFSSNUMVMOOMR-UHFFFAOYSA-N Formaldehyde Chemical compound O=C WSFSSNUMVMOOMR-UHFFFAOYSA-N 0.000 description 3
- 238000004026 adhesive bonding Methods 0.000 description 3
- 239000011083 cement mortar Substances 0.000 description 3
- 238000000429 assembly Methods 0.000 description 2
- 230000000712 assembly Effects 0.000 description 2
- 150000001875 compounds Chemical class 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 2
- 238000012805 post-processing Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- 230000037237 body shape Effects 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000007254 oxidation reaction Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
- E04F13/0805—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall
- E04F13/0807—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall adjustable perpendicular to the wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
- E04F13/081—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
- E04F13/0816—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements extending into the back side of the covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
- E04F13/081—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
- E04F13/0821—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
- E04F2015/0205—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer
- E04F2015/02055—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional supporting elements between furring elements and underlayer
- E04F2015/02061—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional supporting elements between furring elements and underlayer adjustable perpendicular to the underlayer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02044—Separate elements for fastening to an underlayer
- E04F2015/0205—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer
- E04F2015/02066—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional fastening elements between furring elements and flooring elements
- E04F2015/02072—Separate elements for fastening to an underlayer with load-supporting elongated furring elements between the flooring elements and the underlayer with additional fastening elements between furring elements and flooring elements the additional fastening elements extending into the back side of the flooring elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of kitchen assembly and installation methods.Kitchen assembly includes: that the first installation end is mounted on leveling block, and leveling board is jointly mounted on the first wallboard;Filleting plate is embedded in the gap in the first wallboard and the second wallboard at docking;First mounting plate is mounted on leveling board, and the first jointing plate is jointly mounted on the second wallboard;One end of first wallboard is connected in the first wallboard slot, and the end face of abutment end is connected on the outer wall of the first wallboard slot;Card adapter plate is vertically mounted on the side on the second riser backwards to starting stave;One end of top plate is connected in the first card slot;One end of second wallboard is connected in the second card slot.The installation method of kitchen assembly is for installing kitchen assembly.Kitchen assembly and installation method provided by the invention improve levelling effect, increase planarization of the shingle nail at docking, guarantee that the gap between arbitrary neighborhood shingle nail is consistent, simplify levelling process, in working hour needed for reducing construction, reduce the pollution to environment.
Description
Technical field
The present invention relates to building decoration technology field more particularly to a kind of kitchen assemblies and installation method.
Background technique
The traditional finishing mode in kitchen needs the wet process on metope wet process stickup wallboard, ground wet process sticking floor, top plate
Top plate is pasted, to realize comprehensive cladding to the inner surface in kitchen.
In the prior art, top plate, wallboard and floor generally use wet process to install or dry method installation, top plate and wallboard,
And wallboard and floor generally use gluing or nail joint two ways wall top wall intersection, wall junction be attached.
Inventor has found during realizing innovation and creation, is had the disadvantage that with upper plate, wallboard and floor in junction
First, wet process installation refers to be mounted in cement mortar with by top plate, wallboard or floor, by taking wallboard as an example, specifically, first leading to
It crosses and manually smoothes out cement mortar on metope, then shingle nail is mounted in the cement mortar of metope, due to different metopes
It is inconsistent that plate is embedded the depth on metope, the poor flatness between shingle nail, and complex procedures, expends working hour, to live ring
Border pollution is larger;Second, dry method installation refers to for top plate, wallboard and floor being mounted on rough ground, by woodwork plate and
The form of fixing fillet filleting top plate, wallboard and floor are carried out it is levelling, when installation not only need to rough ground, woodwork plate and
Fixing fillet etc. prevented fires, anti-corrosion and insect-prevention treatment, increases installation procedure, and filleting leveling process is complicated, expends working hour,
In the period for extending construction, it is unfavorable for rapid construction;Third, the mounting means of gluing lead to more, the environmental pollution of formaldehyde volatilization
It is larger, after a period of time, since the fatigue of glue, oxidation reaction etc. be easy to cause top plate, wallboard and floor to fall off, cause
Crown wall junction, wall junction structural stability it is poor, need secondary construction;4th, the mounting means of nail joint can destroy top
Plate, wallboard or the outer surface on floor, influence decorative effect, even if the later period can carry out repairing treatment, but also can therefore increase work
Sequence expends working hour, extends construction period, increase construction cost;5th, either gluing or nail joint can exist in meeting
More rubbish is generated in construction site, is easy to leave a trace in positions such as top plate, floor, wallboards, is increased post-processing
Difficulty.
Therefore, it is necessary to solve above-mentioned technical problem.
Summary of the invention
The present invention provides a kind of kitchen assembly and installation method, to solve problems of the prior art, improves levelling
Effect increases planarization of the shingle nail at docking, guarantees that the gap between arbitrary neighborhood shingle nail is consistent, simplifies levelling work
Sequence in working hour needed for reducing construction, reduces the pollution to environment, increases wallboard and floor, top plate and wallboard in the steady of junction
It is qualitative, decorative effect is promoted, secondary construction is avoided, working hour is shortened in rapid construction, reduces decoration cost and building post-processing
Difficulty.
The present invention provides a kind of kitchen assembly, comprising: top plate, floor and the first wallboard and the second wallboard being connected to each other;
Levelling device, the levelling device include leveling part, installing frame and filleting plate;The leveling part includes the tune being oppositely arranged
Flush end and the first installation end;The installing frame includes leveling board and the positive leveling block for being mounted on the leveling board, and described
One installation end is mounted on the leveling block, and the leveling end is located at the leveling block backwards to the side of the leveling board, described
The distance between end and the leveling board are leveled along the direction perpendicular to the leveling board apart from adjustable;The leveling board fitting peace
On first wallboard;The filleting plate is vertically connected on the back side of the leveling board;The filleting plate is embedded described
First wallboard is with second wallboard in the gap for docking place;First plug-in unit, first plug-in unit include first to be connected
Mounting plate, the first jointing plate;First mounting plate is mounted on the leveling board, and first jointing plate is jointly mounted to institute
It states on the second wallboard;Wall earth connection, the wall earth connection include seating surface and the first wallboard slot, remote on first wallboard
One end from second wallboard is connected in the first wallboard slot, and the floor includes abutment end, the side of the abutment end
Face paste, which is closed, to be arranged on the seating surface, and the end face of the abutment end is connected on the outer wall of the first wallboard slot;Top frame
Frame, the top frame include the first positioning plate, the positive starting stave for being vertically mounted on first positioning plate and
Two risers and card adapter plate;The starting stave is arranged in parallel with second riser;The card adapter plate is vertically mounted on described
Backwards to the side of the starting stave on second riser;One end of the top plate is connected to first positioning plate, described second
The opening that riser and the card adapter plate define is in the first card slot of the starting stave;It is remote on second wallboard
One end from first wallboard is connected to the starting stave, first positioning plate and second riser and defines
Opening backwards to first positioning plate the second card slot in.
Optionally, the wall earth connection includes framework, the second positioning plate, fixing piece and plate;The framework includes
Sequentially connected mounting surface and the first leveling face and the second leveling face, the mounting surface and second leveling face are opposite and parallel
Setting, the first leveling face level face perpendicular to described second, offer third card slot on the mounting surface;Described second is fixed
Position plate is mounted in the framework, and second positioning plate includes positioning surface;The fixing piece includes sequentially connected first solid
Fixed board, the second fixed plate and third fixed plate, first fixed plate are oppositely arranged with the third fixed plate, and described
Two fixed plates are connected in the third card slot;The plate includes the second installation end and joint end being oppositely arranged, and described
Two installation ends are connected in the third fixed plate, and the joint end extends towards the direction far from first fixed plate;It is described
Second positioning plate, the third fixed plate and the plate define the first wallboard slot.
Optionally, the wall earth connection further includes the second plug-in unit, and second plug-in unit is inserted including the second mounting plate, second
Fishplate bar and the second jointing plate;Second plugboard is vertically mounted on second mounting plate;The second jointing plate peace
On second mounting plate, the back side of second jointing plate is arranged backwards to second plugboard, second installation
Plate is connected in the clamping groove that first fixed plate, second fixed plate and the third fixed plate define;It is described
The fitting of second plugboard is arranged on the plate;Second plugboard includes the outer wall of the first wallboard slot, and described
The front of two jointing plates includes the seating surface.
Optionally, the first adjustment hole is offered along the direction perpendicular to first leveling face in the framework;The frame
Body further includes the first adjusting foot, and the first adjusting foot includes the first screw rod and the first nut being connected, and described first is adjusted
Hole is threaded hole, and first screw rod is screwed onto first adjustment hole, and first nut is located at first leveling face
It is oppositely arranged outside and with the first leveling face.
Optionally, the second adjustment hole is offered along the direction perpendicular to second leveling face in the framework;The frame
Body further includes the second adjusting foot, and the second adjusting foot includes the second screw rod and the second nut being connected, and described second is adjusted
Hole is threaded hole, and second screw rod is screwed onto second adjustment hole, and second nut is located at second leveling face
It is oppositely arranged outside and with the second leveling face.
Optionally, leveling hole is offered on the leveling block, first installation end is worn into the leveling hole.
Optionally, the leveling hole is threaded hole, and the leveling end includes third screw rod, and the leveling end passes through described the
Three screw rods are adjustably screwed onto the leveling hole.
Optionally, the one end being connected on the top plate in first card slot is the first connecting pin, first connection
The end face at end offers binding groove, and the side on second riser backwards to the starting stave is connected with bracket, described tight
Gu item tightly connects in the binding groove.
Optionally, the first limited block, the wallboard are installed towards the side of the starting stave on second riser
On one end for being connected in second card slot include that end face and the locating piece on the installation end face, the positioning are installed
Surface on block backwards to the installation end face is connected on first limited block on the surface of first positioning plate.
Based on the same inventive concept, the present invention also provides a kind of installation method of kitchen assembly, for install right with
Kitchen assembly described in upper any one, comprising the following steps: be mounted on the wall levelling device, the levelling device includes
Level part, installing frame and filleting plate;The leveling part includes the leveling end being oppositely arranged and the first installation end;The installation
Frame includes leveling board and the positive leveling block for being mounted on the leveling board, and first installation end is mounted on the leveling block
On, the leveling end is located at the leveling block between the side of the leveling board, the leveling end and the leveling board
Distance is along the direction perpendicular to the leveling board apart from adjustable;The filleting plate is vertically connected on the back side of the leveling board;It will
First plug-in unit is mounted on the levelling device, and first plug-in unit includes the first mounting plate being connected, the first jointing plate;Institute
The first mounting plate is stated to be mounted on the leveling board;Will the first wallboard and the second wallboard docking after be mounted on the levelling device and
On first plug-in unit, the leveling board is jointly mounted on first wallboard, and first jointing plate is jointly mounted to institute
It states on the second wallboard;The filleting plate is embedded in the gap in first wallboard and second wallboard at docking;Installation
Wall earth connection, the wall earth connection include seating surface and the first wallboard slot;By on floor and the first wallboard far from described the
One end of two wallboards is mounted on the wall earth connection, and one end on first wallboard far from second wallboard is connected to
In the first wallboard slot, the floor includes abutment end, and the side fitting of the abutment end is arranged on the seating surface, institute
The end face for stating abutment end is connected on the outer wall of the first wallboard slot;Top frame is installed, the top frame includes first
Positioning plate, the positive starting stave for being vertically mounted on first positioning plate and the second riser and card adapter plate;Described
One riser is arranged in parallel with second riser;The card adapter plate is vertically mounted on second riser perpendicular backwards to described first
The side of plate;One end on top plate and second wallboard far from first wallboard is mounted in the top frame, institute
The one end for stating top plate is connected to opening that first positioning plate, second riser and the card adapter plate define backwards
In first card slot of the starting stave;It is perpendicular that one end on second wallboard far from first wallboard is connected to described first
The opening that plate, first positioning plate and second riser define is in the second card slot of first positioning plate.
Kitchen assembly and installation method provided by the invention, on entire metope, the first wallboard of arbitrary neighborhood and second
Wallboard is embedded with filleting plate at docking, ensure that the filleting of any first wallboard and the second wallboard at docking is protected on metope
It holds unanimously, while leveling board is jointly mounted on the first wallboard, the first jointing plate is jointly mounted on the second wallboard, the first plug-in unit
It is mounted on levelling device, leveling end is connected on metope, levels the distance between end and leveling board by adjusting, can be simultaneously
The planarization of the first wallboard and the second wallboard at docking is adjusted, levelling effect is improved, simplifies levelling process, is reduced needed for construction
Working hour, mitigate pollution to environment, shorten construction period, be conducive to rapid construction.Is directly connected to by wall earth connection
One wallboard and floor are avoided the environmental pollution occurred in the prior art using viscose glue or nail joint, influence the first wallboard appearance
The problem of face or floor outer surface, with the improving wall decorative effect of junction, while rapid construction is realized, shorten work
When, decoration cost is reduced, the clamping of wall earth connection acts on while improving the first wallboard and floor in the stabilization of junction
Property, avoid secondary construction.It is directly clamped the second wallboard and top plate by top frame, avoids and is gone out using viscose glue or nail joint
Existing environmental pollution influences the problem of the second wallboard outer surface or top plate outer surface, with improving wall the decoration effect of junction
Fruit, top plate can be rapidly connected in the first card slot, and the second wallboard can be rapidly connected in the second card slot, be realized fast
Speed construction, shortens working hour, reduces decoration cost, the clamping effect of top frame while improving the second wallboard and top plate exists
The stability of junction avoids secondary construction.
Detailed description of the invention
It below will be by preferred embodiment in attached drawing the present invention is described in detail, to help the purpose of the present invention and excellent is understood
Point, in which:
Fig. 1 is the structural schematic diagram for the kitchen assembly that alternative embodiment of the present invention provides.
Fig. 2 is the levelling device structural schematic diagram compatible with the first plug-in unit that alternative embodiment of the present invention provides.
Fig. 3 is the structural schematic diagram for the levelling device that alternative embodiment of the present invention provides.
Fig. 4 is the structural schematic diagram for the first plug-in unit that alternative embodiment of the present invention provides.
Fig. 5 is the structural schematic diagram of the first wallboard that alternative embodiment of the present invention provides and floor in junction.
Fig. 6 is the structural schematic diagram for the wall earth connection that alternative embodiment of the present invention provides.
Fig. 7 is the first structure diagram of the framework being connected and the second positioning plate that alternative embodiment of the present invention provides.
Fig. 8 is the second structural schematic diagram of the framework being connected that alternative embodiment of the present invention provides and the second positioning plate.
Fig. 9 is the structural schematic diagram for the fixing piece for being equipped with plate that alternative embodiment of the present invention provides.
Figure 10 is the structural schematic diagram of the top plate that alternative embodiment of the present invention provides and the second wallboard in junction.
Figure 11 is the structural schematic diagram for the top frame that alternative embodiment of the present invention provides.
Figure 12 is the flow chart of the installation method for the kitchen assembly that alternative embodiment of the present invention provides.
Specific embodiment
It mentions in the present specification or up, down, left, right, before and after, front, the back side, top, the bottom that may mention etc.
Positional terms are defined relative to each construction shown in the drawings, and word "inner" and "outside" refer respectively to direction or remote
From the direction of geometric center of specific component, they are opposite concepts, and it is therefore possible to can different location, difference according to locating for it
Use state and correspondingly changed.So also these or other positional terms should not be construed to restricted use
Language.
Fig. 1 is the structural schematic diagram for the kitchen assembly that alternative embodiment of the present invention provides, and Fig. 2 is alternative embodiment of the present invention
The levelling device of offer structural schematic diagram compatible with the first plug-in unit, Fig. 3 are the leveling dress that alternative embodiment of the present invention provides
The structural schematic diagram set, Fig. 4 are the structural schematic diagram for the first plug-in unit that alternative embodiment of the present invention provides, and Fig. 5 is that the present invention can
In the structural schematic diagram of junction, Fig. 6 alternative embodiment of the present invention provided for the first wallboard for selecting embodiment to provide and floor
The structural schematic diagram of wall earth connection, Fig. 7 are the framework being connected that alternative embodiment of the present invention provides and the second positioning plate
First structure diagram, Fig. 8 are the second structure of the framework being connected that alternative embodiment of the present invention provides and the second positioning plate
Schematic diagram, Fig. 9 are the structural schematic diagram for the fixing piece for being equipped with plate that alternative embodiment of the present invention provides, and Figure 10 is the present invention
In the structural schematic diagram of junction, Figure 11 provides the top plate and the second wallboard that alternative embodiment provides for alternative embodiment of the present invention
Top frame structural schematic diagram.As shown in Figure 1 to 11, the present invention provides a kind of kitchen assemblies, comprising: including top
Plate, floor, the first wallboard being connected to each other and the second wallboard, levelling device, the first plug-in unit, wall earth connection and top frame.
Referring to Fig. 1 to Figure 11, the levelling device includes leveling part 61, installing frame 62 and filleting plate 63;Institute
Stating leveling part 61 includes the leveling end 611 being oppositely arranged and the first installation end 612;The installing frame 62 includes leveling board 64 and peace
Mounted in the positive leveling block 65 of the leveling board 64, first installation end 612 is mounted on the leveling block 65, the tune
Flush end 611 is located at the leveling block 65 backwards to the side of the leveling board 64, between the leveling end 611 and the leveling board 64
Distance along perpendicular to the leveling board 64 direction apart from adjustable;The leveling board 64 is jointly mounted to first wallboard 85
On;The filleting plate 63 is vertically connected on the back side of the leveling board 64;The filleting plate 63 is embedded in first wallboard 85
With second wallboard 86 in the gap for docking place.
Wherein the first installation end 612 can be the adjusting rod along axial scalable setting, by adjusting the length of adjusting rod,
And then realize that leveling the distance between end 611 and leveling board 64 are adjustable.
First plug-in unit includes the first mounting plate 41 being connected, the first jointing plate 45;First mounting plate 41 is pacified
On the leveling board 64, first jointing plate 45 is jointly mounted on second wallboard 86.
The wall earth connection includes seating surface and the first wallboard slot, separate second wallboard on first wallboard 85
86 one end is connected in the first wallboard slot, and the floor 9 includes abutment end, and the side fitting setting of the abutment end exists
On the seating surface, the end face of the abutment end is connected on the outer wall of the first wallboard slot.
The top frame 7 includes: the first positioning plate 71, is vertically mounted on positive the of first positioning plate 71
One riser 72 and the second riser 73, the starting stave 72 are arranged in parallel with second riser 73;The card adapter plate 74 is vertical
It is mounted on the side on second riser 73 backwards to the starting stave 72;One end of the top plate 9 is connected to described first
The opening that positioning plate 71, second riser 73 and the card adapter plate 74 define is backwards to the first of the starting stave 72
In card slot 91;One end on second wallboard 86 far from first wallboard 8 is connected to the starting stave 72, described first
The opening that positioning plate 71 and second riser 73 define is in the second card slot 81 of first positioning plate 71.
Kitchen assembly provided in this embodiment, on entire metope, the first wallboard 85 and the second wallboard 86 of arbitrary neighborhood
It is embedded with filleting plate 63 at docking, ensure that the filleting of any first wallboard 85 and the second wallboard 86 at docking on metope
It is consistent, while leveling board 64 is jointly mounted on the first wallboard 85, the first jointing plate 45 is jointly mounted to the second wallboard 86
On, the first plug-in unit is mounted on levelling device, and leveling end 611 is connected on metope, by adjusting leveling end 611 and leveling board 64
The distance between, the planarization of the first wallboard 85 and the second wallboard 86 at docking can be adjusted simultaneously, improve levelling effect, letter
Change levelling process, in working hour needed for reducing construction, mitigates the pollution to environment, shorten construction period, be conducive to rapid construction.It is logical
It crosses wall earth connection and is directly connected to the first wallboard 85 and floor 95, avoid and in the prior art occurred using viscose glue or nail joint
Environmental pollution influences the problem of 85 outer surface of the first wallboard or 95 outer surface of floor, with improving wall the decoration effect of junction
Fruit, while rapid construction is realized, working hour is shortened, decoration cost is reduced, the clamping of wall earth connection is acted on while being improved
First wallboard 85 and floor 95 avoid secondary construction in the stability of junction.Second is directly clamped by top frame 7
Wallboard 86 and top plate 9 avoid using the environmental pollution of viscose glue or nail joint appearance, influence 86 outer surface of the second wallboard or top
The problem of 9 outer surface of plate, the decorative effect of junction, top plate 9 can be rapidly connected in the first card slot 91 with improving wall,
Second wallboard 86 can be rapidly connected in the second card slot 81, realized rapid construction, shortened working hour, reduce finishing at
This, the clamping of top frame 7 acts on while improving the second wallboard 86 and top plate 9 in the stability of junction, avoids secondary
Construction.
It should be noted that a kind of kitchen assembly is using stalk board as substrate, surface can overlay film, compound tile, compound
Stone material etc.;To realize preferably flameproof effect.
On the basis of the above embodiments, the wall earth connection include framework 1, the second positioning plate 2, fixing piece and
Plate 34;The framework 1 includes sequentially connected mounting surface 11 and the first leveling face 13 and the second leveling face 14, the mounting surface
11 is opposite with the second leveling face 14 and be arranged in parallel, and the first leveling face 13 is perpendicular to second leveling face 14, institute
It states and offers third card slot 12 on mounting surface 11;Second positioning plate 2 is mounted in the framework 1, second positioning plate 2
Including positioning surface 21;The fixing piece includes sequentially connected first fixed plate 31, the second fixed plate 32 and third fixed plate
33, first fixed plate 31 is oppositely arranged with the third fixed plate 33, and second fixed plate 32 is connected to the third
In card slot 12.The plate 34 includes the second installation end and joint end being oppositely arranged, and second installation end is connected to described
In third fixed plate 33, the joint end extends towards the direction far from first fixed plate 31;Second positioning plate 2, institute
It states third fixed plate 33 and the plate 34 defines the first wallboard slot.In the present embodiment, framework 1 is with being mounted on wall
Junction, the first leveling face 13 abut on the ground, and the second leveling face 14 is connected on metope, and 85 grafting of the first wallboard is into first
In wallboard slot, the stability of the first wallboard 85 in wall junction is increased, reduces what the first wallboard 85 fell off from metope
Risk.
Preferably, the wall earth connection further includes the second plug-in unit, second plug-in unit includes the second mounting plate 51, second
Plugboard 54 and the second jointing plate 55;Second plugboard 54 is vertically mounted on second mounting plate 51;Described
Two jointing plates 55 are mounted on second mounting plate 51, and the back side of second jointing plate 55 is backwards to second plugboard 54
Setting, second mounting plate 51 are connected to first fixed plate 31, second fixed plate 32 and the third and fix
In the clamping groove 35 that plate 33 defines;The fitting of second plugboard 54 is arranged on the plate 34;Second plugboard
54 include the outer wall of the first wallboard slot, and the front of second jointing plate 55 includes the seating surface.In the present embodiment, the
Two jointing plates 55 are for being bonded setting on floor 95, further to increase the stable structure of in wall the junction of floor 95
Property.
Optionally, the first adjustment hole is offered along the direction perpendicular to the first leveling face 13 in the framework 1.This reality
Applying the first adjustment hole opened up in example can be used for installation and adjustment part, with the vertical range adjusted and between floor 95 and ground.
On the basis of the above embodiments, the framework further includes the first adjusting foot 22, and the first adjusting foot 22 includes
The first screw rod 23 and the first nut 24 being connected, first adjustment hole are threaded hole, and first screw rod 23 is screwed onto institute
It states in the first adjustment hole, first nut 24 is located at outside the first leveling face 13 and sets relatively with the first leveling face 13
It sets.For first nut 24 for abutting on the ground, the first screw rod 23 provided in this embodiment by precession or can screw out the
One adjustment hole to adjust the distance between the first nut 24 and the first leveling face 13, and then rapidly adjusts floor 95 and ground
Between vertical range, efficiently level.
Preferably, offering the second adjustment hole along the direction perpendicular to the second leveling face 14 in the framework 1.This reality
Apply the second adjustment hole for being opened up in example can to installation and adjustment part, with adjust between the first wallboard 85 and metope it is vertical away from
From.
On the basis of the above embodiments, the framework further includes the second adjusting foot 25, and the second adjusting foot 25 includes
The second screw rod 26 and the second nut 27 being connected, second adjustment hole are threaded hole, and second screw rod 26 is screwed onto institute
It states in the second adjustment hole, second nut 27 is located at outside the second leveling face 24 and sets relatively with the second leveling face 24
It sets.
Optionally, the framework 1 is also provided with the first adjusting cavity 15, and the extending direction of first adjusting cavity 15 is parallel to
First leveling face 13, first adjusting cavity 15 intersect with first adjustment hole.First adjusting cavity 15 can reduce
The resistance of one screw rod 23 precession or back-out in the first adjustment hole reduces the first screw rod 23 in the first adjustment hole inward turning modulation section
Difficulty.
On the basis of the above embodiments, the first stiffening plate 17 is installed, described first adjusts in first adjusting cavity 15
Knothole runs through first stiffening plate 17.First stiffening plate 17 provided in this embodiment can increase the knot in the first adjusting cavity 15
Structure intensity increases the structural stability of framework 1.Further, the first adjusting cavity 15 can be tetragonal body cavity, the first stiffening plate
The both sides being oppositely arranged on 17 are separately mounted on two angles that tetragonal body cavity is oppositely arranged, and tetragonal body is divided into two three
It is angular, the effect of support reinforcing is played to the first adjusting cavity 15 in the form of cornerwise.
Likewise, being also provided with the second adjusting cavity 16 in the framework 1, the extending direction of second adjusting cavity 16 is parallel
In second leveling face 14, second adjusting cavity 16 intersects with second adjustment hole.Second adjusting cavity 16 can reduce
The resistance of second screw rod 26 precession or back-out in the second adjustment hole reduces the second screw rod 26 in the second adjustment hole inward turning modulation
The difficulty of section.
On the basis of the above embodiments, the second stiffening plate 18 is installed, described second adjusts in second adjusting cavity 16
Knothole runs through second stiffening plate 18.Second stiffening plate 18 provided in this embodiment can increase the structure of the second adjusting cavity 16
Intensity increases the structural stability of framework 1.Further, the second adjusting cavity 16 can be with tetragonal body shape, phase in the second stiffening plate 18
The both sides of setting are separately mounted on be oppositely arranged on tetragonal body two inner walls, tetragonal body is divided into two tetragonal bodies, it is right
The form laterally reinforced plays the effect of support reinforcing to the second adjusting cavity 16.
Optionally, second fixed plate 32 includes the first scoreboard 36, the second scoreboard 37 and third scoreboard 38, described
First scoreboard 36 and the third scoreboard 38 are connected to the both sides being oppositely arranged in second scoreboard 37, and described first point
Be connected in first fixed plate 31 on one side far from second scoreboard 37 on plate 36, far from institute in the third scoreboard 38
Being connected in the third fixed plate 33 on one side for the second scoreboard 37 is stated, between first scoreboard 36 and second scoreboard 37
Distance be gradually reduced along far from the direction of first fixed plate 31.The present embodiment can be thinned in the second scoreboard 37 and be provided with
It is clamped the thickness of convex portion, reduces the materials of inner corner trim fixing piece.Further, first scoreboard 36, second scoreboard
37 and 38 integrated punching of third scoreboard molding, can simplify the processing flow of inner corner trim fixing piece.
Further, in second scoreboard 37 towards offering the first locating slot 39 on the surface of the clamping groove 35.
First locating slot 39 provided in this embodiment in the second scoreboard 37 mounting screw provide and efficiently locate effect, while
A positioning groove 39 is thinned the thickness of the second scoreboard 37, reduces the difficulty that screw is fed through the second scoreboard 37.
Preferably, first fixed plate 31 is parallel to the third fixed plate 33.The present embodiment can be worn in wallboard face
After in into the first locating slot 39, the inner surface of the first fixed plate 31 and the inner surface of third fixed plate 33 paste correspondingly respectively
The two sides being oppositely arranged on the second mounting plate 51 are closed, the structural stability of the second mounting plate 51 installation is improved.
Optionally, the distance between the plate 34 and second scoreboard 37 are less than separate in first fixed plate 31
The distance between one end of second scoreboard 37 and second scoreboard 37.The first fixed plate 31 and the second installation can be increased
Contact area between plate 51 improves structural stability when the second mounting plate 51 is connected in clamping groove 35.
Preferably, offering leveling hole 67 on the leveling block 65, first installation end 612 is worn into the leveling hole
In 67.In the present embodiment, installation end 612 is fixed on to be mounted in installing frame 62 in such a way that axis hole is installed, and has installation letter
Just, convenient for the advantage of connection.
On the basis of the above embodiments, the leveling hole 67 is threaded hole, and the leveling end 611 includes third screw rod,
The leveling end 611 is adjustably screwed onto the leveling hole 67 by the third screw rod.Third provided in this embodiment
Screw rod can level the distance between end 611 and leveling board 64 by precession or back-out leveling hole 67 to adjust, and then quickly
Ground adjusts the vertical range between the first wallboard 85 and the second wallboard 86 and metope, realizes efficiently leveling.
As an optional implementation process, third adjustment hole 68 is offered on the leveling block 65, the third is adjusted
Hole 68 is parallel to the leveling board 64, and the leveling hole 67 is intersected with the third adjustment hole 68.Third adjustment hole 68 can subtract
Resistance of few third screw rod when leveling precession in hole 67 or screwing out reduces the difficulty that screw rod is adjusted in leveling hole 67.
On the basis of the above embodiments, the installing frame 62 further includes grip block 66, and the grip block 66 is mounted on institute
State leveling block 65 on, the grip block 66 is oppositely arranged with the leveling board 64, the grip block 66, the leveling block 65, with
And the leveling board 64 defines holding tank, first mounting plate 41 is embedded in the holding tank.In the present embodiment, in reality
In the operating process of border, levelling device can be fitted together with the first wallboard 85 on the ground, and the first plug-in unit can be on the ground
It is fitted together with the second wallboard 86, finally the first mounting plate 41 is connected in holding tank can be by the first wallboard 85 and second
The installation of 86 phase of wallboard, installation process high efficient and reliable, the first wallboard 85 and 86 stability of the second wallboard after installation are high.
Preferably, 45 screw of the first jointing plate is mounted on second wallboard 86,64 screw of the leveling board peace
On first wallboard 85.Firm, the convenient to carry out advantage with installation.
Optionally, first jointing plate 45 includes the second connection end being oppositely arranged and elongated end, second connection
End is mounted on first mounting plate 41;The front of first jointing plate 45 and the front of first mounting plate 41 are coplanar
The back side of setting, the back side of first jointing plate 45 and first mounting plate 41 is respectively positioned on the same of first jointing plate 45
Side, the elongated end extend towards the direction far from the leveling block 65.The present embodiment can effectively increase by the first jointing plate
45 and the second fitting area between wallboard 86, increase the stability of the second wallboard 86 installation.
Preferably, the front of first mounting plate 41 includes interface 47 and is embedded face 48, first mounting plate 41
The back side be benchmark plane, the distance between the interface 47 and the datum plane be less than described in be embedded face 48 and the base
The distance between directrix plane;The face 48 that is embedded is embedded in the holding tank.In the present embodiment, pass through respectively arranged docking
Face 47 and it is embedded face 48, ensure that the first mounting plate 41 while having connects the first wallboard 85 and the second wallboard 86 and fixes the
The effect of two wallboards 86, integrated height, number of components needed for reducing the first plug-in unit are conducive to save material, easy to process.
On the basis of the above embodiments, the back side of the interface 47 and the leveling board 64 is coplanar with.This implementation
Example can further increase the planarization of the first wallboard 85 and the second wallboard 86 at docking.
Optionally, first plug-in unit further includes the first plugboard 44, and first plugboard 44 is vertically mounted on described
Interface 47, first plugboard 44 is bonded with the filleting plate 63 to be arranged and is embedded jointly in first wallboard 85 and institute
At the docking for stating the second wallboard 86.First plugboard 44 and filleting plate 63 provided in this embodiment are embedded jointly to be connected to each other at two
Wallboard docking at, can further increase installing frame 62 and the first plug-in unit in the structural stability of junction.
Optionally, the first lightening hole 43 is offered in first mounting plate 41.First lightening hole 43 can effectively subtract
The weight of light first mounting plate 41 is conducive to mitigate the load that metope is subject to, increases the structural stability of the first plug-in unit.
Further, the back side of first jointing plate 45 offers limiting slot.Limiting slot plays initial alignment and is thinned
Effect, the first jointing plate 45 front fitting be arranged on the second wallboard 86 after, screw can be worn from limiting slot into first
In jointing plate 45 and the second wallboard 86.
Optionally, it is the first connecting pin 92 that one end in first card slot 91 is connected on the top plate 9, described first
The end face of connecting pin 92 offers binding groove 93, is connected with tightly on second riser 73 backwards to the side of the starting stave 72
Gu item 78, the bracket 78 is tightly connected in the binding groove 93.Compatible bracket 78 and binding groove in the present embodiment
93 effectively increase the contact area between top plate 9 and top frame 7, increase top plate 9 and are mounted in the first card slot 91
Stability, and binding groove 93 is clamped bracket 78 and the first card slot 91 is clamped the first connecting pin 92 and realizes top plate 9 and top frame
The dual clamping of frame 7, the stability connected between top frame 7 and top plate 9, which has, further to be promoted.
Preferably, being equipped with the first limited block 75, institute towards the side of the starting stave 72 on second riser 73
Stating the one end being connected in second card slot 81 on the second wallboard 86 includes installing end face 82 and positioned at the installation end face 82
On locating piece 83, the surface on the locating piece 83 backwards to the installation end face 82, which is connected on first limited block 75, carries on the back
To on the surface of first positioning plate 71.The first limited block 75 in the present embodiment plays the effect of support locating piece 83,
Certain space is reserved in second card slot 81 for installing the screw for fixing the first positioning plate 71, and the second card slot 81 is rationally utilized
Interior space.
On the basis of the above embodiments, it is also equipped on second riser 73 towards the side of the starting stave 72
Second limited block 76, second limited block 76 are located at the top of first limited block 75;Court on second limited block 76
It is less than described the on first limited block 75 to the distance between the surface of the starting stave 72 and second riser 73
The distance between the surface of one riser 72 and second riser 73;The two sides difference being oppositely arranged on the locating piece 83
It is connected on the starting stave 72 and second limited block 76 correspondingly.75 He of the first limited block in the present embodiment
Second limited block 76 is similar to step-like structure, and the first limited block 75 plays the effect of support locating piece 83, the second limited block
76 and starting stave 72 jointly by locating piece 83 stabilization be limited in the second card slot 81.
Optionally, the second locating slot 77 is offered on first positioning plate 71, second locating slot 77 is located at described
Between starting stave 72 and first limited block 75.When installation, the tip of screw is directly worn from the notch of the second locating slot 77
If being fixed on top surface after into the first positioning plate 71, and then quickly and stably top frame 7 is mounted on top surface.In this base
On plinth, the second wallboard 86 is clamped into the second card slot 81, top plate 9 is clamped into the first card slot 91, the second wallboard is realized
86 and top plate 9 quick firm installation.
Preferably, the card adapter plate 74 is located at one end on second riser 73 far from first positioning plate 71, institute
It states in card adapter plate 74 on the surface of first positioning plate 71, second limited block 76 backwards to first positioning plate 71
Surface and second riser 73 on the end face of one end far from first positioning plate 71 be coplanar with and define jointly
Plane is positioned out;The positioning plane is connected on the installation end face 82.The positioning plane that the present embodiment defines, Ke Yiyou
Effect ground increases the contact area between installation end face 82 and top frame 7, increases and connects between top frame 7 and the second wallboard 86
Stability, while when positioning planar horizontal setting, can avoid the second wallboard 86 stress in the horizontal direction, prevent the second wallboard
86 run-off the straights are conducive to further increase the stability that the second wallboard 86 is mounted in top frame 7.
Preferably, the starting stave 72 is mounted on the edge of first positioning plate 71, the i.e. edge of starting stave 72
It is connected after being aligned with the edge of first positioning plate 71, ensure that the first positioning plate 71 is connected with one end of starting stave 72
It is coplanar with the starting stave 72.During installation, directly the side that starting stave 72 is provided in top frame 7 is abutted
On metope, simple installation is reliable and stable.
Further, the second lightening hole 79 is offered on first limited block 75, it is possible to reduce the use of top frame 7
Material reduces the weight of top frame 7.Further, can equally offer the second lightening hole 79 on the second limited block 76, with into
Reduce to one step the materials of top frame 7.
Preferably, the wall attachment device further include backing plate 94, the backing plate 94 is located at the bottom of the top plate 9, institute
The back side on backing plate 94 backwards to the surface of the top plate 9 and first positioning plate 71 is stated to be coplanar with.Pad in the present embodiment
Plate 94 effectively compensates for the difference in height being located between the part and top surface other than top frame 7 on top plate 9, maintains top plate 9
Planarization.
Figure 12 is the flow chart of the installation method for the kitchen assembly that alternative embodiment of the present invention provides.
As shown in Figures 1 to 12, based on the same inventive concept, the present invention also provides a kind of installation sides of kitchen assembly
Method, comprising the following steps:
S1: levelling device is mounted on the wall, and making the levelling device includes leveling part 61, installing frame 62, Yi Jiqian
Stitch plate 63;The leveling part 61 includes the leveling end 611 being oppositely arranged and the first installation end 41;The installing frame 62 includes leveling
Plate 64 and the positive leveling block 65 for being mounted on the leveling board 64, first installation end 41 are mounted on the leveling block 65
On, the leveling end 611 is located at the leveling block 65 backwards to the side of the leveling board 64, the leveling end 611 and the tune
The distance between plate 64 is along the direction perpendicular to the leveling board 64 apart from adjustable;The filleting plate 63 is vertically connected on described
The back side of leveling board 64;
S2: the first plug-in unit is mounted on the levelling device, and first plug-in unit includes the first mounting plate being connected
41, the first jointing plate 45;First mounting plate 41 is mounted on the leveling board 64;
S3: it will be mounted on the levelling device and first plug-in unit after the first wallboard and the docking of the second wallboard, make institute
The first wallboard 85 is stated to be jointly mounted on the leveling board 64;Second wallboard 86 is set to be jointly mounted to first jointing plate
On, the filleting plate is embedded in the gap in first wallboard 85 and second wallboard 86 at docking;
S4: installation wall earth connection, the wall earth connection includes seating surface and the first wallboard slot;
S5: one end on floor 95 and the first wallboard 85 far from second wallboard 86 is mounted on the wall earth connection
On, one end on first wallboard 85 far from second wallboard 86 is connected in 85 slot of the first wallboard, the floor
95 include abutment end, and the side fitting of the abutment end is arranged on the seating surface, and the end face of the abutment end is connected to institute
On the outer wall for stating 85 slot of the first wallboard;
S6: installation top frame 7, the top frame 7 includes the first positioning plate 71, to be vertically mounted on described first fixed
The positive starting stave 72 and the second riser 73 and card adapter plate 74 of position plate 71;The starting stave 72 is erected with described second
Plate 73 is arranged in parallel;The card adapter plate 74 is vertically mounted on the side on second riser 73 backwards to the starting stave 72;
S7: one end on top plate 9 and second wallboard 86 far from first wallboard 85 is mounted on the top frame
On frame 7, one end of the top plate 9 is connected to 74 boundary of first positioning plate 71, second riser 73 and the card adapter plate
The opening made is in the first card slot 81 of the starting stave 72;Far from first wallboard 85 on second wallboard 86
One end be connected to the opening back that the starting stave 72, first positioning plate 71 and second riser 73 define
Into the second card slot 81 of first positioning plate 71.
Kitchen assembly and installation method provided in this embodiment, on entire metope, 85 He of the first wallboard of arbitrary neighborhood
Second wallboard 86 is embedded with filleting plate 63 at docking, ensure that any first wallboard 85 and the second wallboard 86 are right on metope
The filleting at the place of connecing is consistent, while leveling board 64 is jointly mounted on the first wallboard 85, and the first jointing plate 45 is jointly mounted to
On second wallboard 86, the first plug-in unit is mounted on levelling device, and leveling end 611 is connected on metope, levels end 611 by adjusting
The distance between leveling board 64 can adjust the planarization of the first wallboard 85 and the second wallboard 86 at docking simultaneously, improve
Levelling effect simplifies levelling process, in working hour needed for reducing construction, mitigates the pollution to environment, shortens construction period, be conducive to
Rapid construction.Be directly connected to the first wallboard 85 and floor 95 by wall earth connection, avoid in the prior art using viscose glue or
The problem of environmental pollution, influence 85 outer surface of the first wallboard or 95 outer surface of floor that person's nail joint occurs, with improving wall even
The decorative effect at place is connect, while realizing rapid construction, shortens working hour, reduces decoration cost, the clamping of wall earth connection
It acts on while improving the first wallboard 85 and floor 95 in the stability of junction, avoid secondary construction.Pass through top frame 7
It is directly clamped the second wallboard 86 and top plate 9, avoids using the environmental pollution of viscose glue or nail joint appearance, influence the second wallboard 86
The problem of 9 outer surface of outer surface or top plate, the decorative effect of junction, top plate 9 can be rapidly connected to improving wall
In first card slot 91, the second wallboard 86 can be rapidly connected in the second card slot 81, realized rapid construction, shortened work
When, decoration cost is reduced, the clamping of top frame 7 acts on while improving the second wallboard 86 and top plate 9 in the steady of junction
It is qualitative, avoid secondary construction.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, the range for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (10)
1. a kind of kitchen assembly characterized by comprising
Top plate, floor and the first wallboard and the second wallboard being connected to each other;
Levelling device, the levelling device include leveling part, installing frame and filleting plate;The leveling part includes being oppositely arranged
Leveling end and the first installation end;The installing frame includes leveling board and the positive leveling block for being mounted on the leveling board, institute
The first installation end to be stated to be mounted on the leveling block, the leveling end is located at the leveling block backwards to the side of the leveling board,
Leveling the distance between the end and the leveling board is along the direction perpendicular to the leveling board apart from adjustable;The leveling board patch
Conjunction is mounted on first wallboard;The filleting plate is vertically connected on the back side of the leveling board;The filleting plate is embedded
First wallboard is with second wallboard in the gap for docking place;
First plug-in unit, first plug-in unit include the first mounting plate being connected, the first jointing plate;The first mounting plate installation
On the leveling board, first jointing plate is jointly mounted on second wallboard;
Wall earth connection, the wall earth connection include seating surface and the first wallboard slot, far from described the on first wallboard
One end of two wallboards is connected in the first wallboard slot, and the floor includes abutment end, and the side fitting of the abutment end is set
It sets on the seating surface, the end face of the abutment end is connected on the outer wall of the first wallboard slot;
Top frame, the top frame include the first positioning plate, are vertically mounted on positive the of first positioning plate
One riser and the second riser and card adapter plate;The starting stave is arranged in parallel with second riser;The card adapter plate is vertical
It is mounted on the side on second riser backwards to the starting stave;One end of the top plate is connected to first positioning
The opening that plate, second riser and the card adapter plate define is in the first card slot of the starting stave;Described
One end on two wallboards far from first wallboard is connected to the starting stave, first positioning plate and described second
The opening that riser defines is in the second card slot of first positioning plate.
2. kitchen assembly according to claim 1, which is characterized in that the wall earth connection includes framework, the second positioning
Plate, fixing piece and plate;
The framework includes sequentially connected mounting surface and the first leveling face and the second leveling face, the mounting surface and described second
Leveling face is opposite and is arranged in parallel, and the first leveling face offers the perpendicular to second leveling face on the mounting surface
Three card slots;
Second positioning plate is mounted in the framework, and second positioning plate includes positioning surface;
The fixing piece includes sequentially connected first fixed plate, the second fixed plate and third fixed plate, and described first is fixed
Plate is oppositely arranged with the third fixed plate, and second fixed plate is connected in the third card slot;
The plate includes the second installation end and joint end being oppositely arranged, and second installation end is connected to the third and fixes
On plate, the joint end extends towards the direction far from first fixed plate;
Second positioning plate, the third fixed plate and the plate define the first wallboard slot.
3. kitchen assembly according to claim 2, which is characterized in that the wall earth connection further includes the second plug-in unit, institute
Stating the second plug-in unit includes the second mounting plate, the second plugboard and the second jointing plate;
Second plugboard is vertically mounted on second mounting plate;Second jointing plate is mounted on second installation
On plate, the back side of second jointing plate is arranged backwards to second plugboard, and second mounting plate is connected to described first
In the clamping groove that fixed plate, second fixed plate and the third fixed plate define;The second plugboard fitting is set
It sets on the plate;
Second plugboard includes the outer wall of the first wallboard slot, and the front of second jointing plate includes the support
Face.
4. kitchen assembly according to claim 3, which is characterized in that along perpendicular to first leveling face in the framework
Direction offer the first adjustment hole;The framework further includes the first adjusting foot, and the first adjusting foot includes the to be connected
One screw rod and the first nut, first adjustment hole are threaded hole, and first screw rod is screwed onto first adjustment hole, institute
The first nut is stated to be located at outside the first leveling face and be oppositely arranged with the first leveling face.
5. kitchen assembly according to claim 4, which is characterized in that along perpendicular to second leveling face in the framework
Direction offer the second adjustment hole;The framework further includes the second adjusting foot, and the second adjusting foot includes the to be connected
Two screw rods and the second nut, second adjustment hole are threaded hole, and second screw rod is screwed onto second adjustment hole, institute
The second nut is stated to be located at outside the second leveling face and be oppositely arranged with the second leveling face.
6. kitchen assembly according to claim 5, which is characterized in that offer leveling hole on the leveling block, described the
One installation end is worn into the leveling hole.
7. kitchen assembly according to claim 6, which is characterized in that the leveling hole is threaded hole, the leveling end packet
Third screw rod is included, the leveling end is adjustably screwed onto the leveling hole by the third screw rod.
8. kitchen assembly described in -7 any one according to claim 1, which is characterized in that be connected to described on the top plate
One end in one card slot is the first connecting pin, and the end face of first connecting pin offers binding groove, carries on the back on second riser
It is connected with bracket to the side of the starting stave, the bracket tightly connects in the binding groove.
9. kitchen assembly according to claim 8, which is characterized in that towards the starting stave on second riser
Side is equipped with the first limited block, and the one end being connected in second card slot on the wallboard includes installing end face and positioned at institute
The locating piece on installation end face is stated, is connected on first limited block on the locating piece backwards to the surface of the installation end face
On the surface of first positioning plate.
10. a kind of installation method of kitchen assembly, which is characterized in that for installing kitchen described in any one of claim 1-9
Room assembly, comprising the following steps:
Levelling device is mounted on the wall, the levelling device includes leveling part, installing frame and filleting plate;The leveling
Part includes the leveling end being oppositely arranged and the first installation end;The installing frame includes leveling board and is being mounted on the leveling board just
The leveling block in face, first installation end are mounted on the leveling block, and the leveling end is located at the leveling block backwards to described
The side of leveling board, leveling the distance between the end and the leveling board can along the direction distance perpendicular to the leveling board
It adjusts;The filleting plate is vertically connected on the back side of the leveling board;
First plug-in unit is mounted on the levelling device, first plug-in unit includes the first mounting plate being connected, the first patch
Plywood;First mounting plate is mounted on the leveling board;
It will be mounted on the levelling device and first plug-in unit after first wallboard and the docking of the second wallboard, the leveling board patch
Conjunction is mounted on first wallboard, and first jointing plate is jointly mounted on second wallboard;The filleting plate is embedded
In first wallboard and second wallboard in the gap at docking;
Wall earth connection is installed, the wall earth connection includes seating surface and the first wallboard slot;
One end on floor and the first wallboard far from second wallboard is mounted on the wall earth connection, first wall
One end on plate far from second wallboard is connected in the first wallboard slot, and the floor includes abutment end, the abutting
The side fitting at end is arranged on the seating surface, and the end face of the abutment end is connected on the outer wall of the first wallboard slot;
Top frame is installed, the top frame includes the first positioning plate, the front for being vertically mounted on first positioning plate
Starting stave and the second riser and card adapter plate;The starting stave is arranged in parallel with second riser;The card adapter plate
It is vertically mounted on the side on second riser backwards to the starting stave;
One end on top plate and second wallboard far from first wallboard is mounted in the top frame, the top plate
One end be connected to opening that first positioning plate, second riser and the card adapter plate define backwards to described
In first card slot of one riser;One end on second wallboard far from first wallboard is connected to the starting stave, institute
It states the first positioning plate and opening that second riser defines is in the second card slot of first positioning plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811558164.0A CN109594735B (en) | 2018-12-19 | 2018-12-19 | Kitchen assembly and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811558164.0A CN109594735B (en) | 2018-12-19 | 2018-12-19 | Kitchen assembly and installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109594735A true CN109594735A (en) | 2019-04-09 |
CN109594735B CN109594735B (en) | 2024-04-19 |
Family
ID=65964014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811558164.0A Active CN109594735B (en) | 2018-12-19 | 2018-12-19 | Kitchen assembly and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109594735B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258997A (en) * | 2019-07-04 | 2019-09-20 | 浙江亚厦装饰股份有限公司 | A kind of metope Fast Installation leveling frame and its installation method |
CN111706025A (en) * | 2020-06-28 | 2020-09-25 | 武汉市研华智造环保科技有限公司 | Support keel with adjusting block on integrated wall curtain |
CN111851909A (en) * | 2020-07-29 | 2020-10-30 | 武汉市研华智造环保科技有限公司 | Integrated wall curtain fossil fragments with adjustable |
CN112593666A (en) * | 2020-12-25 | 2021-04-02 | 浙江亚厦装饰股份有限公司 | Kitchen wall and floor decoration structure and mounting method thereof |
CN113431286A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Mounting structure and mounting method of decorative plate |
CN113931401A (en) * | 2021-10-25 | 2022-01-14 | 河北建工集团装饰工程有限公司 | Thin ceramic large plate adhesive frame hanging structure and construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201794248U (en) * | 2010-09-18 | 2011-04-13 | 安徽省根源光大节能建材有限公司 | Installing fastener of board integrating heat preservation with decoration |
CN205918040U (en) * | 2016-06-29 | 2017-02-01 | 浙江亚厦装饰股份有限公司 | Wallboard connecting device |
CN108842982A (en) * | 2018-07-31 | 2018-11-20 | 浙江亚厦装饰股份有限公司 | The levelling assembly of metope and installation method |
CN211341553U (en) * | 2018-12-19 | 2020-08-25 | 浙江亚厦装饰股份有限公司 | Kitchen assembly |
-
2018
- 2018-12-19 CN CN201811558164.0A patent/CN109594735B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201794248U (en) * | 2010-09-18 | 2011-04-13 | 安徽省根源光大节能建材有限公司 | Installing fastener of board integrating heat preservation with decoration |
CN205918040U (en) * | 2016-06-29 | 2017-02-01 | 浙江亚厦装饰股份有限公司 | Wallboard connecting device |
CN108842982A (en) * | 2018-07-31 | 2018-11-20 | 浙江亚厦装饰股份有限公司 | The levelling assembly of metope and installation method |
CN211341553U (en) * | 2018-12-19 | 2020-08-25 | 浙江亚厦装饰股份有限公司 | Kitchen assembly |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258997A (en) * | 2019-07-04 | 2019-09-20 | 浙江亚厦装饰股份有限公司 | A kind of metope Fast Installation leveling frame and its installation method |
CN111706025A (en) * | 2020-06-28 | 2020-09-25 | 武汉市研华智造环保科技有限公司 | Support keel with adjusting block on integrated wall curtain |
CN111851909A (en) * | 2020-07-29 | 2020-10-30 | 武汉市研华智造环保科技有限公司 | Integrated wall curtain fossil fragments with adjustable |
CN112593666A (en) * | 2020-12-25 | 2021-04-02 | 浙江亚厦装饰股份有限公司 | Kitchen wall and floor decoration structure and mounting method thereof |
CN113431286A (en) * | 2021-06-21 | 2021-09-24 | 北新集团建材股份有限公司 | Mounting structure and mounting method of decorative plate |
CN113931401A (en) * | 2021-10-25 | 2022-01-14 | 河北建工集团装饰工程有限公司 | Thin ceramic large plate adhesive frame hanging structure and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN109594735B (en) | 2024-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109594735A (en) | Kitchen assembly and installation method | |
CN109610766A (en) | Metope assembly and installation method | |
CN108842982A (en) | The levelling assembly of metope and installation method | |
CN203669291U (en) | Movable raised floor installing structure | |
CN211037651U (en) | Wall assembly | |
CN110029761A (en) | A kind of curtain wall Fast Installation attachment device and its construction method | |
US10213018B1 (en) | Corner shelf installation tool | |
CN206360264U (en) | One kind finishing plaque device | |
CN103866940B (en) | A kind of positioning link and application process being provided with hanging head positioner | |
CN109372176B (en) | Suspended ceiling and suspended ceiling mounting method | |
CN109610774A (en) | Ground assembly and method for paving | |
CN207314715U (en) | A kind of sandstone plate | |
CN207063436U (en) | A kind of skirting line structure using wedge leveling | |
CN108104356A (en) | Leveling fastens keel | |
CN211341556U (en) | Internal corner component and internal corner assembly | |
CN108240089A (en) | Metope component and metope installation method | |
CN111997294A (en) | Wallboard mounting system | |
CN211341553U (en) | Kitchen assembly | |
CN109577574A (en) | Stair assembly and installation method | |
CN109610765A (en) | Wallboard assembly and installation method | |
CN109629787A (en) | Wall ground attachment device and connection method | |
CN207332617U (en) | A kind of doorframe structure | |
CN211114591U (en) | Floor assembly | |
CN207974701U (en) | A kind of windowsill modular assembly | |
CN210105160U (en) | Stair surface layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |