CN109610766A - Metope assembly and installation method - Google Patents

Metope assembly and installation method Download PDF

Info

Publication number
CN109610766A
CN109610766A CN201811555547.2A CN201811555547A CN109610766A CN 109610766 A CN109610766 A CN 109610766A CN 201811555547 A CN201811555547 A CN 201811555547A CN 109610766 A CN109610766 A CN 109610766A
Authority
CN
China
Prior art keywords
leveling
wallboard
plate
face
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811555547.2A
Other languages
Chinese (zh)
Inventor
丁欣欣
丁泽成
王文广
周东珊
余广
王金泉
林显杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201811555547.2A priority Critical patent/CN109610766A/en
Publication of CN109610766A publication Critical patent/CN109610766A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/0805Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall
    • E04F13/0807Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall adjustable perpendicular to the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
    • E04F13/0816Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements extending into the back side of the covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/081Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
    • E04F13/0821Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements

Abstract

The invention discloses a kind of metope assembly and installation methods.Metope assembly includes: floor and the first wallboard and the second wallboard that are connected to each other;Levelling device includes leveling part, installing frame and filleting plate;Leveling part includes leveling end and the first installation end;Installing frame includes leveling board and leveling block, and the first installation end is mounted on leveling block;Leveling board is jointly mounted on the first wallboard;Filleting plate is vertically connected on the back side of leveling board;First mounting plate is mounted on leveling board, and the first jointing plate is jointly mounted on the second wallboard;Wall earth connection includes seating surface and the first wallboard slot, and the first wallboard is connected in the first wallboard slot, and floor is connected on the outer wall of the first wallboard slot.The installation method of metope assembly is for installing metope assembly.Metope assembly and installation method provided by the invention, improve levelling effect, increase planarization of the shingle nail at docking, ensure that the gap between arbitrary neighborhood shingle nail is consistent, simplify levelling process.

Description

Metope assembly and installation method
Technical field
The present invention relates to building decoration technology field more particularly to a kind of metope assemblies and installation method.
Background technique
Be generally fitted with wallboard on metope, be generally fitted with floor on ground, wallboard can increase metope fastness and Durability, floor can equally increase the fastness and durability on ground, and the junction on wallboard and floor is Indoor environment sky Between decorations key area.
In the prior art, shingle nail generally uses wet process installation or dry method installation, and shingle nail and floor plate generally use In wall junction is attached for gluing or nail joint two ways, and to wall junction is closed up.Inventor is realizing hair It is found during bright creation, connection type of mounting means, shingle nail and the floor plate of the above shingle nail in junction exists Following deficiency: first, wet process installation refers to be mounted in cement mortar with by shingle nail, specifically, first passing through cement bonded sand manually Slurry smoothes out on metope, then shingle nail is mounted in the cement mortar of metope, since different shingle nails are embedded on metope Depth it is inconsistent, the poor flatness between shingle nail, and complex procedures, expend working hour, to site environment pollute it is larger;The Two, dry method installation refer to for shingle nail being mounted on rough ground, by way of woodwork plate and fixing fillet filleting to shingle nail into Row is levelling, and when installation not only needs to prevent fires to rough ground, woodwork plate and fixing fillet etc., anti-corrosion and insect-prevention treatment, increases Installation procedure is added, and filleting leveling process is complicated, expends working hour, extends the period of construction, be unfavorable for rapid construction;The Three, the mounting means of gluing cause formaldehyde volatilization it is more, environmental pollution is larger, after a period of time, due to the fatigue of glue, Oxidation reaction etc. be easy to cause wallboard and floor to fall off, and the structural stability of junction is poor with leading to wall, needs secondary construction;The Four, the mounting means of nail joint can destroy the outer surface on wallboard or floor, influence decorative effect, even if the later period can carry out mend Reason, but also can therefore increase process, working hour is expended, construction period is extended, increases construction cost;5th, either gluing Or nail joint interior at the construction field (site) can generate more rubbish, be easy to leave a trace in positions such as floor, wallboards, increase The difficulty of post-processing is added.
Therefore, it is necessary to solve above-mentioned technical problem.
Summary of the invention
The present invention provides a kind of metope assembly and installation method, to solve problems of the prior art, improves levelling Effect increases planarization of the shingle nail at docking, guarantees that the gap between arbitrary neighborhood shingle nail is consistent, simplifies levelling work Sequence in working hour needed for reducing construction, reduces the pollution to environment, increases wallboard and floor in the stability of junction, promotes dress Effect is adornd, secondary construction is avoided, working hour is shortened in rapid construction, reduces the difficulty of decoration cost and building post-processing.
Metope assembly provided by the invention, comprising: floor and the first wallboard and the second wallboard that are connected to each other;Leveling dress It sets, the levelling device includes leveling part, installing frame and filleting plate;The leveling part include the leveling end that is oppositely arranged and First installation end;The installing frame includes leveling board and the positive leveling block for being mounted on the leveling board, first installation End is mounted on the leveling block, and the leveling end is located at the leveling block backwards to the side of the leveling board, the leveling end The distance between described leveling board is along the direction perpendicular to the leveling board apart from adjustable;The leveling board is jointly mounted to institute It states on the first wallboard;The filleting plate is vertically connected on the back side of the leveling board;The filleting plate is embedded in first wall Plate is with second wallboard in the gap for docking place;First plug-in unit, first plug-in unit include the first mounting plate being connected, First jointing plate;First mounting plate is mounted on the leveling board, and first jointing plate is jointly mounted to described second On wallboard;Wall earth connection, the wall earth connection include seating surface and the first wallboard slot, far from described on first wallboard One end of second wallboard is connected in the first wallboard slot, and the floor includes abutment end, the side fitting of the abutment end It is arranged on the seating surface, the end face of the abutment end is connected on the outer wall of the first wallboard slot.
Optionally, the wall earth connection includes framework, positioning plate, fixing piece and plate;The framework includes successively The mounting surface of connection and the first leveling face and the second leveling face, the mounting surface and the second leveling face opposite to each other and parallel are set It sets, the first leveling face levels face perpendicular to described second, offers card slot on the mounting surface;The positioning plate is mounted on In the framework, the positioning plate includes positioning surface;The fixing piece includes sequentially connected first fixed plate, the second fixation Plate and third fixed plate, first fixed plate are oppositely arranged with the third fixed plate, and second fixed plate is connected to In the card slot;The plate includes the second installation end and joint end being oppositely arranged, and second installation end is connected to described In third fixed plate, the joint end extends towards the direction far from first fixed plate;The positioning plate, the third are fixed Plate and the plate define the first wallboard slot.
Optionally, the wall earth connection further includes the second plug-in unit, and second plug-in unit is inserted including the second mounting plate, second Fishplate bar and the second jointing plate;Second plugboard is vertically mounted on second mounting plate;The second jointing plate peace On second mounting plate, the back side of second jointing plate is arranged backwards to second plugboard, second installation Plate is connected in the clamping groove that first fixed plate, second fixed plate and the third fixed plate define;It is described The fitting of second plugboard is arranged on the plate;Second plugboard includes the outer wall of the first wallboard slot, and described The front of two jointing plates includes the seating surface.
Optionally, the first adjustment hole is offered along the direction perpendicular to first leveling face in the framework.
Optionally, the framework further includes the first adjusting foot, the first adjusting foot include the first screw rod for being connected and First nut, first adjustment hole are threaded hole, and first screw rod is screwed onto first adjustment hole, first spiral shell Cap is located at outside the first leveling face and is oppositely arranged with the first leveling face.
Optionally, the second adjustment hole is offered along the direction perpendicular to second leveling face in the framework.
Optionally, the framework further includes the second adjusting foot, the second adjusting foot include the second screw rod for being connected and Second nut, second adjustment hole are threaded hole, and second screw rod is screwed onto second adjustment hole, second spiral shell Cap is located at outside the second leveling face and is oppositely arranged with the second leveling face.
Optionally, leveling hole is offered on the leveling block, first installation end is worn into the leveling hole.
Optionally, the leveling hole is threaded hole, and the leveling end includes third screw rod, and the leveling end passes through described the Three screw rods are adjustably screwed onto the leveling hole.
Based on the same inventive concept, the present invention also provides a kind of installation methods of metope assembly, for installing to take up an official post Metope assembly described in meaning one, comprising: be mounted on the wall levelling device, making the levelling device includes leveling part, peace It frames up and filleting plate;The leveling part includes the leveling end being oppositely arranged and the first installation end;The installing frame includes leveling Plate and the positive leveling block for being mounted on the leveling board, first installation end are mounted on the leveling block, the leveling End is located at the leveling block backwards to the side of the leveling board, the distance between the leveling end and the leveling board edge perpendicular to The direction of the leveling board is apart from adjustable;The filleting plate is vertically connected on the back side of the leveling board;First plug-in unit is installed On levelling device, first plug-in unit includes the first mounting plate being connected, the first jointing plate;The first mounting plate installation On the leveling board;First wallboard is mounted on the levelling device, the second wallboard is mounted on second plug-in unit, It is jointly mounted to first wallboard on the leveling board;Second wallboard is mounted on second plug-in unit, makes described Two wallboards are jointly mounted on first jointing plate, and the filleting plate is embedded to exist in first wallboard and second wallboard In gap at docking;Wall earth connection is mounted on to the junction on metope and ground, the wall earth connection includes seating surface With the first wallboard slot;First wallboard is mounted on the wall earth connection, is made on first wallboard far from second wall One end of plate is connected between first snap-gauge and second snap-gauge;Floor is mounted on the wall earth connection, is made The floor includes abutment end, and the side fitting of the abutment end is arranged on the seating surface, and the end face of the abutment end is supported It connects on the outer wall of the first wallboard slot.
Wallboard assembly and installation method provided by the invention, on entire metope, the first wallboard of arbitrary neighborhood and second Wallboard is embedded with filleting plate at docking, ensure that the filleting of any first wallboard and the second wallboard at docking is protected on metope It holds unanimously, while leveling board is jointly mounted on the first wallboard, the first jointing plate is jointly mounted on the second wallboard, the first plug-in unit It is mounted on levelling device, leveling end is connected on metope, levels the distance between end and leveling board by adjusting, can be simultaneously The planarization of the first wallboard and the second wallboard at docking is adjusted, levelling effect is improved, simplifies levelling process, is reduced needed for construction Working hour, mitigate pollution to environment, shorten construction period, be conducive to rapid construction.Is directly connected to by wall earth connection One wallboard and floor are avoided the environmental pollution occurred in the prior art using viscose glue or nail joint, influence the first wallboard appearance The problem of face or floor outer surface, with the improving wall decorative effect of junction, while rapid construction is realized, shorten work When, decoration cost is reduced, the clamping of wall earth connection acts on while improving the first wallboard and floor in the stabilization of junction Property, avoid secondary construction.
Detailed description of the invention
It below will be by preferred embodiment in attached drawing the present invention is described in detail, to help the purpose of the present invention and excellent is understood Point, in which:
Fig. 1 is the structural schematic diagram for the metope assembly that alternative embodiment of the present invention provides.
Fig. 2 is the levelling device structural schematic diagram compatible with the first plug-in unit that alternative embodiment of the present invention provides.
Fig. 3 is the structural schematic diagram for the levelling device that alternative embodiment of the present invention provides.
Fig. 4 is the structural schematic diagram for the first plug-in unit that alternative embodiment of the present invention provides.
Fig. 5 is the structural schematic diagram of the first wallboard that alternative embodiment of the present invention provides and floor in junction.
Fig. 6 is the structural schematic diagram for the wall earth connection that alternative embodiment of the present invention provides.
Fig. 7 is the first structure diagram of the framework being connected and positioning plate that alternative embodiment of the present invention provides.
Fig. 8 is the second structural schematic diagram of the framework being connected and positioning plate that alternative embodiment of the present invention provides.
Fig. 9 is the structural schematic diagram for the fixing piece for being equipped with plate that alternative embodiment of the present invention provides.
Figure 10 is the flow chart of the installation method for the metope assembly that alternative embodiment of the present invention provides.
Specific embodiment
It mentions in the present specification or up, down, left, right, before and after, front, the back side, top, the bottom that may mention etc. Positional terms are defined relative to each construction shown in the drawings, and word "inner" and "outside" refer respectively to direction or remote From the direction of geometric center of specific component, they are opposite concepts, and it is therefore possible to can different location, difference according to locating for it Use state and correspondingly changed.So also these or other positional terms should not be construed to restricted use Language.
Fig. 1 is the structural schematic diagram for the metope assembly that alternative embodiment of the present invention provides, and Fig. 2 is alternative embodiment of the present invention The levelling device of offer structural schematic diagram compatible with the first plug-in unit, Fig. 3 are the leveling dress that alternative embodiment of the present invention provides The structural schematic diagram set, Fig. 4 are the structural schematic diagram for the first plug-in unit that alternative embodiment of the present invention provides, and Fig. 5 is that the present invention can In the structural schematic diagram of junction, Fig. 6 alternative embodiment of the present invention provided for the first wallboard for selecting embodiment to provide and floor The structural schematic diagram of wall earth connection, Fig. 7 are the first of the framework being connected and positioning plate that alternative embodiment of the present invention provides Structural schematic diagram, Fig. 8 are the second structural schematic diagram of the framework being connected and positioning plate that alternative embodiment of the present invention provides, figure The structural schematic diagram of 9 fixing pieces for being equipped with plate provided for alternative embodiment of the present invention.As shown in Figures 1 to 9, of the invention Provide a kind of metope assembly, including floor, the first wallboard being connected to each other and the second wallboard, levelling device, the first plug-in unit and Wall earth connection.
Referring to Fig. 1 to Fig. 9, the levelling device includes leveling part 61, installing frame 62 and filleting plate 63;Institute Stating leveling part 61 includes the leveling end 611 being oppositely arranged and the first installation end 612;The installing frame 62 includes leveling board 64 and peace Mounted in the positive leveling block 65 of the leveling board 64, first installation end 612 is mounted on the leveling block 65, the tune Flush end 611 is located at the leveling block 65 backwards to the side of the leveling board 64, between the leveling end 611 and the leveling board 64 Distance along perpendicular to the leveling board 64 direction apart from adjustable;The leveling board 64 is jointly mounted to first wallboard 81 On;The filleting plate 63 is vertically connected on the back side of the leveling board 64;The filleting plate 63 is embedded in first wallboard 81 With second wallboard 82 in the gap for docking place.
Wherein the first installation end 612 can be the adjusting rod along axial scalable setting, by adjusting the length of adjusting rod, And then realize that leveling the distance between end 611 and leveling board 64 are adjustable.
First plug-in unit includes the first mounting plate 41 being connected, the first jointing plate 45;First mounting plate 41 is pacified On the leveling board 64, first jointing plate 45 is jointly mounted on second wallboard 82.
The wall earth connection includes seating surface and the first wallboard slot, separate second wallboard on first wallboard 81 82 one end is connected in the first wallboard slot, and the floor 9 includes abutment end, and the side fitting setting of the abutment end exists On the seating surface, the end face of the abutment end is connected on the outer wall of the first wallboard slot.
Wallboard assembly provided in this embodiment, on entire metope, the first wallboard 81 and the second wallboard 82 of arbitrary neighborhood It is embedded with filleting plate 63 at docking, ensure that the filleting of any first wallboard 81 and the second wallboard 82 at docking on metope It is consistent, while leveling board 64 is jointly mounted on the first wallboard 81, the first jointing plate 45 is jointly mounted to the second wallboard 82 On, the first plug-in unit is mounted on levelling device, and leveling end 611 is connected on metope, by adjusting leveling end 611 and leveling board 64 The distance between, the planarization of the first wallboard 81 and the second wallboard 82 at docking can be adjusted simultaneously, improve levelling effect, letter Change levelling process, in working hour needed for reducing construction, mitigates the pollution to environment, shorten construction period, be conducive to rapid construction.It is logical It crosses wall earth connection and is directly connected to the first wallboard 81 and floor 9, avoid and in the prior art occurred using viscose glue or nail joint Environmental pollution influences the problem of 81 outer surface of the first wallboard or 9 outer surface of floor, with improving wall the decoration effect of junction Fruit, while rapid construction is realized, working hour is shortened, decoration cost is reduced, the clamping of wall earth connection is acted on while being improved First wallboard 81 and floor 9 avoid secondary construction in the stability of junction.
On the basis of the above embodiments, the wall earth connection includes framework 1, positioning plate 2, fixing piece and plate 34;The framework 1 includes sequentially connected mounting surface 11 and the first leveling face 13 and the second leveling face 14, the mounting surface 11 with The second leveling face 14 is opposite and is arranged in parallel, and the first leveling face 13 is perpendicular to second leveling face 14, the peace Card slot 12 is offered on dress face 11;The positioning plate 2 is mounted in the framework 1, and the positioning plate 2 includes positioning surface 21;Institute Stating fixing piece includes sequentially connected first fixed plate 31, the second fixed plate 32 and third fixed plate 33, and described first is fixed Plate 31 is oppositely arranged with the third fixed plate 33, and second fixed plate 32 is connected in the card slot 12.The plate 34 Including the second installation end being oppositely arranged and joint end, second installation end is connected in the third fixed plate 33, described Joint end extends towards the direction far from first fixed plate 31;The positioning plate 2, the third fixed plate 33 and described Plate 34 defines the first wallboard slot.In the present embodiment, junction, the first leveling face 13 abut framework 1 with being mounted on wall On the ground, the second leveling face 14 is connected on metope, and 81 grafting of the first wallboard increases the first wallboard into the first wallboard slot The stability of 81 in wall junctions, reduces the risk that the first wallboard 81 falls off from metope.
Preferably, the wall earth connection further includes the second plug-in unit, second plug-in unit includes the second mounting plate 51, second Plugboard 54 and the second jointing plate 55;Second plugboard 54 is vertically mounted on second mounting plate 51;Described Two jointing plates 55 are mounted on second mounting plate 51, and the back side of second jointing plate 55 is backwards to second plugboard 54 Setting, second mounting plate 51 are connected to first fixed plate 31, second fixed plate 32 and the third and fix In the clamping groove 35 that plate 33 defines;The fitting of second plugboard 54 is arranged on the plate 34;Second plugboard 54 include the outer wall of the first wallboard slot, and the front of second jointing plate 55 includes the seating surface.In the present embodiment, the Two jointing plates 55 are for being bonded setting on floor 9, further to increase the structural stability of in wall the junction of floor 9.
Optionally, the first adjustment hole is offered along the direction perpendicular to the first leveling face 13 in the framework 1.This reality Applying the first adjustment hole opened up in example can be used for installation and adjustment part, with the vertical range adjusted and between floor 9 and ground.
On the basis of the above embodiments, the framework further includes the first adjusting foot 22, and the first adjusting foot 22 includes The first screw rod 23 and the first nut 24 being connected, first adjustment hole are threaded hole, and first screw rod 23 is screwed onto institute It states in the first adjustment hole, first nut 24 is located at outside the first leveling face 13 and sets relatively with the first leveling face 13 It sets.For first nut 24 for abutting on the ground, the first screw rod 23 provided in this embodiment by precession or can screw out the One adjustment hole, to adjust the distance between the first nut 24 and first leveling face 13, and then rapidly adjust floor 9 and ground it Between vertical range, efficiently level.
Preferably, offering the second adjustment hole along the direction perpendicular to the second leveling face 14 in the framework 1.This reality Apply the second adjustment hole for being opened up in example can to installation and adjustment part, with adjust between the first wallboard 81 and metope it is vertical away from From.
On the basis of the above embodiments, the framework further includes the second adjusting foot 25, and the second adjusting foot 25 includes The second screw rod 26 and the second nut 27 being connected, second adjustment hole are threaded hole, and second screw rod 26 is screwed onto institute It states in the second adjustment hole, second nut 27 is located at outside the second leveling face 24 and sets relatively with the second leveling face 24 It sets.
Optionally, the framework 1 is also provided with the first adjusting cavity 15, and the extending direction of first adjusting cavity 15 is parallel to First leveling face 13, first adjusting cavity 15 intersect with first adjustment hole.First adjusting cavity 15 can reduce The resistance of one screw rod 23 precession or back-out in the first adjustment hole reduces the first screw rod 23 in the first adjustment hole inward turning modulation section Difficulty.
On the basis of the above embodiments, the first stiffening plate 17 is installed, described first adjusts in first adjusting cavity 15 Knothole runs through first stiffening plate 17.First stiffening plate 17 provided in this embodiment can increase the knot in the first adjusting cavity 15 Structure intensity increases the structural stability of framework 1.Further, the first adjusting cavity 15 can be tetragonal body cavity, the first stiffening plate The both sides being oppositely arranged on 17 are separately mounted on two angles that tetragonal body cavity is oppositely arranged, and tetragonal body is divided into two three It is angular, the effect of support reinforcing is played to the first adjusting cavity 15 in the form of cornerwise.
Likewise, being also provided with the second adjusting cavity 16 in the framework 1, the extending direction of second adjusting cavity 16 is parallel In second leveling face 14, second adjusting cavity 16 intersects with second adjustment hole.Second adjusting cavity 16 can reduce The resistance of second screw rod 26 precession or back-out in the second adjustment hole reduces the second screw rod 26 in the second adjustment hole inward turning modulation The difficulty of section.
On the basis of the above embodiments, the second stiffening plate 18 is installed, described second adjusts in second adjusting cavity 16 Knothole runs through second stiffening plate 18.Second stiffening plate 18 provided in this embodiment can increase the structure of the second adjusting cavity 16 Intensity increases the structural stability of framework 1.Further, the second adjusting cavity 16 can be with tetragonal body shape, phase in the second stiffening plate 18 The both sides of setting are separately mounted on be oppositely arranged on tetragonal body two inner walls, tetragonal body is divided into two tetragonal bodies, it is right The form laterally reinforced plays the effect of support reinforcing to the second adjusting cavity 16.
Optionally, second fixed plate 32 includes the first scoreboard 36, the second scoreboard 37 and third scoreboard 38, described First scoreboard 36 and the third scoreboard 38 are connected to the both sides being oppositely arranged in second scoreboard 37, and described first point Be connected in first fixed plate 31 on one side far from second scoreboard 37 on plate 36, far from institute in the third scoreboard 38 Being connected in the third fixed plate 33 on one side for the second scoreboard 37 is stated, between first scoreboard 36 and second scoreboard 37 Distance be gradually reduced along far from the direction of first fixed plate 31.The present embodiment can be thinned in the second scoreboard 37 and be provided with It is clamped the thickness of convex portion, reduces the materials of inner corner trim fixing piece.Further, first scoreboard 36, second scoreboard 37 and 38 integrated punching of third scoreboard molding, can simplify the processing flow of inner corner trim fixing piece.
Further, in second scoreboard 37 towards offering locating slot 39 on the surface of the clamping groove 35.This reality Apply the locating slot 39 of example offer in the second scoreboard 37 mounting screw provide and efficiently locate effect, while locating slot 39 subtracts The thin thickness of second scoreboard 37, reduces the difficulty that screw is fed through the second scoreboard 37.
Preferably, first fixed plate 31 is parallel to the third fixed plate 33.The present embodiment can be worn in wallboard face After in into locating slot 39, the inner surface of the first fixed plate 31 and the inner surface of third fixed plate 33 are fitted in correspondingly respectively The two sides being oppositely arranged on second mounting plate 51 improve the structural stability of the second mounting plate 51 installation.
Optionally, the distance between the plate 34 and second scoreboard 37 are less than separate in first fixed plate 31 The distance between one end of second scoreboard 37 and second scoreboard 37.The first fixed plate 31 and the second installation can be increased Contact area between plate 51 improves structural stability when the second mounting plate 51 is connected in clamping groove 35.
Preferably, offering leveling hole 67 on the leveling block 65, first installation end 612 is worn into the leveling hole In 67.In the present embodiment, installation end 612 is fixed on to be mounted in installing frame 62 in such a way that axis hole is installed, and has installation letter Just, convenient for the advantage of connection.
On the basis of the above embodiments, the leveling hole 67 is threaded hole, and the leveling end 611 includes third screw rod, The leveling end 611 is adjustably screwed onto the leveling hole 67 by the third screw rod.Third provided in this embodiment Screw rod can level the distance between end 611 and leveling board 64 by precession or back-out leveling hole 67 to adjust, and then quickly Ground adjusts the vertical range between the first wallboard 81 and the second wallboard 82 and metope, realizes efficiently leveling.
As an optional implementation process, third adjustment hole 68 is offered on the leveling block 65, the third is adjusted Hole 68 is parallel to the leveling board 64, and the leveling hole 67 is intersected with the third adjustment hole 68.Third adjustment hole 68 can subtract Resistance of few third screw rod when leveling precession in hole 67 or screwing out reduces the difficulty that screw rod is adjusted in leveling hole 67.
On the basis of the above embodiments, the installing frame 62 further includes grip block 66, and the grip block 66 is mounted on institute State leveling block 65 on, the grip block 66 is oppositely arranged with the leveling board 64, the grip block 66, the leveling block 65, with And the leveling board 64 defines holding tank, first mounting plate 41 is embedded in the holding tank.In the present embodiment, in reality In the operating process of border, levelling device can be fitted together with the first wallboard 81 on the ground, and the first plug-in unit can be on the ground It is fitted together with the second wallboard 82, finally the first mounting plate 41 is connected in holding tank can be by the first wallboard 81 and second The installation of 82 phase of wallboard, installation process high efficient and reliable, the first wallboard 81 and 82 stability of the second wallboard after installation are high.
Preferably, 45 screw of the first jointing plate is mounted on second wallboard 82,64 screw of the leveling board peace On first wallboard 81.Firm, the convenient to carry out advantage with installation.
Optionally, first jointing plate 45 includes that the connecting pin being oppositely arranged and elongated end, the connecting pin are mounted on On first mounting plate 41;The front of first jointing plate 45 and the front of first mounting plate 41 are coplanar with, institute The back side at the back side and first mounting plate 41 of stating the first jointing plate 45 is respectively positioned on the same side of first jointing plate 45, institute Elongated end is stated to extend towards the direction far from the leveling block 65.The present embodiment can effectively increase by the first jointing plate 45 and second Fitting area between wallboard 82 increases the stability of the second wallboard 82 installation.
Preferably, the front of first mounting plate 41 includes interface 47 and is embedded face 48, first mounting plate 41 The back side be benchmark plane, the distance between the interface 47 and the datum plane be less than described in be embedded face 48 and the base The distance between directrix plane;The face 48 that is embedded is embedded in the holding tank.In the present embodiment, pass through respectively arranged docking Face 47 and it is embedded face 48, ensure that the first mounting plate 41 while having connects the first wallboard 81 and the second wallboard 82 and fixes the The effect of two wallboards 82, integrated height, number of components needed for reducing the first plug-in unit are conducive to save material, easy to process.
On the basis of the above embodiments, the back side of the interface 47 and the leveling board 64 is coplanar with.This implementation Example can further increase the planarization of the first wallboard 81 and the second wallboard 82 at docking.
Optionally, first plug-in unit further includes the first plugboard 44, and first plugboard 44 is vertically mounted on described Interface 47, first plugboard 44 is bonded with the filleting plate 63 to be arranged and is embedded jointly in first wallboard 81 and institute At the docking for stating the second wallboard 82.First plugboard 44 and filleting plate 63 provided in this embodiment are embedded jointly to be connected to each other at two Wallboard docking at, can further increase installing frame 62 and the first plug-in unit in the structural stability of junction.
Optionally, lightening hole 43 is offered in first mounting plate 41.Lightening hole 43 can effectively mitigate the first peace The weight of loading board 41 is conducive to mitigate the load that metope is subject to, increases the structural stability of the first plug-in unit.
Further, the back side of first jointing plate 45 offers limiting slot.Limiting slot plays initial alignment and is thinned Effect, the first jointing plate 45 front fitting be arranged on the second wallboard 82 after, screw can be worn from limiting slot into first In jointing plate 45 and the second wallboard 82.
Figure 10 is the flow chart of the installation method for the metope assembly that alternative embodiment of the present invention provides.
As shown in Figures 1 to 10, based on the same inventive concept, the present invention also provides a kind of installation methods of metope assembly For installing above-described metope assembly, comprising:
S1: levelling device is mounted on the wall, and making the levelling device includes leveling part 61, installing frame 62, Yi Jiqian Stitch plate 63;The leveling part 61 includes the leveling end 611 being oppositely arranged and the first installation end 41;The installing frame 62 includes leveling Plate 64 and the positive leveling block 65 for being mounted on the leveling board 64, first installation end 41 are mounted on the leveling block 65 On, the leveling end 611 is located at the leveling block 65 backwards to the side of the leveling board 64, the leveling end 611 and the tune The distance between plate 64 is along the direction perpendicular to the leveling board 64 apart from adjustable;The filleting plate 63 is vertically connected on described The back side of leveling board 64;
S2: the first plug-in unit is mounted on levelling device, and first plug-in unit includes the first mounting plate 41 being connected, One jointing plate 45;First mounting plate 41 is mounted on the leveling board 64;
S3: the first wallboard 81 is mounted on the levelling device, and the second wallboard 82 is mounted on second plug-in unit, It is jointly mounted to first wallboard 81 on the leveling board 64;
S4: the second wallboard 82 is mounted on second plug-in unit, and second wallboard 82 is made to be jointly mounted to described On one jointing plate, the filleting plate is embedded in the gap in first wallboard 81 and second wallboard 82 at docking;
Wall earth connection: being mounted on the junction on metope and ground by S5, and the wall earth connection includes seating surface and One wallboard slot;
S6: the first wallboard 81 is mounted on the wall earth connection, is made on first wallboard 81 far from described second One end of wallboard 82 is connected in the first wallboard slot;
S7: floor 9 is mounted on the wall earth connection, and making the floor 9 includes abutment end, the side of the abutment end Face paste, which is closed, to be arranged on the seating surface, and the end face of the abutment end is connected on the outer wall of the first wallboard slot.
Wallboard assembly and installation method provided in this embodiment, on entire metope, 81 He of the first wallboard of arbitrary neighborhood Second wallboard 82 is embedded with filleting plate 63 at docking, ensure that any first wallboard 81 and the second wallboard 82 are right on metope The filleting at the place of connecing is consistent, while leveling board 64 is jointly mounted on the first wallboard 81, and the first jointing plate 45 is jointly mounted to On second wallboard 82, the first plug-in unit is mounted on levelling device, and leveling end 611 is connected on metope, levels end 611 by adjusting The distance between leveling board 64 can adjust the planarization of the first wallboard 81 and the second wallboard 82 at docking simultaneously, improve Levelling effect simplifies levelling process, in working hour needed for reducing construction, mitigates the pollution to environment, shortens construction period, be conducive to Rapid construction.Be directly connected to the first wallboard 81 and floor 9 by wall earth connection, avoid in the prior art using viscose glue or The environmental pollution of nail joint appearance influences the problem of 81 outer surface of the first wallboard or 9 outer surface of floor, with improving wall junction Decorative effect, while realizing rapid construction, shorten working hour, reduce decoration cost, the clamping effect of wall earth connection The first wallboard 81 and floor 9 are improved in the stability of junction simultaneously, avoid secondary construction.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, the range for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (10)

1. a kind of metope assembly characterized by comprising
Floor and the first wallboard and the second wallboard being connected to each other;
Levelling device, the levelling device include leveling part, installing frame and filleting plate;The leveling part includes being oppositely arranged Leveling end and the first installation end;The installing frame includes leveling board and the positive leveling block for being mounted on the leveling board, institute The first installation end to be stated to be mounted on the leveling block, the leveling end is located at the leveling block backwards to the side of the leveling board, Leveling the distance between the end and the leveling board is along the direction perpendicular to the leveling board apart from adjustable;The leveling board patch Conjunction is mounted on first wallboard;The filleting plate is vertically connected on the back side of the leveling board;The filleting plate is embedded First wallboard is with second wallboard in the gap for docking place;
First plug-in unit, first plug-in unit include the first mounting plate being connected, the first jointing plate;The first mounting plate installation On the leveling board, first jointing plate is jointly mounted on second wallboard;
Wall earth connection, the wall earth connection include seating surface and the first wallboard slot, far from described the on first wallboard One end of two wallboards is connected in the first wallboard slot, and the floor includes abutment end, and the side fitting of the abutment end is set It sets on the seating surface, the end face of the abutment end is connected on the outer wall of the first wallboard slot.
2. metope assembly according to claim 1, which is characterized in that the wall earth connection includes framework, positioning plate, consolidates Determine part and plate;
The framework includes sequentially connected mounting surface and the first leveling face and the second leveling face, the mounting surface and described second Leveling face is opposite and is arranged in parallel, and the first leveling face levels face perpendicular to described second, offers card on the mounting surface Slot;
The positioning plate is mounted in the framework, and the positioning plate includes positioning surface;
The fixing piece includes sequentially connected first fixed plate, the second fixed plate and third fixed plate, and described first is fixed Plate is oppositely arranged with the third fixed plate, and second fixed plate is connected in the card slot;
The plate includes the second installation end and joint end being oppositely arranged, and second installation end is connected to the third and fixes On plate, the joint end extends towards the direction far from first fixed plate;
The positioning plate, the third fixed plate and the plate define the first wallboard slot.
3. metope assembly according to claim 2, which is characterized in that the wall earth connection further includes the second plug-in unit, institute Stating the second plug-in unit includes the second mounting plate, the second plugboard and the second jointing plate;
Second plugboard is vertically mounted on second mounting plate;Second jointing plate is mounted on second installation On plate, the back side of second jointing plate is arranged backwards to second plugboard, and second mounting plate is connected to described first In the clamping groove that fixed plate, second fixed plate and the third fixed plate define;The second plugboard fitting is set It sets on the plate;
Second plugboard includes the outer wall of the first wallboard slot, and the front of second jointing plate includes the support Face.
4. metope assembly according to claim 3, which is characterized in that along perpendicular to first leveling face in the framework Direction offer the first adjustment hole.
5. metope assembly according to claim 4, which is characterized in that the framework further includes the first adjusting foot, and described One adjusting foot includes the first screw rod and the first nut being connected, and first adjustment hole is threaded hole, the first screw rod spiral shell It connects in first adjustment hole, it is outer and opposite with the first leveling face set that first nut is located at the first leveling face It sets.
6. metope assembly according to claim 5, which is characterized in that along perpendicular to second leveling face in the framework Direction offer the second adjustment hole.
7. metope assembly according to claim 6, which is characterized in that the framework further includes the second adjusting foot, and described Two adjusting feet include the second screw rod and the second nut being connected, and second adjustment hole is threaded hole, the second screw rod spiral shell It connects in second adjustment hole, it is outer and opposite with the second leveling face set that second nut is located at the second leveling face It sets.
8. metope assembly described in -7 any one according to claim 1, which is characterized in that offer leveling on the leveling block Hole, first installation end are worn into the leveling hole.
9. metope assembly according to claim 8, which is characterized in that the leveling hole is threaded hole, the leveling end packet Third screw rod is included, the leveling end is adjustably screwed onto the leveling hole by the third screw rod.
10. a kind of installation method of metope assembly, which is characterized in that for installing wall described in any one of claim 1-9 Face assembly, comprising:
Levelling device is mounted on the wall, making the levelling device includes leveling part, installing frame and filleting plate;The tune Horizontal member includes the leveling end being oppositely arranged and the first installation end;The installing frame includes leveling board and is mounted on the leveling board Positive leveling block, first installation end are mounted on the leveling block, and the leveling end is located at the leveling block backwards to institute The side of leveling board is stated, leveling the distance between the end and the leveling board can along the direction distance perpendicular to the leveling board It adjusts;The filleting plate is vertically connected on the back side of the leveling board;
First plug-in unit is mounted on levelling device, first plug-in unit includes the first mounting plate being connected, the first jointing plate; First mounting plate is mounted on the leveling board;
First wallboard is mounted on the levelling device, the second wallboard is mounted on second plug-in unit, makes described first Wallboard is jointly mounted on the leveling board;
Second wallboard is mounted on second plug-in unit, is jointly mounted to second wallboard on first jointing plate, The filleting plate is embedded in the gap in first wallboard and second wallboard at docking;
Wall earth connection is mounted on to the junction on metope and ground, the wall earth connection includes seating surface and the first wallboard Slot;
First wallboard is mounted on the wall earth connection, one end card on first wallboard far from second wallboard is made It connects between first snap-gauge and second snap-gauge;
Floor is mounted on the wall earth connection, making the floor includes abutment end, and the side fitting of the abutment end is set It sets on the seating surface, the end face of the abutment end is connected on the outer wall of the first wallboard slot.
CN201811555547.2A 2018-12-19 2018-12-19 Metope assembly and installation method Pending CN109610766A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811555547.2A CN109610766A (en) 2018-12-19 2018-12-19 Metope assembly and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811555547.2A CN109610766A (en) 2018-12-19 2018-12-19 Metope assembly and installation method

Publications (1)

Publication Number Publication Date
CN109610766A true CN109610766A (en) 2019-04-12

Family

ID=66008907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811555547.2A Pending CN109610766A (en) 2018-12-19 2018-12-19 Metope assembly and installation method

Country Status (1)

Country Link
CN (1) CN109610766A (en)

Similar Documents

Publication Publication Date Title
CN109594735A (en) Kitchen assembly and installation method
CN109162582A (en) A kind of installation method of doorframe
CN108842982A (en) The levelling assembly of metope and installation method
CN105908935A (en) Magnetic-attracting hung connecting wall plate and mounting method
CN107035095A (en) A kind of metope integration installation structure
CN110331833A (en) Metope levels component and metope leveling method
CN103866940B (en) A kind of positioning link and application process being provided with hanging head positioner
CN109610766A (en) Metope assembly and installation method
CN208685989U (en) A kind of adjustable ceramic tile thin plate and inorganic decoration panel wall wallboard installation system
CN108240089B (en) Metope component and metope installation method
CN206667655U (en) Fixture in the middle part of wallboard dry-hang
CN109610765A (en) Wallboard assembly and installation method
CN109610774A (en) Ground assembly and method for paving
CN109629787A (en) Wall ground attachment device and connection method
CN207314715U (en) A kind of sandstone plate
CN211396420U (en) Leveling device
CN208633264U (en) A kind of adjustable floating screed keel
CN208456022U (en) A kind of decoration frame
CN211341555U (en) Internal corner frame
CN211341553U (en) Kitchen assembly
CN205297164U (en) Aerated concrete window wrap panel fixed establishment
CN108104356A (en) Leveling fastens keel
CN211341556U (en) Internal corner component and internal corner assembly
CN205297165U (en) Aerated concrete window wrap panel fixed establishment's lower structure
CN211341563U (en) Wallboard leveling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination