CN108952053A - Shingle nail installation assembly and its installation method - Google Patents
Shingle nail installation assembly and its installation method Download PDFInfo
- Publication number
- CN108952053A CN108952053A CN201810859187.9A CN201810859187A CN108952053A CN 108952053 A CN108952053 A CN 108952053A CN 201810859187 A CN201810859187 A CN 201810859187A CN 108952053 A CN108952053 A CN 108952053A
- Authority
- CN
- China
- Prior art keywords
- shingle nail
- shingle
- fixing piece
- plate
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 77
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000007789 sealing Methods 0.000 claims abstract description 56
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 36
- 238000011010 flushing procedure Methods 0.000 claims description 16
- 238000010276 construction Methods 0.000 abstract description 22
- 239000010813 municipal solid waste Substances 0.000 abstract description 12
- 238000005192 partition Methods 0.000 description 66
- 210000002421 cell wall Anatomy 0.000 description 20
- 230000001105 regulatory effect Effects 0.000 description 19
- 230000004308 accommodation Effects 0.000 description 14
- 239000011324 bead Substances 0.000 description 14
- 230000014759 maintenance of location Effects 0.000 description 14
- 238000010586 diagram Methods 0.000 description 12
- 238000005034 decoration Methods 0.000 description 11
- 239000000463 material Substances 0.000 description 8
- 230000008569 process Effects 0.000 description 8
- 238000005253 cladding Methods 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 6
- 239000002390 adhesive tape Substances 0.000 description 5
- 239000000919 ceramic Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 239000000428 dust Substances 0.000 description 4
- 230000003447 ipsilateral effect Effects 0.000 description 4
- 238000000465 moulding Methods 0.000 description 4
- 230000000149 penetrating effect Effects 0.000 description 4
- 239000004575 stone Substances 0.000 description 4
- 238000005260 corrosion Methods 0.000 description 3
- 230000006378 damage Effects 0.000 description 3
- 229910000838 Al alloy Inorganic materials 0.000 description 2
- 239000000956 alloy Substances 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000000758 substrate Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000004078 waterproofing Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005429 filling process Methods 0.000 description 1
- 239000002421 finishing Substances 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000003595 mist Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 231100000241 scar Toxicity 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0889—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of shingle nail installation assembly and its installation method, shingle nail installation assembly includes: shingle nail connector, is arranged between two adjacent shingle nails, and for connecting two adjacent shingle nails;Shingle nail fixing piece, shingle nail connector are connect with shingle nail fixing piece, and shingle nail fixing piece connect for realizing shingle nail connector with the leveling keel of two adjacent shingle nails;Caulking strip is flushed, flushes caulking strip for sealing the gap between two adjacent shingle nails;At least two closing in fixing pieces, at least two closing in fixing pieces are separately positioned on the free end of two shingle nails of end, and for fixing free end and wall.The present invention provides a kind of shingle nail installation assembly and its installation method, it can be achieved that shingle nail and wall quick assembling, can simplify work progress, shorten the construction period, it avoids generating more rubbish at the construction field (site), avoids being easy to leave a trace in positions such as floor, doorframes, improve industrialized level.
Description
Technical field
The present invention relates to indoor wall finishings, more particularly, to a kind of shingle nail installation assembly and its installation method.
Background technique
Wall decoration is the key area of the interior space decorations of building, and wall decoration can protect wall, is increased
The robustness and durability of strong wall, extend the service life of wall.
In existing wall decoration fitment process, especially toilet or kitchen etc. are related in the space with water, it is necessary first to
Pre- water-proofing treatment is carried out to wall, decorative layer is installed on pre- waterproof base, extends the construction time, improves decoration cost.
Decorative layer mainly based on ceramic tile, stone material paving, ceramic tile, stone material paving mode be broadly divided into wet combining and cladding two kinds of shapes
Formula.Wherein, wet combining on ceramic tile or stone material mainly by being arranged cement mortar or tile binding material, to realize the stickup with wall
It is fixed;It is cladding mainly by using cladding component, ceramic tile or stone material are fixed on the wall.What above two method was primarily present
Problem is as follows: wet combining work progress is longer, construction professional standards are higher and quality control difficulty is larger, construction environment pollution etc.
Adverse effect;Cladding component wasting space is larger, levelling in installation process to adjust relatively complicated, single ceramic tile cladding easily broken etc.
Unfavorable condition.Waterproofing step can be omitted as decorative layer come decorated wall surface using shingle nail, saved money laborsaving.Shingle nail can basis
Specific construction space is previously-completed production, realizes assembly after entering construction space, can using shingle nail decorating wall
Installation effectiveness is improved, construction cost is saved.But existing cladding component is not particularly suited for the installation of shingle nail.
Therefore, it is necessary to a kind of shingle nail installation assembly and its installation methods, to solve the above problems.
Summary of the invention
In view of this, it is an object of the invention to propose a kind of shingle nail installation assembly and its installation method, shingle nail peace
Dress assembly can realize shingle nail and wall quick assembling, can simplify work progress, shorten the construction period, avoid at the construction field (site)
More rubbish is generated, avoids being easy to leave a trace in positions such as floor, doorframes, improves industrialized level.
Based on a kind of above-mentioned purpose shingle nail installation assembly provided by the invention, comprising:
Shingle nail connector, the shingle nail connector are arranged between two adjacent shingle nails, and for connecting
Connect two adjacent shingle nails;
Shingle nail fixing piece, the shingle nail connector are connect with the shingle nail fixing piece, the shingle nail fixing piece
It is connect for realizing the shingle nail connector with the leveling keel of two adjacent shingle nails;
Caulking strip is flushed, the caulking strip that flushes is for sealing the gap between two adjacent shingle nails;
At least two closing in fixing pieces, at least two closing in fixing pieces are separately positioned on positioned at described in two of end
On the free end of shingle nail, and for fixing the free end with wall.
Preferably, the shingle nail connector includes interconnecting piece and the first installation that the interconnecting piece opposite sides is arranged in
Portion and the second mounting portion, first mounting portion and second mounting portion are respectively used to install two adjacent metopes
Plate, the interconnecting piece are arranged in the gap between two adjacent shingle nails, and for connecting with shingle nail fixing piece.
Preferably, the shingle nail fixing piece includes that connecting plate, holding tank are opposite with the notch that the holding tank is arranged in
The first limit plate and the second limit plate of two sides, first limit plate and second limit plate prolong into the notch
It stretches;The slot bottom of the connecting plate and the holding tank, which maintains an equal level, to be arranged, and is provided at least one mounting groove on the connecting plate, fixed
Part can be fixed on the leveling keel through the mounting groove and by the shingle nail fixing piece.
Preferably, the strut for flushing caulking strip and including pedestal and extending from the pedestal, the strut is along length
Direction is arranged at intervals with multiple sealing bars, and the sealing bar is used to seal the gap between two adjacent shingle nails.
Furthermore it is preferred that the closing in fixing piece includes:
Support keel, the support keel can be fixed with wall, and the support keel is provided with flat towards shingle nail side
Straight supporting surface;
Ontology, the ontology include slot and mounting plate, the slot and the mounting plate with the support keel
The supporting surface abuts, and the slot is used to limit the shingle nail positioned at end and supports the shingle nail for being located at end
Be arranged in parallel with the supporting surface, the mounting plate is provided at least one mounting hole, fixing piece can through the mounting hole and
It secures the body on the support keel.
The present invention also provides a kind of metope method of plate installation, are pacified by using such as above-mentioned shingle nail installation assembly
Dress, includes the following steps:
(1) multiple shingle nails are arranged successively along wall extending direction, adjacent two is arranged in shingle nail connector
Between shingle nail, two adjacent shingle nails are connected by the shingle nail connector, and multiple shingle nails are connected
It is connected in integral structure;
(2) multiple leveling keel are separately fixed on the adjacent corresponding wall in the shingle nail junction, by metope
Plate fixing piece is connect with the leveling keel of two adjacent shingle nails, and the shingle nail connector is consolidated with the shingle nail
Determine part connection;
(3) it will flush in the gap that caulking strip is installed between two adjacent shingle nails;
(4) at least two closing in fixing pieces are separately positioned on the free end of the company shingle nail of end,
And for the free end to be fixed with wall.
Preferably, in step (1) further include: the interconnecting piece of the shingle nail connector is arranged in two adjacent institutes
It states between shingle nail, and is connect with the shingle nail fixing piece, the first mounting portion of the shingle nail connector and the second installation
Portion is respectively used to install two adjacent shingle nails.
Preferably, in step (2) further include: the interconnecting piece of the shingle nail connector is inserted into the shingle nail
In the holding tank of fixing piece, the first limit plate and the second limit plate of the shingle nail fixing piece are used to support the connection
Portion;The connecting plate is abutted with the leveling keel, fixing piece through the connecting plate mounting groove and by the shingle nail
Fixing piece is fixed on the leveling keel.
Preferably, in step (3) further include: the pedestal for flushing caulking strip is mounted on to two adjacent walls
In the gap of panel, strut extends along the short transverse in the gap, and the sealing bar on the strut is connected to adjacent two
On the end face of a shingle nail, the sealing bar is for sealing the gap.
Preferably, in step (4) further include: fix the support keel and the wall, the support keel court
Straight supporting surface is provided with to shingle nail side;By the slot of the ontology and mounting plate and described in the support keel
Supporting surface abuts, and the slot is used to limit the shingle nail positioned at end and supports the shingle nail and the institute for being located at end
It states supporting surface to be arranged in parallel, the mounting plate is provided at least one mounting hole, and fixing piece can be through the mounting hole and by institute
Ontology is stated fixed on the support keel.
From the above it can be seen that shingle nail installation assembly provided by the invention and its installation method, with the prior art
It compares, has the advantage that the easy installation that can realize shingle nail using above-mentioned shingle nail installation assembly, improve speed of application,
Generation environment pollution or decoration garbage are avoided simultaneously.Shingle nail installation assembly can realize shingle nail and wall quick assembling, can letter
Change work progress, shorten the construction period, avoids generating more rubbish at the construction field (site), avoid in positions such as floor, doorframes
It is easy to leave a trace, improves industrialized level.Moreover, shingle nail installation assembly occupies little space, easy to assembly quick, positioning is quasi-
Really, flatness is high, good decorating effect, leakproofness and good waterproof performance.
Detailed description of the invention
By the way that embodiment is described with reference to the accompanying drawing, features described above of the invention and technological merit will become
More understands and be readily appreciated that.
Fig. 1 is the schematic diagram of the shingle nail installation assembly used in the specific embodiment of the invention.
Fig. 2 is the use state diagram for flushing device of shingle nail installation assembly shown in FIG. 1.
Fig. 3 is the use state diagram of the closing in fixing piece of shingle nail installation assembly shown in FIG. 1.
Fig. 4 is the schematic diagram of the shingle nail connector of shingle nail installation assembly shown in FIG. 1.
Fig. 5 is the schematic diagram of the shingle nail fixing piece of shingle nail installation assembly shown in FIG. 1.
Fig. 6 is the schematic diagram for flushing caulking strip of shingle nail installation assembly shown in FIG. 1.
Wherein appended drawing reference:
10: flushing caulking strip;11: pedestal;12: strut;13: sealing bar;
20: shingle nail connector;21: interconnecting piece;211: bottom plate;212: first partition;
213: second partition;214: the first mounting walls;215: the second mounting walls;
22: the first mounting portions;221: third partition;222: the four partitions;
223: the first connecting plates;224: the first retention beads;23: the second mounting portions;
231: the five partitions;232: the six partitions;233: the second connecting plates;
234: the second retention beads;30: shingle nail fixing piece;31: holding tank;
32: the first limit plates;33: the second limit plates;34: connecting plate;35: positioning plate;
36: partition;41: the first shingle nails;42: the second shingle nails;43: leveling keel;
44: gap;45 regulating parts;
50: ontology;51: the first cell walls;52: the second cell walls;53: limit plate;
54: mounting plate;55: fixing piece;56: positioning plate;57: waterproof adhesive tape;
60: leveling keel;61: support plate;62: support arm.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with specific embodiment, and reference
Attached drawing, the present invention is described in more detail.Wherein identical components are presented with like reference characters.It needs to illustrate
It is that word "front", "rear" used in the following description, "left", "right", "up" and "down" refer to the direction in attached drawing.It uses
Word "inner" and "outside" refer respectively to the direction towards or away from geometric center of specific component.
Fig. 1 is the schematic diagram of the shingle nail installation assembly used in the specific embodiment of the invention.Fig. 2 is wall shown in FIG. 1
The use state diagram for flushing device of panel installation assembly.Fig. 3 is that the closing in of shingle nail installation assembly shown in FIG. 1 is fixed
The use state diagram of part.As shown in Figure 1 to Figure 3, shingle nail installation assembly includes that shingle nail connector 20, shingle nail are fixed
Part 30 and flush caulking strip 10 and at least two closing in fixing pieces.
Shingle nail connector 20 is arranged between two adjacent shingle nails, and for connecting two adjacent shingle nails;
Shingle nail connector 20 is connect with shingle nail fixing piece 30, and shingle nail fixing piece 30 is for realizing shingle nail connector
20 connect with the leveling keel 43 of two adjacent shingle nails;
Caulking strip 10 is flushed for sealing the gap 44 between two adjacent shingle nails;
At least two closing in fixing pieces are separately positioned on the free end of two shingle nails of end, and being used for will be certainly
It is fixed by holding with wall.
When shingle nail is made of multiple sub-panels, such as it is made of the first shingle nail 41 and the second shingle nail 42, by first
Shingle nail 41 and the second shingle nail 42 are arranged successively, and shingle nail connector 20 is for realizing the first adjacent shingle nail 41 and second
Shingle nail 42 flushes, and shingle nail connector 20 is connect with shingle nail fixing piece 30, the tune of shingle nail fixing piece 30 and shingle nail
Flat keel 42 and regulating part 45 connect, so as to after flushing the first shingle nail 41 and the second shingle nail 42 be fixed on wall
On.Caulking strip 10 will be flushed to be inserted into the gap 44 between the first shingle nail 41 and the second shingle nail 42, avoid steam dust etc.
Into in gap 44.Positioned at the free end of 41/ second shingle nail 42 of the first shingle nail at both ends, closed up admittedly by two or more
Determine part to be fixed on the wall.The easy installation that shingle nail can be realized using above-mentioned shingle nail installation assembly, improves speed of application, together
When avoid generation environment pollute or decoration garbage.Shingle nail installation assembly can realize shingle nail and wall quick assembling, can simplify
Work progress shortens the construction period, avoids generating more rubbish at the construction field (site), avoids holding in positions such as floor, doorframes
It easily leaves a trace, improves industrialized level.
Fig. 4 is the schematic diagram of the shingle nail connector of shingle nail installation assembly shown in FIG. 1.As shown in figure 4, shingle nail connects
Fitting 20 includes interconnecting piece 21, the first mounting portion 22 and the second mounting portion 23.
Preferably, shingle nail connector 20 includes interconnecting piece 21 and the first mounting portion that 21 opposite sides of interconnecting piece is arranged in
22 and second mounting portion 23, the first mounting portion 22 and the second mounting portion 23 be respectively used to that two adjacent shingle nails are installed, connect
Portion 21 is arranged in the gap 44 between two adjacent shingle nails, and for connecting with shingle nail fixing piece 30.Interconnecting piece 21
It is arranged in the gap of two adjacent shingle nails, is used for sealing off gap, the first mounting portion 22 and the second mounting portion 23 are used respectively
In installing the first shingle nail 41 and the second shingle nail 42, so that the first shingle nail 41 is connected with the second shingle nail 42 by shingle nail
Part 20 is connected as one, on the regulating part 45 that leveling keel 43 and leveling keel 43 are then installed by interconnecting piece.Above-mentioned metope
Plate connector 20 is stably connected with for realizing adjacent shingle nail, realizes quick assembling, shortens assembly time, simplifies assembler
Sequence.
To simplify apparatus structure, good sealing effect is provided to the gap of adjacent shingle nail, in the present embodiment, even
Socket part 20 includes bottom plate 211 and from 211 opposite end of bottom plate to the ipsilateral first partition 212 extended and second partition 213, bottom
Plate 211, first partition 212 and second partition 213 are enclosed the first card slot, and the first card slot passes through first partition 212 and second
Partition 213 is abutted with two adjacent shingle nails respectively, and first partition 212 and second partition 213 each extend to the outer of gap 44
Portion, and the first mounting wall 214 and the second mounting wall are extended to the notch side far from the first card slot in the free end of the two
215.When the substrate of 42 the two of the first shingle nail 41 and the second shingle nail abuts, there are gaps 44 between the protrusion of the two, will
In interconnecting piece inserted into gap 44, wherein bottom plate 211 is connected on substrate, and first partition 212 and second partition 213 are respectively with
The side wall of the protrusion of the side wall and the second shingle nail 42 of the protrusion of one shingle nail 41 abuts against, the first card slot blind 44, the
One mounting wall 214 and the second mounting wall 215 are plugged on respectively in the holding tank of shingle nail fixing piece 30, realize shingle nail connector
20 with the connection of shingle nail fixing piece 30.The alternative traditional caulking process of interconnecting piece shortens the construction time, avoids pollution simultaneously
Operating environment.
To increase integraty, bonding strength is improved, in the present embodiment, first partition 212 is towards the first shingle nail 41
On surface and second partition 213 is towards being provided with protrusion on the surface of the second shingle nail 42.First partition 212 and second every
Protrusion on plate 213 can produce deformation when being squeezed by the first shingle nail 41 and the second shingle nail 42, convex to restore deformation
It rises and is closely connected on the first shingle nail 41 and the second shingle nail 42, to improve bonding strength.
In the present embodiment, the notch of raised width towards the first card slot is in and first increases to reduce afterwards from the distant to the near, protrusion
Width close to slot bottom side is lower, it is possible to provide guiding role facilitates the second card slot/the 4th card slot to be set in the first shingle nail
In the protrusion of 41/ second shingle nail 42.
To reduce assembly difficulty, in the present embodiment, the free end of 215 the two of the first mounting wall 214 and the second mounting wall
Be guide end, the width of guide end towards the first card slot be from the distant to the near in gradually increase.Appearance is provided on shingle nail fixing piece
The free end of first mounting wall 214 and the second mounting wall 215 is disposed as guide end, passed through by slot of receiving to reduce assembly difficulty
Reduce the width of guide end, enters holding tank to facilitate.
To simplify apparatus structure, in the present embodiment, the first mounting portion 22 includes setting gradually and opening direction is identical
Second card slot and third card slot, the second card slot and third card slot be respectively used to a shingle nail in adjacent with two protrusion and
Groove card and connection;Second mounting portion 23 includes setting gradually and identical 4th card slot of opening direction and the 5th card slot, and the 4th
Card slot and the 5th card slot are respectively used to raised and groove card and the connection of another shingle nail in adjacent with two.To realize the
The close connection of one mounting portion 22 and the first shingle nail 41, by the second card slot and third card slot respectively with protrusion and groove card and
Connection, the second card slot form card with the male cooperation of the first shingle nail 41 and connect, easy disassembly;Third card slot and the first metope
The groove of plate 41 cooperatively forms card and connection, to increase the leakproofness of the first shingle nail 41.For realize the second mounting portion 23 with
The close connection of second shingle nail 42 is blocked with protrusion and groove card and connection, the 4th respectively by the 4th card slot and the 5th card slot
Slot forms card with the male cooperation of the second shingle nail 42 and connect, easy disassembly;The groove of 5th card slot and the second shingle nail 42
Card and connection are cooperatively formed, to increase the leakproofness of the second shingle nail 42.
To further enhance integraty, connectivity and leakproofness, while simplifying apparatus structure, in the present embodiment, along the
One mounting wall, 214 extending direction interval and it is relatively set with third partition 221 and the 4th partition 222, third partition 221, first
Mounting wall 214 and first partition 213 are enclosed the second card slot;4th partition 222 passes through the first connecting plate 223 and third partition
221 connections, and it is enclosed third card slot.Second card slot forms integral structure by the first mounting wall 214 and interconnecting piece 21, the
Three card slots form integral structure by the first connecting plate 223 and the second card slot, i.e. the first mounting portion 22 is integrated with interconnecting piece 21
Structure, to improve integraty, the first mounting portion 22 passes through the second card slot and third the card slot protrusion with the first shingle nail 41 respectively
It is connected with groove, to enhance connectivity and leakproofness.
In the present embodiment, third partition 221 extends from the middle part of the first mounting wall 214 to the first card slot slot bottom side,
Third partition 221 is arranged in parallel with first partition 212, and third partition 221, the first mounting wall 214 and first partition 213 enclose shape
At the second card slot;Extend the first connecting plate 223, the first connecting plate 223 to far from the second card slot side from third partition 221
It is arranged in parallel with the first mounting wall 214, and there is gap between the two, the free end of the first connecting plate 223 is to far from the first peace
The 4th partition 222 is extended in the direction of dress wall 214, and the 4th partition 222 is arranged in parallel with third partition 221, the 4th partition 222,
First connecting plate 223 is connect with third partition 221 is enclosed third card slot.
For the bonding strength for improving the first mounting portion and the first shingle nail, in the present embodiment, the freedom of third partition 221
End is provided with the first retention bead 224, and the first retention bead 224 makes with the limiting card cooperation in the protrusion of the first shingle nail 41
With.First retention bead 224 limits mutually with the limiting card in the protrusion of the first shingle nail 41, avoids the first shingle nail 41
Play back and forth in two draw-in groove improves stability.
To further enhance integraty, connectivity and leakproofness, while simplifying apparatus structure, in the present embodiment, along the
Two mounting walls, 215 extending direction interval and it is relatively set with the 5th partition 231 and the 6th partition 232, the 5th partition 231, second
Mounting wall 215 and second partition 213 are enclosed the 4th card slot;6th partition 232 passes through the second connecting plate 233 and the 5th partition
231 connections, and it is enclosed the 5th card slot.4th card slot forms integral structure by the second mounting wall 215 and interconnecting piece 21, the
Five card slots form integral structure by the second connecting plate 233 and the 4th card slot, i.e. the second mounting portion 23 is integrated with interconnecting piece 21
Structure, to improve integraty, the second mounting portion 23 passes through the 4th card slot and the 5th the card slot protrusion with the second shingle nail 42 respectively
It is connected with groove, to enhance connectivity and leakproofness.
In the present embodiment, the 5th partition 231 extends from the middle part of the second mounting wall 215 to the first card slot slot bottom side,
Second mounting wall 215 is arranged in parallel with second partition 213, and the 5th partition 231, the second mounting wall 215 and first partition 213 enclose
Form the 4th card slot;Extend the second connecting plate 233, the second connecting plate to far from the 4th card slot side from the 5th partition 231
233 are arranged in parallel with the second mounting wall 215, and there is gap between the two, and the free end of the second connecting plate 233 is to far from second
The 6th partition 232 is extended in the direction of mounting wall 215, and the 6th partition 232 is arranged in parallel with the 5th partition 231, the 5th partition
231, the second connecting plate 233 is connect with the 5th partition 231 is enclosed the 5th card slot.
For the bonding strength for improving the second mounting portion and the second shingle nail, in the present embodiment, the freedom of the 5th partition 231
End is provided with the second retention bead 234, and the second retention bead 234 makes with the limiting card cooperation in the protrusion of the second shingle nail 42
With.Second retention bead 234 limits mutually with the limiting card in the protrusion of the second shingle nail 42, avoids the second shingle nail 42
Play back and forth in four card slots improves stability.
In the present embodiment, metope connector 20 is symmetrical structure, 23 the two of first connecting portion 22 and second connecting portion
Cross section is in that nearly m type, first connecting portion 22 and second connecting portion 23 are symmetrical in mirror surface along the axis of interconnecting piece 21.
Fig. 5 is the schematic diagram of the shingle nail fixing piece of shingle nail installation assembly shown in FIG. 1.As shown in figure 5, shingle nail is solid
Determining part 30 includes connecting plate 34, holding tank 31, the first limit plate 32 and the second limit plate 33.
Shingle nail fixing piece 30 include connecting plate 34, holding tank 31 and be arranged in holding tank 31 notch opposite sides the
One limit plate 32 and the second limit plate 33, the first limit plate 32 and the second limit plate 33 extend into notch;Connecting plate 34 with
The slot bottom of holding tank 31, which maintains an equal level, to be arranged, at least one mounting groove (not identifying) is provided on connecting plate 34, and fixing piece can be through peace
Tankage and by shingle nail fixing piece 30 be fixed to adjustment keel 43 on.
The mounting wall of shingle nail connector 20 is pluggable to be arrived in accommodation groove 31, and the first limit plate 32 and the second limit plate 33 are
Be used to support mounting wall, and mounting wall be limited in accommodation groove 31, the slot bottom and connecting plate 34 of accommodation groove 31 with leveling
Keel 43 abut connection, and fixing piece runs through mounting groove, and shingle nail fixing piece 30 is fixed on leveling keel 43 and regulating part
On 45.It is used cooperatively using above-mentioned shingle nail fixing piece with shingle nail connector, realizes shingle nail and levels the connection of keel, kept away
Exempt from the integrality of destruction shingle nail connector, operating space is big, it can be achieved that quick assembling.
In the present embodiment, holding tank include mounting plate and from mounting plate opposite end to the first side wall of ipsilateral extension
And second sidewall, mounting plate, the first side wall and second sidewall are enclosed holding tank;The free end of the first side wall and second sidewall
Extend the first limit plate 32 and the second limit plate 33 into notch, the first limit plate 32 and the second limit plate 33 with installation
Plate is arranged in parallel.
Preferably, shingle nail fixing piece 30 further include: positioning plate 35, positioning plate 35 is from the first limit plate 32 to far from receiving
The notch side of slot 31 extends, and positioning plate 35, the first limit plate 32 and the second limit plate 33 maintain an equal level and be arranged.Shingle nail is fixed
When part 30 and shingle nail connector 20 cooperate, positioning plate 35 can be abutted with shingle nail, be used to support and limited shingle nail, avoid wall
Panel play realizes accurate and quick assembling.
When shingle nail fixing piece 30 and shingle nail connector 20 cooperate, positioning plate 35 can be abutted with shingle nail, be used to support
With limit shingle nail, shingle nail play is avoided, realizes accurate and quick assembling;In general, the mounting wall packet of shingle nail connector 20
The first mounting wall and the second mounting wall are included, the first mounting wall extends round about with the second mounting wall, to realize metope connection
Part and wall surface fixture are stably connected with, and the first mounting wall and the second mounting wall of shingle nail connector 20 can be plugged into respectively
In one accommodation groove and the second accommodation groove, the first limit plate 32 and the second limit plate 33 are used to support mounting wall, and by mounting wall
It is limited in accommodation groove 31, the slot bottom and connecting plate 34 of accommodation groove 31 abut connection with leveling keel 43, and fixing piece runs through
Mounting groove, and shingle nail fixing piece 30 is fixed on leveling keel 43 and regulating part 45.Using above-mentioned shingle nail fixing piece
It is used cooperatively with shingle nail connector, realizes shingle nail and levels the connection of keel, avoid damage to the complete of shingle nail connector
Property, operating space is big, it can be achieved that quick assembling.
Preferably, positioning plate 35 is an integral molding structure with the first limit plate 32.Using integrated formed structure, can simplify
Manufacturing process improves the structural strength of shingle nail fixing piece 30.
In general, the mounting wall of shingle nail connector includes the first mounting wall and the second mounting wall, the first mounting wall and second
Mounting wall extends round about, to realize being stably connected with for metope connector and wall surface fixture, it is preferable that holding tank 31
Slot bottom is provided with the partition 36 extended to notch side, and holding tank 31 is divided into the first holding tank and second and accommodated by partition 36
Slot.First holding tank and the second holding tank carry out limited support to the first mounting wall and the second mounting wall respectively, so as to metope company
Fitting is stably connected with wall surface fixture realization.
In the present embodiment, partition 36, part mounting plate (mounting plate in 36 left side of partition), the first side wall and the first limit
Plate 32 is enclosed the first holding tank, and the first holding tank is for accommodating the first mounting wall, the opposite end difference of the first mounting wall
It is connected on partition 36 and the first side wall;Partition 36, part mounting plate (mounting plate on 36 right side of partition), second sidewall and second
Limit plate 33 is enclosed the second holding tank, and the second accommodation groove is for accommodating the second mounting wall, the opposite end of the second mounting wall
It is connected in partition 36 and second sidewall respectively.
In the present embodiment, the free end of the first limit plate 32 and the second limit plate 33 is provided with to 31 slot bottom of holding tank
The retention bead that side extends.To avoid shingle nail connector 20 from deviating from from holding tank 31, in the first limit plate 32 and the second limit
Retention bead is arranged in the free end of position plate 33, and retention bead is connected on the mounting wall of shingle nail connector 20, mounting plate and limit
Position protrusion clamps mounting wall simultaneously and is limited.
In the present embodiment, mounting groove extends along the width direction of connecting plate 34, and penetrates through opposite the two of connecting plate 34
Hold end face.Mounting groove penetrates through the opposite end end face of connecting plate 34, so that connecting plate 34 can be bent along mounting groove, to adjust
The height of connecting plate 34 improves flexibility to be applicable in different installation spaces.The shape of mounting groove may include a variety of, be square
Just connecting plate 34 is turned up, and in the present embodiment, the width of mounting groove is in be gradually reduced from notch to slot bottom.
In the present embodiment, the mounting hole for accommodating fixing piece is provided on connecting plate 34, mounting hole penetrates through mounting groove
Setting.Fixing piece can be hidden in mounting groove or mounting hole, and connecting plate 34 is facilitated to connect with adjustment keel 43 and regulating part 45,
Avoid influencing the aesthetics of shingle nail.
In the present embodiment, connecting plate 34 and the slot bottom of mounting groove 31 are an integral molding structure.Using integrated formed structure,
It can simplify manufacturing process, improve the structural strength of shingle nail fixing piece 30.
To reduce weight, reduction production cost, while meeting durability requirements, in the present embodiment, shingle nail fixing piece
30 are made by aluminum alloy materials or plastic material.Aluminum alloy materials have the advantages that intensity is high, plasticity is good, weight is low etc., fit
For making shingle nail fixing piece 30.For the service life for extending shingle nail fixing piece 30, it is solid that anti-corrosion layer is coated on shingle nail
The surface for determining part 30 avoids water mist etc. from corroding shingle nail fixing piece 30;Moreover, being provided on shingle nail fixing piece 30 corrosion-resistant
Layer, keeps 30 surface of shingle nail fixing piece smooth, the obvious shortcomings such as pore-free, scar, burr, spot, corrosion, to improve shingle nail
The aesthetics and user satisfaction of fixing piece 30.
Fig. 6 is the schematic diagram for flushing caulking strip of shingle nail installation assembly shown in FIG. 1.As shown in fig. 6, flushing caulking strip
10 include pedestal, strut 12 and sealing bar 13.
Preferably, the strut 12 that caulking strip 10 includes pedestal 11 and extends from pedestal 11 is flushed, strut 12 is along length side
To multiple sealing bars 13 are arranged at intervals with, sealing bar 13 is used to seal the gap between two adjacent shingle nails.It will flush embedding
Stitch the gap 44 that item 10 is inserted between the first shingle nail 41 and the second shingle nail 42, the bottom face of pedestal 11 and the first shingle nail
41, the second shingle nail 42 concordantly setting, the opposite sides wall surface of pedestal 11 respectively with the first shingle nail 41 and the second shingle nail 42
It abuts, strut 12 is extended vertically upwards from the top end face of pedestal 11, and strut 12 is that multiple sealing bars 13 provide a supporting role, multiple
Sealing bar 13 generates deformation when being squeezed by the first shingle nail 41 and the second shingle nail 42, to restore deformation, is closely connected to
On first shingle nail 41 and the second shingle nail 42, for sealing the gap 44 between the first shingle nail 41 and the second shingle nail 42;
It avoids steam dust etc. to enter in gap 44 simultaneously, improves the waterproof performance for flushing device;Traditional gap filling is saved simultaneously
Process simplifies construction process, avoids pollution operating environment.
In the present embodiment, strut 12 includes the body of rod and guide end, and sealing bar 13 is arranged along the length direction interval of the body of rod,
Guide end is connect by the body of rod with pedestal 11, and the width of guide end is in gradually increase towards pedestal 11 from the distant to the near.Guide end tool
There is the width of gradual change, the difficulty in gap 44 is entered for reducing the body of rod and pedestal 11, by the sealing that multilayer is arranged on the body of rod
Bar 13, it is multi-sealed to be provided for gap 44, improve leakproofness.
To avoid sealing bar from being broken when being squeezed, in the present embodiment, the junction of sealing bar 13 and the body of rod
It is provided with rounding off.By rounding off, the intensity for flushing caulking strip is improved, increases the one of sealing bar 13 and strut 11
Property.
In the present embodiment, the width of pedestal 11 is in be gradually reduced towards strut 12 from the distant to the near.To improve bonding strength,
It is connected between pedestal 11 and strut 12 using grading profile.The width of the bottom face of pedestal 11 is greater than the width of the body of rod, so as to base
Seat 11 provides stable support for strut 12 and sealing bar 13.The minimum widith phase of the width of the body of rod of strut 12 and pedestal 11
Together.
To improve leakproofness, in the present embodiment, the free end of sealing bar 13 extends towards close to 11 side of pedestal.Sealing
Bar 13 is tilted towards the extension of pedestal 11, makes to flush caulking strip 10 with stronger deformability, to improve leakproofness.
To further increase leakproofness, in the present embodiment, strut 12 is circumferentially arranged, and there are two sealing bars 13, and two close
The axisymmetrical that bar 13 is sealed along strut 12 is distributed.Sealing bar 13 is symmetricly set on the two sides of 12 axis of strut, two sealing bars 13
When being squeezed by the first shingle nail 41 and the second shingle nail 42, deflection is identical, keeps center of gravity constant.
In the present embodiment, there are six sealing bars 13 for setting on strut 12, symmetrical two-by-two, formation triple seal, and three
Resealing is spaced apart along the extending direction of strut 12.Triple seal is followed successively by lower seal, middle part from pedestal 11 to guide end
Sealing and top seal, middle part sealing and the distance between lower seal be less than be located between middle part sealing and top seal away from
From.
Be to improve to the leakproofness in gap, in the present embodiment, two sealing bars 13 being circumferentially arranged along strut 12 from
It is greater than the width of pedestal 11 by the distance between end.The opposite sides of pedestal 11 respectively with the first shingle nail 41 and the second shingle nail
42 abut, and the distance of the free end of two sealing bars 13 is greater than the width of pedestal 11, when flushing in 10 inserted into gap 44 of caulking strip,
First shingle nail 41 and the second shingle nail 42 squeeze sealing bar 13, bring it about deformation, and to restore deformation, sealing bar 13 is closely
It is fitted on the first shingle nail 41 and the second shingle nail 42, to improve leakproofness.
In the present embodiment, strut 12 is made using hard plastic;Pedestal 11 and sealing bar 13 are all made of flexible modeling
Material is made.It flushes caulking strip 10 to be made using the soft or hard bond material of PVC, strut 12 is made using hard plastic, is made
It provides the support of higher-strength for sealing bar 13;Pedestal 11 and sealing bar 13 are made using flexiplast, flexiplast makes
Pedestal 11 and sealing bar 13 can carry out deformation, to provide better seal effect for gap 44.
In the present embodiment, caulking strip 10 is flushed to be an integral molding structure.Using integrated formed structure, production can simplify
Process improves the structural strength for flushing caulking strip 10.
Furthermore it is preferred that closing in fixing piece includes: support keel 60 and ontology 50.Support keel 60 can be fixed with wall,
Support keel 60 is provided with straight supporting surface towards shingle nail side;Ontology 50 includes slot and mounting plate 54, slot and peace
Loading board 54 is abutted with the supporting surface of support keel 60, and slot, which is used to limit the shingle nail positioned at end and supports, is located at end
Shingle nail is arranged in parallel with supporting surface, and mounting plate 54 is provided at least one mounting hole, and fixing piece 55 can penetrating mounting holes and general
Ontology is fixed on support keel.Support keel 60 is fixed with wall, straightening support is provided by supporting surface, by ontology 50
The outside wall surface of mounting plate 54 and slot abuts on the support surface, and by 55 penetrating mounting holes of fixing piece, consolidates to ontology 50
It is fixed;Shingle nail (such as the first shingle nail 41 or the second shingle nail 42) is plugged on limit in slot, slotted supports shingle nail and branch
Support face is parallel, so that shingle nail is stably mounted on wall.By the above-mentioned closing in fixing piece for shingle nail to positioned at end
The free end of shingle nail be fixed, close up for the end to shingle nail, realize the easy installation of shingle nail, improve
Speed of application, while avoiding generation environment pollution or decoration garbage.
Support keel is for providing straight support, and to simplify apparatus structure, in the present embodiment, support keel 60 includes
Support plate 61 and from 61 opposite end of support plate to the ipsilateral support arm 62 extended, two support arms 62 and support plate 61 enclose
Accommodating chamber is formed, two support arms 62 extend to accommodating chamber inner bending and towards 61 side of support plate.Support arm 62 is for being
Support plate 61 provides support, so that there are certain gaps between support plate 61 and wall, to avoid when mounting fixing parts 55
Destroy wall.
For the curvature for absorbing wall, the inclination of shingle nail caused by installation error or dislocation are reduced, in the present embodiment, is used for
The closing in fixing piece of shingle nail further include: regulating part (not shown), regulating part are set in accommodating chamber and extend to outside accommodating chamber,
And for being fitted and connected with wall, two support arms 62 grip regulating part.Deformation is generated when regulating part is squeezed, so as to
The curvature for absorbing wall avoids metope is uneven support plate 61 is caused to tilt, and regulating part supports support plate 61 from inside to outside, with
Just support plate 61 provides straight supporting surface.
For convenience of assembly, in the present embodiment, slot includes limit plate 53 and extends phase to ipsilateral from limit plate 53
To parallel the first cell wall 51 and the second cell wall 52, the first cell wall 51 and 52 cell wall of the second cell wall are limited for clamping shingle nail,
Mounting plate 54 extends from limit plate 53 to far from notch side, and mounting plate 54 is abutted with supporting surface with the second cell wall 52.First
Cell wall 51 is parallel with the second cell wall 52 and for clamping shingle nail limit, to limit position of the shingle nail in slot, avoids
Its play back and forth, influences stability.
In the present embodiment, the first cell wall 51 to intersect vertically with limit plate 53 is extended on the top of limit plate 53, is limiting
Position plate 53 extends the second cell wall 52 to intersect vertically with limit plate 53 by positon of near bottom, extend in the bottom end of limit plate 53 and
The mounting plate 54 that limit plate 53 intersects vertically, mounting plate 54 are opposite with the extending direction of both the second cell walls 52.
In the present embodiment, the junction of limit plate 53 and the first cell wall 51 is provided with limited block, and limited block is for limiting
Position of the shingle nail in slot.Shingle nail is inserted into slot, is connected on limited block, be continued into it can not, avoid wall
Panel 41 squeezes limit plate 53, causes slot to deform, influences shingle nail mounting stability.
To simplify apparatus structure, in the present embodiment, the notch end of the second cell wall 52, which is provided with to far from notch side, prolongs
The flange stretched is provided with flange, flange setting concordant with mounting plate 54 on flange.Flange and mounting plate 54 simultaneously with shingle nail
Support keel 60 abuts, so that it is determined that the installation site of shingle nail, improves installation accuracy.
In the present embodiment, for the closing in fixing piece of shingle nail further include: waterproof adhesive tape 57, waterproof adhesive tape 57 are set to
In slot, and it is fitted and connected with the second cell wall 52 towards shingle nail side.Ontology 50 can be improved by the way that waterproof adhesive tape 57 is arranged
Waterproof performance, avoid aqueous vapor from entering slot.
In the present embodiment, for the closing in fixing piece of shingle nail further include: positioning plate 56, positioning plate 56 is from mounting plate 54
Free end extend, positioning plate 56 is arranged in parallel with limit plate 53.Positioning plate 56 is arranged in parallel with limit plate 53, and ontology 50 can
It is abutted by the surface that positioning plate 56 is adjacent wall, to provide more accurate positioning for wall.
In the present embodiment, ontology 50 is an integral molding structure.Using integrated formed structure, manufacturing process can simplify,
Improve the structural strength of ontology 50.
The use process of shingle nail installation assembly is described further below.
When installing shingle nail connector 20, shingle nail fixing piece 30 is abutted with leveling keel 43, by bolt by wall
Faceplate fastener 30 is fixed on leveling keel 43 and regulating part 45.Shingle nail connector 20 is passed through into 214 He of the first mounting wall
Second mounting wall 215 is connect with shingle nail fixing piece 30.The protrusion and groove of first shingle nail 41 are plugged on the second card respectively
In slot and third card slot, limiting card in the protrusion of the first retention bead 224 and the first shingle nail 41 cooperation, so as to by the first wall
Panel 41 is fixed on the first mounting portion 22;The protrusion and groove of second shingle nail 42 are plugged on the 4th card slot and the 5th respectively
In card slot, the limiting card in the protrusion of the second retention bead 234 and the second shingle nail 42 cooperates, to consolidate the second shingle nail 42
It is scheduled on the second mounting portion 23;First card slot is arranged in the gap 44 between the first shingle nail 41 and the second shingle nail 42.
When installing shingle nail fixing piece 30, the first shingle nail 41 and the second shingle nail 42 are separately mounted to metope connector
On 20, the first mounting wall and the second mounting wall of shingle nail connector 20 are inserted respectively into the first accommodation groove and the second accommodation groove
Interior, the opposite end of the first mounting wall is connected to respectively on partition 36 and the first side wall, the opposite end difference of the second mounting wall
It is connected in partition 36 and second sidewall;First limit plate 32 and the second limit plate 33 are respectively the first mounting wall and the second installation
Wall provides a supporting role, the first limit plate 32 and the second limit plate 33 be on retention bead limit the first mounting wall and respectively
Two mounting walls are connected on the mounting plate of 36 two sides of partition.Positioning plate 35 is that the first shingle nail 41 provides positioning action, fixing piece
Through the mounting hole of connecting plate 34, shingle nail fixing piece 30 is fixed on leveling keel 43 and regulating part 45.
When installation flushes caulking strip 10, caulking strip 10 will be flushed and be inserted between the first shingle nail 41 and the second shingle nail 42
Gap 44, the concordant setting of the bottom face of pedestal 11 and the first shingle nail 41, the second shingle nail 42, the two lateral walls of pedestal 11
Face is abutted with the first shingle nail 41 and the second shingle nail 42 respectively, and strut 12 is extended vertically upwards from the top end face of pedestal 11, branch
Bar 12 is that multiple sealing bars 13 provide a supporting role, and there are six sealing bars 13 for setting on strut 12, symmetrical two-by-two, forms three
Resealing, triple seal are spaced apart along the extending direction of strut 12.Two sealing bars 13 of every resealing are by the first wall
Panel 41 and the second shingle nail 42 generate deformation when squeezing, and to restore deformation, are closely connected to the first shingle nail 41 and the second wall
On panel 42, for sealing the gap 44 between the first shingle nail 41 and the second shingle nail 42.
When installing closing in fixing piece, regulating part is installed in the accommodating chamber of support keel 60, and by regulating part with
Wall connecting;The flange of the mounting plate 54 of ontology 50 and the second cell wall 52 is abutted with support plate 61, and fixing piece 55 is inserted into
Into mounting hole, ontology 50 is fixed in support plate 61 and regulating part;Waterproof adhesive tape 57 is installed on the second cell wall 52, it will
Shingle nail is inserted into slot, and the first cell wall 51 and the second cell wall 52 grip shingle nail, the end face of shingle nail and limited block
It abuts.
The present invention also provides a kind of metope method of plate installation, are pacified by using such as above-mentioned shingle nail installation assembly
Dress, includes the following steps:
(1) multiple shingle nails are arranged successively along wall extending direction, adjacent two is arranged in shingle nail connector 20
Between a shingle nail, two adjacent shingle nails are connected by shingle nail connector 20, and multiple shingle nails are connected as one
Structure;
(2) multiple leveling keel 43 are separately fixed on the adjacent corresponding wall in shingle nail junction, by shingle nail
Fixing piece 30 is connect with the leveling keel 43 of two adjacent shingle nails, and shingle nail connector 20 and shingle nail fixing piece 30 are connected
It connects;
(3) it will flush in the gap 44 that caulking strip 10 is installed between two adjacent shingle nails;
(4) at least two closing in fixing pieces are separately positioned on the free end of two shingle nails of end, and used
It is fixed in by free end and wall.
When the splicing of multiple shingle nails is into a single integrated structure, such as it is made of the first shingle nail 41 and the second shingle nail 42, by the
One shingle nail 41 and the second shingle nail 42 are arranged successively, and shingle nail connector 20 is for realizing the first adjacent shingle nail 41 and
Two shingle nails 42 flush, and shingle nail connector 20 is connect with shingle nail fixing piece 30, shingle nail fixing piece 30 and shingle nail
Keel 42 and regulating part 45 is leveled to connect, so as to after flushing the first shingle nail 41 and the second shingle nail 42 be fixed on wall
On.Caulking strip 10 will be flushed to be inserted into the gap 44 between the first shingle nail 41 and the second shingle nail 42, avoid steam dust etc.
Into in gap 44.Positioned at the free end of 41/ second shingle nail 42 of the first shingle nail at both ends, closed up admittedly by two or more
Determine part to be fixed on the wall.The easy installation that shingle nail can be realized using above-mentioned shingle nail installation assembly, improves speed of application, together
When avoid generation environment pollute or decoration garbage.Shingle nail installation assembly can realize shingle nail and wall quick assembling, can simplify
Work progress shortens the construction period, avoids generating more rubbish at the construction field (site), avoids holding in positions such as floor, doorframes
It easily leaves a trace, improves industrialized level.
Preferably, in step (1) further include: the interconnecting piece 21 of shingle nail connector 20 is arranged in two adjacent walls
It between panel, and is connect with shingle nail fixing piece 30, the first mounting portion 22 and the second mounting portion 23 of shingle nail connector 20 divide
Two adjacent shingle nails Yong Yu be installed.Interconnecting piece 21 is arranged in the gap of two adjacent shingle nails, for sealing seam
Gap, the first mounting portion 22 and the second mounting portion 23 are respectively used to the first shingle nail 41 of installation and the second shingle nail 42, so that first
Shingle nail 41 and the second shingle nail 42 are connected as one by shingle nail connector 20, then install leveling keel by interconnecting piece
43 and leveling keel 43 regulating part 45 on.Above-mentioned being stably connected with for realizing adjacent shingle nail of shingle nail connector 20, it is real
Existing quick assembling, shortens assembly time, simplifies assembly process.
Preferably, in step (2) further include: the interconnecting piece 21 of shingle nail connector 20 is inserted into shingle nail fixing piece 30
Holding tank 31 in, the first limit plate 32 and the second limit plate 33 of shingle nail fixing piece 30 be used to support interconnecting piece 21;It will
Connecting plate 34 is abutted with leveling keel 43, and fixing piece, which runs through the mounting groove of connecting plate 34 and is fixed to shingle nail fixing piece 30, to be adjusted
On flat keel 43.When shingle nail fixing piece 30 and shingle nail connector 20 cooperate, positioning plate 35 can be abutted with shingle nail, for branch
Support and limit shingle nail, avoid shingle nail play, realize accurate and quick assembling;In general, the mounting wall packet of shingle nail connector
The first mounting wall and the second mounting wall are included, the first mounting wall extends round about with the second mounting wall, to realize metope connection
Part and wall surface fixture are stably connected with, and the first mounting wall and the second mounting wall of shingle nail connector 20 can be plugged into respectively
In one accommodation groove and the second accommodation groove, the first limit plate 32 and the second limit plate 33 are used to support mounting wall, and by mounting wall
It is limited in accommodation groove 31, the slot bottom and connecting plate 34 of accommodation groove 31 abut connection with leveling keel 43, and fixing piece runs through
Mounting groove, and shingle nail fixing piece 30 is fixed on leveling keel 43 and regulating part 45.Using above-mentioned shingle nail fixing piece
It is used cooperatively with shingle nail connector, realizes shingle nail and levels the connection of keel, avoid damage to the complete of shingle nail connector
Property, operating space is big, it can be achieved that quick assembling.
Preferably, in step (3) further include: the pedestal 11 for flushing caulking strip 10 is mounted on to two adjacent shingle nails
Gap 44 in, strut 12 extends along the short transverse in gap 44, and the sealing bar 13 on strut 12 is connected to adjacent two
On the end face of shingle nail, sealing bar 13 is used for sealing off gap 44.Caulking strip 10 will be flushed and be inserted into the first shingle nail 41 and the second wall
Gap 44 between panel 42, the concordant setting of the bottom face of pedestal 11 and the first shingle nail 41, the second shingle nail 42, pedestal 11
Opposite sides wall surface is abutted with the first shingle nail 41 and the second shingle nail 42 respectively, strut 12 from the top end face of pedestal 11 vertically to
Upper extension, strut 12 are that multiple sealing bars 13 provide a supporting role, and multiple sealing bars 13 are by the first shingle nail 41 and second
Shingle nail 42 generates deformation when squeezing, and to restore deformation, is closely connected on the first shingle nail 41 and the second shingle nail 42, is used for
Seal the gap 44 between the first shingle nail 41 and the second shingle nail 42;It avoids steam dust etc. to enter in gap 44 simultaneously, mentions
Height flushes the waterproof performance of device;Traditional gap filling process is saved simultaneously, is simplified construction process, is avoided pollution operation ring
Border.
Preferably, in step (4) further include: fix support keel 60 with wall, support keel 60 is towards shingle nail
Side is provided with straight supporting surface;The slot of ontology 50 and mounting plate 54 are abutted with the supporting surface of support keel 60, inserted
Slot is used to limit the shingle nail positioned at end and the shingle nail for being located at end is supported to be arranged in parallel with supporting surface, and mounting plate 54 is arranged
There is at least one mounting hole, ontology 50 penetrating mounting holes and can be fixed on support keel 60 by fixing piece 55.By support keel
60 fix with wall, provide straightening support by supporting surface, the outside wall surface of the mounting plate 54 of ontology 50 and slot is connected to branch
On support face, and by 55 penetrating mounting holes of fixing piece, ontology 50 is fixed;By shingle nail (such as the first shingle nail 41 or the
Two shingle nails 42) it is plugged on limit in slot, slotted supports shingle nail is parallel with supporting surface, so that shingle nail is stably mounted to wall
On body.The free end of shingle nail for being located at end is fixed by the above-mentioned closing in fixing piece for shingle nail, for pair
The end of shingle nail is closed up, and is realized the easy installation of shingle nail, is improved speed of application, at the same avoid generation environment pollute or
Decoration garbage.
It is and existing from the description above with practice it is found that shingle nail installation assembly provided by the invention and its installation method
Technology is compared, and is had the advantage that the easy installation that can realize shingle nail using above-mentioned shingle nail installation assembly, is improved construction speed
Degree, while avoiding generation environment pollution or decoration garbage.Shingle nail installation assembly can realize shingle nail and wall quick assembling, can
Simplify work progress, shorten the construction period, avoids generating more rubbish at the construction field (site), avoid on floor, doorframe equipotential
It sets and is easy to leave a trace, improve industrialized level.Moreover, shingle nail installation assembly occupies little space, easy to assembly quick, positioning
Accurately, flatness is high, good decorating effect, leakproofness and good waterproof performance.
It should be understood by those ordinary skilled in the art that: the above is only a specific embodiment of the present invention, and
It is not used in the limitation present invention, all any modification, equivalent substitution, improvement and etc. within purport of the invention, done should all include
Within protection scope of the present invention.
Claims (10)
1. a kind of shingle nail installation assembly characterized by comprising
Shingle nail connector, the shingle nail connector are arranged between two adjacent shingle nails, and for connecting phase
Two adjacent shingle nails;
Shingle nail fixing piece, the shingle nail connector are connect with the shingle nail fixing piece, and the shingle nail fixing piece is used for
Realize that the shingle nail connector and the leveling keel of two adjacent shingle nails are connect;
Caulking strip is flushed, the caulking strip that flushes is for sealing the gap between two adjacent shingle nails;
At least two closing in fixing pieces, at least two closing in fixing pieces are separately positioned on two metopes positioned at end
On the free end of plate, and for fixing the free end with wall.
2. shingle nail installation assembly according to claim 1, which is characterized in that
The shingle nail connector includes interconnecting piece and the first mounting portion that the interconnecting piece opposite sides is arranged in and the second peace
Dress portion, first mounting portion and second mounting portion are respectively used to install two adjacent shingle nails, the connection
Portion is arranged in the gap between two adjacent shingle nails, and for connecting with shingle nail fixing piece.
3. shingle nail installation assembly according to claim 2, which is characterized in that
The shingle nail fixing piece include connecting plate, holding tank and be arranged in the holding tank notch opposite sides first limit
Position plate and the second limit plate, first limit plate and second limit plate extend into the notch;The connecting plate
Maintain an equal level with the slot bottom of the holding tank and be arranged, at least one mounting groove is provided on the connecting plate, fixing piece can be through described
Mounting groove and by the shingle nail fixing piece be fixed to the leveling keel on.
4. shingle nail installation assembly according to any one of claims 1 to 3, which is characterized in that
The strut for flushing caulking strip and including pedestal and extending from the pedestal, the strut are spaced setting along its length
There are multiple sealing bars, the sealing bar is used to seal the gap between two adjacent shingle nails.
5. shingle nail installation assembly according to any one of claims 1 to 3, which is characterized in that the closing in fixing piece packet
It includes:
Support keel, the support keel can be fixed with wall, and the support keel is provided with straight towards shingle nail side
Supporting surface;
Ontology, the ontology include slot and mounting plate, and the slot and the mounting plate are described with the support keel
Supporting surface abuts, and the slot is used to limit the shingle nail positioned at end and supports the shingle nail and the institute for being located at end
It states supporting surface to be arranged in parallel, the mounting plate is provided at least one mounting hole, and fixing piece can be through the mounting hole and by institute
Ontology is stated fixed on the support keel.
6. a kind of metope method of plate installation, which is characterized in that by using the metope as described in any one of claims 1 to 5
Plate installation assembly is installed, and is included the following steps:
(1) multiple shingle nails are arranged successively along wall extending direction, shingle nail connector is arranged in two adjacent metopes
Between plate, two adjacent shingle nails are connected by the shingle nail connector, and multiple shingle nails are connected as
Integral structure;
(2) multiple leveling keel are separately fixed on the adjacent corresponding wall in the shingle nail junction, shingle nail is consolidated
Determine part to connect with the leveling keel of two adjacent shingle nails, by the shingle nail connector and the shingle nail fixing piece
Connection;
(3) it will flush in the gap that caulking strip is installed between two adjacent shingle nails;
(4) at least two closing in fixing pieces are separately positioned on the free end of the company shingle nail of end, and used
In the free end is fixed with wall.
7. metope method of plate installation according to claim 6, which is characterized in that in step (1) further include: by the wall
The interconnecting piece of desk connector is arranged between two adjacent shingle nails, and connect with the shingle nail fixing piece, institute
The first mounting portion and the second mounting portion for stating shingle nail connector are respectively used to install two adjacent shingle nails.
8. metope method of plate installation according to claim 7, which is characterized in that in step (2) further include: by the wall
The interconnecting piece of desk connector is inserted into the holding tank of the shingle nail fixing piece, the first limit of the shingle nail fixing piece
Position plate and the second limit plate are used to support the interconnecting piece;The connecting plate is abutted with the leveling keel, fixing piece passes through
It wears the mounting groove of the connecting plate and the shingle nail fixing piece is fixed on the leveling keel.
9. metope method of plate installation according to claim 7, which is characterized in that in step (3) further include: will be described flat
The pedestal for connecing caulking strip is mounted in the gap of two adjacent shingle nails, and strut prolongs along the short transverse in the gap
It stretches, the sealing bar on the strut is connected on the end face of two adjacent shingle nails, and the sealing bar is for sealing institute
State gap.
10. metope method of plate installation according to claim 7, which is characterized in that in step (4) further include: will be described
Support keel is fixed with the wall, and the support keel is provided with straight supporting surface towards shingle nail side;By described
The slot and mounting plate of body are abutted with the supporting surface of the support keel, and the slot is used to limit the institute positioned at end
It states the shingle nail of shingle nail and support positioned at end to be arranged in parallel with the supporting surface, the mounting plate is provided at least one
A mounting hole, fixing piece can run through the mounting hole and secure the body on the support keel.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810859187.9A CN108952053B (en) | 2018-07-31 | 2018-07-31 | Wall panel installation assembly and installation method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810859187.9A CN108952053B (en) | 2018-07-31 | 2018-07-31 | Wall panel installation assembly and installation method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108952053A true CN108952053A (en) | 2018-12-07 |
| CN108952053B CN108952053B (en) | 2023-06-23 |
Family
ID=64466577
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810859187.9A Active CN108952053B (en) | 2018-07-31 | 2018-07-31 | Wall panel installation assembly and installation method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108952053B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109610758A (en) * | 2018-12-25 | 2019-04-12 | 浙江亚厦装饰股份有限公司 | Shingle nail installation assembly and installation method |
| CN110042994A (en) * | 2019-04-22 | 2019-07-23 | 浙江亚厦装饰股份有限公司 | A kind of quick levelling adjustment structure and inner corner trim integrated morphology |
| CN110259005A (en) * | 2019-07-10 | 2019-09-20 | 苏州言筠家居科技有限公司 | A kind of quick closing-in structure of middle seam closing in parts |
| CN110273522A (en) * | 2018-12-25 | 2019-09-24 | 浙江亚厦装饰股份有限公司 | A kind of ultra-thin cement fiber board mounting structure |
| CN111502177A (en) * | 2020-05-06 | 2020-08-07 | 浙江亚厦装饰股份有限公司 | Installation method of leveling substrate assembly |
| CN111764587A (en) * | 2020-06-08 | 2020-10-13 | 山西智捷装科科技有限公司 | A slotted fastener |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6170213B1 (en) * | 1998-01-13 | 2001-01-09 | Dfb Sales, Inc. | Wall panel mounting system and method |
| DE10301140A1 (en) * | 2003-01-14 | 2004-07-22 | Kaefer Isoliertechnik Gmbh & Co Kg | Securement for building wall panels, has projection and recess formed on each flank to respectively engage to matching groove and protrusion formed on each retaining strip at end face of each panel |
| AU2004203244A1 (en) * | 2003-07-24 | 2005-02-10 | Robert Geoffrey Graham | Cladding joiner |
| EP2023402A1 (en) * | 2007-08-01 | 2009-02-11 | Tenesol | Profile and device for assembling photovoltaic panels within a building structure, and in particular a roof, and building structure integrating these elements |
| CN201972354U (en) * | 2011-01-21 | 2011-09-14 | 珠海市雄威蜂窝制品有限公司 | Aluminum honeycomb panel withhold style installation structure |
| CN204282597U (en) * | 2014-12-06 | 2015-04-22 | 浙江大学 | For installing the press fastening type structure of aluminium honeycomb curtain wall |
| CN205046684U (en) * | 2015-10-14 | 2016-02-24 | 丘杭 | Lid stitches subassembly and uses this lid to stitch gypsum board partition wall of subassembly |
-
2018
- 2018-07-31 CN CN201810859187.9A patent/CN108952053B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6170213B1 (en) * | 1998-01-13 | 2001-01-09 | Dfb Sales, Inc. | Wall panel mounting system and method |
| DE10301140A1 (en) * | 2003-01-14 | 2004-07-22 | Kaefer Isoliertechnik Gmbh & Co Kg | Securement for building wall panels, has projection and recess formed on each flank to respectively engage to matching groove and protrusion formed on each retaining strip at end face of each panel |
| AU2004203244A1 (en) * | 2003-07-24 | 2005-02-10 | Robert Geoffrey Graham | Cladding joiner |
| EP2023402A1 (en) * | 2007-08-01 | 2009-02-11 | Tenesol | Profile and device for assembling photovoltaic panels within a building structure, and in particular a roof, and building structure integrating these elements |
| CN201972354U (en) * | 2011-01-21 | 2011-09-14 | 珠海市雄威蜂窝制品有限公司 | Aluminum honeycomb panel withhold style installation structure |
| CN204282597U (en) * | 2014-12-06 | 2015-04-22 | 浙江大学 | For installing the press fastening type structure of aluminium honeycomb curtain wall |
| CN205046684U (en) * | 2015-10-14 | 2016-02-24 | 丘杭 | Lid stitches subassembly and uses this lid to stitch gypsum board partition wall of subassembly |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109610758A (en) * | 2018-12-25 | 2019-04-12 | 浙江亚厦装饰股份有限公司 | Shingle nail installation assembly and installation method |
| CN110273522A (en) * | 2018-12-25 | 2019-09-24 | 浙江亚厦装饰股份有限公司 | A kind of ultra-thin cement fiber board mounting structure |
| CN110042994A (en) * | 2019-04-22 | 2019-07-23 | 浙江亚厦装饰股份有限公司 | A kind of quick levelling adjustment structure and inner corner trim integrated morphology |
| CN110042994B (en) * | 2019-04-22 | 2024-05-14 | 浙江亚厦装饰股份有限公司 | Quick leveling adjusting structure and internal corner integrated structure |
| CN110259005A (en) * | 2019-07-10 | 2019-09-20 | 苏州言筠家居科技有限公司 | A kind of quick closing-in structure of middle seam closing in parts |
| CN111502177A (en) * | 2020-05-06 | 2020-08-07 | 浙江亚厦装饰股份有限公司 | Installation method of leveling substrate assembly |
| CN111764587A (en) * | 2020-06-08 | 2020-10-13 | 山西智捷装科科技有限公司 | A slotted fastener |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108952053B (en) | 2023-06-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108952053A (en) | Shingle nail installation assembly and its installation method | |
| CN109356350A (en) | Shingle nail integrated installation assembly and wall surface decorating method | |
| CN109162582A (en) | A kind of installation method of doorframe | |
| CN215631260U (en) | Wall decorative board bracket | |
| CN109403575A (en) | Shingle nail integrated installation assembly and wall surface decorating method | |
| CN210177866U (en) | Wall keel | |
| CN113550527A (en) | Assembly type wall surface leveling structure and mounting method thereof | |
| CN217580989U (en) | Assembled built-in integral bathroom structure | |
| CN212897326U (en) | A kind of quick installation structure of prefabricated wall | |
| CN105064588A (en) | A brand-new composite suspended ceiling and its installation method | |
| CN213979724U (en) | Wall keel fixing structure capable of being leveled | |
| CN210316353U (en) | A wall panel assembly with no leveling on the wall | |
| CN215631243U (en) | Assembled aluminum alloy wallboard mounting system | |
| KR20040003293A (en) | sticking device of a panel for interior | |
| CN204577722U (en) | Built-in switch jack | |
| CN114150803A (en) | Light curtain wall keel assembly and mounting method | |
| CN218562866U (en) | Wall veneer dry hanging structure assembly | |
| CN115341780B (en) | Method for performing curtain wall reconstruction on outer wall surface of window wall structure | |
| CN208184130U (en) | A kind of building decoration hanging plate that stability is good | |
| CN216076085U (en) | Assembled wall leveling structure | |
| CN110273522A (en) | A kind of ultra-thin cement fiber board mounting structure | |
| CN204626853U (en) | A kind of unit assembled mounting structure of special-shaped cambered surface moulding GRG decoration panel | |
| CN210177867U (en) | Soil style of calligraphy wall fossil fragments | |
| CN214575243U (en) | Mounting structure of assembled wall | |
| CN214498157U (en) | Wall body reentrant corner ceramic tile mounting structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |