CN104405115A - Wall plastering flatness and perpendicularity control device and construction method - Google Patents
Wall plastering flatness and perpendicularity control device and construction method Download PDFInfo
- Publication number
- CN104405115A CN104405115A CN201410528604.3A CN201410528604A CN104405115A CN 104405115 A CN104405115 A CN 104405115A CN 201410528604 A CN201410528604 A CN 201410528604A CN 104405115 A CN104405115 A CN 104405115A
- Authority
- CN
- China
- Prior art keywords
- plastering
- wall
- wall part
- control
- attached wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention belongs to the technical field of architectural engineering. To solve the technical problems of complex construction process, long period, low accuracy of controlling flatness and perpendicularity and low construction efficiency when a wall body is plastered, the invention provides a wall plastering flatness and perpendicularity control device and a construction method. The device comprises a wall-attached part, a fixing pin, a control rod and a mounting hole; the mounting hole is formed on the wall-attached part; the fixing pin passes through the mounting hole to fix the wall-attached part on the wall; the control rod is vertically fixed on the wall-attached part. The construction method comprises the following steps: determining a mounting point position of the wall-attached part according to the length of the wall and after determining the point position, fixing the wall-attached part on the wall and assembling the control rod; after completing assembling, hanging a plastering thickness control line on the control rod; controlling a plastering thickness according to the control line by a worker; reserving a wall-attached part range in the plastering process, disassembling the device after completing plastering, and carrying out plastering plugging on the reserved position. According to the invention, the construction process can be simplified, wall plastering quality and the once success rate are improved and engineering construction cost is reduced.
Description
Technical field
The invention belongs to construction engineering technical field, be specifically related to a kind of wall plastering planeness, verticality control device and construction method.
Background technology
In prior art, before wall plastering, construction needs in metope basic unit, to set out floated coat reference surface point in advance.The quality of the reference point that wall plastering basic unit is arranged and number, directly have influence on the work efficiency of the planeness of building wall floated coat, verticality and construction.Need before current conventional method plastering construction to carry out on metope in advance to paste cake, floating screed to arrange the reference point of wall plastering basic unit, adopt that the method working procedure is numerous and diverse, the cycle is long, to planeness and degree control precision low, efficiency of construction is low.
Summary of the invention
The present invention needs floating screed (or pasting cake) for solving body of wall when plastering, working procedure is numerous and diverse, the cycle is long, to planeness and degree control precision low, the technical problem that efficiency of construction is low, provides a kind of wall plastering planeness, verticality control device and construction method.
The technical solution used in the present invention is as follows:
A kind of wall plastering planeness, verticality control device, comprise attached wall part, staple, control lever and installing hole, attached wall part be provided with installing hole, and attached wall part is fixed on metope through installing hole by staple, and control lever is vertically fixed on attached wall part.
The central vertical of described attached wall part is provided with male thread, is provided with interior screw thread in control lever, and control lever carries out abutting joint by the male thread of interior screw thread and attached wall part.
A construction method for wall plastering planeness, degree control, its concrete steps are:
(1) on body of wall, the position of attached wall part is determined according to the length of metope;
(2) be fixed on metope according to the some position staple that metope is determined by the installing hole on attached wall part;
(3), after attached wall part installs, control lever is carried out abutting joint by the male thread of interior screw thread and attached wall part;
(4) assemble rear weight and carry out hanging wire location on control lever, determine depth of plastering;
(5) having good positioning on the securing lever after plastering control line, by adopting control line, each backstay being carried out hanging wire connection control depth of plastering according to actual action need of plastering;
(6) vacate this device installation site when plastering, treat that whole metope is all plastered complete, after being removed by this device, benefit ash is carried out to reserved room.
Beneficial effect of the present invention:
1. the present invention can simplify working procedure, improves wall plastering quality and a survival rate;
2. this device is can turnover tool, can reuse;
3. this device adopts hanging wire flexibly can the whole metope of all standing, can ensure that plastering of whole metope is comprehensively controlled;
4. adopt the present invention can fast and convenient adjustment depth of plastering, effectively can control depth of plastering under the prerequisite ensureing workmanship, reduce costs.
Accompanying drawing explanation
Fig. 1 is the decomposing schematic representation of control device of the present invention;
Fig. 2 is schematic diagram after the assembling of control device of the present invention;
Fig. 3 is practice of construction method schematic diagram;
In figure: 1-attached wall part, 2-staple, 3-control lever, 4-installing hole, 5-male thread, screw thread in 6-, 7-control line, 8-metope.
Detailed description of the invention
As shown in Figure 1, a kind of wall plastering planeness, verticality control device, comprise attached wall part 1, staple 2, control lever 3, installing hole 4, male thread 5 and interior screw thread 6, the central vertical of attached wall part 1 is provided with male thread 5, installing hole 4 is provided with between the edge of male thread 5 and attached wall part 1, attached wall part 1 is fixed on metope 8 through installing hole 4 by staple 2, is provided with interior screw thread 6 in control lever 3, and control lever 3 carries out abutting joint by interior screw thread 6 with the male thread 5 of attached wall part 1.Schematic diagram after installation as shown in Figure 2.
The concrete construction method of wall plastering planeness, degree control is:
(1) on body of wall, the position of attached wall part is determined according to the length of metope;
(2) be fixed on metope according to the some position staple that metope is determined by the installing hole on attached wall part;
(3), after attached wall part installs, control lever is carried out abutting joint by the male thread of interior screw thread and attached wall part;
(4) assemble rear weight and carry out hanging wire location on control lever, determine depth of plastering;
(5) having good positioning on the securing lever after plastering control line, by adopting control line, each backstay being carried out hanging wire connection control depth of plastering according to actual action need of plastering;
(6) vacate this device installation site when plastering, treat that whole metope is all plastered complete, after being removed by this device, benefit ash is carried out to reserved room.
As shown in Figure 3, the length of metope arranges this control device, Jun Juqiang limit, both sides 300mm ~ 400mm at interval of 800mm respectively at 300mm ~ 400mm same position bottom the top 300mm ~ 400mm and distance body of wall of body of wall.
This construction method is reliably reasonable in design, can solve when tradition is plastered and need on metope, carry out floating screed (or pasting cake) in advance, operation is comparatively complicated, the plastering quality simultaneously formed controls the problems such as difficulty is large, can control flexibly to make wall plastering thickness under the prerequisite ensureing workmanship, thus reduction Construction Cost, plastering quality can be made to reach simultaneously and once survive, ensure the effect of plastering.
Claims (4)
1. a wall plastering planeness, verticality control device, it is characterized in that: comprise attached wall part (1), staple (2), control lever (3) and installing hole (4), attached wall part (1) is provided with installing hole (4), attached wall part (1) is fixed on metope (8) through installing hole (4) by staple (2), and control lever (3) is vertically fixed on attached wall part (1).
2. a kind of wall plastering planeness according to claim 1, verticality control device, it is characterized in that: the central vertical of described attached wall part (1) is provided with male thread (5), be provided with interior screw thread (6) in control lever (3), control lever (3) carries out abutting joint by interior screw thread (6) and the male thread (5) of attached wall part (1).
3. a construction method for wall plastering planeness, degree control, is characterized in that concrete steps are:
(1) on body of wall, the position of attached wall part is determined according to the length of metope;
(2) be fixed on metope according to the some position staple that metope is determined by the installing hole on attached wall part;
(3), after attached wall part installs, control lever is carried out abutting joint by the male thread of interior screw thread and attached wall part;
(4) assemble rear weight and carry out hanging wire location on control lever, determine depth of plastering;
(5) having good positioning on the securing lever after plastering control line, by adopting control line, each backstay being carried out hanging wire connection control depth of plastering according to actual action need of plastering;
(6) vacate this device installation site when plastering, treat that whole metope is all plastered complete, after being removed by this device, benefit ash is carried out to reserved room.
4. the construction method of a kind of wall plastering planeness according to claim 3, degree control, it is characterized in that: the length of metope arranges this control device, Jun Juqiang limit, both sides 300mm ~ 400mm at interval of 800mm respectively at 300mm ~ 400mm same position bottom the top 300mm ~ 400mm and distance body of wall of body of wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410528604.3A CN104405115A (en) | 2014-10-10 | 2014-10-10 | Wall plastering flatness and perpendicularity control device and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410528604.3A CN104405115A (en) | 2014-10-10 | 2014-10-10 | Wall plastering flatness and perpendicularity control device and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104405115A true CN104405115A (en) | 2015-03-11 |
Family
ID=52642773
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410528604.3A Pending CN104405115A (en) | 2014-10-10 | 2014-10-10 | Wall plastering flatness and perpendicularity control device and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104405115A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672632A (en) * | 2016-01-29 | 2016-06-15 | 中冶建工集团有限公司 | Adjustable distance and perpendicularity based exposed corner guard board sand-lime dressing system and construction method |
CN106988509A (en) * | 2017-05-16 | 2017-07-28 | 中建八局第三建设有限公司 | A kind of wall plastering thickness controls device surely |
CN110593585A (en) * | 2019-08-23 | 2019-12-20 | 中国十七冶集团有限公司 | High-rise building outer wall external corner base layer painting perpendicularity control method |
CN113622631A (en) * | 2021-09-23 | 2021-11-09 | 中建五局华东建设有限公司 | Precast ash cake for concrete layer |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86104516A (en) * | 1986-07-02 | 1987-01-24 | 吴学孔 | Plastering method for building engineering |
CN101100893A (en) * | 2007-08-22 | 2008-01-09 | 贵州中建建筑科研设计院 | Building plastering leveling method and building wall thereof |
CN201031493Y (en) * | 2007-04-13 | 2008-03-05 | 张扬聪 | Building wall surface decorative reference controls |
WO2008093380A2 (en) * | 2007-01-30 | 2008-08-07 | Angelo Coccaro | A system of guides for levelling plaster |
DE202010016364U1 (en) * | 2010-12-08 | 2011-03-31 | Twf-Tec Gmbh | Device for setting straight surfaces or edges of individual components for the construction industry |
-
2014
- 2014-10-10 CN CN201410528604.3A patent/CN104405115A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN86104516A (en) * | 1986-07-02 | 1987-01-24 | 吴学孔 | Plastering method for building engineering |
WO2008093380A2 (en) * | 2007-01-30 | 2008-08-07 | Angelo Coccaro | A system of guides for levelling plaster |
CN201031493Y (en) * | 2007-04-13 | 2008-03-05 | 张扬聪 | Building wall surface decorative reference controls |
CN101100893A (en) * | 2007-08-22 | 2008-01-09 | 贵州中建建筑科研设计院 | Building plastering leveling method and building wall thereof |
DE202010016364U1 (en) * | 2010-12-08 | 2011-03-31 | Twf-Tec Gmbh | Device for setting straight surfaces or edges of individual components for the construction industry |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672632A (en) * | 2016-01-29 | 2016-06-15 | 中冶建工集团有限公司 | Adjustable distance and perpendicularity based exposed corner guard board sand-lime dressing system and construction method |
CN105672632B (en) * | 2016-01-29 | 2017-07-21 | 中冶建工集团有限公司 | External corner backplate sand-lime conditioning system and construction method based on adjustable pitch and perpendicularity |
CN106988509A (en) * | 2017-05-16 | 2017-07-28 | 中建八局第三建设有限公司 | A kind of wall plastering thickness controls device surely |
CN110593585A (en) * | 2019-08-23 | 2019-12-20 | 中国十七冶集团有限公司 | High-rise building outer wall external corner base layer painting perpendicularity control method |
CN110593585B (en) * | 2019-08-23 | 2021-09-17 | 中国十七冶集团有限公司 | High-rise building outer wall external corner base layer painting perpendicularity control method |
CN113622631A (en) * | 2021-09-23 | 2021-11-09 | 中建五局华东建设有限公司 | Precast ash cake for concrete layer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104405128B (en) | Infilled wall concealed distribution box is direct installation method in advance | |
CN104405115A (en) | Wall plastering flatness and perpendicularity control device and construction method | |
CN109267671A (en) | A kind of decoration method of indoor wall system | |
CN201502164U (en) | Tool for paving floor tile | |
CN105569325A (en) | Leveling device, wall surface assembly and installing method | |
CN202090569U (en) | Plastering screed template | |
CN102605938B (en) | Building wall-whitewashing, plastering and leveling or ground leveling guiding rule and assorted punched ribs | |
CN105735603A (en) | Mounting device for movable decorative plate | |
CN103195226B (en) | Method for mounting decoration panel | |
CN202299020U (en) | A unit pottery pipe decoration curtain wall member | |
CN104018650A (en) | Plane screeding rod for wall plastering and use method thereof | |
CN205153303U (en) | Energy -conserving prefabricated wallboard | |
CN203961227U (en) | Plane floating screed bar for wall plastering | |
CN204001309U (en) | A kind of syndeton of Multi-function light concrete curtain wall | |
CN204357080U (en) | Troweling machine for building | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN202530724U (en) | Guiding rule for building wall whitewashing and plastering leveling or ground leveling and matched impact fillet | |
CN202899526U (en) | Wall body decoration structure for old house renovation | |
CN206158117U (en) | Wall ground floating screed instrument of making level | |
CN202745259U (en) | Hollow block electric tube post-tensioning groove structure | |
CN104018651B (en) | Wall plastering Yang Jiao rushes muscle bar and using method thereof | |
CN205382641U (en) | Lightning -arrest support of taking of special white steel of verge tile | |
CN203684332U (en) | Water pipe mounting auxiliary tool | |
CN104278784A (en) | Ceiling without keels and installation method thereof | |
CN105464242A (en) | Building method of plastering-free high-precision infilled wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150311 |
|
RJ01 | Rejection of invention patent application after publication |