CN101100893A - Building plastering leveling method and building wall thereof - Google Patents

Building plastering leveling method and building wall thereof Download PDF

Info

Publication number
CN101100893A
CN101100893A CNA2007102014314A CN200710201431A CN101100893A CN 101100893 A CN101100893 A CN 101100893A CN A2007102014314 A CNA2007102014314 A CN A2007102014314A CN 200710201431 A CN200710201431 A CN 200710201431A CN 101100893 A CN101100893 A CN 101100893A
Authority
CN
China
Prior art keywords
screw
line
basic unit
wall
stretches tight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007102014314A
Other languages
Chinese (zh)
Other versions
CN100570099C (en
Inventor
帅颂宪
林力勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Guizhou China Construction Architecture Research and Design Institute Co Ltd
Original Assignee
Guizhou Chinese Architecture Science & Research Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Chinese Architecture Science & Research Design Institute filed Critical Guizhou Chinese Architecture Science & Research Design Institute
Priority to CNB2007102014314A priority Critical patent/CN100570099C/en
Publication of CN101100893A publication Critical patent/CN101100893A/en
Application granted granted Critical
Publication of CN100570099C publication Critical patent/CN100570099C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

A plastering and level up method follows the steps as: 1. fix a screw on the top corner of the working area and another screw on the bottom corner of the same side; 2. thread the two screws and adjust the height of the screw according to required plastering thickness; 3. fix screws evenly along the thread with their top matching to the thread; 4. follow the steps 1-3 on the other side of the working area; 5. thread each two horizontal screws on two sides and fix screws evenly along the thread with their top matching to the thread; 6. diagonally thread two screws of parallel horizontal lines and fix one screw in the middle with its top matching to the thread; 7. move all threads and plaster according to screws.

Description

A kind of building plastering leveling method and construction wall thereof
(1) technical field
The present invention relates to a kind of construction wall plastering construction method.
(2) background technology
In building engineering construction, plastering engineering includes that plastering (metope, ground, ceiling etc.) in the plane, plasters in the hole (door and window mouth, sewer mouth, well head etc.) and protruding eaves is plastered (two covers, balcony, post buttress, lintel, stringcourse, window covering etc.).At present, plastering technique is generally continued to use the traditional operation method, i.e. backguy levelling, do attribute block (ash cake), the mark muscle (floating screed), smear bottom ash, levelling, surfacing etc.During as interior wall plastering, check the wall surface levelling vertical extent with cable inlet bracket earlier, determine depth of plastering, near the inner corner trim of wall both sides, paste ash cake (attribute block), do the control point; Ash cake is arranged in backguy more at regular intervals, as the standard of wall surface levelling and verticality, marks muscle (floating screed) then, smears bottom ash, darby levelling.When plaster in other positions, also need similar operation, all need in body of wall basic unit, make attribute block (ash cake) and mark muscle (floating screed).The common defects of these existing plastering method constructions is that technology is comparatively loaded down with trivial details, operation easier is big, and plastering engineering is wasted time and energy, long construction period, and workman's the amount of labour is very big, simultaneously because ash cake comes off easily and thickness should not be adjusted, so also relatively poor to the roughness control of metope.
(3) summary of the invention
The purpose of this invention is to provide a kind of building plastering leveling method and construction wall thereof, solve that traditional plastering leveling method is comparatively loaded down with trivial details, operation easier is big, construction period is long, to the relatively poor technical problem of the roughness control of metope, and solve as attribute block ash cake and mark muscle, can be fast, high-quality finishes the technical problem of wall plastering levelling.
For achieving the above object, the present invention adopts following technical scheme:
A kind of building plastering leveling method is characterized in that step is as follows:
Step 1. is selected plaster leveling zone in a body of wall basic unit 3 earlier, and a screw 1 is fixed at the angle on the one side in this zone, also fixes a screw then under this zone homonymy inferior horn, above-mentioned screw.
Step 2. line 2 that stretches tight between above-mentioned two screw tops adjusts screw 1 by the thickness of plaster leveling layer 4 and expose the length of body of wall substrate surface, and the line 2 that will stretch tight is tightened.
Step 3. evenly is fixed on the spacing of screw by 0.35-1.5m in the body of wall basic unit between above-mentioned two-screw nail, and is adjusted to the top of screw concordant with the line height that stretches tight along the line 2 that stretches tight.
Step 4. is at the another side repetitive operation step 1-3 in body of wall basic unit plaster leveling zone.
Step 5. line that stretches tight in the horizontal direction between the corresponding screw in body of wall basic unit plaster leveling both sides, zone evenly is fixed on the spacing of screw by 0.35-1.5m in the body of wall basic unit along this line that stretches tight, and is adjusted to the top of screw concordant with the line height that stretches tight.
Step 6. at the adjacent level screw diagonal angle of the line line that stretches tight that stretches tight, and at the centre position of the line that stretches tight setscrew, is adjusted to the top of screw concordant with the line height that stretches tight in body of wall basic unit plaster leveling zone.
Step 7. line that will stretch tight takes down, and is the absolute altitude of degree of plainness for wall surface and verticality with the screw, smears bottom ash, darby levelling.
In the above-mentioned steps 1, the method that hammers into of screw is that elder generation bores a hole, hammers into the bloated bolt of plastics in body of wall basic unit, and the screw of screwing on again is with the verticality of two-screw nail about the ceiling hammer inspection.
The construction wall that this application building plastering leveling method is made, it is characterized in that: this body of wall from the inside to the outside order by body of wall basic unit, plaster leveling layer with the exterior trim surface layer is bonding forms, be evenly distributed with the screw that spacing is 0.5-1.5m in the plaster leveling layer, above-mentioned screw is vertical with body of wall basic unit, and puts in the body of wall basic unit fixing.
Compared with prior art the present invention has following characteristics and beneficial effect:
The present invention adopts new thinking, courageously break through existing plasterer's method and operational procedure, overcome the technology prejudice that the construction of construction wall plaster leveling must be made ash cake, mark muscle, simplified the step of building plaster leveling construction, reduce operation easier, accelerated speed of application.The present invention does not need to make ash cake of the prior art, mark muscle or other attribute block, can be fast, high-quality finishes the wall plastering levelling.With the absolute altitude of screw as degree of plainness for wall surface and verticality, fixation, so the problem that does not exist ash cake to paste difficulty, easily drop; Simultaneously, the thickness of traditional ash cake is sticking the just very difficult change in back, and after having adopted screw, controls leveling layer thickness by adjusting the screw height, regulates absolute altitude to be more prone to, and can significantly improve the control accuracy to metope leveling layer planeness, and is very convenient.
Spacing minimum between the screw of the present invention only is 0.35m, and conventional method is to arrange an ash cake at interval about 2m, and the present invention has just dwindled control area greatly, dwindled the used chi side of workman simultaneously like this, has reduced workman's the amount of labour.
(4) description of drawings
The present invention will be further described in detail below in conjunction with accompanying drawing.
Fig. 1 is the schematic diagram that the present invention builds plastering leveling method step 1-3.
Fig. 2 is the schematic diagram that the present invention builds plastering leveling method step 4.
Fig. 3 is the schematic diagram that the present invention builds plastering leveling method step 5.
Fig. 4 is the schematic diagram that the present invention builds plastering leveling method step 6.
Fig. 5 is the structural representation of construction wall of the present invention.
Reference numeral: 1-screw, 2-stretch tight line, 3-body of wall basic unit, 4-plaster leveling layer, 5-finish coat.
(5) specific embodiment
Embodiment is referring to Fig. 1, and step 1. is bored a hole at an end top of body of wall basic unit earlier, hammered into the bloated bolt of plastics, the screw of screwing on; Ceiling hammer is checked verticality then, bores a hole simultaneously in the bottom, hammers into the bloated bolt of plastics, the screw of screwing on.
Step 2. line that stretches tight between two screw tops is adjusted screw by leveling layer thickness and is exposed the length of body of wall, and the line that stretches tight is kept vertically.
The bloated bolt of plastics, the screw of screwing on are holed, hammered into to step 3. along the line that stretches tight by the spacing of 1m at last, the top of screw is screwed onto the height of the line that stretches tight.
More than 3 steps determined the leveling layer thickness of body of wall basic unit one end.
Referring to Fig. 2, step 4. is at the other end repetitive operation step 1-3 of body of wall basic unit.
This step has been determined the leveling layer thickness of the body of wall basic unit other end.
Referring to Fig. 3, step 5. is the screw at the body of wall basic unit two ends line that stretches tight in the horizontal direction, along the spacing boring of the line that stretches tight by 1m, hammer into plastics expand bolt, the screw of screwing on, the top of screw is screwed onto the height of the line that stretches tight.
This step is separated into square one by one fritter with whole body of wall basic unit.
Referring to Fig. 4, step 6. stretches tight the screw diagonal member of line to stretching tight line with adjacent level, and in the boring of the centre position of the line that stretches tight, hammer into plastics expand bolt, the screw of screwing on, the top of screw is screwed onto the height of the line that stretches tight.This step has further been dwindled the single control area of plastering.
Step 7. line that will stretch tight takes down, and is the standard of degree of plainness for wall surface and verticality with the screw, smears bottom ash, darby levelling.
Referring to Fig. 5, this application the present invention builds the construction wall that plastering leveling method is made, order is by body of wall basic unit 3, plaster leveling layer 4 and finish coat 5 bonding forming from the inside to the outside, being distributed with spacing in the plaster leveling layer is the screw 1 of 0.5-1m, above-mentioned screw is vertical with body of wall basic unit, and puts in the body of wall basic unit fixing.

Claims (3)

1. build plastering leveling method for one kind, it is characterized in that step is as follows:
Step 1. goes up selected plaster leveling zone in a body of wall basic unit (3) earlier, and a screw (1) is fixed at the angle on the one side in this zone, also fixes a screw then under this zone homonymy inferior horn, above-mentioned screw;
Step 2. line (2) that stretches tight between above-mentioned two screw tops adjusts screw (1) by the thickness of plaster leveling layer (4) and expose the length of body of wall substrate surface, and the line (2) that will stretch tight is tightened;
Step 3. evenly is fixed on the spacing of screw by 0.35-1.5m in the body of wall basic unit between above-mentioned two-screw nail, and is adjusted to the top of screw concordant with the line height that stretches tight along the line that stretches tight (2);
Step 4. is at the another side repetitive operation step 1-3 in body of wall basic unit plaster leveling zone;
Step 5. line that stretches tight in the horizontal direction between the corresponding screw in body of wall basic unit plaster leveling both sides, zone evenly is fixed on the spacing of screw by 0.35-1.5m in the body of wall basic unit along this line that stretches tight, and is adjusted to the top of screw concordant with the line height that stretches tight;
Step 6. at the adjacent level screw diagonal angle of the line line that stretches tight that stretches tight, and at the centre position of the line that stretches tight setscrew, is adjusted to the top of screw concordant with the line height that stretches tight in body of wall basic unit plaster leveling zone.
Step 7. line that will stretch tight takes down, and is the absolute altitude of degree of plainness for wall surface and verticality with the screw, smears bottom ash, darby levelling.
2. building plastering leveling method according to claim 1, it is characterized in that: in the above-mentioned steps 1, the method that hammers into of screw is that elder generation bores a hole, hammers into the bloated bolt of plastics in body of wall basic unit, and the screw of screwing on again is with the verticality of two-screw nail about the ceiling hammer inspection.
3. an application rights requires 1 or 2 to build the construction wall that plastering leveling methods are made, it is characterized in that: this body of wall from the inside to the outside order by body of wall basic unit, plaster leveling layer with the exterior trim surface layer is bonding forms, be evenly distributed with the screw that spacing is 0.5-1.5m in the plaster leveling layer, above-mentioned screw is vertical with body of wall basic unit, and puts in the body of wall basic unit fixing.
CNB2007102014314A 2007-08-22 2007-08-22 A kind of building plastering leveling method and construction wall thereof Expired - Fee Related CN100570099C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007102014314A CN100570099C (en) 2007-08-22 2007-08-22 A kind of building plastering leveling method and construction wall thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007102014314A CN100570099C (en) 2007-08-22 2007-08-22 A kind of building plastering leveling method and construction wall thereof

Publications (2)

Publication Number Publication Date
CN101100893A true CN101100893A (en) 2008-01-09
CN100570099C CN100570099C (en) 2009-12-16

Family

ID=39035329

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007102014314A Expired - Fee Related CN100570099C (en) 2007-08-22 2007-08-22 A kind of building plastering leveling method and construction wall thereof

Country Status (1)

Country Link
CN (1) CN100570099C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832017A (en) * 2009-03-11 2010-09-15 吴喜生 Sucking disc type 'ash cake' for wall plastering
CN102277977A (en) * 2010-06-09 2011-12-14 万科企业股份有限公司 Method of rending plasters on wall with high precision
WO2014063481A1 (en) * 2012-10-26 2014-05-01 深圳广田装饰集团股份有限公司 Inner wall screeding method
CN104405115A (en) * 2014-10-10 2015-03-11 山西四建集团有限公司 Wall plastering flatness and perpendicularity control device and construction method
CN104712112A (en) * 2015-01-19 2015-06-17 东莞智优仪器科技有限公司 Finishing method for rapidly confirming of rendering plane
CN106988509A (en) * 2017-05-16 2017-07-28 中建八局第三建设有限公司 A kind of wall plastering thickness controls device surely
CN107013017A (en) * 2017-05-27 2017-08-04 上海聚通装饰集团有限公司 A kind of levelling positioning pile construction method of metope
CN107060236A (en) * 2017-06-12 2017-08-18 贵州中建建筑科研设计院有限公司 A kind of construction method and structure of preventing Thermal insulation mortar for building external walls and method of use thereof system to come off

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832017A (en) * 2009-03-11 2010-09-15 吴喜生 Sucking disc type 'ash cake' for wall plastering
CN102277977A (en) * 2010-06-09 2011-12-14 万科企业股份有限公司 Method of rending plasters on wall with high precision
CN102277977B (en) * 2010-06-09 2015-04-22 万科企业股份有限公司 Method of rending plasters on wall with high precision
WO2014063481A1 (en) * 2012-10-26 2014-05-01 深圳广田装饰集团股份有限公司 Inner wall screeding method
CN104405115A (en) * 2014-10-10 2015-03-11 山西四建集团有限公司 Wall plastering flatness and perpendicularity control device and construction method
CN104712112A (en) * 2015-01-19 2015-06-17 东莞智优仪器科技有限公司 Finishing method for rapidly confirming of rendering plane
CN106988509A (en) * 2017-05-16 2017-07-28 中建八局第三建设有限公司 A kind of wall plastering thickness controls device surely
CN107013017A (en) * 2017-05-27 2017-08-04 上海聚通装饰集团有限公司 A kind of levelling positioning pile construction method of metope
CN107060236A (en) * 2017-06-12 2017-08-18 贵州中建建筑科研设计院有限公司 A kind of construction method and structure of preventing Thermal insulation mortar for building external walls and method of use thereof system to come off

Also Published As

Publication number Publication date
CN100570099C (en) 2009-12-16

Similar Documents

Publication Publication Date Title
CN100570099C (en) A kind of building plastering leveling method and construction wall thereof
CN103374986B (en) A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof
CN104032925A (en) Construction method for CSI residential wall and ground empty space
CN102839804B (en) Method for paving and sticking stone materials or ceramic tiles
CN101476361B (en) Inner partition plate system and its construction method
CN106121231A (en) A kind of skyscraper interts cross construction method
CN202090569U (en) Plastering screed strip template
CN206554358U (en) Top surface sheet material hoisting structure
CN104153495A (en) Multifunctional lightweight concrete curtain wall connecting structure
CN203856178U (en) Self-leveling and separation structure for ground bricks
CN201695651U (en) Punctuation nail
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN203961115U (en) A kind of decoration integrated Multi-function light concrete composite plates of self-heat conserving and curtain wall
CN104018650B (en) Wall plastering plane rushes muscle bar and using method thereof
CN1012515B (en) Plastering method for building engineering
CN110259144A (en) A kind of novel energy-saving environment-friendly ash concrete lightweight wall plate construction method
CN206158117U (en) Wall ground floating screed instrument of making level
CN206571022U (en) A kind of grafting leveling structure and suspended ceiling device
CN103953183A (en) Wall ceramic tile fixing tool
CN206737374U (en) A kind of ground tile paving instrument
CN203783095U (en) Wall body tile sticking tool
RU131825U1 (en) LIGHTHOUSE MOUNTING DEVICE
CN207017511U (en) A kind of ceramic plate curtain wall with splash guard installation connects system
CN218861995U (en) Hang wall fossil fragments with wall leveling structure
CN204531449U (en) Multidimensional marked rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION FOURTH ENGEERING BUREAU CO., L

Free format text: FORMER OWNER: GUIZHOU CHINA CONSTRUCTION BUILDING RESEARCH DESIGN INSTITUTE CO., LTD.

Effective date: 20081017

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20081017

Address after: Zip Road, Tianhe District, Guangzhou, Guangdong, No. 16, Guangzhou information port, block 5, B, zip code: 510665

Applicant after: China Construction Fourth Engineering Bureau Co., Ltd.

Co-applicant after: Guizhou China Construction Building Research Design Institute Co., Ltd.

Address before: Gan Yin Tong Ganping Road No. 4 Nanming District of Guizhou Province Post encoding in Guiyang city in Guizhou Province: 550006

Applicant before: Guizhou China Construction Building Research Design Institute Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091216

Termination date: 20120822