CN104153495A - Multifunctional lightweight concrete curtain wall connecting structure - Google Patents

Multifunctional lightweight concrete curtain wall connecting structure Download PDF

Info

Publication number
CN104153495A
CN104153495A CN201410336641.4A CN201410336641A CN104153495A CN 104153495 A CN104153495 A CN 104153495A CN 201410336641 A CN201410336641 A CN 201410336641A CN 104153495 A CN104153495 A CN 104153495A
Authority
CN
China
Prior art keywords
shaped plate
plate part
plate face
shaped
transverse plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410336641.4A
Other languages
Chinese (zh)
Other versions
CN104153495B (en
Inventor
梁炳恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong, Heyuan, Tian Tian building industrialization Limited by Share Ltd
Original Assignee
GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING Co Ltd
GUANGDONG LANTY METAL ENGINEERING CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING Co Ltd, GUANGDONG LANTY METAL ENGINEERING CONSTRUCTION Co Ltd filed Critical GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING Co Ltd
Priority to CN201410336641.4A priority Critical patent/CN104153495B/en
Publication of CN104153495A publication Critical patent/CN104153495A/en
Application granted granted Critical
Publication of CN104153495B publication Critical patent/CN104153495B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a multifunctional lightweight concrete curtain wall connecting structure. The multifunctional lightweight concrete curtain wall connecting structure comprises a fixing part and a pair of L-shaped plates, a transverse plate side of the lower L-shaped plate supports a transverse plate side of the upper L-shaped plate, a vertical plate side of the upper L-shaped plate is used for being connected with a lightweight concrete plate, the transverse plate side of the lower L-shaped plate is used for being connected with a building body structure, the transverse plate side of the upper L-shaped plate is provided with elongated holes transversely or longitudinally extending, the transverse plate side of the lower L-shaped plate is provided with two elongated holes transversely or longitudinally extending, the elongated holes are crossed, and the fixing part penetrates the elongated holes and moves to adjust and fastened along the elongated holes so as to connect and fix the upper L-shaped plate and the lower L-shaped plate. Load bearing strength of the connecting structure is improved, the relative positions of the upper L-shaped plate and the lower L-shaped plate are adjusted through the elongated holes of the upper and lower L-shaped plates, that is, the relative positions of the lightweight concrete plate and the building body structure are adjusted, mounting accuracy is improved, and mounting is convenient.

Description

A kind of syndeton of Multi-function light concrete curtain wall
Technical field
The present invention relates to the concrete curtain wall in construction work applied technical field, particularly a kind of syndeton of Multi-function light concrete curtain wall.
Background technology
Curtain wall (Curtain Wall), have another name called building curtain wall, curtain wall, it is the modern large-scale Light Wall with decorative effect of commonly using with highrise building, generally formed by materials such as metal, glass, stone material and artificial boards, be arranged on the outermost layer of building, effect is as body of wall, attractive in appearance, windproof, rainproof, energy-conservation etc., curtain wall does not bear any structural load, is only connected with structural slab or post and bears deadweight and opposing blast.
Concrete curtain wall is wherein a type of curtain wall, and it is normally with concrete masonry units moulding body of wall, then on moulding body of wall, dalle is installed with wet combining or dry hanging.The process that adopts wet combining mode to make concrete curtain wall is: first use concrete masonry units moulding body of wall, then on moulding body of wall, apply cement, then take advantage of cement sticking decorative board material when not dry; Adopt dry hanging to make the process of concrete curtain wall to be: first use concrete masonry units moulding body of wall, then keel are fixed on moulding body of wall, dalle is arranged on keel to realize being connected of dalle and moulding body of wall by suspension member.
All there is following defect in above-mentioned two kinds of modes: (1) must build by laying bricks or stones and plaster at the construction field (site), inefficiency, long construction period; (2) along with the lifting of building operations labor cost, employing scene is built the mode of plastering by laying bricks or stones and is directly caused construction cost to increase considerably; (3) field fabrication curtain wall, body of wall can not be carried, and the noise that construction produces and the heap of the material surrounding environment of being rivals in a contest causes and has a strong impact on.Therefore, conventional concrete curtain wall has been not suitable with the demand of current industrialization of construction industry development.
When building operations labor cost promotes, the foundation of China's steel structure system, prefabricated costruction system is also gradually improved, require most building unit to realize batch production prefabricated, and along with the quick raising of China's architectural design level, industrialization of construction industry design software has been realized the marketization, relevant industrialization of construction industry technology is ripe, and particularly the existing building machinery level of China market, construction level, workman's operant level meets the demand that active cell formula Curtain Wall is installed completely.So, under such background, still adopt conventional method to make curtain wall and be undoubtedly the wasting of resources, real non-wise move.
Application for a patent for invention (application number: 201310268811.5) disclose a kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof, it is mainly combined along major structure of construction external surface by lightweight concrete slab unit, lightweight concrete slab unit is laterally spliced to form side by side by least 2 lightweight concrete slabs, the external surface of lightweight concrete slab is provided with decorative cover, lightweight concrete slab unit upper, in the shaped steel that it is groove type that lower end is fixed respectively at cross section, the shaped steel that is positioned at upper end, lightweight concrete slab unit is provided with the suspension member for being connected with major structure of construction.The rectangular bending of suspension member, lower end is connected with the inner side edge of channel-section steel, and upper end is connected with girder steel (H shaped steel) top flange in major structure of construction.
Although, technique scheme has overcome the defect that conventional concrete curtain wall exists, but the suspension member that adopts right angle bending is fixed on concrete curtain wall on major structure of construction, also to have following shortcoming: (1) suspension member need to bear the deadweight of lightweight concrete slab, but the suspension member load-bearing of right angle bending is limited, and applicable limitation is larger; (2) while lightweight concrete slab being arranged on major structure of construction by suspension member, owing to there is no location structure, be difficult to accurate positioning, the plate face of lightweight concrete slab can be twisted with respect to the body of wall of major structure of construction, cause the distance between concrete slab and major structure of construction different, thereby have a strong impact on aesthetic property and the practical effect of concrete curtain wall outward appearance.
Summary of the invention
The object of the present invention is to provide a kind of syndeton that can improve load bearing stength, Multi-function light concrete curtain wall that installation accuracy is high and easy, guaranteed aesthetic property and the practical effect of concrete curtain wall outward appearance.
Above-mentioned purpose of the present invention realizes by the following technical solutions: a kind of syndeton of Multi-function light concrete curtain wall, it is characterized in that: it comprises fixture and pair of L-shaped plate, one of them L shaped plate part is upper L shaped plate part, another L shaped plate part is lower L shaped plate part, the transverse plate face of L shaped plate part in the transverse plate face support of lower L shaped plate part, the vertical plate face of upper L shaped plate part is for being connected with lightweight concrete slab, the transverse plate face of lower L shaped plate part is for being connected with major structure of construction, on the transverse plate face of described upper L shaped plate part, have along the bar hole of horizontal or longitudinal extension, on the transverse plate face of described lower L shaped plate part, have longitudinally or the bar hole of horizontal expansion, these two bar holes are decussation shape, described fixture passes two bar holes and moves to regulate along bar hole and tightens up so that upper L shaped plate part and lower L shaped plate part are connected and fixed again.
The present invention adopts upper and lower L shaped plate part as syndeton, lightweight concrete slab to be fixed on major structure of construction, has improved the load bearing stength of syndeton, can bear more heavy weight lightweight concrete slab, has eliminated applicable limitation; In addition, can implement to regulate to the relative position of upper and lower L shaped plate part by the bar hole of upper and lower L shaped plate part, the relative position of lightweight concrete slab and major structure of construction be implemented to regulate, improve installation accuracy, and, install very easyly, improve installation effectiveness.
In order further to improve the bearing strength of syndeton, as a modification of the present invention, the dual-side of described lower L shaped plate part transverse plate face and the connecting portion of vertical plate face dual-side set up the reinforcing rib of pair of plate-shaped separately.
As a further improvement on the present invention, one end of L shaped plate part transverse plate face is provided with vertical flanging on described, described vertical flanging is relative with the vertical plate face of described upper L shaped plate part, on the vertical plate face of described vertical flanging and described lower L shaped plate part, have the bar v notch v extending along vertical, this v notch v is passed fixing by dismountable keeper, so that before tightening up fixture, in advance upper and lower L shaped plate part is implemented to location transversely to prevent the horizontal changing of the relative positions.After fixture tightens up, keeper can be removed, can recycle, reduce cost.
The present invention can also do following improvement, on the transverse plate face of L shaped plate part, have a pair of locating hole on described, described locating hole is between the bar hole and its vertical plate face of upper L shaped plate part transverse plate face, described locating hole is passed by dismountable locating part, the lower end of described locating part is pushed against on the transverse plate face of lower L shaped plate part, so that before tightening up fixture, in advance upper and lower L shaped plate part is implemented to location in rotation direction to prevent twisting.After fixture tightens up, locating part can be removed, can recycle, reduce cost.
As one embodiment of the present invention, the transverse plate face of described lower L shaped plate part is fixedly connected with the girder steel top flange of major structure of construction by connector, and the soffit periphery of lower L shaped plate part transverse plate face and the welding of the girder steel top flange of major structure of construction.
Compared with prior art, the present invention has following significant effect:
(1) the present invention adopts upper and lower L shaped plate part as syndeton, lightweight concrete slab to be fixed on major structure of construction, has improved the load bearing stength of syndeton, can bear more heavy weight lightweight concrete slab, has eliminated applicable limitation.
(2) the present invention can implement to regulate to the relative position of upper and lower L shaped plate part by the bar hole of upper and lower L shaped plate part, the relative position of lightweight concrete slab and major structure of construction is implemented to regulate, and has improved installation accuracy.
(3) the present invention installs very easyly, has improved installation effectiveness.
(4) before tightening up fixture, in advance upper and lower L shaped plate part is implemented to the location laterally and in rotation direction, avoid, between upper and lower L shaped plate part, the horizontal changing of the relative positions and twisting occur, make the distance between lightweight concrete slab and major structure of construction consistent, guaranteed aesthetic property and the practical effect of concrete curtain wall outward appearance.
(5) after fixture tightens up, keeper and locating part can be removed, can recycle, reduce cost.
Brief description of the drawings
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Fig. 1 is the vertical cross-sectional that the present invention connects lightweight concrete slab and major structure of construction;
Fig. 2 is the local enlarged diagram of A in Fig. 1;
Fig. 3 is the perspective view that the present invention connects lightweight concrete slab and major structure of construction;
Fig. 4 is the local enlarged diagram of B in Fig. 3;
Fig. 5 is the perspective view of lower L shaped plate part;
Fig. 6 is the perspective view of upper L shaped plate part.
Detailed description of the invention
As shown in Fig. 1~6, it is the syndeton of a kind of Multi-function light concrete curtain wall of the present invention, it comprises the L shaped plate part of fixture and a pair of steel, fixture adopts bolt 5, one of them L shaped plate part is upper L shaped plate part 1, another L shaped plate part is lower L shaped plate part 2, the transverse plate face 11 of L shaped plate part 1 in transverse plate face 21 supports of lower L shaped plate part 2, the vertical plate face 12 of upper L shaped plate part 1 is connected with lightweight concrete slab 3 by bolt 17, the transverse plate face 21 of lower L shaped plate part 2 is for being connected with major structure of construction, on the transverse plate face 11 of upper L shaped plate part 1, have along the bar hole 13 that laterally (directions X shown in Fig. 1) extends, on the transverse plate face 21 of lower L shaped plate part 2, have longitudinally the bar hole 23 that (Y-direction shown in Fig. 3) extends, these two bar holes 13, 23 are decussation shape, fixture is through two bar holes 13, 23 and along bar hole 13, 23 move to regulate and tighten up so that upper L shaped plate part 1 and lower L shaped plate part 2 are connected and fixed again.
The connecting portion of the dual-side of lower L shaped plate part 2 transverse plate faces 21 and vertical plate face 22 dual-sides sets up the reinforcing rib 4 of pair of plate-shaped separately, can further improve the bearing strength of syndeton.Be provided with vertical flanging 14 in one end of upper L shaped plate part 1 transverse plate face 11, vertical flanging 14 is relative with the vertical plate face 12 of upper L shaped plate part 1, on the vertical plate face 22 of vertical flanging 14 and lower L shaped plate part 2, have the bar v notch v 15,24 extending along vertical (direction of Z shown in Fig. 1), this v notch v 15,24 is passed fixing by dismountable keeper, keeper adopts bolt 6 and nut, so that before tightening up fixture, in advance upper and lower L shaped plate part 1,2 is implemented to location transversely to prevent the horizontal changing of the relative positions.
On the transverse plate face 11 of upper L shaped plate part 1, have the locating hole 16 of pair of parellel, locating hole 16 is between the bar hole 13 and its vertical plate face 12 of upper L shaped plate part 1 transverse plate face 11, locating hole 16 is passed by dismountable locating part, locating part adopts screw 7, the lower end of locating part is pushed against on the transverse plate face 21 of lower L shaped plate part 2, so that before tightening up fixture, in advance upper and lower L shaped plate part 1,2 is implemented to location in rotation directions (C shown in Fig. 3, D direction) to prevent twisting.After fixture tightens up, locating part and keeper can be removed, can recycle.
The concrete structure that lower L shaped plate part is connected with major structure of construction is: the transverse plate face 21 of lower L shaped plate part 2 is fixedly connected with girder steel 8 top flanges of major structure of construction by connector, and the soffit periphery of lower L shaped plate part 2 transverse plate faces 21 and the 8 top flange welding of the girder steel of major structure of construction.
Installation process of the present invention is as follows: lower L shaped plate part is connected on the girder steel top flange of major structure of construction, upper L shaped plate part is connected on lightweight concrete slab 3 by bolt 17, the transverse plate face of lower L shaped plate part is placed in the transverse plate face below of L shaped plate part, fixture (bolt 5) is through bar hole the nut of screwing on (in unscrewing state) on upper L shaped plate part and lower L shaped plate part, keeper (bolt 6) is through upper, the bar v notch v of lower L shaped plate part the nut of screwing on (in unscrewing state), locating part (screw 7) is through the transverse plate face (in not pushing against state) of upper L shaped plate part, do horizontal and vertical movement by bolt 5 along bar hole, the relative position of L shaped plate part and lower L shaped plate part in adjusting, after regulating, tight a bolt 6 and screw 7, prevent that L shaped plate part and lower L shaped plate part from the horizontal changing of the relative positions and twisting occurring, complete the installation location of lightweight concrete slab, tight a bolt again 5, lightweight concrete slab is connected on major structure of construction, dismountable bolt 6 and screw 7, can recycle.
In other embodiments, the bar hole on the transverse plate face of upper L shaped plate part also can extend transversely, and correspondingly, the bar hole on the transverse plate face of lower L shaped plate part extends longitudinally, and these two bar holes are decussation shape.
Embodiments of the present invention are not limited to this; according to foregoing of the present invention; according to ordinary skill knowledge and the customary means of this area; do not departing under the above-mentioned fundamental technics thought of the present invention prerequisite; the present invention can also make amendment, replacement or the change of other various ways, within all dropping on rights protection scope of the present invention.

Claims (5)

1. the syndeton of a Multi-function light concrete curtain wall, it is characterized in that: it comprises fixture and pair of L-shaped plate, one of them L shaped plate part is upper L shaped plate part, another L shaped plate part is lower L shaped plate part, the transverse plate face of L shaped plate part in the transverse plate face support of lower L shaped plate part, the vertical plate face of upper L shaped plate part is for being connected with lightweight concrete slab, the transverse plate face of lower L shaped plate part is for being connected with major structure of construction, on the transverse plate face of described upper L shaped plate part, have along the bar hole of horizontal or longitudinal extension, on the transverse plate face of described lower L shaped plate part, have longitudinally or the bar hole of horizontal expansion, these two bar holes are decussation shape, described fixture passes two bar holes and moves to regulate along bar hole and tightens up so that upper L shaped plate part and lower L shaped plate part are connected and fixed again.
2. the syndeton of Multi-function light concrete curtain wall according to claim 1, is characterized in that: the dual-side of described lower L shaped plate part transverse plate face and the connecting portion of vertical plate face dual-side set up the reinforcing rib of pair of plate-shaped separately.
3. the syndeton of Multi-function light concrete curtain wall according to claim 2, it is characterized in that: one end of L shaped plate part transverse plate face is provided with vertical flanging on described, described vertical flanging is relative with the vertical plate face of described upper L shaped plate part, on the vertical plate face of described vertical flanging and described lower L shaped plate part, have the bar v notch v extending along vertical, this v notch v is passed fixing by dismountable keeper, so that before tightening up fixture, in advance upper and lower L shaped plate part is implemented to location transversely to prevent the horizontal changing of the relative positions.
4. the syndeton of Multi-function light concrete curtain wall according to claim 3, it is characterized in that: on the transverse plate face of L shaped plate part, have a pair of locating hole on described, described locating hole is between the bar hole and its vertical plate face of upper L shaped plate part transverse plate face, described locating hole is passed by dismountable locating part, the lower end of described locating part is pushed against on the transverse plate face of lower L shaped plate part, so that before tightening up fixture, in advance upper and lower L shaped plate part is implemented to location in rotation direction to prevent twisting.
5. according to the syndeton of the Multi-function light concrete curtain wall described in claim 1~4 any one, it is characterized in that: the transverse plate face of described lower L shaped plate part is fixedly connected with the girder steel top flange of major structure of construction by connector, and the soffit periphery of lower L shaped plate part transverse plate face and the welding of the girder steel top flange of major structure of construction.
CN201410336641.4A 2014-07-15 2014-07-15 A kind of attachment structure of Multi-function light concrete curtain wall Active CN104153495B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410336641.4A CN104153495B (en) 2014-07-15 2014-07-15 A kind of attachment structure of Multi-function light concrete curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410336641.4A CN104153495B (en) 2014-07-15 2014-07-15 A kind of attachment structure of Multi-function light concrete curtain wall

Publications (2)

Publication Number Publication Date
CN104153495A true CN104153495A (en) 2014-11-19
CN104153495B CN104153495B (en) 2016-10-26

Family

ID=51879109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410336641.4A Active CN104153495B (en) 2014-07-15 2014-07-15 A kind of attachment structure of Multi-function light concrete curtain wall

Country Status (1)

Country Link
CN (1) CN104153495B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756245A (en) * 2014-12-17 2016-07-13 北新建材集团有限公司 Method for mounting curtain wall skeleton and structural beam
CN105756246A (en) * 2014-12-17 2016-07-13 北新建材集团有限公司 Adjustable wall and beam connecting structure
CN105863109A (en) * 2016-05-26 2016-08-17 河南仕腾建筑有限公司 Novel wall body installation structure and novel wall body
CN107035035A (en) * 2017-05-25 2017-08-11 浙江中屹建设集团有限公司 Curtain wall is found outside a kind of lightweight
WO2018009129A1 (en) * 2016-07-07 2018-01-11 Scandinavian Licence Ab A curtain wall system, a composite module for a curtain wall system and a building comprising a curtain wall system
CN114961055A (en) * 2022-06-08 2022-08-30 中国建筑第八工程局有限公司 Curtain wall fixing structure and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2499463Y (en) * 2001-10-16 2002-07-10 北京市第一建筑工程公司 Wind-proof anti-shock hanging piece for stone curtain wall
JP3785403B2 (en) * 2003-04-11 2006-06-14 パナホーム株式会社 Curtain wall mounting structure
CN202299054U (en) * 2011-10-28 2012-07-04 沈阳远大铝业工程有限公司 Concrete slab curtain wall member
JP5294305B2 (en) * 2008-06-20 2013-09-18 株式会社Lixil curtain wall
CN103352525A (en) * 2013-07-09 2013-10-16 邱平 Curtain wall dry hanging multidirection adjusting device
CN103374986A (en) * 2013-06-28 2013-10-30 广东莲田金属工程建筑有限公司 Multifunctional combined lightweight concrete curtain wall and constructing method thereof
CN204001309U (en) * 2014-07-15 2014-12-10 广东莲田金属工程建筑有限公司 A kind of syndeton of Multi-function light concrete curtain wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2499463Y (en) * 2001-10-16 2002-07-10 北京市第一建筑工程公司 Wind-proof anti-shock hanging piece for stone curtain wall
JP3785403B2 (en) * 2003-04-11 2006-06-14 パナホーム株式会社 Curtain wall mounting structure
JP5294305B2 (en) * 2008-06-20 2013-09-18 株式会社Lixil curtain wall
CN202299054U (en) * 2011-10-28 2012-07-04 沈阳远大铝业工程有限公司 Concrete slab curtain wall member
CN103374986A (en) * 2013-06-28 2013-10-30 广东莲田金属工程建筑有限公司 Multifunctional combined lightweight concrete curtain wall and constructing method thereof
CN103352525A (en) * 2013-07-09 2013-10-16 邱平 Curtain wall dry hanging multidirection adjusting device
CN204001309U (en) * 2014-07-15 2014-12-10 广东莲田金属工程建筑有限公司 A kind of syndeton of Multi-function light concrete curtain wall

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756245A (en) * 2014-12-17 2016-07-13 北新建材集团有限公司 Method for mounting curtain wall skeleton and structural beam
CN105756246A (en) * 2014-12-17 2016-07-13 北新建材集团有限公司 Adjustable wall and beam connecting structure
CN105756245B (en) * 2014-12-17 2019-01-15 北新建材集团有限公司 The installation method of Curtain wall frame and structural beams
CN105756246B (en) * 2014-12-17 2019-05-17 北新建材集团有限公司 The connection structure of adjustable wall and beam
CN105863109A (en) * 2016-05-26 2016-08-17 河南仕腾建筑有限公司 Novel wall body installation structure and novel wall body
WO2018009129A1 (en) * 2016-07-07 2018-01-11 Scandinavian Licence Ab A curtain wall system, a composite module for a curtain wall system and a building comprising a curtain wall system
CN107035035A (en) * 2017-05-25 2017-08-11 浙江中屹建设集团有限公司 Curtain wall is found outside a kind of lightweight
CN114961055A (en) * 2022-06-08 2022-08-30 中国建筑第八工程局有限公司 Curtain wall fixing structure and construction method thereof

Also Published As

Publication number Publication date
CN104153495B (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN104153495A (en) Multifunctional lightweight concrete curtain wall connecting structure
CN103374986A (en) Multifunctional combined lightweight concrete curtain wall and constructing method thereof
CN103422606B (en) Structural column erecting-free block and construction method
CN104895193A (en) Precast outer wallboard connecting box and connecting joint
CN204001309U (en) A kind of syndeton of Multi-function light concrete curtain wall
CN104074305B (en) A kind of self-heat conserving decoration integrated Multi-function light concrete composite plates and curtain wall
CN104895279A (en) Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure
CN204299039U (en) A kind of for after water the concrete prefabricated board of assembling
CN104912231A (en) Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same
CN102561691A (en) Method for eliminating cracking of joint between fair-faced concrete shear wall and masonry
CN104975614A (en) Structural steel combined unilateral formwork reinforcement construction method
CN203961115U (en) A kind of decoration integrated Multi-function light concrete composite plates of self-heat conserving and curtain wall
CN204753834U (en) Partition plate of scissors stair and connection structure of floor roof beam
CN208039450U (en) A kind of prefabricated panel and bottom plate wallboard connecting structure
CN101592006B (en) Method for preventing window being damaged in construction
CN210888330U (en) Prefabricated building enclosure
CN205063248U (en) Prefabricated exterior wall board and precast beam hang connection structure futilely
CN103470038A (en) Concrete one-step forming process of building appearance moulding and main structure
CN203256930U (en) Connection structure for concrete wall body and masonry wall face
CN103276892A (en) Light steel keel system suitable for spraying and filling slurry
CN2846567Y (en) Steel net structure concrete composite building
CN216787893U (en) Prefabricated shear wall positioner
CN111809792B (en) Assembled precast concrete wallboard
CN107775781A (en) A kind of assembly concrete beam mould
CN1958984A (en) Concrete complex building of steel meshwork framework, and construction procedure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160621

Address after: 517100 Guangdong province Heyuan City Lianping Lung Street Town Logistics Industrial Park

Applicant after: GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING CO., LTD.

Address before: Cai Xin Lu Nansha District Lanhe town Guangzhou city Guangdong province 511480 386-1

Applicant before: Guangdong Lanty Metal Engineering Construction Co., Ltd.

Applicant before: GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 517100 Guangdong province Heyuan City Lianping Lung Street Town Logistics Industrial Park

Patentee after: Guangdong, Heyuan, Tian Tian building industrialization Limited by Share Ltd

Address before: 517100 Guangdong province Heyuan City Lianping Lung Street Town Logistics Industrial Park

Patentee before: GUANGDONG HEYUAN LIANTIAN BUILDING INDUSTRIALIZATION MANUFACTURING CO., LTD.