CN103195226B - Method for mounting decoration panel - Google Patents
Method for mounting decoration panel Download PDFInfo
- Publication number
- CN103195226B CN103195226B CN201310108806.8A CN201310108806A CN103195226B CN 103195226 B CN103195226 B CN 103195226B CN 201310108806 A CN201310108806 A CN 201310108806A CN 103195226 B CN103195226 B CN 103195226B
- Authority
- CN
- China
- Prior art keywords
- screw
- slip
- knot
- decoration panel
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005034 decoration Methods 0.000 title claims abstract description 57
- 238000000034 method Methods 0.000 title claims abstract description 34
- 238000009434 installation Methods 0.000 claims description 12
- 239000012634 fragment Substances 0.000 claims description 8
- 230000009286 beneficial effect Effects 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 15
- 229910000831 Steel Inorganic materials 0.000 abstract 1
- 239000010959 steel Substances 0.000 abstract 1
- 239000007943 implant Substances 0.000 description 7
- 239000000853 adhesive Substances 0.000 description 3
- 230000001070 adhesive effect Effects 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 3
- 238000011900 installation process Methods 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 238000005253 cladding Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229910052573 porcelain Inorganic materials 0.000 description 1
- -1 pottery plate Substances 0.000 description 1
- 238000009877 rendering Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Landscapes
- Finishing Walls (AREA)
- Fencing (AREA)
Abstract
The invention provides a method for mounting a decoration panel. An embedded slipknot screw, a bracket and a back bolt are required to be provided. The embedded slipknot screw comprises a slipknot cap, and at least one threaded rod is vertically arranged on the slipknot cap. The method comprises the steps of fixing the threaded rod of the embedded slipknot screw on a wall or a steel frame; opening a hole at the back of the decoration panel, embedding bolt head of the back bolt in the hole, meshing the back bolt with the decoration panel, and fixing one side of the bracket on the back bolt; and aligning the other side of the bracket with the slipknot cap, fastening a through hole with the slipknot cap through a connection screw and a nut, and accordingly, the decoration panel is mounted. The method can be used for fixing decoration panels and has a good fixing function; and the heights of the decoration panels can be adjusted by adjusting a nut of the connection screw, and the construction is convenient and flexible.
Description
Technical field
The present invention relates to construction and installation method, particularly a kind of mounting method of decoration panel.
Background technology
Stone material, pottery plate, metal sheet or porcelain plate (hereinafter referred to as decoration panel) are be pasted onto on body of wall by its decoration panel with cement in early days, but often can flow white tear mark because of decoration panel seam crossing, have a strong impact on decorative effect, and time have obscission.Therefore also using 5 mounting methods is afterwards pasted and fixed on exterior wall by decorative panel, but because technical requirements is higher, slightly construction wrong, just there is hidden danger of quality, and as there is hollowing in body of wall and the husky rendering layer of cement, so consequence is even more serious, in the wall body decoration engineering that a maxi-mum height is lower in this way.The construction method that current decoration panel also has is on the supporting system that consisted of at metal framework (column, crossbeam) by erecting of panel supporting arrangement or decoration panel is directly hung the plant anchor decorated construction method be affixed on masonry exterior enclosure wall or structure outer face; And current this construction method construction is inconvenient, also economic not environmental protection; Utilize the distance of the bar planting anchor in the extension of the plant anchor on structure outer face subsides this kind of method and metope unadjustable, flexibility is not high.In order to solve the problem, applicant has developed a kind of mounting method of decoration panel, decoration panel can be fixed installation by well, and the position of the screw rod top nut of embedded slip-knot screw can be regulated in installation process, be beneficial to the degree of depth that adjusting screw(rod) will implant body of wall, thus the distance between metope and decoration panel can be adjusted neatly; Its construction is extremely convenient.
Summary of the invention
The technical problem to be solved in the present invention, is the mounting method providing a kind of decoration panel, can be widely used in the fixed installation of decoration panel, and easy construction.
The present invention is achieved in that scheme one:
A mounting method for decoration panel, described method need provide an embedded slip-knot screw, corner brace and back of the body bolt; Described embedded slip-knot screw comprises a slip-knot and begins to crop up, and this slip-knot is vertically installed with at least one screw rod on begining to crop up; The method comprises the steps:
Step 1, the screw rod of embedded slip-knot screw is fixed on body of wall or steelframe;
Step 2, on the back side of described decoration panel, offer a hole, the bolt head of back of the body bolt is implanted this hole, and the one side of corner brace is set on the back of the body tightening latch of back of the body bolt, the nut sleeve of back of the body bolt is located on back of the body tightening latch, and rotating nut makes the back of the body bolt expander carrying on the back bolt carry out expanding thus makes back of the body bolt engage decoration panel, and the one side of corner brace is allowed to be fixed on back of the body bolt;
Step 3, begun to crop up by slip-knot described in the through-hole alignment on the another side of corner brace, through hole and slip-knot are begun to crop up and are undertaken sealed by a connecting screw and nut, thus complete the installation of decoration panel.
Scheme two:
A mounting method for decoration panel, described method need provide an embedded slip-knot screw and back of the body bolt; Described embedded slip-knot screw comprises a slip-knot and begins to crop up, and this slip-knot is vertically installed with at least one screw rod on begining to crop up; The back of the body tightening latch afterbody of described back of the body bolt is provided with a contiguous block, and this contiguous block offers through hole; The method comprises the steps:
Step 11, the screw rod of embedded slip-knot screw is fixed on body of wall or steelframe;
Step 21, on the back side of described decoration panel, offer a hole, the bolt head of back of the body bolt is implanted this hole, the nut sleeve of back of the body bolt is located on back of the body tightening latch, and rotating nut makes the back of the body bolt expander carrying on the back bolt carry out expanding thus makes back of the body bolt engage decoration panel;
Step 31, begun to crop up by slip-knot described in the through-hole alignment of contiguous block, through hole and slip-knot are begun to crop up and are undertaken sealed by a connecting screw and nut, thus complete the installation of decoration panel.
Tool of the present invention has the following advantages: the present invention can carry out installation decoration panel by the scheme of the scheme of embedded slip-knot screw, corner brace and back of the body bolt or embedded slip-knot screw and back of the body bolt; Decoration panel can be fixed installation by well, and can regulate the position of the screw rod top nut of embedded slip-knot screw in installation process, is beneficial to the degree of depth that adjusting screw(rod) will implant body of wall, thus controls the distance between decoration panel and body of wall; Regulate the nut of connecting screw can regulate the height of decoration panel; In addition, connecting screw can freely move left and right on the slip-knot of embedded slip-knot screw is begun to crop up, and in construction, it is more convenient and flexible that this decoration panel can move freely construction like this.Mounting method of the present invention is more secured in the form of construction work that traditional cladding and point is hung, and facilitates the monolithic maintain and replace of decoration panel.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of the present invention program one.
Fig. 2 is the top view of embedded slip-knot screw in the present invention program one.
Fig. 3 is the structured flowchart of the present invention program two.
Fig. 4 is the top view of embedded slip-knot screw in the present invention program two.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Refer to shown in Fig. 1 and Fig. 2,
Scheme one: the mounting method of a kind of decoration panel of the present invention, described method need provide an embedded slip-knot screw 1, corner brace 2 and back of the body bolt 3; Described embedded slip-knot screw 1 comprises a slip-knot and begins to crop up 11, and this slip-knot is begun to crop up on 11 and is vertically installed with at least one screw rod 12, is two screw rods 12 in the present invention, and the sidewall of screw rod 12 afterbody is provided with at least two corresponding dovetail slip hooks 121 or dovetail shell fragment; This slip-knot begin to crop up 11 cross section can for square or circular, be square in the present invention; The method comprises the steps:
Step 1, the first bellmouth (not shown) single or multiple in body of wall processing, by the screw rod 12 of embedded slip-knot screw 1 by bellmouth, be implanted to (not shown) on body of wall 4 or steelframe with anchoring adhesive;
Step 2, implant embedded slip-knot screw 1 after, the dovetail slip hook 121 of screw rod 12 afterbody or dovetail shell fragment can be stuck within the walls or on steelframe, and fix embedded slip-knot screw 1 with anchoring adhesive (not shown);
Step 3, on the back side 5 of described decoration panel, offer a hole (not shown), the bolt head 31 of back of the body bolt 3 is implanted this hole, and the one side of corner brace 2 is set on the back of the body tightening latch 32 of back of the body bolt 3, the nut 33 of back of the body bolt 3 is set on back of the body tightening latch 32, and rotating nut 33 makes the back of the body bolt expander 34 carrying on the back bolt 3 carry out expanding thus makes back of the body bolt 3 engage decoration panel 5, and the one side of corner brace 2 is allowed to be fixed on back of the body bolt 3;
Step 4, the through hole (not shown) on the another side of corner brace 2 is aimed at described slip-knot begin to crop up 11, through hole and slip-knot are begun to crop up and 11 are undertaken sealed by a connecting screw 6 and nut 33, thus complete the installation of decoration panel.
In this scenario, the screw rod 12 of described embedded slip-knot screw offers screw thread (not shown), and on this screw rod 12, spiral is provided with a nut 33.
Wherein, also include between step 1 and step 2:
The position of step 10, adjusting screw(rod) 12 top nut 33, is beneficial to control the degree of depth that screw rod 12 will implant body of wall.
Refer to shown in Fig. 3 and Fig. 4,
Scheme two: the mounting method of a kind of decoration panel of the present invention, described method need provide an embedded slip-knot screw 1 ' and back of the body bolt 2 '; Described embedded slip-knot screw 1 ' comprises a slip-knot and begins to crop up 11 ', this slip-knot is begun to crop up on 11 ' and is vertically installed with at least one screw rod 12 ', be two screw rods 12 ' in the present invention, the sidewall of screw rod 12 ' afterbody is provided with at least two corresponding dovetail slip hooks 13 ' or dovetail shell fragment; The back of the body tightening latch 21 ' afterbody of described back of the body bolt 2 ' is provided with a contiguous block 22 ', this contiguous block 22 ' offers through hole (not shown); This slip-knot begin to crop up 11 ' cross section can for square or circular, be square in the present invention; The method comprises the steps:
Step 11, elder generation process single or multiple bellmouths (not shown) at body of wall, are implanted on wall 3 ' or on steelframe by the screw rod 12 ' of embedded slip-knot screw 1 ' by bellmouth;
Step 21, implant embedded slip-knot screw 1 ' after, the dovetail slip hook 13 ' of screw rod 12 ' afterbody or dovetail shell fragment can be stuck within the walls or on steelframe, and fix embedded slip-knot screw 1 ' with anchoring adhesive (not shown);
Step 31, on the back side 4 ' of described decoration panel, offer a hole (not shown), the bolt head 23 ' carrying on the back bolt 2 ' is implanted this hole, the nut 24 ' carrying on the back bolt 2 ' is set on back of the body tightening latch 21 ', and rotating nut 24 ' makes the back of the body bolt expander 25 ' carrying on the back bolt 2 ' carry out expanding thus makes back of the body bolt 2 ' engage decoration panel 4 ';
Step 41, the through hole (not shown) of contiguous block 22 ' is aimed at described slip-knot begin to crop up 11 ', through hole and slip-knot are begun to crop up and 11 ' are undertaken sealed by a connecting screw 5 ' and nut 24 ', thus complete the installation of decoration panel.
In this scenario, the screw rod 12 ' of described embedded slip-knot screw 1 ' offers screw thread (not shown), and the upper spiral of this screw rod 12 ' is provided with a nut 24 '.
Wherein, also include between step 11 and step 21:
The position of step 12, adjusting screw(rod) 12 ' top nut 24 ', is beneficial to control the degree of depth that screw rod 12 ' will implant body of wall.
In a word, decoration panel can be fixed installation by the present invention well, and the position of the screw rod top nut of embedded slip-knot screw can be regulated in installation process, be beneficial to the degree of depth that adjusting screw(rod) will implant body of wall, thus control the distance between decoration panel and body of wall; Regulate the nut of connecting screw can regulate the height of decoration panel; In addition, connecting screw can freely move left and right on the slip-knot of embedded slip-knot screw is begun to crop up, and in construction, it is more convenient and flexible that this decoration panel can move freely construction like this.Mounting method of the present invention is more secured in the form of construction work that traditional cladding and point is hung, and facilitates the monolithic maintain and replace of decoration panel.。
The foregoing is only preferred embodiment of the present invention, all equalizations done according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.
Claims (4)
1. a mounting method for decoration panel, is characterized in that: described method need provide an embedded slip-knot screw, corner brace and back of the body bolt; Described embedded slip-knot screw comprises a slip-knot and begins to crop up, and this slip-knot is vertically installed with at least one screw rod on begining to crop up; The screw rod of described embedded slip-knot screw offers screw thread, and on this screw rod, spiral is provided with a nut; The method comprises the steps:
Step 1, the screw rod of embedded slip-knot screw is fixed on body of wall or steelframe;
The position of step 10, adjusting screw(rod) top nut, is beneficial to control screw rod and will be fixed on the degree of depth on body of wall or steelframe;
Step 2, on the back side of described decoration panel, offer a hole, the bolt head of back of the body bolt is implanted this hole, and the one side of corner brace is set on the back of the body tightening latch of back of the body bolt, the nut sleeve of back of the body bolt is located on back of the body tightening latch, and rotating nut makes the back of the body bolt expander carrying on the back bolt carry out expanding thus makes back of the body bolt engage decoration panel, and the one side of corner brace is allowed to be fixed on back of the body bolt;
Step 3, begun to crop up by slip-knot described in the through-hole alignment on the another side of corner brace, through hole and slip-knot are begun to crop up and are undertaken sealed by a connecting screw and nut, thus complete the installation of decoration panel.
2. the mounting method of a kind of decoration panel according to claim 1, is characterized in that: the sidewall of the screw rod tail of described embedded slip-knot screw is provided with at least two corresponding dovetail slip hooks or dovetail shell fragment; After then wall implanted by embedded slip-knot screw, dovetail slip hook or the dovetail shell fragment of screw rod tail can be stuck within the walls.
3. a mounting method for decoration panel, is characterized in that: described method need provide an embedded slip-knot screw and back of the body bolt; Described embedded slip-knot screw comprises a slip-knot and begins to crop up, and this slip-knot is vertically installed with at least one screw rod on begining to crop up, and the screw rod of described embedded slip-knot screw offers screw thread, and on this screw rod, spiral is provided with a nut; The back of the body tightening latch afterbody of described back of the body bolt is provided with a contiguous block, and this contiguous block offers through hole; The method comprises the steps:
Step 11, the screw rod of embedded slip-knot screw is fixed on body of wall or steelframe;
The position of step 12, adjusting screw(rod) top nut, is beneficial to control screw rod and will be fixed on the degree of depth on body of wall or steelframe;
Step 21, on the back side of described decoration panel, offer a hole, the bolt head of back of the body bolt is implanted this hole, the nut sleeve of back of the body bolt is located on back of the body tightening latch, and rotating nut makes the back of the body bolt expander carrying on the back bolt carry out expanding thus makes back of the body bolt engage decoration panel;
Step 31, begun to crop up by slip-knot described in the through-hole alignment of contiguous block, through hole and slip-knot are begun to crop up and are undertaken sealed by a connecting screw and nut, thus complete the installation of decoration panel.
4. the mounting method of a kind of decoration panel according to claim 3, is characterized in that: the sidewall of the screw rod tail of described embedded slip-knot screw is provided with at least two corresponding dovetail slip hooks or dovetail shell fragment; After then wall implanted by embedded slip-knot screw, dovetail slip hook or the dovetail shell fragment of screw rod tail can be stuck within the walls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310108806.8A CN103195226B (en) | 2013-03-29 | 2013-03-29 | Method for mounting decoration panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310108806.8A CN103195226B (en) | 2013-03-29 | 2013-03-29 | Method for mounting decoration panel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195226A CN103195226A (en) | 2013-07-10 |
CN103195226B true CN103195226B (en) | 2015-06-24 |
Family
ID=48718029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310108806.8A Active CN103195226B (en) | 2013-03-29 | 2013-03-29 | Method for mounting decoration panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195226B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912282A (en) * | 2015-05-28 | 2015-09-16 | 刘超 | Adjustable connector for integrated thermal insulation wallboard and installation method |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104405103A (en) * | 2014-12-03 | 2015-03-11 | 深圳市特艺达装饰设计工程有限公司 | Installation method and structure of indoor wood veneer of decoration engineering |
CN104831929B (en) * | 2015-06-08 | 2017-10-27 | 李剑峰 | Decorated construction method of the interior wall plaque without scaffold |
CN106760373A (en) * | 2017-01-14 | 2017-05-31 | 山东飞越钢结构工程有限公司 | A kind of assembled material inner wall decoration plate dried hanging hang structure and method |
CN106760079A (en) * | 2017-02-23 | 2017-05-31 | 福建鹏坤实业有限公司 | A kind of back of the body bolt and the apparatus for fixing decorating board using the back of the body bolt |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2364370A1 (en) * | 1973-12-22 | 1975-06-26 | Lutz Fa Karl | Adjustable spaced cladding panel suspension - with holder arm, tie bar, spacer and guide-rail forming three-way adjustable rectangle |
CN201531075U (en) * | 2009-11-13 | 2010-07-21 | 苏州金螳螂幕墙有限公司 | Fixed device used for Back-tied type stone curtain wall |
CN201649528U (en) * | 2010-02-12 | 2010-11-24 | 浙江中南建设集团有限公司 | Mounting structure of indoor stone veneer |
CN102995795A (en) * | 2012-11-21 | 2013-03-27 | 沈阳远大铝业工程有限公司 | Conical-rod spherical-hinge back bolt of stone curtain wall |
CN202835888U (en) * | 2012-08-30 | 2013-03-27 | 北京天普太阳能工业有限公司 | Wall mounted fixed installation support |
-
2013
- 2013-03-29 CN CN201310108806.8A patent/CN103195226B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2364370A1 (en) * | 1973-12-22 | 1975-06-26 | Lutz Fa Karl | Adjustable spaced cladding panel suspension - with holder arm, tie bar, spacer and guide-rail forming three-way adjustable rectangle |
CN201531075U (en) * | 2009-11-13 | 2010-07-21 | 苏州金螳螂幕墙有限公司 | Fixed device used for Back-tied type stone curtain wall |
CN201649528U (en) * | 2010-02-12 | 2010-11-24 | 浙江中南建设集团有限公司 | Mounting structure of indoor stone veneer |
CN202835888U (en) * | 2012-08-30 | 2013-03-27 | 北京天普太阳能工业有限公司 | Wall mounted fixed installation support |
CN102995795A (en) * | 2012-11-21 | 2013-03-27 | 沈阳远大铝业工程有限公司 | Conical-rod spherical-hinge back bolt of stone curtain wall |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912282A (en) * | 2015-05-28 | 2015-09-16 | 刘超 | Adjustable connector for integrated thermal insulation wallboard and installation method |
Also Published As
Publication number | Publication date |
---|---|
CN103195226A (en) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195226B (en) | Method for mounting decoration panel | |
CN206646700U (en) | Small space cell curtain wall mounting device | |
CN203977782U (en) | A kind of wooden facing mounting structure | |
CN204676815U (en) | A kind of decoration panel point hangs system | |
CN104153495A (en) | Multifunctional lightweight concrete curtain wall connecting structure | |
CN107639723A (en) | A kind of the production template and production method of concrete prefabricated wallboard with holes | |
CN103362313B (en) | The assemble method of modularized combination type heat insulating curtain wall panel | |
CN204001309U (en) | A kind of syndeton of Multi-function light concrete curtain wall | |
CN201190388Y (en) | Heat insulation decoration board for building external wall fixed by internal thread and post-added anchor bolt | |
CN102787709A (en) | Construction method of decorating plate dry hanging system and decorating plate dry hanging system manufactured by same | |
CN104878902A (en) | Veneer point hanging system and construction method thereof | |
CN104405115A (en) | Wall plastering flatness and perpendicularity control device and construction method | |
CN204703436U (en) | A kind of novel knot stationary crab-bolt | |
CN203514521U (en) | Wall crown tie | |
CN206987270U (en) | A kind of close joint hanging-type aluminium single plate structure | |
CN103967252B (en) | A kind of decorative panel for building timber securing member and mounting method thereof | |
CN205777340U (en) | A kind of removable bracket | |
CN204040376U (en) | Anchoring bolt reinforced by a kind of stone material | |
CN203066492U (en) | Mounting device for embedded part of feeding equipment | |
CN205531058U (en) | Lightning protection support mounting structure | |
CN206873639U (en) | Bay window wall adjusts absolute altitude structure | |
CN203783092U (en) | Dowel bar regulating frame | |
CN206289817U (en) | The mounting structure of curtain wall in a kind of adjustable stone material room | |
CN206512895U (en) | A kind of ceramic thin plate glass composite board is seamless to mount system | |
CN205688736U (en) | A kind of many curved surfaces concavo-convex moulding GRG mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180412 Address after: 511450 No. 414, C16 building, Huachang Animation Industrial Park, Jinshan Village, Shiji Town, Panyu District, Guangzhou, Guangdong Patentee after: Guangdong Yu Hao Decoration Engineering Co., Ltd. Address before: 350000 Fuzhou, Fujian, Jinan District, 81, Wen Bo Road, deep edge 1 block 208 units. Patentee before: Wu Shicheng |
|
TR01 | Transfer of patent right |