CN105256928B CN201510787227.XA CN201510787227A CN105256928B CN 105256928 B CN105256928 B CN 105256928B CN 201510787227 A CN201510787227 A CN 201510787227A CN 105256928 B CN105256928 B CN 105256928B
Authority
CN
China
Prior art keywords
work
upper edge
word
word steelframe
steelframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510787227.XA
Other languages
Chinese (zh)
Other versions
CN105256928A (en
Inventor
刘卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN KEJIAN CONSTRUCTION ENGINEERING Co.,Ltd.
Original Assignee
Wenling Yi Ji Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenling Yi Ji Machinery Technology Co Ltd filed Critical Wenling Yi Ji Machinery Technology Co Ltd
Priority to CN201510787227.XA priority Critical patent/CN105256928B/en
Publication of CN105256928A publication Critical patent/CN105256928A/en
Application granted granted Critical
Publication of CN105256928B publication Critical patent/CN105256928B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Wall-surface stone dry-hanging method, discharge that channel steel is endways, between side and metope plus cushion pad is fixed on setscrew on metope, single " work " word steelframe at corner is discharged sidewards and is weldingly fixed on channel steel another side, during installation, stone plate is put position and spreads dry-hang glue, stone plate is packed on two " work " word steelframe heads gap between its upper edge and lower edge vis-a-vis, at corner, " work " word steelframe is erected support and lower edge cuts out certain angle and makes upper edge pairing, when corner docking " work " word steelframe to the end and stone plate are installed, upper edge on " work " word steelframe head is removed one section to refill, for removing this section of upper edge, stone plate is directly bonded in " work " word steelframe to erect in support and lower edge, then the upper edge for being stained with and being lacked on " work " word steelframe head is mended again.

Description

Wall-surface stone dry-hanging method
Technical field
The invention belongs to building field outdoor wall surface stone material dry suspendings.
Background technology
There are many present outdoor wall surface stone material dry suspending methods, but similar, and usually setscrew fixes " work " word steel Frame welds angle bar on " work " word steelframe, corner brace is screwed on angle bar, double hook is screwed in corner brace, with double hook With dry-hang glue fixing stone plate again, technique is cumbersome, complicated, and materials are more, and construction is time-consuming and laborious, and stone material and metope distance are big.
Invention content
The technical scheme is that:Discharge that channel steel is endways, between side and metope plus cushion pad is fixed with setscrew On metope, one group of " work " word steelframe, single discharge sidewards up and down is weldingly fixed on channel steel another side at corner, Spacing is 0.5-3 millimeters bigger than stone material plate thickness between " work " word steelframe upper edge and lower edge, the relatively perpendicular support of two " work " word steelframes Spacing is 0.5-3 millimeters bigger than stone plate height, and during installation, stone plate puts position and spreads dry-hang glue, stone plate from two Gap between its upper edge and lower edge vis-a-vis is packed on " work " word steelframe head, with hand push to the end, is adjusted to just, having pacified one group After " work " word steelframe, then the discharge installation of another group of " work " word steelframe connector, at corner, " work " word steelframe erect support with Lower edge, which cuts out certain angle, makes upper edge pairing, when installing connector corner to the end, upper edge on " work " word steelframe head is removed and compares stone One section of big 0.5-5 millimeters of material plate length, then stone plate removed from two " work " word steelframe heads this section of upper edge and be packed into Gap between its upper edge and lower edge vis-a-vis, for removing this section of upper edge, is directly bonded in stone plate " work " word steel Frame is erected in support and lower edge, then mends the upper edge for being stained with and being lacked on " work " word steelframe head again.
It is simple in structure that this outdoor wall surface stone material does dress method, simple for process, saves trouble, material-saving, and stone material and metope distance are near, Save space.
Description of the drawings
Fig. 1 is outdoor wall surface dry-hang stone(Including connector corner)Topology view and partial enlarged view.
Fig. 2 is that outdoor wall surface dry-hang stone A-A is erected and cut view.
Specific embodiment
In figure, 1, stone plate, 2, " work " word steelframe, 3, dry-hang glue, 4, channel steel, 5, setscrew, 6, cushion pad, 7, wall Face, 8, connector corner, 4 endways discharge of channel steel, between side and metope 7 plus cushion pad 6 is fixed on setscrew 5 on metope 7, One group of " work " word steelframe 2, single discharge sidewards up and down is weldingly fixed on 4 another side of channel steel at corner, " work " word steelframe Spacing is 2 millimeters bigger than 1 thickness of stone plate between 2 upper edges and lower edge, and the relatively perpendicular branch tie distance of two " work " word steelframes 2 compares stone plate 1 height is 2 millimeters big, and during installation, stone plate 1 puts position and spreads dry-hang glue 3, and stone plate 1 is packed into two " work " word steelframes 2 Gap between its upper upper edge and lower edge vis-a-vis, with hand push to the end, after adjusting to just, having pacified one group of " work " word steelframe 2, then The perpendicular support of " work " word steelframe 2 and lower edge at corner, are cut out certain angle by another group of 2 connector of " work " word steelframe discharge installation Degree makes upper edge pairing, when installing connector corner 8 to the end, 2 upper upper edges of " work " word steelframe is removed bigger by 2 than 1 length of stone plate One section of millimeter, then stone plate 1 from two " work " word steelframes 2 removed this section of upper edge and be packed into its upper edge vis-a-vis The gap between lower edge, for removing this section of upper edge, stone plate 1 be directly bonded in the perpendicular support of " work " word steelframe 2 and under Along upper, then mend again and be stained with the upper upper edges lacked of " work " word steelframe 2.

Claims (1)

1. wall-surface stone dry-hanging method, it is characterized in that:Discharge that channel steel is endways, between side and metope plus cushion pad is consolidated with setscrew It is scheduled on metope, one group of " work " word steelframe, single discharge sidewards up and down is weldingly fixed on channel steel another side at corner, Spacing is 0.5-3 millimeters bigger than stone material plate thickness between " work " word steelframe upper edge and lower edge, the relatively perpendicular support of two " work " word steelframes Spacing is 0.5-3 millimeters bigger than stone plate height, and during installation, stone plate puts position and spreads dry-hang glue, stone plate from two Gap between its upper edge and lower edge vis-a-vis is packed on " work " word steelframe head, with hand push to the end, is adjusted to just, having pacified one group After " work " word steelframe, then the discharge installation of another group of " work " word steelframe connector, at corner, " work " word steelframe erect support with Lower edge, which cuts out certain angle, makes upper edge pairing, when installing connector corner to the end, upper edge on " work " word steelframe head is removed and compares stone One section of big 0.5-5 millimeters of material plate length, then stone plate removed from two " work " word steelframe heads this section of upper edge and be packed into Gap between its upper edge and lower edge vis-a-vis, for removing this section of upper edge, is directly bonded in stone plate " work " word steel Frame is erected in support and lower edge, then mends the upper edge for being stained with and being lacked on " work " word steelframe head again.
CN201510787227.XA 2015-11-17 2015-11-17 Wall-surface stone dry-hanging method Active CN105256928B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510787227.XA CN105256928B (en) 2015-11-17 2015-11-17 Wall-surface stone dry-hanging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510787227.XA CN105256928B (en) 2015-11-17 2015-11-17 Wall-surface stone dry-hanging method

Publications (2)

Publication Number Publication Date
CN105256928A CN105256928A (en) 2016-01-20
CN105256928B true CN105256928B (en) 2018-06-12

Family

ID=55096830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510787227.XA Active CN105256928B (en) 2015-11-17 2015-11-17 Wall-surface stone dry-hanging method

Country Status (1)

Country Link
CN (1) CN105256928B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101769061A (en) * 2009-12-31 2010-07-07 郭祥山 Structure member for dry hanging of veneer on wall surface steel joist and application method thereof
CN102877622A (en) * 2012-10-17 2013-01-16 王民熙 Mounting structure of outer wall decorative plate
KR20130033151A (en) * 2011-09-26 2013-04-03 주식회사 에스앤에스패널 The panel assembly for an outer wall of buildings
CN104234361A (en) * 2014-09-24 2014-12-24 苏州美瑞德建筑装饰有限公司 Assembling method of facade stones
US9140005B2 (en) * 2013-06-03 2015-09-22 Philip Glen Miller Self-aligning corner bead for fireproofing structural steel member and method of using same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101769061A (en) * 2009-12-31 2010-07-07 郭祥山 Structure member for dry hanging of veneer on wall surface steel joist and application method thereof
KR20130033151A (en) * 2011-09-26 2013-04-03 주식회사 에스앤에스패널 The panel assembly for an outer wall of buildings
CN102877622A (en) * 2012-10-17 2013-01-16 王民熙 Mounting structure of outer wall decorative plate
US9140005B2 (en) * 2013-06-03 2015-09-22 Philip Glen Miller Self-aligning corner bead for fireproofing structural steel member and method of using same
CN104234361A (en) * 2014-09-24 2014-12-24 苏州美瑞德建筑装饰有限公司 Assembling method of facade stones

Also Published As

Publication number Publication date
CN105256928A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN210976227U (en) Curtain decorative board mounting structure
CN105421715A (en) Wall surface stone cladding method
CN103216069A (en) Floor or wallboard clamping assembly
CN105256928B (en) Wall-surface stone dry-hanging method
CN103215891B (en) The manufacture craft of a kind of reserved anticollision barrier shrinkage joint, deformation joint
CN203403637U (en) Wall board and wall face installation fixing device
CN207739549U (en) A kind of ceramic tile dried hanging hang structure
CN104196263A (en) Supporting system for concrete precast component
CN205840201U (en) A kind of stone decoration external corner structure of wall cylindrical surface
CN105421711B (en) The dry dress method of indoor wall stone material
CN106836577B (en) A kind of method of building stone curtain wall dried hanging
CN103967252B (en) A kind of decorative panel for building timber securing member and mounting method thereof
CN213329629U (en) Light steel keel suspended ceiling
CN105421712B (en) The dry dress method of indoor wall stone material
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation
CN105256929B (en) Outdoor wall surface stone material dry suspending method
CN204081129U (en) A kind of 3D printing building board wall collecting load-bearing, insulation, integral outer wall decorative
CN105421714A (en) Wall surface stone cladding method
CN203066416U (en) Splayed stone/tile dry hanging piece
CN205276765U (en) Stone material location pendant
CN203808336U (en) Staggered ceiling framework system
CN205444884U (en) Wallboard for civil engineering
CN101864834A (en) Construction method of wall wood formers adopting steel pipes as back edges
CN204645502U (en) A kind of back of the body bolt stone structure
CN204920214U (en) A elasticity template for concrete expansion joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180508

Address after: 317500 No. 106, Liang Shan village, Dashi, Wenling, Taizhou, Zhejiang

Applicant after: Wenling Yi Ji Machinery Technology Co., Ltd.

Address before: 271000 Room 101, unit 2, building 2, North Fifth Ring Road, Tai'an, Shandong.

Applicant before: Liu Weidong

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191126

Address after: 233300 shop 112, building 30, Longwan mansion, Chengnan, Wuhe County, Bengbu City, Anhui Province

Patentee after: Wuhe Yiran Intellectual Property Service Co., Ltd.

Address before: Wenling City, Taizhou City, Zhejiang Province town of 317500 Liang Village No. 106

Patentee before: Wenling Yi Ji Machinery Technology Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210402

Address after: 450001 Room 401, 4th floor, building 1, 72 nongnong Road, Jinshui District, Zhengzhou City, Henan Province

Patentee after: HENAN KEJIAN CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 233300 112 shop, 30 building, Longwan mansion, Wuhe County, Bengbu, Anhui

Patentee before: Wuhe Yiran Intellectual Property Service Co.,Ltd.