CN210508324U - Oil tank inner wall construction hanging flower basket - Google Patents

Oil tank inner wall construction hanging flower basket Download PDF

Info

Publication number
CN210508324U
CN210508324U CN201920758833.2U CN201920758833U CN210508324U CN 210508324 U CN210508324 U CN 210508324U CN 201920758833 U CN201920758833 U CN 201920758833U CN 210508324 U CN210508324 U CN 210508324U
Authority
CN
China
Prior art keywords
fixedly connected
construction
oil tank
standard knot
large arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920758833.2U
Other languages
Chinese (zh)
Inventor
顿军杰
张丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Shiqi Construction Machinery Co Ltd
Original Assignee
Henan Shiqi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Shiqi Construction Machinery Co Ltd filed Critical Henan Shiqi Construction Machinery Co Ltd
Priority to CN201920758833.2U priority Critical patent/CN210508324U/en
Application granted granted Critical
Publication of CN210508324U publication Critical patent/CN210508324U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model belongs to the technical field of high-altitude operation hanging baskets, in particular to an oil tank inner wall construction hanging basket which comprises a stand column standard knot, a sliding mechanism, a large arm standard knot and a construction platform, wherein the sliding mechanism is arranged outside the stand column standard knot, and the large arm standard knot is fixedly connected to two sides of the sliding mechanism; the utility model discloses, through setting up slide mechanism, make people at the in-process of carrying out the construction to the oil tank inner wall, made things convenient for people to control workman's construction position through control slide mechanism, the adjustment of position when carrying out the construction to the oil tank inner wall for the workman, the possibility is provided, at flexible groove, expansion plate and electric putter's effect down, make the workman carry out the in-process of being under construction to the oil tank at the operation panel when the space appears not enough, people can make electric putter extend through control panel, under electric putter's effect, make people can release the expansion plate in the flexible groove, thereby increase workman's construction space.

Description

Oil tank inner wall construction hanging flower basket
Technical Field
The utility model belongs to the technical field of the high altitude construction hanging flower basket, concretely relates to oil tank inner wall construction hanging flower basket.
Background
The corrosion prevention, the overhaul and the construction of the inner wall of the large oil tank are indispensable work in the production of chemical enterprises, but the traditional scaffold lapping mode is adopted when most of the inner walls of the oil tank are constructed at present, and a large number of scaffolds are built in the oil tank to form a construction platform in a full red style. The traditional scaffold lapping construction has high lapping difficulty and consumes time, when an oil tank with large volume is constructed, the scaffold has large potential safety hazards in the processes of lapping, dismantling, segmented construction and the like, and the workload is overlarge; and scaffold frame overlap joint scheme has certain drawback when the construction, and the workman can not freely control the position of whole oil tank inner wall construction face, and the platform space that the workman stood at the in-process of construction is less simultaneously, and inconvenient workman carries out the construction.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides an oil tank inner wall construction hanging flower basket has simple structure, the simple operation to have the characteristics that enlarge the construction platform area.
In order to achieve the above object, the utility model provides a following technical scheme: a hanging basket for construction of the inner wall of an oil tank comprises a stand column standard knot, a sliding mechanism, a large arm standard knot and a construction platform, wherein the sliding mechanism is arranged on the outer side of the stand column standard knot, the large arm standard knot is fixedly connected to two sides of the sliding mechanism, the other end of the large arm standard knot is provided with the construction platform, the construction platform comprises an operation table, a pedal, a telescopic groove and a partition plate, the pedal is arranged at the bottom end inside the operation table, the telescopic groove is formed in the inner side of the pedal, the partition plate is arranged in the telescopic groove and divides the telescopic groove into two chambers, an electric push rod is fixedly connected to the side surface of the partition plate, a telescopic plate is fixedly connected to the other end of the electric push rod, a support plate is fixedly connected to the upper end of the telescopic plate, a telescopic rod is fixedly connected to the side surface of the operation, the first fixed block is eight in number and is arranged on the side face of the operating table and the side face of the supporting plate respectively, the other end of the first fixed block is fixedly connected with a safety fence, and the other end of the safety fence is fixedly connected to the surface of the first fixed block arranged on the side face of the supporting plate.
Preferably, the operation panel has openly been seted up the spacing groove, fixedly connected with slide bar in the spacing groove, the limiting plate has been cup jointed on the slide bar surface, the spring has been cup jointed on the slide bar surface, spacing groove, spring and slide bar respectively have two to set up respectively openly at the operation panel, limiting plate lower extreme fixedly connected with nylon wire, the other end fixed connection of nylon wire is in the operation panel bottom, the inside side of operation panel is provided with control panel.
Preferably, the bottom end of the inner side of the large arm standard knot is provided with an antiskid plate, and the two groups of the large arm standard knots are respectively arranged on two sides of the sliding mechanism.
Preferably, the bottom end inside the large arm standard knot is provided with an anti-slip plate, the side face of the sliding mechanism is fixedly connected with a second fixing block, the surface of the second fixing block is fixedly connected with a first pull rope, the other end of the first pull rope is fixedly connected to the upper end of the large arm standard knot, the side face of the sliding mechanism is fixedly connected with a second pull rope, and the other end of the second pull rope is fixedly connected to the upper end of the large arm standard knot.
Preferably, the input end of the control panel is electrically connected with the output end of an external power supply, and the output end of the control panel is electrically connected with the input end of the electric push rod.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, through setting up slide mechanism, make people in the process of being under construction to the oil tank inner wall, made things convenient for people to control workman's construction position through control slide mechanism, for the adjustment of position when the workman is under construction to the oil tank inner wall, provided the possibility, under the effect of big arm standard festival and antiskid ribbed tile, make the workman guarantee workman's safety when getting into the construction platform, avoid the workman to take place the accident in the process of getting into the construction platform, under the effect of expansion groove, expansion plate and electric putter, make the workman when the space is not enough in the process that the operation panel is under construction to the oil tank, people can make electric putter extend through control panel, under the effect of electric putter, make people can push out the expansion plate in the expansion groove, thereby increase workman's construction space, under the effect of spacing groove, slide bar and spring, make people examine when carrying out the construction to the position of nylon wire lower extreme, the workman can adjust the nylon wire through pressing the limiting plate, makes things convenient for the workman to be under construction to the position of nylon wire lower extreme, has also guaranteed the personal safety of workman in the work progress simultaneously.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a front view of the present invention;
FIG. 2 is a schematic structural diagram of the construction platform of the present invention with an enlarged side view section;
FIG. 3 is a schematic side view enlarged structure diagram of the construction platform of the present invention;
FIG. 4 is an enlarged schematic view of the position A of the present invention;
in the figure: 1. standard sections of the upright posts; 2. a sliding mechanism; 3. a large arm standard knot; 4. an anti-skid plate; 5. a construction platform; 501. an operation table; 502. a pedal; 503. a telescopic groove; 504. a partition plate; 505. an electric push rod; 506. a retractable plate; 507. a support plate; 508. a telescopic rod; 509. a first fixed block; 510. a security fence; 511. a control panel; 512. a limiting groove; 513. a slide bar; 514. a limiting plate; 515. a spring; 516. a nylon mesh; 6. a second fixed block; 7. a first pull cord; 8. a second draw cord.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides the following technical solutions: a construction hanging basket for the inner wall of an oil tank comprises a standard upright section 1, a sliding mechanism 2, a standard large arm section 3 and a construction platform 5, wherein the sliding mechanism 2 is arranged on the outer side of the standard upright section 1, people can conveniently control the construction position of workers by controlling the sliding mechanism 2 in the construction process of the inner wall of the oil tank by arranging the sliding mechanism 2, the possibility is provided for the adjustment of the position of the workers in the construction process of the inner wall of the oil tank, the standard large arm section 3 is fixedly connected to two sides of the sliding mechanism 2, the construction platform 5 is arranged at the other end of the standard large arm section 3, the construction platform 5 comprises an operation table 501, pedals 502, a telescopic groove 503 and a partition plate 504, the pedals 502 are arranged at the bottom end inside the operation table 501, the telescopic groove 503 is arranged on the inner side of the pedals 502, the partition plate 504 is arranged in the telescopic groove 503, the partition plate 504 divides the telescopic groove 503 into two chambers, an electric push rod 505 is fixedly connected to the side surface of the partition 504, under the action of the electric push rod 505, people can push out the telescopic plate 506 in the telescopic groove 503, so that the construction space of workers is enlarged, the telescopic plate 506 is fixedly connected to the other end of the electric push rod 505, a support plate 507 is fixedly connected to the upper end of the telescopic plate 506, under the action of the telescopic groove 503, the telescopic plate 506 and the electric push rod 505, when insufficient space occurs in the process of constructing the oil tank by the workers on the operation table 501, people can extend the electric push rod 505 through the control panel 511, a telescopic rod 508 is fixedly connected to the side surface of the operation table 501, the other end of the telescopic rod 508 is fixedly connected to the side surface of the support plate 507, a first fixed block 509 is fixedly connected to the side surface of the operation table 501, eight first fixed blocks 509 are respectively arranged on the side surfaces of, the other end of the first fixing block 509 is fixedly connected with a safety fence 510, and the other end of the safety fence 510 is fixedly connected to the surface of the first fixing block 509 arranged at the side of the supporting plate 507.
Specifically, the front surface of the operating platform 501 is provided with a limiting groove 512, a sliding rod 513 is fixedly connected in the limiting groove 512, the surface of the sliding rod 513 is sleeved with a limiting plate 514, the surface of the sliding rod 513 is sleeved with a spring 515, the number of the limiting grooves 512, the number of the springs 515 and the number of the sliding rod 513 are two respectively, and are respectively arranged on the front surface of the operating platform 501, the lower end of the limit plate 514 is fixedly connected with a nylon net 516, the other end of the nylon net 516 is fixedly connected with the bottom end of the operating platform 501, under the action of the limiting groove 512, the sliding rod 513 and the spring 515, when people carry out construction on the position detection of the lower end of the nylon net 516, the worker can adjust the nylon net 516 by pressing the limit plate 514, so that the worker can conveniently construct the position of the lower end of the nylon net 516, meanwhile, the personal safety of workers in the construction process is guaranteed, and a control panel 511 is arranged on the inner side face of the operating platform 501.
Specifically, the bottom end of the inner side of the large arm standard joint 3 is provided with the antiskid plate 4, the large arm standard joints 3 are two groups in total and are respectively arranged on two sides of the sliding mechanism 2, and under the action of the large arm standard joints 3 and the antiskid plates 4, the safety of workers is ensured when the workers enter the construction platform 5, and accidents of the workers in the process of entering the construction platform 5 are avoided.
Specifically, the bottom end of the inside of the large arm standard knot 3 is provided with an antiskid plate 4, the side of the sliding mechanism 2 is fixedly connected with a second fixing block 6, the surface of the second fixing block 6 is fixedly connected with a first pull rope 7, the other end of the first pull rope 7 is fixedly connected to the upper end of the large arm standard knot 3, the side of the sliding mechanism 2 is fixedly connected with a second pull rope 8, and the other end of the second pull rope 8 is fixedly connected to the upper end of the large arm standard knot 3.
Specifically, the input end of the control panel 511 is electrically connected to the output end of an external power supply, and the output end of the control panel 511 is electrically connected to the input end of the electric push rod 505.
The utility model discloses a theory of operation and use flow: when the utility model is used, firstly, workers enter a construction platform 5 through an antiskid plate 4 arranged at the lower end of the inner side of a big arm standard joint 3, then in the lifting process of a sliding mechanism 2, the big arm standard joint 3 and the construction platform 5 which are fixedly connected can lift along with the sliding mechanism 2, so that the height of the workers can be changed in the construction process, when the height and the position of the construction are properly adjusted, the workers can extend an electric push rod 505 through a control panel 511, so that a telescopic plate 506 can extend out of a telescopic groove 503, the space for the construction of the workers is enlarged, the construction of workers on the inner wall of an oil tank is facilitated, the construction area of the workers is also enlarged, the condition that the workers always adjust the construction position of the workers is avoided, in the construction process, when the workers need to construct the position below a nylon net 516, the workman only need press the backup pad 507 downwards, can make things convenient for the workman to be under construction to the position of nylon net 516 lower extreme, and the effectual construction area who has increaseed the workman has also accelerated people's construction speed simultaneously.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides an oil tank inner wall construction hanging flower basket, includes stand standard festival (1), slide mechanism (2), big arm standard festival (3) and construction platform (5), its characterized in that: the sliding mechanism (2) is arranged on the outer side of the upright standard knot (1), the large arm standard knot (3) is fixedly connected to two sides of the sliding mechanism (2), the other end of the large arm standard knot (3) is provided with a construction platform (5), the construction platform (5) comprises an operation table (501), a pedal (502), a telescopic groove (503) and a partition plate (504), the pedal (502) is arranged at the bottom end inside the operation table (501), the telescopic groove (503) is arranged on the inner side of the pedal (502), the partition plate (504) is arranged in the telescopic groove (503), the partition plate (504) divides the telescopic groove (503) into two chambers, the side face of the partition plate (504) is fixedly connected with an electric push rod (505), the other end of the electric push rod (505) is fixedly connected with a telescopic plate (506), and the upper end of the telescopic plate (506) is fixedly connected with a support plate (507), operation panel (501) side fixedly connected with telescopic link (508), telescopic link (508) other end fixed connection is in backup pad (507) side, the first fixed block (509) of operation panel (501) side fixedly connected with, eight total of first fixed block (509) to set up respectively in operation panel (501) and backup pad (507) side, first fixed block (509) other end fixed connection has security fence (510), the other end fixed connection of security fence (510) is on setting up first fixed block (509) surface in backup pad (507) side.
2. The oil tank inner wall construction hanging basket according to claim 1, characterized in that: limiting groove (512) have openly been seted up in operation panel (501), fixedly connected with slide bar (513) in limiting groove (512), limiting plate (514) have been cup jointed on slide bar (513) surface, spring (515) have been cup jointed on slide bar (513) surface, limiting groove (512), spring (515) and slide bar (513) respectively have two to set up respectively openly at operation panel (501), limiting plate (514) lower extreme fixedly connected with nylon wire (516), the other end fixed connection of nylon wire (516) is in operation panel (501) bottom, the inside side of operation panel (501) is provided with control panel (511).
3. The oil tank inner wall construction hanging basket according to claim 1, characterized in that: the anti-skidding plates (4) are arranged at the bottom end of the inner side of the large arm standard knot (3), and the large arm standard knots (3) are divided into two groups and are respectively arranged on two sides of the sliding mechanism (2).
4. The oil tank inner wall construction hanging basket according to claim 1, characterized in that: the novel arm standard knot is characterized in that an anti-slip plate (4) is arranged at the bottom end inside the large arm standard knot (3), a second fixing block (6) is fixedly connected to the side surface of the sliding mechanism (2), a first pull rope (7) is fixedly connected to the surface of the second fixing block (6), the other end of the first pull rope (7) is fixedly connected to the upper end of the large arm standard knot (3), a second pull rope (8) is fixedly connected to the side surface of the sliding mechanism (2), and the other end of the second pull rope (8) is fixedly connected to the upper end of the large arm standard knot (3).
5. The oil tank inner wall construction hanging basket according to claim 2, characterized in that: the input end of the control panel (511) is electrically connected with the output end of an external power supply, and the output end of the control panel (511) is electrically connected with the input end of the electric push rod (505).
CN201920758833.2U 2019-05-24 2019-05-24 Oil tank inner wall construction hanging flower basket Expired - Fee Related CN210508324U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920758833.2U CN210508324U (en) 2019-05-24 2019-05-24 Oil tank inner wall construction hanging flower basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920758833.2U CN210508324U (en) 2019-05-24 2019-05-24 Oil tank inner wall construction hanging flower basket

Publications (1)

Publication Number Publication Date
CN210508324U true CN210508324U (en) 2020-05-12

Family

ID=70576585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920758833.2U Expired - Fee Related CN210508324U (en) 2019-05-24 2019-05-24 Oil tank inner wall construction hanging flower basket

Country Status (1)

Country Link
CN (1) CN210508324U (en)

Similar Documents

Publication Publication Date Title
CN210947650U (en) Assembly movable type lifting cantilever operation platform
CN110616885A (en) Movable overhanging working frame
CN210508324U (en) Oil tank inner wall construction hanging flower basket
CN107806242A (en) A kind of high intensity scaffold fastenings for building
CN208734045U (en) Monoblock type mould bases for Super High fission conjoined composite structure
CN206784876U (en) Indoor construction scaffold is built in room
CN204400568U (en) Become span hanging basket suspension mechanism
CN212689494U (en) Construction platform for building construction
CN214785825U (en) Telescopic hanging basket
CN206154240U (en) Over -and -under type ceiling puncher
CN213626567U (en) Construction work frame for building engineering
CN212534991U (en) Make things convenient for convex hanging flower basket of jar external wall work effect
CN209353664U (en) Buffer unit is used in a kind of landing of building Lifting basket
CN208456101U (en) A kind of housing construction scaffold
CN208105835U (en) A kind of safe construction frame of construction
CN218375127U (en) Workman high altitude hanging flower basket for construction
CN207847045U (en) A kind of swinging scaffold for building
CN208106295U (en) A kind of building safety ladder
CN206957170U (en) A kind of scaffold for building being easily installed
CN215368640U (en) High-altitude suspension cable hanging basket operation platform for large high-speed rail station building
CN218264859U (en) Hanging basket structure for building exterior wall decoration
CN206915704U (en) A kind of construction high-altitude operation vehicle
CN216947882U (en) Movable construction platform device in narrow limited space
CN205396963U (en) Base is put things in good order to whole steel pipe on scaffold
CN209040530U (en) A kind of construction operation hanging cage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200512

Termination date: 20210524

CF01 Termination of patent right due to non-payment of annual fee