CN209119674U - For installing the fixed structure of secondary piping - Google Patents

For installing the fixed structure of secondary piping Download PDF

Info

Publication number
CN209119674U
CN209119674U CN201822178288.8U CN201822178288U CN209119674U CN 209119674 U CN209119674 U CN 209119674U CN 201822178288 U CN201822178288 U CN 201822178288U CN 209119674 U CN209119674 U CN 209119674U
Authority
CN
China
Prior art keywords
fixed structure
wire box
metope
secondary piping
support rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822178288.8U
Other languages
Chinese (zh)
Inventor
薛庆文
刘刚
王永斌
林裕
田泽辉
王文珏
文俊杰
石伟
张敏
尹超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Engineering Second Construction Engineering Co Ltd
Original Assignee
Chengdu Construction Engineering Second Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Construction Engineering Second Construction Engineering Co Ltd filed Critical Chengdu Construction Engineering Second Construction Engineering Co Ltd
Priority to CN201822178288.8U priority Critical patent/CN209119674U/en
Application granted granted Critical
Publication of CN209119674U publication Critical patent/CN209119674U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses the fixed structures for installing secondary piping.The secondary piping includes being embedded in the spool in the first metope and the wire box set on the conduit end, which includes support rod, which is fastenedly connected with the wire box, and the other end is fastenedly connected with built metope.The fixed structure for installing secondary piping of the utility model can carry out a positioning molding to spool and wire box, ensure the accurate installation of spool, wire box, effectively the construction of brick setting is avoided to change the broken of pipe box, masonry, spool, wire box good forming effect also reduce the influence to masonry impression quality as far as possible.Reduce to pick and beat slot hole, facilitate construction, reduces waste of material.Fixed structure is at low cost, can Reusability.Fixed structure can be recycled, is convenient to assemble and disassemble.As it can be seen that the of simple structure and strong practicability of the fixed structure for installing secondary piping of the utility model.

Description

For installing the fixed structure of secondary piping
Technical field
The utility model relates to the technical fields of the secondary piping of construction and installation, in particular to for installing secondary match The fixed structure of pipe.
Background technique
As architectural engineering is more and more perfect, construction engineering quality requires to be continuously improved, spool of constructing again in brick setting, The requirement of wire box is also more and more precisely and stringent, is a no small test for our installing engineerings.
At present in installing engineering in brick setting, spool, wire box are all to construct to finish in advance to be wrapped up with brick again, in the package phase Between simultaneously arrange personnel adjust pipe box, it is ensured that pipe box can all wrap up in place.But it is inevitably had in brick setting package various It inevitably happens: during Construction of Brick Wall, since work post is interspersed, can often be caused because of some odjective causes a Phenomena such as other spool, wire box damage, interface fall off, walk so as to cause bottom pour ladle, package.Therefore the adjustment of spool, wire box is repaired Change, becomes the indispensable work of secondary piping installation.In the case of such, the unrest of the mode of processing from early stage It strikes, batter, to the joint-cutting tick slot on brick setting for having planning at present.These modes all unavoidably cause following adverse effect: 1) brick setting destruction point is more, causes to run through to masonry, be not easily repaired;2) masonry molding effect is poor, and aesthetic quality is seriously bad; 3) it generates and largely builds slag pollution and noise pollution;4) a large amount of lost labor's adjustment, waste mortar, brick body are repaired, quality It is not up to requirement.Also, handing in the clear water room of Quality Supervision Station requires new construction installation two to match and cannot occur in metope in room file Pick beat, grooving etc..So these more extensive modes have been no longer appropriate for the trend of technology fast development.Therefore, how to subtract How few installation piping destruction caused by brick setting engineering improves brick setting molding effect and impression quality, how to reduce and apply Work fugitive dust and building waste, how to reduce the problems such as artificial and material waste be that the secondary piping angle steel of our construction and installation is fixed And the key that clip package construction needs to solve.
Utility model content
The main purpose of the utility model is to provide the fixed structure for installing secondary piping and secondary piping is installed Method, to solve the problems, such as that existing joint-cutting tick slot is installed in secondary piping in the prior art.
To achieve the goals above, one aspect according to the present utility model provides a kind of for installing secondary piping Fixed structure.The secondary piping includes being embedded in the spool in the first metope and the wire box set on the conduit end, the use It include support rod in the fixed structure for installing secondary piping, which is fastenedly connected with the wire box, the other end and The metope built up is fastenedly connected.
The fixed structure for installing secondary piping of the utility model can once be positioned to spool and wire box Type, it is ensured that the accurate installation of spool, wire box effectively avoids the construction of brick setting from changing the broken of pipe box, masonry, spool, wire box Good forming effect also reduces the influence to masonry impression quality as far as possible.Reduce to pick and beat slot hole, facilitate construction, reduces material Material waste.Fixed structure is at low cost, can Reusability.Fixed structure can be recycled, is convenient to assemble and disassemble.As it can be seen that the utility model For install secondary piping fixed structure of simple structure and strong practicability.
Further, the support rod is angle steel.Angle bar frame can weigh completely after the completion of spool, wire box brick setting as a result, Multiple utilize also can be used as pipeline or the use of gantry bracket, economize on resources.
Further, it is equipped with screw hole in the wire box, is equipped on the support rod matched with the screw hole First hole, the support rod passes through the screw hole using screw with the wire box and the realization of the first hole is fastenedly connected; The screw hole and the first hole are respectively two.Structure is simple and convenient for disassembly and assembly as a result,.
Further, it is equipped with support base between the support rod and the second metope, is welded between the support base and support rod It connects, is connected between the support base and the second metope using setscrew;Second metope and first metope are non-coplanar. Structure is simple and convenient for disassembly and assembly as a result,.
Further, the support base is equipped at least two and matched second hole of setscrew.As a result, to avoid The reinforcing bar in concrete is met when fixed.
Further, it is connected between the support rod and third metope using setscrew;The third metope and first Metope is coplanar.Structure is simple and convenient for disassembly and assembly as a result,.
Further, the support rod is equipped at least two and the matched third hole of setscrew;As a result, to avoid The reinforcing bar in concrete is met when fixed.Cushion block is equipped between the support rod and the third metope.As a result, when wire box needs When going out wall a distance, by the way that cushion block is arranged, can preferably wire box be positioned and fastened.
Further, the support rod is connect at least two wire box.Practicability is stronger as a result,.
To achieve the goals above, other side according to the present utility model additionally provides a kind of secondary piping of installation Method.The method of the secondary piping of the installation, comprising the following steps:
1) wire box is fixed for installing the fixed structure of secondary piping using above-mentioned;
2) it lays bricks to form the first metope, uses in the surrounding of the wire box and wrapped up with the matched brick of its shape;
3) it removes described for installing the fixed structure of secondary piping.
The method of the secondary piping of installation of the utility model reduces two with process, and constructing operation is simple and easy to do, installation is fast Speed, rework rate is low, increases artificial service efficiency, improves work efficiency, saves the duration with manually, effectively avoids brick setting The broken of pipe box is changed in construction.
Further, the brick is " < " shape, " Fang " shape, " Qian " font or " Fang " shape.It is suitable for difference as a result, The wire box of size, preferably package wire box.
As it can be seen that the fixed structure for installing secondary piping of the utility model once determine to spool and wire box Position molding, it is ensured that the accurate installation of spool, wire box effectively avoids the construction of brick setting from changing the broken of pipe box, masonry, spool, Wire box good forming effect also reduces the influence to masonry impression quality as far as possible.Reduce to pick and beat slot hole, facilitates construction, subtract Few waste of material.Fixed structure is at low cost, can Reusability.Fixed structure can be recycled, is convenient to assemble and disassemble.The utility model The method for installing secondary piping reduces two with process, and constructing operation is simple and easy to do, installation is quick, and rework rate is low, increases people Work service efficiency, improves work efficiency, saves the duration with manually, the construction of brick setting is effectively avoided to change the broken of pipe box.
The utility model is described further with reference to the accompanying drawings and detailed description.The utility model is additional Aspect and advantage will be set forth in part in the description, and partially will become apparent from the description below, or practical by this Novel practice is recognized.
Detailed description of the invention
The attached drawing for constituting a part of the utility model is used to assist understanding to the utility model, provided in attached drawing Content and its related explanation can be used for explaining the utility model in the present invention, but is not constituted to the utility model not Work as restriction.
In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the fixed structure for installing secondary piping of the utility model embodiment 1.
Fig. 2 is the structural schematic diagram of the fixed structure for installing secondary piping of the utility model embodiment 3.
Fig. 3 is the structural schematic diagram of the fixed structure for installing secondary piping of the utility model embodiment 4.
Fig. 4 is the structural schematic diagram of the utility model wire box.
Fig. 5 is the structural schematic diagram of the utility model brick.
Related label in above-mentioned attached drawing are as follows:
1: spool;
2: wire box;
21: screw hole;
31: the first metopes;
321: side elevation;
322: floor;
33: third metope;
4: support rod;
5: support base;
6: screw;
7: setscrew;
8: cushion block;
9: brick.
Specific embodiment
Clear, complete explanation is carried out to the utility model with reference to the accompanying drawing.Those of ordinary skill in the art are being based on The utility model will be realized in the case where these explanations.Before being illustrated in conjunction with attached drawing to the utility model, spy is needed It is not pointed out that:
The technical solution provided in each section including following the description and technical characteristic in the utility model, In the case where not conflicting, these technical solutions and technical characteristic be can be combined with each other.
In addition, the embodiments of the present invention being related in following the description are generally only the reality of the utility model a part Example is applied, instead of all the embodiments.Therefore, based on the embodiments of the present invention, those of ordinary skill in the art are not having Every other embodiment obtained under the premise of creative work is made, the model of the utility model protection all should belong to It encloses.
About term in the utility model and unit.The specification and claims of the utility model and related part In term " includes ", " having " and their any deformation, it is intended that cover and non-exclusive include.
Embodiment 1
Secondary piping includes being embedded in the spool 1 in the first metope 31 and the wire box 2 set on 1 end of spool.Such as Fig. 1 Shown in for installing the fixed structure of secondary piping, including support rod 4,4 one end of support rod and the wire box 2 fastening connect It connects, the other end is fastenedly connected with built metope.
The support rod 4 is angle steel, model ∠ 40*4.
It is equipped with screw hole 21 in the wire box 2, is equipped with and the screw hole 21 matched first on the support rod 4 Hole, the support rod 4 passes through the screw hole 21 using screw 6 with the wire box 2 and the realization of the first hole is fastenedly connected; As shown in figure 4, the wire box 2 is 86 molded line boxes.The screw hole 21 and the first hole are respectively two.The diameter of first hole For 4mm.The screw 6 is galvanized mild steel drive screw 6.
It is equipped with support base 5 between the support rod 4 and the second metope, is welded between the support base 5 and support rod 4, institute It states and is connected between support base 5 and the second metope using setscrew 7;Second metope and first metope 31 are non-coplanar, Second metope is the side elevation 321 of first metope 31, and support rod 4 is horizontal positioned at this time.
Set on the support base 5 there are two with matched second hole of setscrew 7.The diameter of second hole is 8mm.
Embodiment 2
Compared with Example 1, the difference that the fixed structure for installing secondary piping of the present embodiment has is: described the Two metopes are floor 322, and support rod 4 is vertically placed at this time.
Embodiment 3
Secondary piping includes being embedded in the spool 1 in the first metope 31 and the wire box 2 set on 1 end of spool.Such as Fig. 2 Shown in for installing the fixed structure of secondary piping, including support rod 4,4 one end of support rod and the wire box 2 fastening connect It connects, the other end is fastenedly connected with built metope.
The support rod 4 is angle steel.
It is equipped with screw hole 21 in the wire box 2, is equipped with and the screw hole 21 matched first on the support rod 4 Hole, the support rod 4 passes through the screw hole 21 using screw 6 with the wire box 2 and the realization of the first hole is fastenedly connected; As shown in figure 4, the wire box 2 is 86 molded line boxes.The screw hole 21 and the first hole are respectively two.The diameter of first hole For 4mm.The screw 6 is galvanized mild steel drive screw 6.
It is connected between the support rod 4 and third metope 33 using setscrew 7;The third metope 33 and the first metope 31 is coplanar, and support rod 4 is horizontal positioned.
Set on the support rod 4 there are two with the matched third hole of setscrew 7;The support rod 4 and the third Cushion block 8 is equipped between metope 33.The diameter of third hole is 8mm.
Embodiment 4
Compared with Example 3, the difference that the fixed structure for installing secondary piping of the present embodiment has is: such as Fig. 3 Shown, the support rod 4 is connect at least two wire box 2.
Embodiment 5
The method for installing secondary piping, comprising the following steps:
1) wire box 2 is fixed for installing the fixed structure of secondary piping using one of embodiment 1-4;
2) it lays bricks to form the first metope 31, uses in the surrounding of the wire box 2 and wrapped up with the matched brick 9 of its shape;Institute Stating brick is " < " shape.
3) it removes described for installing the fixed structure of secondary piping.
The related content of the utility model is illustrated above.Those of ordinary skill in the art are being based on these explanations In the case where will realize the utility model.Above content based on the utility model, those of ordinary skill in the art are not having Every other embodiment obtained under the premise of creative work is made, the model of the utility model protection all should belong to It encloses.

Claims (8)

1. the fixed structure for installing secondary piping, which includes the spool (1) being embedded in the first metope (31) And it is set to the wire box (2) of spool (1) end, it is characterised in that: the fixed structure includes support rod (4), the support rod (4) one end is fastenedly connected with the wire box (2), and the other end is fastenedly connected with built metope.
2. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: the support rod (4) is Angle steel.
3. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: on the wire box (2) Equipped with screw hole (21), it is equipped with and matched first hole of the screw hole (21), the support rod on the support rod (4) (4) screw hole (21) are passed through using screw (6) with the wire box (2) and the realization of the first hole is fastenedly connected;The spiral shell Wire hole (21) and the first hole are respectively two.
4. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: the support rod (4) with Support base (5) are equipped between second metope, are welded between the support base (5) and support rod (4), the support base (5) and the It is connected between two metopes using setscrew (7);Second metope and first metope (31) are non-coplanar.
5. as claimed in claim 4 for installing the fixed structure of secondary piping, it is characterised in that: on the support base (5) Equipped at least two and setscrew (7) matched second hole.
6. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: the support rod (4) with It is connected between third metope (33) using setscrew (7);The third metope (33) is coplanar with the first metope (31).
7. as claimed in claim 6 for installing the fixed structure of secondary piping, it is characterised in that: on the support rod (4) Equipped at least two and setscrew (7) matched third hole;It is set between the support rod (4) and the third metope (33) There are cushion block (8).
8. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: the support rod (4) with At least two wire box (2) connection.
CN201822178288.8U 2018-12-24 2018-12-24 For installing the fixed structure of secondary piping Active CN209119674U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822178288.8U CN209119674U (en) 2018-12-24 2018-12-24 For installing the fixed structure of secondary piping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822178288.8U CN209119674U (en) 2018-12-24 2018-12-24 For installing the fixed structure of secondary piping

Publications (1)

Publication Number Publication Date
CN209119674U true CN209119674U (en) 2019-07-16

Family

ID=67208536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822178288.8U Active CN209119674U (en) 2018-12-24 2018-12-24 For installing the fixed structure of secondary piping

Country Status (1)

Country Link
CN (1) CN209119674U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109586204A (en) * 2018-12-24 2019-04-05 成都建工第二建筑工程有限公司 Method for installing the fixed structure and the secondary piping of installation of secondary piping

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109586204A (en) * 2018-12-24 2019-04-05 成都建工第二建筑工程有限公司 Method for installing the fixed structure and the secondary piping of installation of secondary piping
CN109586204B (en) * 2018-12-24 2024-04-19 成都建工第二建筑工程有限公司 Fixing structure for installing secondary piping and method for installing secondary piping

Similar Documents

Publication Publication Date Title
CN108000689B (en) Combined template for concrete member with window frame, pouring method of combined template and concrete member
CN210887275U (en) Concrete pile bearing platform template structure
CN206616862U (en) Formwork root bracing means
CN109208790A (en) Circular arc shear wall single side formwork construction method
CN206625428U (en) Pipe shaft post-cast floor slab closed system
CN110409811A (en) Exempt to split into type column template, formwork structure and construction process containing steel reinforcement cage
CN110409813A (en) Exempt to split into type beam forms, formwork structure and construction process containing steel reinforcement cage
CN108222066A (en) A kind of combined steel formwork support system and its construction method
CN103161313B (en) Connection method of main reinforcement of constructional column of infilled wall and framed girder
CN110485742A (en) A kind of positioning device and construction method of the pre-buried pedestal anchor bolt in isolated footing
CN209119674U (en) For installing the fixed structure of secondary piping
CN207812838U (en) One kind is U-shaped to be exempted to tear construction column template open
CN207878789U (en) A kind of assembled architecture reinforcing steel bar connecting device
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN109586204A (en) Method for installing the fixed structure and the secondary piping of installation of secondary piping
CN110469005A (en) For installing the fixation keel, keel of partition wall component and assemble method of wiring back box
CN110284594A (en) It is a kind of to be bolted Assembled Building board group conjunction joist steel tubular column frame node and its forming method entirely
JP2004068385A (en) Adjustment structure for erection of steel pipe pole
CN206158192U (en) Concrete pump pipe&#39;s simple easily fixable device on concrete face
CN109853973A (en) For the field erected overhanging type supporting and positioning device of prefabricated air-conditioning plate
CN210685369U (en) Concrete side wall formwork structure for narrow space
CN211499784U (en) Pouring module device after secondary hole opening of floor slab
CN106436973B (en) Steel column arranged in post-cast section of steel shear structure and casting method of steel column
CN208056625U (en) A kind of toilet drop plate hangs mould
CN202284291U (en) Concrete overflowing surface template shaped like Chinese character ba

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant