CN202284291U - Concrete overflowing surface template shaped like Chinese character ba - Google Patents

Concrete overflowing surface template shaped like Chinese character ba Download PDF

Info

Publication number
CN202284291U
CN202284291U CN2011204153578U CN201120415357U CN202284291U CN 202284291 U CN202284291 U CN 202284291U CN 2011204153578 U CN2011204153578 U CN 2011204153578U CN 201120415357 U CN201120415357 U CN 201120415357U CN 202284291 U CN202284291 U CN 202284291U
Authority
CN
China
Prior art keywords
template
concrete
chinese character
characters
passing surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204153578U
Other languages
Chinese (zh)
Inventor
刘龙兵
费江平
盛信平
商永红
周维虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN2011204153578U priority Critical patent/CN202284291U/en
Application granted granted Critical
Publication of CN202284291U publication Critical patent/CN202284291U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A concrete overflowing surface template shaped like a Chinese character ba comprises an upper template shaped like the Chinese character ba, a bottom template, a template enclosing purlin and a pull strip. A template face plate is a piece of wood plywood, and the upper template shaped like the Chinese character ba is integrally connected with the bottom template through screws. During a concreting process of a joining portion of an overflowing surface bottom plate and a side wall, the bottom template and the side wall template can be dismantled successively according to concreting developing conditions, manual plastering is carried out, and concreting quality and construction progress of the joining portion of the overflowing surface bottom plate and the side wall are greatly improved. The concrete overflowing surface template shaped like the Chinese character ba is simple and practical in structure, easy to produce, convenient to install and dismantle and capable of being reused.

Description

Concrete flow-passing surface splay configuration template
Technical field
The utility model relates to concrete construction and uses template, particularly a kind of concrete flow-passing surface splay configuration template.
Background technology
In the hydroelectric project; The water conservancy diversion bottom outlet, sluice box culvert and lead concrete flow-passing surface base plate such as wall and side wall handing-over position standing in respect of the splayed chamfering; Way was that this chamfer site template and side wall template synchronous frame are upright in the past; Stripping not in the process of building, treat concrete all build finish after stripping again.During this job practices concreting, to adopt the technology of shaking again usually, to strengthen exhaust; But because chamfering structure is unfavorable for exhaust; And the construction of can not in the process of building, wiping one's face behind the stripping so this position flow-passing surface blibbing is more usually, has certain influence to the flow-passing surface apparent mass; Often need the later stage to repair, objectively increased construction cost.
Summary of the invention
The utility model technical problem to be solved provides a kind of concrete flow-passing surface splay configuration template; The construction of can be in concreting process by stages wiping one's face behind the stripping; Thereby make the exterior concrete at concrete flow-passing surface base plate and side wall handing-over position smooth smooth; No bubble has been exempted later stage patch work amount, has saved construction cost.
For solving the problems of the technologies described above; The technical scheme that the utility model adopted is: a kind of concrete flow-passing surface splay configuration template; Comprise that Eight characters template, soffit formwork, template enclose purlin and tie rod, last Eight characters template is herringbone, and last Eight characters template is spliced into integral body through spiral nail and soffit formwork.
Last Eight characters template and soffit formwork are equipped with template through the tie rod sleeve and enclose purlin and liner, and tie rod sleeve and tie rod are welded to connect.
The back side of panel of last Eight characters template and soffit formwork is provided with floor.
Last Eight characters template and soffit formwork panel adopt wood plywood.
Floor adopts the lumps of wood.
A kind of concrete flow-passing surface splay configuration template that the utility model provides; Through adopting above-mentioned structure, a whole set of template is easy to make, peace is torn open conveniently, and construction fast; Both guarantee the concrete pouring quality at flow-passing surface base plate and side wall handing-over position, reduced the input of resource again.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is described further:
Fig. 1 is the structure chart of the utility model;
Fig. 2 is that the A-A of Fig. 1 is to view.
The specific embodiment
Like Fig. 1, shown in Figure 2, a kind of concrete flow-passing surface splay configuration template comprises that Eight characters template 1, soffit formwork 2, template enclose purlin 3 and tie rod 4, and last Eight characters template 1 is herringbone, is spliced into integral body at the middle part of flow-passing surface through spiral nail 5 and soffit formwork 2.
Last Eight characters template 1 is equipped with template with soffit formwork 2 through tie rod sleeve 6 and encloses purlin 3 and liner 7, and tie rod sleeve 6 is welded to connect with tie rod 4.
The back side of panel of last Eight characters template 1 and soffit formwork 2 is provided with floor 8.
Last Eight characters template 1 adopts wood plywood with soffit formwork 2 panels, and floor 8 adopts the lumps of wood.
The liner that liner 7 is processed for short steel pipes.
Embodiment:
1), template construct: select template size according to the concrete flow-passing surface base plate 12 and the project organization at side wall handing-over position, form surfacing adopts the thick wood plywood of 1.6cm, and floor adopts 5 * 10cm lumps of wood in processing factory, to make.
2), template installs: soffit formwork 2 is installed earlier, after install Eight characters template 1, on the floor of the two contact position, connect into integral body through spiral nail 5.Each template is enclosed purlin 3, liner 7, tie rod sleeve 6, tie rod 4 and 11 welding of side wall reinforcing bar through the bearing bar in the storehouse 9, template and is fixed.Timber wedge 10 wedgings are adopted in the upper end of bearing bar 9 and form surfacing contact position, and purpose is to be convenient to calibration template and protection form surfacing.
3), concreting: when the concrete height of building greater than soffit formwork 2 and when reaching initial set, outward winding spiral nail 5 and tie rod sleeve 6 are laid down soffit formwork 2 and timber wedge 10, to the pouring concrete of the bottom receipts light of wiping one's face.When the concrete height of building greater than the corner and when reaching initial set, take same method form removal after, to flow-passing surface base plate 12 concrete of the corner bottom receipts light of wiping one's face.
4), in the process of building, according to concrete striking time of building the strict control of situation the utility model.Striking time generally was controlled at after the concreting of corresponding site in 3~4 hours, in time light is wiped one's face, received to concrete after the form removal.And from the lower stripping construction of wiping one's face one by one that hoists successively, accomplish until all form removables, the concrete coating construction is accomplished.

Claims (5)

1. concrete flow-passing surface splay configuration template; Comprise that Eight characters template (1), soffit formwork (2), template enclose purlin (3) and tie rod (4); It is characterized in that: go up Eight characters template (1) and be herringbone, last Eight characters template (1) is spliced into integral body through spiral nail (5) and soffit formwork (2).
2. according to the said a kind of concrete flow-passing surface splay configuration template of claim 1; It is characterized in that: described upward Eight characters template (1) and soffit formwork (2) are equipped with template through tie rod sleeve (6) and enclose purlin (3) and liner (7), and tie rod sleeve (6) is welded to connect with tie rod (4).
3. according to claim 1 or 2 said a kind of concrete flow-passing surface splay configuration templates, it is characterized in that: the said back side of panel of going up Eight characters template (1) and soffit formwork (2) is provided with floor (8).
4. according to claim 1 or 2 said a kind of concrete flow-passing surface splay configuration templates, it is characterized in that: said Eight characters template (1) and soffit formwork (2) the panel employing wood plywood gone up.
5. according to the said a kind of concrete flow-passing surface splay configuration template of claim 3, it is characterized in that: said floor (8) adopts the lumps of wood.
CN2011204153578U 2011-10-27 2011-10-27 Concrete overflowing surface template shaped like Chinese character ba Expired - Fee Related CN202284291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204153578U CN202284291U (en) 2011-10-27 2011-10-27 Concrete overflowing surface template shaped like Chinese character ba

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204153578U CN202284291U (en) 2011-10-27 2011-10-27 Concrete overflowing surface template shaped like Chinese character ba

Publications (1)

Publication Number Publication Date
CN202284291U true CN202284291U (en) 2012-06-27

Family

ID=46295819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204153578U Expired - Fee Related CN202284291U (en) 2011-10-27 2011-10-27 Concrete overflowing surface template shaped like Chinese character ba

Country Status (1)

Country Link
CN (1) CN202284291U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165410A (en) * 2017-05-04 2017-09-15 中交第二航务工程局有限公司 A kind of construction formwork and its construction method for slope concrete
CN112359873A (en) * 2020-11-17 2021-02-12 中建八局轨道交通建设有限公司 Construction method of guide wall with haunch structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107165410A (en) * 2017-05-04 2017-09-15 中交第二航务工程局有限公司 A kind of construction formwork and its construction method for slope concrete
CN112359873A (en) * 2020-11-17 2021-02-12 中建八局轨道交通建设有限公司 Construction method of guide wall with haunch structure

Similar Documents

Publication Publication Date Title
CN203440831U (en) Novel basement concrete shear wall guide wall structure
CN107905522A (en) A kind of exterior wall assembly plank sheathing monolithic construction method
CN206616862U (en) Formwork root bracing means
CN206174146U (en) Assembly type structure's assembly node
CN104652830A (en) Construction method for building of prefabricated slab floor and prefabricated wall plate
CN207582956U (en) A kind of one-time formed constructing device of concrete window tongue and groove
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN103206088B (en) Parts of shear wall structure wall, slab integral pouring construction method
CN203878995U (en) Side wall stair formwork
CN202284291U (en) Concrete overflowing surface template shaped like Chinese character ba
CN107435439A (en) A kind of shear wall sizing template for door window opening fixing means
CN203514793U (en) Equipment reserved formwork
CN102011490B (en) Template supporting construction process of wall after slab for high-rise shear wall structure system
CN102121313A (en) Rebar planting-free formwork erecting method for masonry construction and device thereof
CN204418666U (en) A kind of building site is with there being side wall stair template
CN202450539U (en) Cement prefabricated tyre template
CN207813014U (en) It can turnover type multi-ribbed plate plastics putamina joint treatment device
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN203729473U (en) Lightweight thermal-sound insulation support-free floor
CN102777028B (en) Pseudo-classic building eaves rafter poly-phenyl template system and construction method thereof
CN202787992U (en) Constructional column top concrete pouring structure
CN102605895B (en) Installation and construction method of ceiling board heat insulation mortar prefabricated block
CN105317216A (en) Wall body reversed construction method and wall body and concrete framework casting structure
CN106193578B (en) It is a kind of that modular system and construction technology are matched somebody with somebody based on groove type quarter bend
CN206299115U (en) A kind of template Quick Release holder device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120627