CN112359873A - Construction method of guide wall with haunch structure - Google Patents

Construction method of guide wall with haunch structure Download PDF

Info

Publication number
CN112359873A
CN112359873A CN202011282357.5A CN202011282357A CN112359873A CN 112359873 A CN112359873 A CN 112359873A CN 202011282357 A CN202011282357 A CN 202011282357A CN 112359873 A CN112359873 A CN 112359873A
Authority
CN
China
Prior art keywords
guide wall
template
haunching
bottom plate
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011282357.5A
Other languages
Chinese (zh)
Inventor
付智多
耿晓亮
郭帅龙
张大威
石燕平
程晋
王学明
王将阳
刘昱
张劲涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Rail Transit Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202011282357.5A priority Critical patent/CN112359873A/en
Publication of CN112359873A publication Critical patent/CN112359873A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/04Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof

Abstract

The invention relates to a construction method of a guide wall with an armpit structure, which comprises the following steps: after the bottom plate reinforcing steel bars are constructed, providing an haunching template, and supporting the haunching template in an inclined manner on the bottom plate reinforcing steel bars, so that the haunching template is supported at the arrangement position of the haunching structure; providing a guide wall template, supporting the guide wall template on the haunching template and fixedly connecting the guide wall template with the haunching template, so that the guide wall template is vertically arranged; providing a fastener, penetrating the fastener through the haunching template and extending into the bottom plate steel bar, fixedly connecting the fastener with the corresponding bottom plate steel bar, and fixedly connecting the fastener with the haunching template; and pouring concrete of the bottom plate to form a bottom plate structure, pouring concrete to the inner sides of the haunching template and the guide wall template to form a guide wall with the haunching structure, wherein the guide wall is positioned on the bottom plate structure. When concrete is poured, the haunching template and the guide wall template are not easy to shift, so that the forming quality of the guide wall with the haunching structure can be ensured.

Description

Construction method of guide wall with haunch structure
Technical Field
The invention relates to the technical field of buildings, in particular to a construction method of a guide wall with an armpit structure.
Background
At present, rail transit such as subway has become one of the main development directions of the modern city construction of our country.
The cast-in-place concrete structure formwork project of the subway station is generally formed by splicing wood formworks, and the construction is more remarkable by adopting the wood formworks when a guide wall position with an armpit structure is constructed. In actual plank sheathing, concrete engineering work progress, because plank sheathing self steadiness is relatively poor, bearing capacity is lower, when the unsatisfied requirement of installation reinforcement, the plank sheathing piece position very easily appears great wrong platform, appears warping easily during concrete placement for the fashioned wall position of leading takes place the slope easily and leads to structure clearance size to change. Due to the structural form of the haunching structure, the construction difficulty which is common and difficult to control can be met when the wood formwork is used for construction, and the construction efficiency is greatly influenced if the wood formwork splicing and installing process of the guide wall with the haunching structure is complex and difficult, and the guide wall is difficult to dismantle and takes long when being dismantled.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide a construction method of a guide wall with an armpit structure, so as to solve the problems that the forming position of the guide wall is easy to incline and the wood formwork is difficult to splice and difficult to dismantle due to the fact that the existing wood formwork of the guide wall with the armpit structure is easy to stagger.
In order to achieve the purpose, the invention provides a construction method of a guide wall with an armpit structure, which comprises the following steps:
after the bottom plate reinforcing steel bars are constructed, providing an haunching template, obliquely supporting the haunching template on the bottom plate reinforcing steel bars, and supporting the haunching template at the arrangement position of the haunching structure;
providing a guide wall template, erecting the guide wall template on the haunched template and fixedly connecting the guide wall template with the haunched template, so that the guide wall template is vertically arranged;
providing a fastener, penetrating the fastener through the haunching template and extending into the bottom plate steel bar, fixedly connecting the fastener with the corresponding bottom plate steel bar, and fixedly connecting the fastener with the haunching template;
and pouring concrete of the bottom plate to form a bottom plate structure, pouring concrete to the inner sides of the haunching formwork and the guide wall formwork to form a guide wall with the haunching structure, wherein the guide wall is positioned on the bottom plate structure.
The haunching template and the guide wall template are respectively arranged at the arrangement position corresponding to the haunching structure and the arrangement position of the guide wall, and the haunching template is fixedly connected to the bottom plate steel bar through the fastener, so that the guide wall template is also fixed. Add armpit template and lead the wall template and be difficult to shift when concreting to can ensure to add the armpit structure and lead the shaping quality of wall, because add armpit template and lead the wall template and be fixed connection, can demolish armpit template and lead the wall template wholly, avoid the big and difficult problem of demolising of the wooden form concatenation degree of difficulty.
The construction method of the guide wall with the haunching structure is further improved in that a reinforcing structure is arranged at the top of the provided guide wall template, and a through groove is formed in the top of the reinforcing structure; the construction method further comprises the following steps:
after the guide wall formworks are erected, a pulling piece is provided, and the pulling piece is clamped in the through grooves of the two oppositely arranged guide wall formworks so as to realize the fastening connection of the two oppositely arranged guide wall formworks.
The construction method of the guide wall with the haunching structure is further improved in that a reinforcing structure is arranged at the top of the provided guide wall template, and a through groove is formed in the top of the reinforcing structure; the construction method further comprises the following steps:
before the guide wall template is erected, guide wall reinforcing steel bars are arranged at the positions of the guide walls;
after the guide wall template is erected, providing a fixing piece, clamping the fixing piece into the through groove of the guide wall template, and extending the fixing piece into the guide wall reinforcing steel bars and fixedly connecting the fixing piece with the corresponding guide wall reinforcing steel bars.
The construction method of the guide wall with the haunch structure is further improved in that the haunch template and the guide wall template are vertically provided with connecting frames around; the construction method further comprises the following steps:
when the haunching template and the guide wall template are erected, the adjacent guide wall template and the haunching template are connected through the connecting frame.
The construction method of the guide wall with the haunching structure is further improved in that the construction method further comprises the following steps:
the outsides of the haunched template and the guide wall template are also provided with a plurality of transverse rib plates and a plurality of longitudinal rib plates which are arranged in a transverse and longitudinal staggered manner.
The construction method of the guide wall with the haunching structure is further improved in that the construction method further comprises the following steps:
the fasteners are located at the four corners of the haunch template.
Drawings
Fig. 1 is a schematic structural view of an axillary corner template and a guide wall template in the construction method of the guide wall with the axillary structure.
Fig. 2 is a schematic view of a main structure of a station for use in the construction method of the guide wall with the haunched structure according to the present invention.
Fig. 3 is a partially enlarged schematic view of fig. 2.
In the figure: the reinforced wall comprises an armpit template-1, through holes-11, a connecting frame-12, a guide wall template-2, a reinforcing structure-21, a through groove-211, an armpit structure-3, a guide wall-4, a transverse rib plate-6 and a longitudinal rib plate-7.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a construction method of a guide wall with an armpit structure, which is used for pouring the guide wall with the armpit structure. The haunching template and the guide wall template are respectively arranged at the arrangement position corresponding to the haunching structure and the arrangement position of the guide wall, and the haunching template is fixedly connected to the bottom plate steel bar through the fastener, so that the guide wall template is also fixed. Add armpit template and lead the wall template and be difficult to shift when concreting to can ensure to add the armpit structure and lead the shaping quality of wall, because add armpit template and lead the wall template and be fixed connection, can demolish armpit template and lead the wall template wholly, avoid the big and difficult problem of demolising of the wooden form concatenation degree of difficulty.
The construction method of the guide wall with the haunch structure according to the present invention will be described with reference to the accompanying drawings.
Referring to fig. 1, there is shown a schematic structural view of a construction method of a guide wall with an armpit structure according to the present invention. In this embodiment, a method for constructing a guide wall with an armpit structure includes the following steps:
after the bottom plate steel bars are constructed, providing an haunching template 1, obliquely supporting the haunching template 1 on the bottom plate steel bars, and supporting the haunching template 1 at the arrangement position of the haunching structure 3;
providing a guide wall template 2, erecting the guide wall template 2 on the haunching template 1 and fixedly connecting the guide wall template 2 with the haunching template 1, so that the guide wall template 2 is vertically arranged;
providing a fastener, penetrating the fastener through the haunching formwork 1 and extending into the bottom plate steel bar, fixedly connecting the fastener with the corresponding bottom plate steel bar, and fixedly connecting the fastener with the haunching formwork 1;
pouring concrete of a bottom plate to form a bottom plate structure, pouring concrete to the inner sides of the haunching formwork 1 and the guide wall formwork 2 to form a guide wall 4 with a haunching structure 3, wherein the guide wall 4 is located on the bottom plate structure.
According to the construction method, the haunching template 1 and the guide wall template 2 are respectively arranged at the setting position corresponding to the haunching structure 3 and the setting position corresponding to the guide wall 4, and the haunching template 1 is fixedly connected to the bottom plate steel bar through the fastening piece, so that the guide wall template 2 is fixed. Add armpit template 1 and lead wall template 2 and be difficult to shift when concreting to can ensure to add the shaping quality of armpit structure 3 and lead wall 4, because add armpit template 1 and lead wall template 2 and be fixed connection, can demolish and add armpit template 1 and lead wall template 2 wholly, avoid the big and difficult problem of demolising of the wooden template concatenation degree of difficulty.
Referring to fig. 1, 2 and 3, in the present embodiment, a reinforcing structure 21 is provided on the top of the guide wall form 2, and a through groove 211 is provided on the top of the reinforcing structure 21; the construction method also comprises the following steps:
after the guide wall formworks 2 are erected, a pulling piece is provided, and the pulling piece is clamped in the through grooves 211 of the two oppositely arranged guide wall formworks 2 so as to realize the fastening connection of the two oppositely arranged guide wall formworks 2. When the arrangement position of the haunching structure 3 is positioned at the two sides of the arrangement position of the guide wall 4, the two guide wall templates 2 which are oppositely arranged are fastened and connected through the pulling piece, so that the guide wall templates 2 are prevented from shifting to influence the forming quality of the guide wall 4 when concrete is poured.
Referring to fig. 1, 2 and 3, further, a reinforcing structure 21 is provided on the top of the guide wall formwork 2, and a through groove 211 is provided on the top of the reinforcing structure 21; the construction method also comprises the following steps:
before the guide wall template 2 is erected, reinforcing steel bars of the guide wall 4 are arranged at the position of the guide wall 4;
after the guide wall formwork 2 is erected, a fixing piece is provided, the fixing piece is clamped into the through groove 211 of the guide wall formwork 2, and the fixing piece extends into the guide wall 4 steel bars and is fixedly connected with the corresponding guide wall 4 steel bars. When the setting position of the haunching structure 3 is only located at the setting position side of the guide wall 4, the guide wall template 2 and the corresponding guide wall 4 steel bar are fixedly connected through the fixing piece, so that the guide wall template 2 is prevented from shifting to influence the forming quality of the guide wall 4 when concrete is poured.
Referring to fig. 1, further, a connecting frame 12 is vertically arranged around each of the provided haunching template 1 and the guide wall template 2; the construction method also comprises the following steps:
when the haunching template 1 and the guide wall template 2 are erected, the adjacent guide wall template 2 and the haunching template 1 are connected through the connecting frame 12.
Referring to fig. 1, in this embodiment, the construction method further includes the following steps:
the outsides of the haunched template 1 and the guide wall template 2 are also provided with a plurality of transverse rib plates 6 and a plurality of longitudinal rib plates 7 which are arranged in a transverse and longitudinal staggered manner. Preferably, the haunching template 1 and the guide wall template 2 are steel plates, and the rigidity and the strength of the haunching template 1 and the guide wall template 2 are enhanced through the plurality of transverse rib plates 6 and the plurality of longitudinal rib plates 7, so that the phenomenon that the haunching template 1 and the guide wall template 2 are displaced to influence the forming quality of the haunching structure 3 and the guide wall 4 when concrete is poured is avoided.
Referring to fig. 1, further, the construction method further includes the following steps:
the fasteners are provided at the four corners of the haunch template 1.
Preferably, through holes 11 are formed at four corners of the axillary template 1, the fasteners are screws and penetrate through the corresponding through holes 11, a plurality of nuts are provided, the nuts are screwed on the fasteners and clamp and fix the axillary template at two sides of the axillary template, and thus the axillary template is mounted and fixed on the fasteners.
By adopting the technical scheme, the invention has the following beneficial effects:
the haunching template and the guide wall template are respectively arranged at the arrangement position corresponding to the haunching structure and the arrangement position of the guide wall, and the haunching template is fixedly connected to the bottom plate steel bar through the fastener, so that the guide wall template is also fixed. Add armpit template and lead the wall template and be difficult to shift when concreting to can ensure to add the armpit structure and lead the shaping quality of wall, because add armpit template and lead the wall template and be fixed connection, can demolish armpit template and lead the wall template wholly, avoid the big and difficult problem of demolising of the wooden form concatenation degree of difficulty. Add armpit template and lead the wall template and be difficult to bond the concrete for the steel sheet drawing of patterns back and avoided the wooden form to cause the problem of concrete pitted surface easily, moreover because the rigidity of steel sheet is big for fixed fastness is stronger, is difficult to the aversion. Need punch to the plank sheathing among the prior art, and this application adopts bolt hole and bolt zonulae occludens's cooperation mode, has avoided the problem of concrete seepage.

Claims (6)

1. A construction method of a guide wall with an armpit structure is characterized by comprising the following steps:
after the bottom plate reinforcing steel bars are constructed, providing an haunching template, obliquely supporting the haunching template on the bottom plate reinforcing steel bars, and supporting the haunching template at the arrangement position of the haunching structure;
providing a guide wall template, erecting the guide wall template on the haunched template and fixedly connecting the guide wall template with the haunched template, so that the guide wall template is vertically arranged;
providing a fastener, penetrating the fastener through the haunching template and extending into the bottom plate steel bar, fixedly connecting the fastener with the corresponding bottom plate steel bar, and fixedly connecting the fastener with the haunching template;
and pouring concrete of the bottom plate to form a bottom plate structure, pouring concrete to the inner sides of the haunching formwork and the guide wall formwork to form a guide wall with the haunching structure, wherein the guide wall is positioned on the bottom plate structure.
2. The construction method of the guide wall with the haunching structure as claimed in claim 1, wherein a reinforcing structure is provided on the top of the guide wall formwork, and a through groove is provided on the top of the reinforcing structure; the construction method further comprises the following steps:
after the guide wall formworks are erected, a pulling piece is provided, and the pulling piece is clamped in the through grooves of the two oppositely arranged guide wall formworks so as to realize the fastening connection of the two oppositely arranged guide wall formworks.
3. The construction method of the guide wall with the haunching structure as claimed in claim 1, wherein a reinforcing structure is provided on the top of the guide wall formwork, and a through groove is provided on the top of the reinforcing structure; the construction method further comprises the following steps:
before the guide wall template is erected, guide wall reinforcing steel bars are arranged at the positions of the guide walls;
after the guide wall template is erected, providing a fixing piece, clamping the fixing piece into the through groove of the guide wall template, and extending the fixing piece into the guide wall reinforcing steel bars and fixedly connecting the fixing piece with the corresponding guide wall reinforcing steel bars.
4. The construction method of the guide wall with the haunch structure according to claim 1, wherein the haunch formwork and the guide wall formwork are vertically provided with connecting frames around; the construction method further comprises the following steps:
when the haunching template and the guide wall template are erected, the adjacent guide wall template and the haunching template are connected through the connecting frame.
5. The method for constructing a guide wall with an armpit structure according to claim 1, further comprising the steps of:
the outsides of the haunched template and the guide wall template are also provided with a plurality of transverse rib plates and a plurality of longitudinal rib plates which are arranged in a transverse and longitudinal staggered manner.
6. The method for constructing a guide wall with an armpit structure according to claim 1, further comprising the steps of:
the fasteners are located at the four corners of the haunch template.
CN202011282357.5A 2020-11-17 2020-11-17 Construction method of guide wall with haunch structure Pending CN112359873A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011282357.5A CN112359873A (en) 2020-11-17 2020-11-17 Construction method of guide wall with haunch structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011282357.5A CN112359873A (en) 2020-11-17 2020-11-17 Construction method of guide wall with haunch structure

Publications (1)

Publication Number Publication Date
CN112359873A true CN112359873A (en) 2021-02-12

Family

ID=74515145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011282357.5A Pending CN112359873A (en) 2020-11-17 2020-11-17 Construction method of guide wall with haunch structure

Country Status (1)

Country Link
CN (1) CN112359873A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113123215A (en) * 2021-03-23 2021-07-16 中铁建工集团有限公司 Construction method of platform wall and platform wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110033650A (en) * 2009-09-25 2011-03-31 유한회사 엘씨건설 Method for underground roadway using slurry wall method
CN202284291U (en) * 2011-10-27 2012-06-27 中国葛洲坝集团股份有限公司 Concrete overflowing surface template shaped like Chinese character ba
CN204112712U (en) * 2014-09-28 2015-01-21 北京万兴建筑集团有限公司 A kind of side root haunch cast-in-place wall model sheetinstallat device
CN106088148A (en) * 2016-08-04 2016-11-09 中国华冶科工集团有限公司 Pipe gallery template and application thereof
CN207469301U (en) * 2017-11-13 2018-06-08 中国十九冶集团有限公司 Piping lane leads the formwork structure of wall
CN208517966U (en) * 2018-07-02 2019-02-19 中国建筑第八工程局有限公司 The erecting device for leading wall of underground pipe gallery

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110033650A (en) * 2009-09-25 2011-03-31 유한회사 엘씨건설 Method for underground roadway using slurry wall method
CN202284291U (en) * 2011-10-27 2012-06-27 中国葛洲坝集团股份有限公司 Concrete overflowing surface template shaped like Chinese character ba
CN204112712U (en) * 2014-09-28 2015-01-21 北京万兴建筑集团有限公司 A kind of side root haunch cast-in-place wall model sheetinstallat device
CN106088148A (en) * 2016-08-04 2016-11-09 中国华冶科工集团有限公司 Pipe gallery template and application thereof
CN207469301U (en) * 2017-11-13 2018-06-08 中国十九冶集团有限公司 Piping lane leads the formwork structure of wall
CN208517966U (en) * 2018-07-02 2019-02-19 中国建筑第八工程局有限公司 The erecting device for leading wall of underground pipe gallery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113123215A (en) * 2021-03-23 2021-07-16 中铁建工集团有限公司 Construction method of platform wall and platform wall

Similar Documents

Publication Publication Date Title
CN112196107A (en) Prefabricated assembled type steel reinforced concrete primary and secondary beam connecting joint
CN114319977B (en) Steel pipe concrete row column type connection precast shear wall structure and construction method
US3819143A (en) Formwork for concrete walls
CN112359873A (en) Construction method of guide wall with haunch structure
CN213682129U (en) Deep foundation pit unilateral die carrier
CN212154120U (en) Aluminum alloy template set for prefabricated building
CN111576620A (en) Construction method for beam-column core area of stiffened concrete structure
CN214195532U (en) Formwork structure with guide wall with haunching structure
CN212642113U (en) Formwork support system and construction structure
CN213647966U (en) Telescopic prefabricated T-beam formwork
CN109057318B (en) Assembly type building template system and wall body module
CN211369523U (en) Template system of expansion joint shear force wall
CN108755938B (en) Steel core area node of assembled concrete frame
CN218668553U (en) Be used for anti-reinforced (rfd) structure of bank template of concrete
CN215594464U (en) Prefabricated wallboard and connection structure of prefabricated wallboard
CN110735529A (en) Construction process for shear wall plastic-wood combined template ultra-low-loss supporting construction
CN213418467U (en) Concrete shear wall mould
CN213653761U (en) Prefabricated assembled type steel reinforced concrete primary and secondary beam connecting joint
CN215630802U (en) Prefabricated wallboard and connecting joint of prefabricated wallboard
CN217420484U (en) Detachable formwork system for cast-in-place one-way plate
CN112227407B (en) Connecting system and connecting method for prefabricated superposed foundation and prefabricated concrete column
CN216765629U (en) Design template construction platform
CN217203917U (en) Template structure of hole is reserved to hydraulic pressure dam built-in fitting
CN220868784U (en) Template's no protruding coupling mechanism
CN212670601U (en) Flat pipe template system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210212