CN207177286U - Add region mould after fabricated shear wall is reserved - Google Patents
Add region mould after fabricated shear wall is reserved Download PDFInfo
- Publication number
- CN207177286U CN207177286U CN201721189450.5U CN201721189450U CN207177286U CN 207177286 U CN207177286 U CN 207177286U CN 201721189450 U CN201721189450 U CN 201721189450U CN 207177286 U CN207177286 U CN 207177286U
- Authority
- CN
- China
- Prior art keywords
- mould
- shear wall
- region
- framework
- mold frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model provides after a kind of fabricated shear wall is reserved plus region mould, including the region mold frame surrounded by channel-section steel, the framework is installed on precast shear wall framework base, it is identical with shear wall's thickness, the region mold frame is welded, rubber slab is provided with the inside of the top margin of channel-section steel and two sides, rubber slab passes through bolt and the affixed one of region mold frame;The corresponding position of mould circular hole is reserved with wallboard mould on the framework and rubber slab of mould top margin and is provided with nib, the nib is provided with air bag between mould circular hole, air bag diameter is less than precast shear wall thickness of wall body, region mold frame is trapezoidal, and rubber parts is provided with gap, and structure of the present utility model is steel framework, because steel bracket does not contact directly with concrete, isolated by rubber slab, be easier assembled, dismounting than punching block and wooden model, production efficiency is higher.
Description
Technical field
The utility model belongs to the mould construction method of architectural engineering precast concrete wall panel.
Background technology
The vertical connection of assembly of shear wall structure is typically connected using sleeve grouting, slurry anchor overlap joint connection, when using overlap joint
During connection, it is necessary in the reserved cavity in prefabricated panel member bottom section middle part, this cavity is fixed with overlap joints such as channel-section steel, steel pipes to be surrounded
Framework, then the template for being formed isolation concrete is enclosed with wooden model, support of the 200mm width wallboard as component is retained between hole,
Blanking hole is reserved in hole top, after component installs, the colligation in reserved area of levels reinforcing bar overlaps, and is utilized after matched moulds
The blanking hole casting concrete of panel tops, makes wallboard form entirety.Existing reserved opening formwork builds inconvenience, time-consuming to take
Power, framework is not firm to cause edge loosely deformed consequence.
Utility model content
The utility model adds region mould, bag in order to solve the above technical problems, providing after a kind of fabricated shear wall is reserved
The region mold frame surrounded by channel-section steel is included, the framework is installed on precast shear wall framework base, identical with shear wall's thickness,
The region mold frame is welded, and is provided with rubber slab on the inside of the top margin of channel-section steel and two sides, rubber slab passes through bolt and area
The affixed one of domain mold frame;Reserved on the framework and rubber slab of mould top margin with wallboard mould on the corresponding position of mould circular hole
Provided with nib, the nib is less than precast shear wall thickness of wall body to air bag, air bag diameter is provided between mould circular hole.
Region mold frame is trapezoidal.
Rubber parts is provided with gap.
Structure of the present utility model is steel framework, because steel bracket does not contact directly with concrete, is isolated by rubber slab,
Assembled, dismounting is easier than punching block and wooden model, production efficiency is higher.
Brief description of the drawings
Fig. 1 is the utility model of the whole structure diagram;
Fig. 2 is region mold frame side view;
Fig. 3 is region mold frame angle of depression figure.
In figure:Top margin 1, rubber slab 2, side 3, air bag 4, gap 5, nib 6.
Embodiment
The utility model is illustrated below in conjunction with the accompanying drawings, a kind of fabricated shear wall as depicted reserves Hou Jia areas
Domain mould, including the region mold frame surrounded by channel-section steel, the framework is installed on precast shear wall framework base, with shear wall
Thickness is identical, the entirety that the region mold frame is welded, and the inner side of 1 and two side of top margin 3 of region mold frame is provided with
Rubber slab 2, rubber slab 2 pass through bolt and the affixed one of region mold frame;On the framework and rubber slab 2 of mould top margin 1 with wall
Board mold reserve mould circular hole corresponding to position be provided with nib 6, the nib 6 is to being provided with air bag 4, air bag between mould circular hole
4 diameters are less than precast shear wall thickness of wall body.
This programme is described in detail using process with reference to an example:
Prefabricated one high 2700mm of target, wide 4000m, thick 200mm walls, reserved Hou Jiao areas and blanking hole are needed on wall.
Wall mold framework M1, M2, M3, M4 are set first, and for four rhizospheres into the framework of dimension, framed wall top sets mould circular hole.
Reference picture 1-3, in wall mold bottom installation region mould:So that [14 channel-section steels and steel pipe process 4 components and be used to make in this example
Make region mold frame;From same wallboard thickness identical rubber slab 2,3 are cut into according to the size in bottom Hou Jiao regions, and
It is fixedly mounted on bolt on the inside of the mold frame of region;Region mould top margin reserves diameter 100mm nib 6, the nib 6 and wall
Side mold circular hole position correspondence on plate;Rubber slab cornice sheathing reinforcing bar cuts out gap 5 through position.Also air bag, the air bag 4 fill
Gas diameter 100mm, its upper end pass through the mould set on region mould top margin 1 through the mould circular hole at the top of wall mold, lower end
Hole 6.
Removed downwards for the ease of region mould, the following component length of steel pipe of mold frame is more slightly longer than top margin channel-section steel, makes area
Domain mould is trapezoidal.
After wall plate member surrounding set of molds installs, support is bolted in bottom die.With bolt by rubber
Offset plate 2 is fixed on steel bracket.When reinforcing bar ties up muscle, the gap 5 of rubber mold is sequentially passed through, these holes can both fix steel
The position of muscle, it is also ensured that the protective layer of reinforcing bar.After reinforcing bar colligation is complete, with rubber pneumatic bag mould through side mold on wallboard and
The support of bottom, can be with casting concrete after inflation.
It is complete in wallboard concrete pouring, rubber pneumatic bag is deflated before steam-cured.During steam-cured complete component form removal, by wallboard surrounding mould
After tool is removed, level pours a section support after extracting bottom, again removes hole rubber mold after support removing.Due to steel bracket not with
Concrete directly contacts, and is isolated by rubber slab, is easier assembled, dismounting than punching block and wooden model, production efficiency is higher.
Claims (3)
- Add region mould after 1. a kind of fabricated shear wall is reserved, including the region mold frame surrounded by channel-section steel, framework peace It is identical with shear wall's thickness loaded on precast shear wall framework base, it is characterized in that:The region mold frame is to be welded Entirety, be provided with rubber slab on the inside of the top margin of framework and two sides, rubber slab passes through bolt and the affixed one of region mold frame; The corresponding position of mould circular hole is reserved with wallboard mould on the framework and rubber slab of mould top margin and is provided with nib;The nib is extremely Air bag is installed, air bag diameter is less than precast shear wall thickness of wall body between mould circular hole.
- Add region mould after 2. fabricated shear wall as claimed in claim 1 is reserved, it is characterized in that:Region mold frame is in ladder Shape.
- Add region mould after 3. fabricated shear wall as claimed in claim 1 or 2 is reserved, it is characterized in that:Rubber parts, which is provided with, to slit Mouthful.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721189450.5U CN207177286U (en) | 2017-09-16 | 2017-09-16 | Add region mould after fabricated shear wall is reserved |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721189450.5U CN207177286U (en) | 2017-09-16 | 2017-09-16 | Add region mould after fabricated shear wall is reserved |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207177286U true CN207177286U (en) | 2018-04-03 |
Family
ID=61747732
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721189450.5U Active CN207177286U (en) | 2017-09-16 | 2017-09-16 | Add region mould after fabricated shear wall is reserved |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207177286U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108756233A (en) * | 2018-05-30 | 2018-11-06 | 中国二十二冶集团有限公司 | Reserved electronic box hole mold and its application method |
CN113500694A (en) * | 2021-06-30 | 2021-10-15 | 中国二十二冶集团有限公司 | Production and construction method of lap joint prefabricated wall |
CN114704095A (en) * | 2022-04-15 | 2022-07-05 | 濮阳市宏超建筑安装有限公司 | Continuous casting equipment and method for reinforcement cage concrete pipe in building |
-
2017
- 2017-09-16 CN CN201721189450.5U patent/CN207177286U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108756233A (en) * | 2018-05-30 | 2018-11-06 | 中国二十二冶集团有限公司 | Reserved electronic box hole mold and its application method |
CN113500694A (en) * | 2021-06-30 | 2021-10-15 | 中国二十二冶集团有限公司 | Production and construction method of lap joint prefabricated wall |
CN114704095A (en) * | 2022-04-15 | 2022-07-05 | 濮阳市宏超建筑安装有限公司 | Continuous casting equipment and method for reinforcement cage concrete pipe in building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104295088A (en) | Steel-wood combined formwork structure of shear walls on two sides of deformation joint and construction method of steel-wood combined formwork structure | |
CN207177286U (en) | Add region mould after fabricated shear wall is reserved | |
CN111734018A (en) | Formwork structure, disassembly-free mold and concrete wall construction method | |
CN210658959U (en) | Constructional column concrete placement construction structures of smashing | |
CN102373713B (en) | Construction method and device for preserved hole of equipment foundation bolt | |
CN107083804B (en) | A kind of wall structure column joint bar construction method | |
CN107217790B (en) | Prefabricated reinforced concrete frame hollow column and construction method thereof | |
CN207988490U (en) | A kind of easy device that deformation joint shear wall formwork installs | |
CN206233560U (en) | Wall formwork erecting structure | |
CN107639723A (en) | A kind of the production template and production method of concrete prefabricated wallboard with holes | |
CN208343121U (en) | Prefabricated assembled steel structure concrete wallboard mould | |
CN108858690B (en) | Mold for producing precast concrete member and use method | |
CN202831624U (en) | Template for deformation joint of shear wall | |
CN207260574U (en) | Template fixing system of building waterproof structure | |
CN108442698B (en) | Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve | |
CN210738077U (en) | Waterproof reverse-edge aluminum alloy hanging die | |
CN107060173A (en) | Early form removal construction method in clear-water concrete wafer board structure hole | |
CN209907926U (en) | Pouring template system capable of realizing subsection vibrating of secondary structure wall constructional column | |
CN105839824B (en) | Shed deckhead construction method | |
CN209799354U (en) | casting die system of cast-in-place concrete sandwich partition wall with extrusion molding insulation board | |
CN207160052U (en) | A kind of skewback for connecting arcuate bead steel construction | |
CN206957201U (en) | Early form removal in clear-water concrete wafer board structure hole | |
CN218911791U (en) | Horizontal connection node of hollow wallboard | |
CN207160048U (en) | A kind of main transformer of transformer substation foundation structure | |
CN207344800U (en) | A kind of production template of concrete prefabricated wallboard with holes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |