CN109586204A - Method for installing the fixed structure and the secondary piping of installation of secondary piping - Google Patents
Method for installing the fixed structure and the secondary piping of installation of secondary piping Download PDFInfo
- Publication number
- CN109586204A CN109586204A CN201811581056.5A CN201811581056A CN109586204A CN 109586204 A CN109586204 A CN 109586204A CN 201811581056 A CN201811581056 A CN 201811581056A CN 109586204 A CN109586204 A CN 109586204A
- Authority
- CN
- China
- Prior art keywords
- secondary piping
- fixed structure
- installing
- metope
- wire box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000009434 installation Methods 0.000 title abstract description 18
- 239000011449 brick Substances 0.000 claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 14
- 230000000694 effects Effects 0.000 abstract description 7
- 239000002699 waste material Substances 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract description 5
- 238000000465 moulding Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 5
- 230000006378 damage Effects 0.000 description 3
- 229910001209 Low-carbon steel Inorganic materials 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 206010038743 Restlessness Diseases 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
- H02G1/08—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The invention discloses the methods of fixed structure and the secondary piping of installation for installing secondary piping.The secondary piping includes being embedded in the spool in the first metope and the wire box set on the conduit end, which includes support rod, which is fastenedly connected with the wire box, and the other end is fastenedly connected with built metope.Fixed structure for installing secondary piping of the invention can carry out a positioning molding to spool and wire box, ensure the accurate installation of spool, wire box, effectively the construction of brick setting is avoided to change the broken of pipe box, masonry, spool, wire box good forming effect also reduce the influence to masonry impression quality as far as possible.Reduce to pick and beat slot hole, facilitate construction, reduces waste of material.Fixed structure is at low cost, can Reusability.Fixed structure can be recycled, is convenient to assemble and disassemble.As it can be seen that the of simple structure and strong practicability of the fixed structure for installing secondary piping of the invention.
Description
Technical field
The present invention relates to the technical fields of the secondary piping of construction and installation, in particular to for installing secondary piping
Fixed structure and the method for the secondary piping of installation.
Background technique
As architectural engineering is more and more perfect, construction engineering quality requires to be continuously improved, spool of constructing again in brick setting,
The requirement of wire box is also more and more precisely and stringent, is a no small test for our installing engineerings.
At present in installing engineering in brick setting, spool, wire box are all to construct to finish in advance to be wrapped up with brick again, in the package phase
Between simultaneously arrange personnel adjust pipe box, it is ensured that pipe box can all wrap up in place.But it is inevitably had in brick setting package various
It inevitably happens: during Construction of Brick Wall, since work post is interspersed, can often be caused because of some odjective causes a
Phenomena such as other spool, wire box damage, interface fall off, walk so as to cause bottom pour ladle, package.Therefore the adjustment of spool, wire box is repaired
Change, becomes the indispensable work of secondary piping installation.In the case of such, the unrest of the mode of processing from early stage
It strikes, batter, to the joint-cutting tick slot on brick setting for having planning at present.These modes all unavoidably cause following adverse effect:
1) brick setting destruction point is more, causes to run through to masonry, be not easily repaired;2) masonry molding effect is poor, and aesthetic quality is seriously bad;
3) it generates and largely builds slag pollution and noise pollution;4) a large amount of lost labor's adjustment, waste mortar, brick body are repaired, quality
It is not up to requirement.Also, handing in the clear water room of Quality Supervision Station requires new construction installation two to match and cannot occur in metope in room file
Pick beat, grooving etc..So these more extensive modes have been no longer appropriate for the trend of technology fast development.Therefore, how to subtract
How few installation piping destruction caused by brick setting engineering improves brick setting molding effect and impression quality, how to reduce and apply
Work fugitive dust and building waste, how to reduce the problems such as artificial and material waste be that the secondary piping angle steel of our construction and installation is fixed
And the key that clip package construction needs to solve.
Summary of the invention
The main purpose of the present invention is to provide the sides of fixed structure and the secondary piping of installation for installing secondary piping
Method, to solve the problems, such as that existing joint-cutting tick slot is installed in secondary piping in the prior art.
To achieve the goals above, according to an aspect of the invention, there is provided it is a kind of for installing consolidating for secondary piping
Determine structure.The secondary piping includes being embedded in the spool in the first metope and the wire box set on the conduit end, this is used to pacify
The fixed structure for filling secondary piping includes support rod, which is fastenedly connected with the wire box, the other end and be completed
Metope be fastenedly connected.
Fixed structure for installing secondary piping of the invention can carry out a positioning molding to spool and wire box, really
The accurate installation for protecting spool, wire box, effectively avoids the construction of brick setting from changing the broken of pipe box, masonry, spool, wire box molding effect
Fruit is good, also reduces the influence to masonry impression quality as far as possible.Reduce to pick and beat slot hole, facilitate construction, reduces waste of material.
Fixed structure is at low cost, can Reusability.Fixed structure can be recycled, is convenient to assemble and disassemble.As it can be seen that of the invention is used to install two
The of simple structure and strong practicability of the fixed structure of secondary piping.
Further, the support rod is angle steel.Angle bar frame can weigh completely after the completion of spool, wire box brick setting as a result,
Multiple utilize also can be used as pipeline or the use of gantry bracket, economize on resources.
Further, it is equipped with screw hole in the wire box, is equipped on the support rod matched with the screw hole
First hole, the support rod passes through the screw hole using screw with the wire box and the realization of the first hole is fastenedly connected;
The screw hole and the first hole are respectively two.Structure is simple and convenient for disassembly and assembly as a result,.
Further, it is equipped with support base between the support rod and the second metope, is welded between the support base and support rod
It connects, is connected between the support base and the second metope using setscrew;Second metope and first metope are non-coplanar.
Structure is simple and convenient for disassembly and assembly as a result,.
Further, the support base is equipped at least two and matched second hole of setscrew.As a result, to avoid
The reinforcing bar in concrete is met when fixed.
Further, it is connected between the support rod and third metope using setscrew;The third metope and first
Metope is coplanar.Structure is simple and convenient for disassembly and assembly as a result,.
Further, the support rod is equipped at least two and the matched third hole of setscrew;As a result, to avoid
The reinforcing bar in concrete is met when fixed.Cushion block is equipped between the support rod and the third metope.As a result, when wire box needs
When going out wall a distance, by the way that cushion block is arranged, can preferably wire box be positioned and fastened.
Further, the support rod is connect at least two wire box.Practicability is stronger as a result,.
To achieve the goals above, according to another aspect of the present invention, a kind of side for installing secondary piping is additionally provided
Method.The method of the secondary piping of the installation, comprising the following steps:
1) wire box is fixed for installing the fixed structure of secondary piping using above-mentioned;
2) it lays bricks to form the first metope, uses in the surrounding of the wire box and wrapped up with the matched brick of its shape;
3) it removes described for installing the fixed structure of secondary piping.
The method of the secondary piping of installation of the invention reduces two with process, and constructing operation is simple and easy to do, installation is quick, returns
Work rate is low, increases artificial service efficiency, improves work efficiency, saves the duration with manually, effectively avoids the construction of brick setting
The broken of pipe box is changed.
Further, the brick is " < " shape, " Fang " shape, " Qian " font or " Fang " shape.It is suitable for difference as a result,
The wire box of size, preferably package wire box.
As it can be seen that the fixed structure for installing secondary piping of the invention can once be positioned to spool and wire box
Type, it is ensured that the accurate installation of spool, wire box effectively avoids the construction of brick setting from changing the broken of pipe box, masonry, spool, wire box
Good forming effect also reduces the influence to masonry impression quality as far as possible.Reduce to pick and beat slot hole, facilitate construction, reduces material
Material waste.Fixed structure is at low cost, can Reusability.Fixed structure can be recycled, is convenient to assemble and disassemble.Installation of the invention is secondary
The method of piping reduces two with process, and constructing operation is simple and easy to do, installation is quick, and rework rate is low, increases artificial using effect
Rate improves work efficiency, saves the duration with manually, the construction of brick setting is effectively avoided to change the broken of pipe box.
The present invention is described further with reference to the accompanying drawings and detailed description.The additional aspect of the present invention and excellent
Point will be set forth in part in the description, and partially will become apparent from the description below, or practice through the invention
It solves.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to assist the understanding of the present invention, content provided in attached drawing and its
Related explanation can be used for explaining the present invention in the present invention, but not constitute an undue limitation on the present invention.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the fixed structure for installing secondary piping of the embodiment of the present invention 1.
Fig. 2 is the structural schematic diagram of the fixed structure for installing secondary piping of the embodiment of the present invention 3.
Fig. 3 is the structural schematic diagram of the fixed structure for installing secondary piping of the embodiment of the present invention 4.
Fig. 4 is the structural schematic diagram of wire box of the present invention.
Fig. 5 is the structural schematic diagram of brick of the present invention.
Related label in above-mentioned attached drawing are as follows:
1: spool;
2: wire box;
21: screw hole;
31: the first metopes;
321: side elevation;
322: floor;
33: third metope;
4: support rod;
5: support base;
6: screw;
7: setscrew;
8: cushion block;
9: brick.
Specific embodiment
Clear, complete explanation is carried out to the present invention with reference to the accompanying drawing.Those of ordinary skill in the art are being based on these
The present invention will be realized in the case where explanation.Before in conjunction with attached drawing, the present invention will be described, of particular note is that:
The technical solution provided in each section including following the description and technical characteristic in the present invention are not rushing
In the case where prominent, these technical solutions and technical characteristic be can be combined with each other.
In addition, the embodiment of the present invention being related in following the description is generally only the embodiment of present invention a part, and
The embodiment being not all of.Therefore, based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness
Every other embodiment obtained, should fall within the scope of the present invention under the premise of labour.
About term in the present invention and unit.Term in description and claims of this specification and related part
" comprising ", " having " and their any deformation, it is intended that cover and non-exclusive include.
Embodiment 1
Secondary piping includes being embedded in the spool 1 in the first metope 31 and the wire box 2 set on 1 end of spool.Such as Fig. 1
Shown in for installing the fixed structure of secondary piping, including support rod 4,4 one end of support rod and the wire box 2 fastening connect
It connects, the other end is fastenedly connected with built metope.
The support rod 4 is angle steel, model ∠ 40*4.
It is equipped with screw hole 21 in the wire box 2, is equipped with and the screw hole 21 matched first on the support rod 4
Hole, the support rod 4 passes through the screw hole 21 using screw 6 with the wire box 2 and the realization of the first hole is fastenedly connected;
As shown in figure 4, the wire box 2 is 86 molded line boxes.The screw hole 21 and the first hole are respectively two.The diameter of first hole
For 4mm.The screw 6 is galvanized mild steel drive screw 6.
It is equipped with support base 5 between the support rod 4 and the second metope, is welded between the support base 5 and support rod 4, institute
It states and is connected between support base 5 and the second metope using setscrew 7;Second metope and first metope 31 are non-coplanar,
Second metope is the side elevation 321 of first metope 31, and support rod 4 is horizontal positioned at this time.
Set on the support base 5 there are two with matched second hole of setscrew 7.The diameter of second hole is 8mm.
Embodiment 2
Compared with Example 1, the difference that the fixed structure for installing secondary piping of the present embodiment has is: described the
Two metopes are floor 322, and support rod 4 is vertically placed at this time.
Embodiment 3
Secondary piping includes being embedded in the spool 1 in the first metope 31 and the wire box 2 set on 1 end of spool.Such as Fig. 2
Shown in for installing the fixed structure of secondary piping, including support rod 4,4 one end of support rod and the wire box 2 fastening connect
It connects, the other end is fastenedly connected with built metope.
The support rod 4 is angle steel.
It is equipped with screw hole 21 in the wire box 2, is equipped with and the screw hole 21 matched first on the support rod 4
Hole, the support rod 4 passes through the screw hole 21 using screw 6 with the wire box 2 and the realization of the first hole is fastenedly connected;
As shown in figure 4, the wire box 2 is 86 molded line boxes.The screw hole 21 and the first hole are respectively two.The diameter of first hole
For 4mm.The screw 6 is galvanized mild steel drive screw 6.
It is connected between the support rod 4 and third metope 33 using setscrew 7;The third metope 33 and the first metope
31 is coplanar, and support rod 4 is horizontal positioned.
Set on the support rod 4 there are two with the matched third hole of setscrew 7;The support rod 4 and the third
Cushion block 8 is equipped between metope 33.The diameter of third hole is 8mm.
Embodiment 4
Compared with Example 3, the difference that the fixed structure for installing secondary piping of the present embodiment has is: such as Fig. 3
Shown, the support rod 4 is connect at least two wire box 2.
Embodiment 5
The method for installing secondary piping, comprising the following steps:
1) wire box 2 is fixed for installing the fixed structure of secondary piping using one of embodiment 1-4;
2) it lays bricks to form the first metope 31, uses in the surrounding of the wire box 2 and wrapped up with the matched brick 9 of its shape;Institute
Stating brick is " < " shape.
3) it removes described for installing the fixed structure of secondary piping.
Related content of the invention is illustrated above.Those of ordinary skill in the art are in the feelings illustrated based on these
The present invention will be realized under condition.Based on above content of the invention, those of ordinary skill in the art are not making creativeness
Every other embodiment obtained, should fall within the scope of the present invention under the premise of labour.
Claims (10)
1. the fixed structure for installing secondary piping, which includes the spool (1) being embedded in the first metope (31)
And it is set to the wire box (2) of spool (1) end, it is characterised in that: the fixed structure includes support rod (4), the support rod
(4) one end is fastenedly connected with the wire box (2), and the other end is fastenedly connected with built metope.
2. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: the support rod (4) is
Angle steel.
3. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: on the wire box (2)
Equipped with screw hole (21), it is equipped with and matched first hole of the screw hole (21), the support rod on the support rod (4)
(4) screw hole (21) are passed through using screw (6) with the wire box (2) and the realization of the first hole is fastenedly connected;The spiral shell
Wire hole (21) and the first hole are respectively two.
4. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: the support rod (4) with
Support base (5) are equipped between second metope, are welded between the support base (5) and support rod (4), the support base (5) and the
It is connected between two metopes using setscrew (7);Second metope and first metope (31) are non-coplanar.
5. as claimed in claim 4 for installing the fixed structure of secondary piping, it is characterised in that: on the support base (5)
Equipped at least two and setscrew (7) matched second hole.
6. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: the support rod (4) with
It is connected between third metope (33) using setscrew (7);The third metope (33) is coplanar with the first metope (31).
7. as claimed in claim 6 for installing the fixed structure of secondary piping, it is characterised in that: on the support rod (4)
Equipped at least two and setscrew (7) matched third hole;It is set between the support rod (4) and the third metope (33)
There are cushion block (8).
8. as described in claim 1 for installing the fixed structure of secondary piping, it is characterised in that: the support rod (4) with
At least two wire box (2) connection.
9. the method for installing secondary piping, comprising the following steps:
1) wire box (2) are fixed for installing the fixed structure of secondary piping using one of claim 1-8;
2) it lays bricks to form the first metope (31), uses in the surrounding of the wire box (2) and wrapped up with the matched brick of its shape (9);
3) it removes described for installing the fixed structure of secondary piping.
10. installing the method for secondary piping as claimed in claim 9, it is characterised in that: the brick is " < " shape, " Contraband " word
Shape, " Qian " font or " Fang " shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811581056.5A CN109586204B (en) | 2018-12-24 | 2018-12-24 | Fixing structure for installing secondary piping and method for installing secondary piping |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811581056.5A CN109586204B (en) | 2018-12-24 | 2018-12-24 | Fixing structure for installing secondary piping and method for installing secondary piping |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109586204A true CN109586204A (en) | 2019-04-05 |
CN109586204B CN109586204B (en) | 2024-04-19 |
Family
ID=65930813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811581056.5A Active CN109586204B (en) | 2018-12-24 | 2018-12-24 | Fixing structure for installing secondary piping and method for installing secondary piping |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109586204B (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101247029A (en) * | 2008-03-27 | 2008-08-20 | 成都市第四建筑工程公司 | Construction method for installing wire pipe and wire box on the wall |
CN102047432A (en) * | 2007-12-21 | 2011-05-04 | 纳幕尔杜邦公司 | Photovoltaic array, framework, and methods of installation and use |
CN103321436A (en) * | 2013-07-10 | 2013-09-25 | 成都市第八建筑工程公司 | Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof |
CN203352042U (en) * | 2013-07-10 | 2013-12-18 | 成都市第八建筑工程公司 | Brick masonry inner line box preinstallation top-suspened support rack |
CN104806025A (en) * | 2015-05-26 | 2015-07-29 | 中建五局蚌埠建筑工程有限公司 | Masonry engineering electromechanical pipeline and wire box direct-buried complete construction process |
US20170012421A1 (en) * | 2015-07-08 | 2017-01-12 | David Terwilleger | Self-Measuring Wall Box Bracket |
CN206053371U (en) * | 2016-07-25 | 2017-03-29 | 中国建筑第八工程局有限公司 | The horizontal line box of adjustable type installs locating support |
CN107012976A (en) * | 2017-05-31 | 2017-08-04 | 上海聚通装饰集团有限公司 | A kind of light steel keel partition switch, socket box fixed mount and fixing means |
CN107178210A (en) * | 2017-07-11 | 2017-09-19 | 中国五冶集团有限公司 | The accurate pre-embedded construction method of many line box of China Democratic National Construction Association's wall |
CN108390307A (en) * | 2018-03-14 | 2018-08-10 | 中国五冶集团有限公司 | A kind of box installation point construction method |
CN209119674U (en) * | 2018-12-24 | 2019-07-16 | 成都建工第二建筑工程有限公司 | For installing the fixed structure of secondary piping |
-
2018
- 2018-12-24 CN CN201811581056.5A patent/CN109586204B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102047432A (en) * | 2007-12-21 | 2011-05-04 | 纳幕尔杜邦公司 | Photovoltaic array, framework, and methods of installation and use |
CN101247029A (en) * | 2008-03-27 | 2008-08-20 | 成都市第四建筑工程公司 | Construction method for installing wire pipe and wire box on the wall |
CN103321436A (en) * | 2013-07-10 | 2013-09-25 | 成都市第八建筑工程公司 | Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof |
CN203352042U (en) * | 2013-07-10 | 2013-12-18 | 成都市第八建筑工程公司 | Brick masonry inner line box preinstallation top-suspened support rack |
CN104806025A (en) * | 2015-05-26 | 2015-07-29 | 中建五局蚌埠建筑工程有限公司 | Masonry engineering electromechanical pipeline and wire box direct-buried complete construction process |
US20170012421A1 (en) * | 2015-07-08 | 2017-01-12 | David Terwilleger | Self-Measuring Wall Box Bracket |
CN206053371U (en) * | 2016-07-25 | 2017-03-29 | 中国建筑第八工程局有限公司 | The horizontal line box of adjustable type installs locating support |
CN107012976A (en) * | 2017-05-31 | 2017-08-04 | 上海聚通装饰集团有限公司 | A kind of light steel keel partition switch, socket box fixed mount and fixing means |
CN107178210A (en) * | 2017-07-11 | 2017-09-19 | 中国五冶集团有限公司 | The accurate pre-embedded construction method of many line box of China Democratic National Construction Association's wall |
CN108390307A (en) * | 2018-03-14 | 2018-08-10 | 中国五冶集团有限公司 | A kind of box installation point construction method |
CN209119674U (en) * | 2018-12-24 | 2019-07-16 | 成都建工第二建筑工程有限公司 | For installing the fixed structure of secondary piping |
Non-Patent Citations (1)
Title |
---|
张勇国;: "房屋住宅砖墙线管二次配管新工艺初探", 四川建筑, no. 06, 28 December 2013 (2013-12-28), pages 202 - 203 * |
Also Published As
Publication number | Publication date |
---|---|
CN109586204B (en) | 2024-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088148B (en) | Pipe gallery template and its application | |
CN206616862U (en) | Formwork root bracing means | |
CN108000689B (en) | Combined template for concrete member with window frame, pouring method of combined template and concrete member | |
CN109208790A (en) | Circular arc shear wall single side formwork construction method | |
CN206625428U (en) | Floor closed system is poured after a kind of pipe well | |
CN206337819U (en) | A kind of bracing means of concrete structure templates for expansion joints | |
CN103161313B (en) | Connection method of main reinforcement of constructional column of infilled wall and framed girder | |
CN209119674U (en) | For installing the fixed structure of secondary piping | |
CN207177286U (en) | Add region mould after fabricated shear wall is reserved | |
CN207878789U (en) | A kind of assembled architecture reinforcing steel bar connecting device | |
CN110485742A (en) | A kind of positioning device and construction method of the pre-buried pedestal anchor bolt in isolated footing | |
CN109586204A (en) | Method for installing the fixed structure and the secondary piping of installation of secondary piping | |
CN105649329A (en) | Reinforcing structure for large-section framework column formworks and construction method | |
CN209523198U (en) | A kind of underpinning structure supporting lattice column | |
CN110284594A (en) | It is a kind of to be bolted Assembled Building board group conjunction joist steel tubular column frame node and its forming method entirely | |
CN105256923A (en) | Fixing connector for floor keels of light steel keel partition walls | |
CN206600005U (en) | The positioning component and positioner of reserved joint bar in shear wall | |
CN206158192U (en) | Concrete pump pipe's simple easily fixable device on concrete face | |
CN103114725A (en) | Chuck type split bolt formwork erecting method | |
CN210685369U (en) | Concrete side wall formwork structure for narrow space | |
CN106436973B (en) | Steel column arranged in post-cast section of steel shear structure and casting method of steel column | |
CN209603390U (en) | A kind of precast shear wall conversion layer embedded bar locating rack | |
CN208749089U (en) | A kind of novel combination type is returned along mould fixture | |
CN102635374B (en) | Support die structure in tunnel | |
CN205857379U (en) | A kind of precast wall panel and post attachment means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |